VALUE PERFORMANCE REPORT
CALIPER LS
Author: Maureen Sateriale
Creation Date: January 11, 2011
Last Updated: February 4, 2011Version: 2.0
7/27/2019 Value Performance Spec-Revisied
2/13
Document Control
Change Record
3
Date Author Versio
n
Change Reference
11-Jan-2011 Maureen Sateriale 1.0 Original, no previous document.4-Feb-2011 Maureen Sateriale 2.0 Changed DFF from vendor site to vendor
Reviewers
Name Organization
Jackie GiaquintoMaurice PlourdeSandeep Adapala
Distribution
CopyNo.
Name Location
1 Caliper LS US2
Value Performance Report
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
3/13
Contents
Document Control.......................................................................................ii
Introduction................................................................................................4
Basic Business Needs............................................................................4Major Features .....................................................................................4Assumptions..........................................................................................4
Descriptive Flexfield Purchasing / Vendors.............................................5
Layout of the existing Report ....................................................................6
Data Requirements / Mapping....................................................................7
Open and Closed Issues for this Deliverable.............................................13
Issues..................................................................................................13
Value Performance Report
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
4/13
Introduction
This document will describe and define the requirement to create a ValuePerformance Report in Oracle that can be run on demand. This report iscurrently done in MS Access after extracting the data needed from reportsdeveloped in Discoverer.
Basic Business Needs
Vendor Performance Report can be run on demand for specific vendors thatare classified as Tier 1 performers. In doing so the goal is to eliminatehaving to do multiple data extracts and calculations outside of Oracle.
Major Features
1. Planner / Buyers will be able to run the Vendor Performance Reportfor any specified period of time, for all tier 1 or individual tier 1vendor / suppliers.
Assumptions
1. Existing discoverer reports described in this document will beleveraged to achieve the final results.
2. Vendor / Suppliers that this report can be used for will be identifiedat the vendor site level. A descriptive flexfield will be set up to
define attributes that are constant values for the vendor/supplier. The Value Performance section of the output will be defined usingvalue sets and descriptive flexfields. The users will be responsiblefor the Value Performance Available Pts. Value and the ValuePerformance Actual Pts. Value given to the vendor/supplier.
~ 4 ~
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
5/13
Descriptive Flexfield Purchasing / Vendors
Added 3 segments and none are required on the vendors descriptive flexfield
Only vendors that this report can be run for will have these segments populated on the vendors DFF
~ 5 ~
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
6/13
Layout of the existing Report
The goal is to produce the same report. One page per vendor/supplier.
~ 6 ~
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
7/13
Data Requirements / Mapping
Report Parameters:
1. Organization - Required
2. Beginning Date - Required
3. Ending Date - Required
4. Vendor / Supplier (name) or All- Optional
5. Evaluation Period - Required
Report Heading = Value Performance Report
Evaluation Period: (from report parameter 5)
A. Fundamentals
Quality Performance - Based on the report value below this number would appear as9,316 DPM (6/644) Rejected
Quality performance data is currently being extracted from the Discoverer reportCaliper Receiving Rejection Code Listing Report.
We need to use the same logic that is used to produce this report today to arrive atthe values we need for the quality performance. The parameters we are using forthis Vendor Performance Report should be valid to produce the data for the QualityPerformance.
The selection criteria on the Rejects and Return to vendor only should always beNO. This will include both rejected material and return to vendor material.
CALIPER RECEIVING REJECTION CODE LIST: SUMMARY SEARCH
~ 7 ~
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
8/13
7/27/2019 Value Performance Spec-Revisied
9/13
Actual Pts. 10 The actual points will be based on the Quality Performance Value. Thevalue set defines the sequence to evaluate the value. For the example provided in thisdocument the Quality Performance is 9,316, the Actual Pts. would equate to #3 or 10 pts. 10pts. =
7/27/2019 Value Performance Spec-Revisied
10/13
8.82% On time = On time / total deliveries * 100 = 8.82% from the report
(3/34) on time
~ 10 ~
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
11/13
Available Pts. 40 Setup a Value Set called Value Delivery Performance CriteriaAvailable Pts. will always default to the highest value which is 40
Actual Pts. 0 The actual points will be based on the Delivery Performance Value. Thevalue set defines the sequence to evaluate the value. For the example provided in thisdocument the Delivery Performance is 8.82% the Actual Pts. would equate to #4 or 0 pts. 0pts. =
7/27/2019 Value Performance Spec-Revisied
12/13
Available Pts. print the value from the vendor site descriptive flexfield attribute 2
Actual Pts. print the value from the vendor site descriptive flexfield attribute 3.
Hardcode the Note that appears at the bottom of the page:
Note: A score of zero (0) points in any category requires submittal of a written CorrectiveAction Plan within 2 weeks.
TOTAL SCORE: = 100 pts. -Total of the Available Pts. from the Quality Performance,Delivery Performance and Value Performance columns. Actual Pts. from the QualityPerformance, Delivery Performance and Value Performance columns and in this example itwould be 10
~ 12 ~
MD050 Caliper Value Performance Report
7/27/2019 Value Performance Spec-Revisied
13/13
Open and Closed Issues for this Deliverable
Issues
ID Issue Resolution Responsibility Target Date ImpactDate
123
~ 13 ~
MD050 Caliper Value Performance Report