54
Validation & Post Validation Monitoring Reefer Validation Done Right David Ulrich Abbott Laboratories, QA Distribution Manager

Validation & Post Validation Monitoring

Embed Size (px)

DESCRIPTION

Validation & Post Validation Monitoring. Reefer Validation Done Right David Ulrich Abbott Laboratories, QA Distribution Manager. What is Validation?. According to the Food and Drug Administration (FDA), the goal of validation is to: - PowerPoint PPT Presentation

Citation preview

Page 1: Validation & Post Validation Monitoring

Validation & Post Validation MonitoringReefer Validation Done Right

David UlrichAbbott Laboratories, QA Distribution Manager

Page 2: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

2

What is Validation?

According to the Food and Drug Administration (FDA), the goal of validation is to:

“[Establish] documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its pre-determined specifications and quality attributes.”

- FDA, Guideline on General Principles of Process Validation

Page 3: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

3

How do we Validate?

FDA’s Center for Drug Evaluation & Research (CDER) General Principles of Process Validation:

Installation Qualification (IQ)

Insures that the system/equipment and its components are installed correctly and to the original manufacturer’s specifications.

Operational Qualification (OQ)

The OQ, tests are performed on the critical parameters of the system/process. These are usually the independent and/or manipulated variables associated with the system/equipment

Performance Qualification (PQ)

This phase tests the ability of the process to perform over long periods of time within tolerance deemed acceptable.

Page 4: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

4

Validation is NOT new for Pharma Mfg’ers (nor the FDA)

We currently execute validations on:

Methods, Assays, cleaning, recovery, E/U/F, computers, water systems (PW, DW, PO, WFI, etc), Lab instruments, etc

Processes (process validation); fill/finish mfg’ing, RO units, steam sterilization, EtOH sterilization, endotoxin removal, viral clearance, model virus studies, etc

Page 5: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

5

Good Distribution Practices (GDP)

Good Import Practices (GIPs)

Good Cold Chain Practices (GCCPs)

Distribution Control Systems

(DCS)

GDP

Three maincomponents of GDPs

Page 6: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

6

Good Distribution Practices (GDP)

Good Import Practices (GIPs)

Good Cold Chain Practices (GCCPs)

Distribution Control Systems

(DCS)

GDP

RF TT, ISS Qualification, “import/Export ”Issues, returns, restock, Reverse Logistics

Complaint mgt, Quality Agreements

GTIN, TnT, ePedigree (RFID),Lot number vs. 1-6-3-3,

Serialization Mfg’ing/MA vs.Dist Control

Beyond Our Boarders,FDA Green lane, Import

optimization (AOCC), RF enabled infoFlow and “supplier supplier” information,

Lacey Amendment, etc

C-TPAT, TSA (CCFS/CCSP)Rules of Origin (COO),10+2 (ocean transport),

Trusted importer program

Congress (Dingle amendment,Kennedy Amendment, etc)And Other Gov’t initiatives

FEI rulechanges

Page 7: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

7

GDP – Program Overview AQ16-00-GN-001

Ambient Temperature Profiles

Shipping Systems / Shipping Lanes

Shipping Lane Temperature Monitoring

Facilities / Equipment

Validation Master Plans

LSP List

Quality Questionnaires

Quality Agreements

Quarterly Business Review Meetings

Stability Studies

Distribution Website

Exception Management (RCA/CAPA)

Performance Measurement and Reporting

Root-Cause Analysis and Trend Analysis

GTIN, TnT & Serialization

RF enabled temp monitoring

Unit level cumulative temp indicating

Shipping Systems

Regulatory and Industry Trends Monitoring

Benchmarking

Policies / Procedures

Training Modules

Website

Newsletter

Quarterly Management Update Meetings

Qualification / Validation

LSP ManagementProduct Stability

Studies

Performance Measurement and

Reporting

Communication and Education

Continuous Improvement

GDPs are Similar to the other GXPs

Maintain product quality and ensure compliance with global regulations and industry standards for the storage, handling and distribution of temperature-sensitive products

Ambient Temperature Profiles

MKT &PDA TR 39

Shipping Systems / Shipping Lanes

Shipping Lane Temperature Monitoring

Facilities / Equipment

Supply Lane VMP: DQ, OQ, PQ & Supply lane qualification

LSP Mgt

TSP Mgt

Quality Questionnaires

Quality Agreements

Quarterly Business Review (QBR) Meetings

Set and communicate expectations

Stability Studies

Temperature Cycle Studies

“Typical” Supply Chain Excursions

Distribution Stability Website

How to handle cumulative supply chain excursions

Exception Management (RCA/CAPA)

Performance Measurement and Reporting

Root-Cause Analysis and Trend Analysis

Global CAPA effectivity

Quarantine

Returns & restocks

Policies / Procedures

Training Modules

Website

Newsletter

Quarterly Management Update Meetings

Benchmarking & Reaching out to other divisions

Page 8: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

8

What do we Validate?

Mixers, granulators, mills, grinders, etc

Fluid Bed Dryers (FBDers), RO units, UF units, etc

Sterilizers, Ovens

Software (SQA, SIQ, SOQ, etc)

Manufacturing process of bulk APIs

Manufacturing process of finished goods

Shipment process of finished goods

HVAC units, clean rooms (class 100 hoods), etc

Controlled temperature warehouses

Refrigerated trucks (as part of the E/U/F validation program)

Page 9: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

9

So how do we (should we) “validate” a reefer truck?

Big “V” and little “v”

Page 10: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

10

What do we Validate?

Refrigerated trucks are nomore complex

Insulated Trailer

Insulating capacity

Refrigeration unit

Cooling / Heating efficiently

Air flow efficiency

All trailers (Class A, B, C) are all validated the same

Page 11: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

11

Requirements - CFR Trailer Qualification

Title 7: Agriculture – Can be used for your DQ, IQ, OQ

Chapter XXXIII—Office of Transportation, Department of Agriculture

PART 3300_ATP means the Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be Used for Such Carriage (ATP),

Sec. 3300.61 Testing and verification requirements.

Sec. 3300.64 “the effective refrigerating capacity, W, in watts, of the appliance at an outside temperature of +30°C and the inside temperature for the class of equipment for which certification is sought”

Page 12: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

12

Requirements – Industry Standards

Industrial Standardization…

is the process of establishing agreement on uniform identifications for definite characteristics of quality, design, performance, quantity, service, etc.

sets acceptance criteria to meet requirements

maintains process controls and establishes testing methods

For reefer trucks the standard is already in place

So no need to repeat the DQ, IQ, OQ

As part of your quality agreement – make sure your TSP know this AND has acceptable maintaiance

Page 13: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

13

Validation – The Steps

FDA’s Center for Drug Evaluation & Research (CDER) General Principles of Process Validation (big “V”):

The little “v” componensts of the big “V”

1. Design Qualification (DQ)

2. Installation Qualification (IQ)

3. Operational Qualification (OQ)

4. Performance Qualification (PQ)

5. Process Validation (PV) for the “process”

Page 14: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

14

Validation – Installation Qualification (IQ)

Vendor’s Data Sheet or Specification required:

Insulating specification or data sheet for the trailer

Refrigeration and heating system specification or data sheet for the trailer

Insures that the system/equipment and its components are installed correctly and to the original manufacturer’s specifications

HVAC on wheels

Page 15: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

15

Validation – Operational Qualification (OQ)

ATP testing meets OQ requirements:

A trailer’s insulating capacity A trailer refrigeration / heating system must have sufficient

capacity to remove and add heat generated by: Residual heat from the air inside the trailer Exterior heat conducted through the floor, walls and ceiling Infiltration heat from outside air through small holes, cracks and

seals A trailer air circulation system must have sufficient air flow (VOLUME

AND VELOCITY) to carry the heat of the trailer to the refrigeration unit where it can be removed.

Tests are performed on the critical parameters of the system/process. These are usually the independent and/or manipulated variables associated with the system/equipment

Page 16: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

16

Validation – Performance Qualification (PQ)

This phase tests the ability of the process to perform over long periods of time within tolerance deemed acceptable.

Testing Actual shipments

Run in triplicate

Next steps Post PQ:

Periodic Monitoring

Page 17: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

17

Reefer Validation – History

What’s been done:

It was suggested that a staggered (wall loading) loading pattern was safer AND would adequately cool

That’s was wrong

Why? Blocked airflow

Page 18: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

18

Data Review

Actual PQ data review

Page 19: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

19

Ambient Temps Week of 7-9-07

Chicago Ambient Temperatures

Somerset Ambient TemperaturesAir temperature

Page 20: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

20

All Monitors 7-9-07 Shipment

•Maximum load of 4 ½ product pallets plus Commodities•Loaded with the Off-set Wall loading pattern

Truck surface temperature

Next to wall

Next to ice bricks

Page 21: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

21

Current Monitor Locations – based off previous Reefer truck mapping

Blue Line – Pallet A driver side Green Line – Pallet B facing back doors Red Line – Pallet V, last pallet facing doors

Next to wall, first pallet inLong “cool down” time

Page 22: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

22

Monitors on outsides of pallets

Monitor next to ice bricks, Walls, and on the top of commodity pallets not included.Warmest location – Pallet D up against the wall Coldest location – Last pallet facing the back doors

Long “cool down”Wide “profile”

Page 23: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

23

External Monitors – Stationary Truck ExternalSurface temp > Ambient air temp

Maximum air temperature was 92 °F (33 °C)

Blue Line – Back door of trailer Green Line – Driver side Trailer wall Red Line – Passenger side Trailer wall

115 °F

Air cooling effect

40 °C

Page 24: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

24

Monitors on Product Pallets – Wall Loading

Pallet E – next to the ice bricks

Pallet D – Passenger side (against the wall)

Wall loading “blocks” airflow causing long cool down times and variable profile. Not a flat line.

Page 25: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

25

Monitors on Commodity Pallets

Ambient corrugate doesn’t effect profile

No heat load/sink, therefore, does not effect temperature, BUT loading pattern is still

critical

Page 26: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

26

Internal on the product pallets – Wall loading

Blue Line – Pallet A Green Line – Pallet B Red Line – Pallet C Yellow Line – Pallet D

Pallet A took 6.5 hours to get within spec.

Wide “Product” temperature profile and long cool down

Page 27: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

27

Pallet A Monitors – Next to driver side wall

Blue Line – Driver side(against the wall) Red Line – internal to the pallet Green Line – Middle between rows of pallets Yellow Line – Top of pallet

Bad airflow, therefore, > 8 °CPer ASHRAE – airflow is more critical than

temperature

Page 28: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

28

Monitors on the inside of the trailer walls (6 ft high)

Above 8 °C for 3.5 hours.Longer to achieve acceptable temperature – not optimal

Pallet height was variable from 5 Ft to 7 Ft

Page 29: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

29

Monitors on pallets up against the walls – Wall Loading

Highest to Lowest Temperature (Maximum Delta of 8.5 °C)Green Line – Pallet D Blue Line – Pallet A Red Line – Pallet E

Yellow Line – Pallet L Light Blue Line – Pallet U

Wall Loading blocks airflow

Page 30: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

30

TempTales on pallets away from the walls

Highest to Lowest Temperature (Maximum Delta of 2.2 °C)Green Line – Pallet C Red Line – Pallet K Blue Line – Pallet B Yellow Line – Pallet V

Still a long time to cool vs centerline loading (and not a flat line)

Page 31: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

31

Middle Monitors between Pallets – stayed above temp as long as wall pallets

6 hours above 8 °C

Highest to Lowest Temperature (Maximum Delta of 21°C) Red Line – Pallet U Green Line - Pallet E (next to icebricks)

Next to ice bricks

Page 32: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

32

What Should be Done

Centerline Loading

Shows that loading pattern is most critical and that set point can be maintained with proper loading pattern

Page 33: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

33

Ambient Temps Week of 7-16-07

Chicago Ambient Temperatures

Somerset Ambient Temperatures

Page 34: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

34

All internal monitors - Centerline

Quick cool down and excellent control (low variability)

Looks like a cold room

Page 35: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

35

External Monitors – Truck surface

Blue Line – Back door of trailer Green Line – Driver side Trailer wall Red Line – Passenger side Trailer wall

Page 36: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

36

Monitors on Product Pallets

Good airflow – based off loading pattern, no hot/cold spots,

therefore, monitor location not critical

Page 37: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

37

Internal on the product pallet

Blue Line – Pallet A Green Line – Pallet B

Monitor location not critical

Page 38: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

38

Monitors on the inside of the trailer walls

External wall temp ~ 100 °F, R value is adequate to insulate vs. conduction

Page 39: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

39

Middle Monitor between Pallets

Flat line

Page 40: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

40

Ambient Temps Week of 7-23-07

Chicago Ambient Temperatures

Somerset Ambient Temperatures

Page 41: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

41

All Monitors 7-23-07 Shipment – Centerline Loading

•Maximum load of 4 ½ product pallets plus Commodities•Loaded with the Centerline loading pattern

Page 42: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

42

Current Monitor Locations (3 per shipment)

Blue line – Pallet A driver side Red Line – Pallet N, last pallet facing back doors Green Line – Pallet B, facing back doors

Page 43: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

43

All possible monitoring locations

Warmest location – Pallet M, middle between pallets Coldest location – Pallet D, top

Nice and tight

Page 44: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

44

External Monitors – truck surface

Blue Line – Back door of trailer Green Line – Driver side Trailer wall Red Line – Passenger side Trailer wall

Page 45: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

45

Monitors on Product Pallets

Tight

Page 46: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

46

Monitors on Commodity Pallets

No heat load

Page 47: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

47

Internal on the product pallet

Blue Line – Pallet A Green Line – Pallet B Red Line – Pallet C Yellow Line – Pallet D Lt Blue Line – Pallet E

Product was at 2-8 °C and stayed at 2-8 °C

Page 48: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

48

Monitors on the inside of the trailer walls

Airflow and wall R value keeps inside wall temperatures acceptable

Page 49: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

49

Monitors placed towards the walls

Highest to Lowest Temperature (Maximum Delta of 2°C)Orange Line – Pallet F Aqua Green Line – Pallet M

Monitor facing the wall – potential heat source

4-6 °C = beautiful

Page 50: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

50

Middle Monitors between Pallets

Highest to Lowest Temperature (Maximum Delta of 4°C) Light Blue Line – Pallet M Dark Blue Line - Pallet A

4-6 °C = beautiful

Page 51: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

51

Loading Pattern

Criteria Wall Loading Centerline Loading

Impact of Load High Minimal

Hot/cold spots Yes No

Cool down times Lengthy – up to 8 hours Less than 2 hours

Temperature Profile

Wide and Varied Tight and within specifications

Airflow Reduced, making walls heat up and product temperatures

rise

Optimal

Monitor location/quantity

Monitor the hot and cold spots / need 3+ monitors

Location and quantity not critical

Page 52: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

52

Transport Equipment Guidelines

These documents provide definitions, requirements, test methods, and conformance conditions for the trucking industry.

Page 53: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

53

Conclusion

1. Loading pattern is critical (airflow is most important)

2. Set point has to be correct

3. DQ, IQ, OQ has already been done per the stds

4. PQ – do this to understand your equipment and loading/transportation process

• Equipment maintenance is critical

5. Post validation monitoring

• 0-1 point based of PQ

6. We did not see a hot or cold spot with proper loading

7. Program and any justification should be part of the VMP

Page 54: Validation & Post Validation Monitoring

HPCLC - ValidationMarch 2009

54

Questions?