GROUND IMPROVEMENT WORKSHOP 11-12 JUNE 2010 PERTH, AUSTRALIA INTRODUCTION TO SOIL INTRODUCTION TO SOIL IMPROVEMENT , PARAMETERS, IMPROVEMENT , PARAMETERS, CLASSIFICATION, CASE CLASSIFICATION, CASE HISTORY OF KAUST HISTORY OF KAUST HISTORY OF KAUST HISTORY OF KAUST Presented by Serge VARAKSIN CHAIRMAN OF T.C. Ground Improvement

Varaksin-1

Embed Size (px)

Citation preview

Page 1: Varaksin-1

GROUND IMPROVEMENT WORKSHOP 11-12 JUNE 2010

PERTH, AUSTRALIA

INTRODUCTION TO SOIL INTRODUCTION TO SOIL IMPROVEMENT, PARAMETERS, IMPROVEMENT, PARAMETERS, , ,, ,

CLASSIFICATION, CASE CLASSIFICATION, CASE HISTORY OF KAUSTHISTORY OF KAUSTHISTORY OF KAUSTHISTORY OF KAUST

Presented by

Serge VARAKSINCHAIRMAN OF T.C. Ground Improvement

Page 2: Varaksin-1

State of the Art Report

17TH International Conference onSoil Mechanics & Geotechnical Engineering

17TH International Conference onSoil Mechanics & Geotechnical Engineering

17TH International Conference onSoil Mechanics & Geotechnical Engineering

Construction Processes

State of the Art Report

Construction Processes

State of the Art Report

Construction Processes

State of the Art Report

Construction ProcessesProcédés de Construction

Jian ChuNanyang Technological University, Singapore

Serge Varaksin

Construction ProcessesProcédés de Construction

Jian ChuNanyang Technological University, Singapore

Serge Varaksin

Construction ProcessesProcédés de Construction

Jian ChuNanyang Technological University, Singapore

Serge VaraksinSerge VaraksinMenard, France

Ulrich KlotzZublin International GmbH, Germany

Patrick MengéDredging International n.v., DEME, Belgium

Serge VaraksinMenard, France

Ulrich KlotzZublin International GmbH, Germany

Patrick MengéDredging International n.v., DEME, Belgium

Serge VaraksinMenard, France

Ulrich KlotzZublin International GmbH, Germany

Patrick MengéDredging International n.v., DEME, Belgium

Alexandria, Egypt5-9 October 2009Alexandria, Egypt5-9 October 2009Alexandria, Egypt5-9 October 2009

PERTH - AUSTRALIA – June 20102

NOTA : TC 17 meeting ground improvement – 07/10/2009Website : www.bbri.be/go/tc17NOTA : TC 17 meeting ground improvement – 07/10/2009Website : www.bbri.be/go/tc17NOTA : TC 17 meeting ground improvement – 07/10/2009Website : www.bbri.be/go/tc17

Page 3: Varaksin-1

Category Method Principle A1. Dynamic compaction Densification of granular soil by dropping a heavy weight from air onto ground. A Ground A2. Vibrocompaction Densification of granular soil using a vibratory probe inserted into ground. A3. Explosive compaction Shock waves and vibrations are generated by blasting to cause granular soil ground

to settle through liquefaction or compaction. A4. Electric pulse compaction Densification of granular soil using the shock waves and energy generated by electric

pulse under ultra-high voltage.

A. Ground improvement without admixtures in non-cohesive soils or fill soils or fill materials A5. Surface compaction (including rapid

impact compaction). Compaction of fill or ground at the surface or shallow depth using a variety of compaction machines.

B1. Replacement/displacement (including load reduction using light weight materials)

Remove bad soil by excavation or displacement and replace it by good soil or rocks. Some light weight materials may be used as backfill to reduce the load or earth pressure.

p

B2. Preloading using fill (including the use of vertical drains)

Fill is applied and removed to pre-consolidate compressible soil so that its compressibility will be much reduced when future loads are applied.

B3. Preloading using vacuum (including combined fill and vacuum)

Vacuum pressure of up to 90 kPa is used to pre-consolidate compressible soil so that its compressibility will be much reduced when future loads are applied.

B4. Dynamic consolidation with enhanced Similar to dynamic compaction except vertical or horizontal drains (or together with

B. Ground improvement without admixtures in cohesive soils y a c co so da o e a ced

drainage (including the use of vacuum) S a o dy a c co pac o e cep e ca o o o a d a s (o oge evacuum) are used to dissipate pore pressures generated in soil during compaction.

B5. Electro-osmosis or electro-kinetic consolidation

DC current causes water in soil or solutions to flow from anodes to cathodes which are installed in soil.

B6. Thermal stabilisation using heating or freezing

Change the physical or mechanical properties of soil permanently or temporarily by heating or freezing the soil. freezing heating or freezing the soil.

B7. Hydro-blasting compaction Collapsible soil (loess) is compacted by a combined wetting and deep explosion action along a borehole.

PERTH - AUSTRALIA – June 20103

Page 4: Varaksin-1

C1. Vibro replacement or stone columns Hole jetted into soft, fine-grained soil and back filled with densely compacted gravel or sand to form columns.

C2. Dynamic replacement Aggregates are driven into soil by high energy dynamic impact to form columns. The backfill can be either sand, gravel, stones or demolition debris.

C3. Sand compaction piles Sand is fed into ground through a casing pipe and compacted by either vibration, dynamic impact, or static excitation to form columns.

C. Ground improvement with admixtures y p ,

C4. Geotextile confined columns Sand is fed into a closed bottom geotextile lined cylindrical hole to form a column. C5. Rigid inclusions (or composite foundation, also see Table 5)

Use of piles, rigid or semi-rigid bodies or columns which are either premade or formed in-situ to strengthen soft ground.

C6. Geosynthetic reinforced column or pile supported embankment

Use of piles, rigid or semi-rigid columns/inclusions and geosynthetic girds to enhance the stability and reduce the settlement of embankments.

or inclusions

supported embankment the stability and reduce the settlement of embankments. C7. Microbial methods Use of microbial materials to modify soil to increase its strength or reduce its

permeability. C8 Other methods Unconventional methods, such as formation of sand piles using blasting and the use

of bamboo, timber and other natural products.

PERTH - AUSTRALIA – June 20104

Page 5: Varaksin-1

gD2. Chemical grouting Solutions of two or more chemicals react in soil pores to form a gel or a solid

precipitate to either increase the strength or reduce the permeability of soil or ground. D3. Mixing methods (including premixing or deep mixing)

Treat the weak soil by mixing it with cement, lime, or other binders in-situ using a mixing machine or before placement

D4. Jet grouting High speed jets at depth erode the soil and inject grout to form columns or panels

D. Ground improvement with grouting type admixtures D4. Jet grouting High speed jets at depth erode the soil and inject grout to form columns or panels

D5. Compaction grouting Very stiff, mortar-like grout is injected into discrete soil zones and remains in a homogenous mass so as to densify loose soil or lift settled ground.

D6. Compensation grouting Medium to high viscosity particulate suspensions is injected into the ground between a subsurface excavation and a structure in order to negate or reduce settlement of the structure due to ongoing excavation the structure due to ongoing excavation.

E1. Geosynthetics or mechanically stabilised earth (MSE)

Use of the tensile strength of various steel or geosynthetic materials to enhance the shear strength of soil and stability of roads, foundations, embankments, slopes, or retaining walls.

E2. Ground anchors or soil nails Use of the tensile strength of embedded nails or anchors to enhance the stability of slopes or retaining walls

E. Earth reinforcement

slopes or retaining walls. E3. Biological methods using vegetation Use of the roots of vegetation for stability of slopes.

PERTH - AUSTRALIA – June 20105

Page 6: Varaksin-1

Unified Soil Classification System

PERTH - AUSTRALIA – June 20106

Page 7: Varaksin-1

Unified Soil Classification

PERTH - AUSTRALIA – June 20107

Page 8: Varaksin-1

Sampling methods

2.1 – UD: 2’’ or 3 ’ Shelby Tube

Suitable for cohesive soils UNDISTURBED

2.2 – Piston sampler Osterberg

Suitable for cohesive and fine granular soils UNDISTURBED

2.3 – SPT: suitable for cohesive and granular Soil REPRESENTATIVE SAMPLE

2.4 – Core barrel

Suitable for rock type of soils UNDISTURBED

2.5 – Block sample REPRESENTATIVE SAMPLE

PERTH - AUSTRALIA – June 20108

Page 9: Varaksin-1

Soil Identification

Define terms important for Unified Soil Classification System

Percent Finese ce esMechanical AnalysisLiquid LimitLiquid LimitPlastic Limit, Plasticity IndexWater ContentWater ContentOrganic

PERTH - AUSTRALIA – June 20109

Page 10: Varaksin-1

Laboratory Engineering PropertiesLaboratory Engineering Properties

PERTH - AUSTRALIA – June 201010

Page 11: Varaksin-1

Laboratory Engineering Properties

Direct shear testDirect shear test

φ (imposed failure plane)τ, φτ, φ

PERTH - AUSTRALIA – June 201011

Page 12: Varaksin-1

Laboratory Engineering Properties

Triaxial on cohesionless soil φ, Mohr Coulomb curve

PERTH - AUSTRALIA – June 201012

Page 13: Varaksin-1

W C C C P k A C

Laboratory Engineering Properties

W, Co, Ce, Cv, Pc, k, Av, Cα

Consolidation test Frame with consolidation units

PERTH - AUSTRALIA – June 201013

Consolidation test Frame with consolidation units

Page 14: Varaksin-1

Laboratory Engineering Properties

Proctor Test w, wcpt, γmax, Proctor curve

PERTH - AUSTRALIA – June 201014

Page 15: Varaksin-1

Different types of In Situ tests

Vane test(VT)

Static Cone Penetration

Standard Penetration

Pressuremeter (PMT)

Test (CPT) Test (SPT)

PERTH - AUSTRALIA – June 201015

Page 16: Varaksin-1

Laboratory Engineering Properties

Why Soil Improvement ?

•To increase bearing capacity and stability (avoid failure)g p y y ( )

•To reduce post construction settlements

• To reduce liquefaction risk (seismic areas)To reduce liquefaction risk (seismic areas)

Advantages over classical solutions

• Avoid deep foundation (price reduction also on structure work like slab• Avoid deep foundation (price reduction also on structure work like slab on pile)

• Avoid soil replacementp

• Save time

•Avoid to change siteAvoid to change site

•Save money !

PERTH - AUSTRALIA – June 201016

Page 17: Varaksin-1

Soil Improvement Techniques

Without added materials

With addedmaterials

1 D i 4 DynamicCohesive soil Peat , clay …

1 Drainage 2 Vacuum

4 Dynamicreplacement

5 Stone columns

Soil ith

5 Stone columns6 CMC7 Jet Grouting8 Cement MixingSoil with

friction

Sand fill

3 Dynamic consolidation4 Vibroflottation

8 Cement Mixing

Sand , fill 4 Vibroflottation

PERTH - AUSTRALIA – June 201017

Page 18: Varaksin-1

Parameters For Concept

•Soil characteristics-Cohesive or non cohesive

•Site environment-Close to existing structures-Cohesive or non cohesive

- Blocks?

•Water content water table position

-Close to existing structures-Height constraints

•Available construction time•Water content, water table position

•Organic materials

•Available construction time

•Soil thickness

•Structure to support-Isolated or uniform load-Deformabilityy

PERTH - AUSTRALIA – June 201018

Page 19: Varaksin-1

Paramaters for Concept

CONCEPT PARAMETERS

2

4

FILL FILL+UNIFORM LOAD FILL+ LOAD

GWT GWT GWTSBCσ’z SBCσ’z SBCσ’z

802

4

FILL FILL+UNIFORM LOAD FILL+ LOAD

GWT GWT GWTSBCσ’z SBCσ’z SBCσ’z

80

- Age if fill saturated or not-PL

4

6

8

1012FILL FILL FILL

SB σ’z

σ’z30%

50%

80%

4

6

8

1012FILL FILL FILL

SB σ’z

σ’z30%

50%

80% -Selfbearing level

-φ, EP or EM-QC, FR-N

1

Depth(m)

Depth(m)

Depth(m)

t(about 10 years)

80% (SBC)

90% (SBC)DC : h(m) = ECδ

C(menard) = 0.9-1 C(h d li ) 0 55

1

Depth(m)

Depth(m)

Depth(m)

t(about 10 years)

80% (SBC)

90% (SBC)DC : h(m) = ECδ

C(menard) = 0.9-1 C(h d li ) 0 55

N-R.D. (???)-Shear wave velocity-Seismic parametersG i i2

3

4

S (%) 30% (SBC)50% (SBC)

60% (SBC)

80% (SBC)

δ

C(hydraulic) = 0.55

SBC = 0.9-1 (SILICA SAND)

δ LOAD = 0.4-0.6 (SILICA SAND)

S.B.C. = Self Bearing CoefficientS B C = S(t)

2

3

4

S (%) 30% (SBC)50% (SBC)

60% (SBC)

80% (SBC)

δ

C(hydraulic) = 0.55

SBC = 0.9-1 (SILICA SAND)

δ LOAD = 0.4-0.6 (SILICA SAND)

S.B.C. = Self Bearing CoefficientS B C = S(t)

-Grain size

S.B.C. = S(t)

S( )∞

S.B.C. = S(t)

S( )¥

PERTH - AUSTRALIA – June 201019

Page 20: Varaksin-1

Nice International Airport Runway consolidation

Case History

p yGranular soil

Very high energy (170 t 23 m)

PERTH - AUSTRALIA – June 201020

Very high energy (170 t, 23 m)

Page 21: Varaksin-1

KAUST PROJECT

Concept and Application of 2,600,000 m² of ground improvementfor

King Abdulla University of Science & Technology(KAUST)

PERTH - AUSTRALIA – June 201021

Page 22: Varaksin-1

localisation

PERTH - AUSTRALIA – June 201022

Page 23: Varaksin-1

Master Plan

PERTH - AUSTRALIA – June 201023

Page 24: Varaksin-1

Original site Conditions

PERTH - AUSTRALIA – June 201024

Page 25: Varaksin-1

Jeddah, a modern city

PERTH - AUSTRALIA – June 201025

Page 26: Varaksin-1

Discovering the Habitants

PERTH - AUSTRALIA – June 201026

Page 27: Varaksin-1

Areas to be treated

Areas to be treated

•Al Khodari (1,800,000 m2( , ,•Saudi Bin Ladin 720,000 m2

Schedule

•8 months

PERTH - AUSTRALIA – June 201027

Page 28: Varaksin-1

Dates for soil improvement

KAUSTDates for soil improvement

PERTH - AUSTRALIA – June 201028

Page 29: Varaksin-1

Dynamic Consolidation

Wave Type Percent of Total EnergyRayleighShear

6726

After R.D. Woods (1968)

ShearCompression

267

PERTH - AUSTRALIA – June 201029

Page 30: Varaksin-1

Specifications

I l d f i 1 0•Isolated footings up to 150 tons

•Bearing capacity 200 kPaBearing capacity 200 kPa

•Maximum footing settlement 25 mm

•Maximum differential settlement 1/500

•Footing location unknown at works stage

PERTH - AUSTRALIA – June 201030

Page 31: Varaksin-1

Concept

Depth of footing = 0.8mBelow G L

150 TONS

+ 4.0

Below G.L.

Engineered fill/ ²

+ 2.52 meters arching layer

σz = 200 kN/m²

+ 1.2Working platform (gravelly sand)

Compressible layer from loose d t ft bk h

0 to 9 meterssand to very soft sabkah

PERTH - AUSTRALIA – June 201031

Page 32: Varaksin-1

Decision process of selection of technique

Presence of Silt (Sabkha) layer

No Yes

No Deep silt (Sabkha) layer, ie bottom elevation higher than 5 m below

Working Platform Level

Deep silt (Sabkha) layer, ie bottom elevation lower than 5 m below

Working Platform Level

Transition layer > 2 m

Transition layer < 2 m

Case A Case B1 Case B2 Case B3

DC DR

Sabkha Substitution over 1 m +

DR

HDR + temporary surcharge

PERTH - AUSTRALIA – June 201032

Page 33: Varaksin-1

Selection of technique

FPL2,

80

esig

n

WPL

0,80 Preloading

DR (Dynamic Replacement)

NGL

GWT

>

Working Platform

ons

DeReplacement)

HDR (High Energy Dynamic

BSL (variable)

Soi

l Con

ditio

> 4,

50

yReplacement) + Surcharge

PERTH - AUSTRALIA – June 201033

Page 34: Varaksin-1

PMT loading test applies the cavity expansion theory

PMT compared with loading of column

which is similar to granular column bulging under applied vertical load.

MT

MT

PM

PM

⎞⎛L

sc2ult,sc P

4πtanq ⎟

⎠⎞

⎜⎝⎛ +=

direct measurement of PL

Pressure induced to fail the surrounding soil =ultimate bearing capacity of column supported by

PERTH - AUSTRALIA – June 201034

g p y pp ylateral pressure of the surrounding soil.

Page 35: Varaksin-1

Typical Site Cross Section of Upper Deposit

PERTH - AUSTRALIA – June 201035

Page 36: Varaksin-1

Variation in soil profile over 30 meters

PERTH - AUSTRALIA – June 201036

Page 37: Varaksin-1

Limit Pressure Cone ResistancePressuremeter Modulus

Typical soil profile

Limit Pressure

3.00 5 10 15 20 25 30

Cone Resistance

2.5

3.00 2 4 6 8 10 12 14

Pressuremeter Modulus

3.00 40 80 120 160 200 240

7.5

1.0

2.0

00

0.51.0

1.5

2.0

64.9

1.0

2.0

2.8

1.0

0.0

(m E

-20-1.5

-1.0

-0.50.0

m E

36.0

9.8

-10

0.0

m E

0.9

-2.0

-1.0

Ele

vatio

n

-4.0

-3.5-3.0

-2.5

-2.0

Elev

atio

n (m

3.8

61.5

-2.0

1.0

Elev

atio

n (m

2.2

3.23.23.23.23.2

-3.0

-6.0-5.5

-5.0-4.5

22.922.922.922.922.9

-4.0

-3.0

-5.0

-4.0

P (b )-8.0

-7.5-7.0

-6.5

-6.0

-5.0

PERTH - AUSTRALIA – June 201037

Pl (bar) qc (Mpa)Ep (bar)

Page 38: Varaksin-1

Human Resources

1 P j t t (4)1. Project management (4)

2. Production team (32)

3. Mechanical team (18)

4 Survey team (16)

5. Administrative team (6)

4. Survey team (16)

6 G h i l (8)6. Geotechnical team (8)

7. Safety and Quality (2)

8. Logistic team (4)

PERTH - AUSTRALIA – June 201038

Page 39: Varaksin-1

Typical surface conditions

PERTH - AUSTRALIA – June 201039

Page 40: Varaksin-1

Typical test pits (120) and grain size

PERTH - AUSTRALIA – June 201040

Page 41: Varaksin-1

PERTH - AUSTRALIA – June 201041

Page 42: Varaksin-1

Equipment Resources

•13 DC/DR Rigs of 95 to 120 tonsg•15 pounders from 12-23 tons•30 vehicles (bus, 4x4, pick-up, berlines)•1 truck with crane•1 forklift•3 CPT rigs•1 drill + pressuremeter•15 containers•1 set of site offices

PERTH - AUSTRALIA – June 201042

Page 43: Varaksin-1

Equipment Resources

•13 DC/DR Rigs of 95 to 120 tonsg•15 pounders from 12-23 tons•30 vehicles (bus, 4x4, pick-up, berlines)•1 truck with crane•1 forklift•3 CPT rigs•1 drill + pressuremeter•15 containers•1 set of site offices

PERTH - AUSTRALIA – June 201043

Page 44: Varaksin-1

Equipment Resources

•13 DC/DR Rigs of 95 to 120 tonsg•15 pounders from 12-23 tons•30 vehicles (bus, 4x4, pick-up, berlines)•1 truck with crane•1 forklift•3 CPT rigs•1 drill + pressuremeter•15 containers•1 set of site offices

PERTH - AUSTRALIA – June 201044

Page 45: Varaksin-1

Before DCBefore DC

PMT results before DC

Limit Pressure

3

0 5 10 15 20 25 30

Before DCLimit Pressure

3

0 5 10 15 20 25 30

Before DC

1

2

3

1

2

3

-1

0

EL) -1

0

EL)

4

-3

-2

Elev

atio

n(m

4

-3

-2

Elev

atio

n(m

-6

-5

-4

-6

-5

-4

-8

-7

Pl (bar)-8

-7

Pl (bar)

PERTH - AUSTRALIA – June 201045

Pl (bar)Minimum Average

Pl (bar)Minimum Average

Page 46: Varaksin-1

PMT results before and after DR

Limit PressureLimit Pressure

Before DR After DR – Between columns

Limit PressureLimit Pressure

Before DR After DR – Between columns

23.4

1 0

2.0

3.00 5 10 15 20 25 30

7.5

1 0

2.0

3.00 5 10 15 20 25 30

23.4

1 0

2.0

3.00 5 10 15 20 25 30

7.5

1 0

2.0

3.00 5 10 15 20 25 30

4.3

1.9

3 3

-1.0

0.0

1.0

EL)

2.8

1.0

0 9

-1.0

0.0

1.0

EL)

16 7

18,0

15,24.3

1.9

3 3

-1.0

0.0

1.0

EL)

2.8

1.0

0 9

-1.0

0.0

1.0

EL)

16 7

18,0

15,2

3.3

5.8

3.4

-3.0

-2.0

Elev

atio

n(m

E0.9

2.2

3.23.23.23.23.2

4 0

-3.0

-2.0

Elev

atio

n(m

E

8,2

14,1

16,73.3

5.8

3.4

-3.0

-2.0

Elev

atio

n(m

E0.9

2.2

3.23.23.23.23.2

4 0

-3.0

-2.0

Elev

atio

n(m

E

8,2

14,1

16,7

9.2

-6.0

-5.0

-4.0

-6.0

-5.0

-4.0

12,29.2

-6.0

-5.0

-4.0

-6.0

-5.0

-4.0

12,2

-8.0

-7.0

Pl (bar)-8.0

-7.0

Pl (bar)Between columns Inside columns

-8.0

-7.0

Pl (bar)-8.0

-7.0

Pl (bar)Between columns Inside columns

PERTH - AUSTRALIA – June 201046

Between columns Inside columnsBetween columns Inside columns

Page 47: Varaksin-1

ANALYSIS OF (P P ) IMPROVEMENT AS FUNCTION OF ENERGY AND FINES

Analysis of improvement

KAUST – Saudi Arabia

ANALYSIS OF (PL-Po) IMPROVEMENT AS FUNCTION OF ENERGY AND FINES

1 4

1.6BASIS

•60 grainsize tests

•180 PMT testsI = 8

SI = 4,7

PL-Po (MPa)

10%

1

1.2

1.4

PARAMETERS

•PL – Po = pressuremeter limit pressure

•kJ/m3 = Energy per m3 (E)I = 6,25SI = 2,3

20%

KAUST KAUST

0.6

0.8

1•% = % passing n°200 sieve

•I = improvement factor

•S.I : energy specific improvement factorI = 5,5

SI = 1,5Li

LF

PP

EI 100×

DC30%

0.2

0.4

0.6

LEGEND

Average pre-treatment values

Average values between phases

I = 3,1SI = 0,72

EDC DOMAIN

DR DOMAIN 40%

0

0.2

0 100 200 300 400 500

Average values between phases

Average post-treatment valuesI = 3SI = 0,56

Energy (kJ/m3)

50%

PERTH - AUSTRALIA – June 201047

( )

Page 48: Varaksin-1

Analysis of Worst Case Scenario for Various Grids

Stress distribution

Analysis of Worst Case Scenario for Various Grids

.

5.5

5.5 3.80

3.805.5

PERTH - AUSTRALIA – June 201048

Page 49: Varaksin-1

Site procedure

A – Identify depth trend of SABKAH by CPT Tests

B – Closely eye witness the penetration of pounder to confirm DC or DRB Closely eye witness the penetration of pounder to confirm DC or DRtreatment

C – Verify by PMT that factor of safety is at least 3 for bearing capacityC Verify by PMT that factor of safety is at least 3 for bearing capacity

D – Verify by stress analysis that limit pressure at any depth exceedsfactors of safety of at least 3 in order to safely utilize the settlementfactors of safety of at least 3 in order to safely utilize the settlementanalysis (no creep)

E Vary the grid to obtain at any location the condition DE – Vary the grid to obtain at any location the condition D

F – Test the gravelly sand columns and check if specified settlement is hi dachieved

G – Monitor surcharge if HDR is required

PERTH - AUSTRALIA – June 201049

Page 50: Varaksin-1

Provisionnal master plan

PERTH - AUSTRALIA – June 201051

Page 51: Varaksin-1

It can be assumed that those impacts do generatea pore pressure at least equal to the porepressure generated by the embankment load.

This new consolidation process with the final

For the considered case,

du = UΔσ

and thus t’f = U1t1 + (1-U1)tfThis new consolidation process with the finalat a time t’f, where

( ) TCtt'C'0 848T 1v11v +−

==

The Table allows to compare the gain in consolidation time, at different degrees of consolidation

H²H²0,848TV +==

With

consolidation.

U1 10% 20% 30% 40% 50% 60% 70% 80% 90%

t1/tf 0.009 0.037 0.083 0.148 0.231 0.337 0.474 0.669 1.00

⎥⎥⎦

⎢⎢⎣

−+=

1)VV UΔσ(1

du1CC'

1 f

t’1/tf 0.901 0.807 0.725 0.659 0.615 0.602 0.632 0.735 1.00

Supposing primary consolidation completed

The following equation allows to comparethe respective times of consolidation being:

t’f with impactt ith t i t

Suppos g p a y co so dat o co p eted

U = 0.9 or T = 0.848 if du=U1Δσ,then t’f = U1t1 + (1-U1)tf

tf without impact

f1

11

1

t)UΔσ(1du

)UΔσ(1t)UΔσ(1du

duft'−+

−+

−+=

The optimal effectiveness occurs aroundU1 = 60%.One can thus conclude that, theoretically theconsolidation time is reduced by 20% to 50%,

PERTH - AUSTRALIA – June 201052

y ,what is for practical purpose insufficient.

Page 52: Varaksin-1

Dynamic surcharge

PERTH - AUSTRALIA – June 201053

Page 53: Varaksin-1

Settlement curves from dynamic surcharge

‐10,0

7,000

8,000

‐5,0

0,0

19/1 21/1 23/1 25/1 27/1 29/1 31/1 2/2 4/2 6/21110 - 1

1110 - 2

1110 - 34,000

5,000

6,000

1110 - 1

1110 - 2

1110 - 3

5,0

10,0

1110 - 4

1110 - AVG

1 000

2,000

3,000

1110 - 4

1110 - AVG

15,0

20,00,000

1,000

19/1 21/1 23/1 25/1 27/1 29/1 31/1 2/2 4/2 6/2

PERTH - AUSTRALIA – June 201054

Page 54: Varaksin-1

PERTH - AUSTRALIA – June 201055

Page 55: Varaksin-1

GROUND IMPROVEMENT WORKSHOP 11-12 JUNE 2010

PERTH, AUSTRALIA

Thank YouThank You