V. VENKATA NARAYANA 9440818440, 07799139399
Amount EARTH WORKS FOR ROADS
0.00 0.00 ADDRESSES D
0.00 0.00 1 Forming embankmentwith Side Earth PA
0.00 0.00 2 Forming embankmentwith Borrowed Soils 1000m Lead PA
0.00 0.00 3 Forming embankment with Borrowed Soils 0 KM Lead P
0.00 0.00 4 E/W for Trenchcutting PA
0.00 0.00 5 Removal of soils by Mechanical means & carting1000 M P
Varies with pipe dia. 100.00 6 Removal of soils by Manual Means & carting 1000 M P
GRANULAR BASES and SUB BASES
684.00 7 Granular Sub-basewith Grade I (Table 400 -1) type material PA
42024.18 8 Granular Sub-basewith Grade I (Table 400-2)type material PA
41234.00 9 Granular Sub-basewith Grade III (Table 400-2)type material PA
42345.00 10 Scarifying the existinggranular surface P
28973.00 11 Scarifyingthe existing BT surface P
12 WBM Gr II with MC metal 22.4 mm & belowand PRR PA
4400.00 13 WBM Gr III with MC metal 22.4 mm & below and PRR PA
47000.00 14 WBM Gr II withMC metal 45 mm & belowand PRR PA
43000.00 15 WBM Gr III with MC metal 45 mm & belowand PRR PA
30200.00 16 WBM Gr II with MC metal 22.4 mm & below and VRR PA
17 WBM Gr III with MC metal 22.4 mm & belowand VRR PA
Place ITEM 18 WBM Gr II with MC metal 45 mm & belowand VRR PA
DATA Labour 0.00 % 19 WBM Gr III with MC metal 45 mm & belowand VRR PA
RMR Metal % 20 Wet Mix Macadam PA
RMR Gravel % BITUMINOUS SUB BASES, BASES and SURFACING
RMR Sand 0.00 % 21 Single coat surface dressingwith 80/100 grade Bitumen PA
5.00 % 22 Single coat surface dressingwith 60/70 grade Bitumen PA
20.00 % 23 Prime Coatwith BT Emulsion (MS) PA
10.00 % 24 Tack Coatwith BT Emulsion (MS) PA
0.00 % 25 Tack Coatwith BT 80/100 Grade A
Local Entry % 26 Mix seal 20 mm with BT 60/ 70 Grade PA
27 Mix seal 25 mm with BT 60/ 70 Grade N
28 Mix seal 25 mm with BT CRMB N
29 Macadam 50 mm with BT 60/70 Grade PA
30 Macadam 50 mm with BT 80/100 Grade PA
Name of Work :: Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in M
Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
Embankment Earth
CONVEYANCE & RATES OF MATERIALS
Details
S.No
Specification in Brief
BITUMEN
HMP
Crusher
Metal/ Stone Qry
Gravel
8/10/2008
Hume Pipes
Overhead Charges ( R)
Value
Rates
Rates
Leads
10-Aug-08
Municipal Area Allowance
Sand
VAT
Grade 60/70
Emulsion (MS)
Contractors Profit
Name
ALLOWANCES
HYSD Steel
Overhead Charges ( B)
Hy
to
Centering Charges
CEMENT / STEEL
CRMB 55 Grade
LEAD
6 mm Mild Steel
Grade 80/100
MS STEEL
MASTER DATA FOR
ROADSFOR THE YEAR 2008-09
Date (dd/mm/yy)
of Preparation of Estimate
CEMENT
7/27/2019 Venkats Master DATA2008 09New1
2/185
31 Dense Graded Bituminous Macadam with BT 60/70 Grade
32 SDBC 25 mm with BT 60/70 Grade
33 Bituminous Concretewith BT CRMB 55 Grade
34 Gravel Shoulders
C.C. BASE COURSE and WEARING COARSE
35 VCC(1:4:8) Base course below CC Pavement
36 VCC(1:3:6) Base coursebelow CC Pavement
37 VCC M35 for C.C. Pavement 38 VCC(1:3:6) Base course with FLY ASH & Sand
39 VCC M35 for C.C. Pavement with FLY ASH & Sand
CULVERTS, BRIDGES Foundations, Substructures & Superstructure
40 EW for Foundation of Structures by Mechanical Means
41 EW for Foundation of Structures by Manual Means
42 Granular Bedding Below Pipes
43 VCC (1:3:6) for Foundations
44 VCC(1:3:6) for Body Walls
45 Cost and Conveyance of 600 mmDia Hume pipes to Site
46 Cost, conveyance and Laying of 600Dia Hume Pipes
47 Cost and Conveyance of 800 mmDia Hume pipes to Site
48 Cost, conveyance and Laying of 800 Dia Hume Pipes
49 Cost and Conveyance of 1000 mmDia Hume pipes to Site
50 Cost, conveyance and Laying of 1000 Dia Hume Pipes
51 Cost and Conveyance of 1200 mmDia Hume pipes to Site
52 Cost, conveyance and Laying of 1200Dia Hume Pipes
53 Filling between Body walls with Gravel
54 Rough Stone Revetment with 300 mmHBG Stone
55 Filter Material with Gravel underneath Pitching
56 VCC M15 Grade CC with 40 mm metal for Raft Foundation
57 VCC M15 Grade CC with 40 mm metal for Sub Structure
58 VCC M20 Grade CC with 40 mm metal for Raft Foundation
59 VCC M20Grade CC with 40 mm metal for Sub Structure
60 VRCC M20 Grade CC for Bed blocks & Backing walls
61 VRCC M20 Grade CC with 20 mm metal for Deck Slab
62 VRCC M30 Grade CC with 20 mm metal forWearing Coat
63 VRCC M25 Grade CC with 20 mm metal for Approach Slab
64 VRCC M20 Grade CC with 12 mm metal for Railing
-- DO -- -- DO --
65 VCC M15 Grade CC with 40 mm metal for leveling course
66 Grouted Revetmentwith 300 mm HBG stone + CC(1:4:8)
67 Back filling behind Abutments with gravel
68 Providing and laying of filter media using 150 mm IRC stone
69 Providing HYSD ( Fe-415 ) forSuper structureof R.C.C items.
70 Providing HYSD ( Fe-415 ) for Sub structureof R.C.C items.
71 Providing HYSD ( Fe-415 ) for Foundation of R.C.C items.
72 Providing MS ( Fe-250 ) for all RCC Items
7/27/2019 Venkats Master DATA2008 09New1
3/185
MISCELLANEOUS ITEMS
73 Sand filling in foundation
74 Providing 100 mm dia AC Weep holesin VCC Abutment
75 VCC M 15 Grade CC using 40 - 10 mm metal for Dividers
76 VRCC M 20 Grade forCover Slabsover Side Drains
77 Plasteringin CM(1:5) 12 mm thick ( Rate per 10 sqm )
78 Paintingtwo coats to new plastered surface
79 Built-up-spray grout layer 75 mm thick with BT 80/100 Grade
80 Providing BT Patch work using 40 mm metal& BT 80/100
81 Providing BT Patch work using 9.5 to11.2mm metal& BT 80/100
82 Patch work 50 - 70 mm depth using 40-10 mm metal & 80/100 BT
83 Patch work 25 - 35 mmdepth using 25-10 mm metal & 80/100 BT
84 Patch work 15 - 25 mm depth using 12-10 mm metal & 80/100 BT
85 RR Masonry in CM(1:3) for Foundation.
86 RR Masonry in CM(1:3) for Substructure
87 Dismantlingculverts & bridges in CC M15- M20
88 Dismantlingculverts & bridges in Ruble Masonary in CM
89 25.4 mm Mastic padfor Longitudinal & Transversal Expansion joints
90 12.7 mm Mastic padfor Transversal Contraction joints.
91 Penetration macadam 50 mmthick
92 Penetration macadam 75 mmthick
93 Open-graded premix carpet of 20 mm thick with 80/100 BT
94 Providing and laying type B seal coat simultaneously with 80/100 BT
95 Hot Applied Thermopalstic Compound
V. VENKATA NARAYANA 94408 18440, 07799139399
7/27/2019 Venkats Master DATA2008 09New1
4/185
Rs
::
::
Lakhs
D. P. R.
GOVERNMENT OF
ANDHRA PRADESH
IMPROEMENTS TO ZAHEERABAD - BIDAR ROAD
FROM KM 1/0 - 10/0 IN MEDAK DIST.IMPROEMENTS
TO ZAHEERABAD - BIDAR ROAD FROM KM 1/0 -
10/0 IN MEDAK
ROADS & BUILDINGS
DEPARTMENT
HYDERABAD - INDIA
(R&B) Division
SANGAREDDY.
SANGAREDDY.
AMOUNT OF ESTIMATE
(R&B) Circle
7/27/2019 Venkats Master DATA2008 09New1
5/185
Factor Quantity Factor Quantity Factor Quantity
1 4 5 6 7 8 9 10
1 1 cum 1.000 0.000
2 1 cum 1.280 0.00
3 1 cum 1.450 0.00
4 1 cum 1.530 0.00
5 1 cum 1.320 0.00
6 1 sqm 0.004 0.00
7 1 sqm
8 1 sqm
9 1 cum 0.027 0.00
10 1 cum 1.462 0.00
11 1 cum 1.415 0.00
12 1 cum 1.280 0.00013 1 cum 0.900 0.00 0.450 0.00
14 1 cum 0.900 0.00 0.450 0.00
15 1 cum 0.900 0.00 0.450 0.00
16 1 cum 0.900 0.00 0.450 0.00
17 1 cum 0.900 0.00 0.450 0.00
18 1 cum 0.900 0.00 0.450 0.00
19 1 cum 0.900 0.00 0.450 0.00
20 1 cum
21 1 cum 1.200 0.000
22 1 cum 1.200 0.000
23 1 cum 1.200 0.00
24 1 cum 1.200 0.000
25 1 cum 1.180 0.00 0.090 0.00
26 1 cum
27 1 cum 1.200 0.000
28 1 cum 1.200 0.000
29 1 m 0.002 0.000
30 1 sqm 0.151 0.000
31 1 sqm 0.113 0.00
32 1 cum 1.330 0.00
33 1 sqm 0.078 0.00
34 1 sqm 0.040 0.00
35 1 sqm 0.030 0.00
36 1 cum 1.258 0.00 0.326 0.00
37 1 cum 1.158 0.00 0.347 0.00
0.00 0.00 0.00
Rate 22.00 50.00 40.00
Amount Rs 0.00 0.00 0.00
S.No Unit
3
Earth/ Gravel
cum
2
Metal/ Stone
cum
Sand
cumSpecification in Brief Quantity
E/W for Trench cutting/Embankment
Granular Sub-base
WBM Gr II
WBM Gr III
Wet Mix Macadam
Single coat surface dressing
Prime Coat with BT Emulsion
Tack Coat with BT Emulsion
Mix seal 20 mm with BT 60/ 70
SDBC 25 mm with BT 60/70
Macadam 50 mm with BT 80/100
Gravel ShouldersVCC(1:4:8)
VCC(1:3:6)
VCC M15 Grade CC
VRCC M20 Grade CC
VRCC M25 Grade CC
VRCC M30 Grade CC
VCC M35 Grade CC
VRCC M20 Grade CC for Railing
Granular Bedding Below Pipes
Filling between Body walls
Rough Stone Revetment
BT Patch work using 40 mm metal
Patch work 50 - 70 mm depth
Patch work 25 - 35 mm depth
Patch work 15 - 25 mm depth
Filter Material with Gravel
Grouted Revetment with CC(1:4:8)
Back filling with gravel
Filter media using 150 mm stone
Sand filling in foundation
100 mm dia AC Weep holes
RR Masonry in CM(1:3) foundation
Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak Dist.Improements to Zaheerabad - Bidar road
from KM 1/0 - 10/0 in Medak
Name of Work :-
Total Quantity
Total Amount Rs 0.00
RR Masonry in CM(1:3) substructure
Plastering in CM(1:5) 12 mm
BUSG 75 mm thick with BT 80/100
7/27/2019 Venkats Master DATA2008 09New1
6/185
7/27/2019 Venkats Master DATA2008 09New1
7/185
Sir,
Sub :-
GOVERNMENT OF ANDHRA PRADESH
ROADS AND BUILDINGS DEPARTMENT.
Sri V. VENKATA NARAYANA, B.E., D.A.C.
Deputy Executive Engineer,
MEDAK Dist.
Letter No. DEE/ZHB/2012-13 Date :12-05-2010
Construction of 3 vents of 8.0 m Bridge at km 3/4-6 on
Koukuntla Road in Rangareddy dist. - Estimate submitted - Re
1) Report, Estimates, RMR, Drawings.
From To
Enclosures ::
I request the Superintending Engineer (R&B) Rural Circle,
kindly obtain necessary approval from the competent authority and communic
Yours faithfull
(R&B) Sub Division,ZAHEERABAD
The Executive Engi
(R&B) Division,
I am herewith submitting an estimate for the work "Construc
of 8.0 m Bridge at km 3/4-6 on Chittempally- Koukuntla Road in Rangaredd
amount of Rs 165.00 Lakhs along with Report, data, lead statement, RMR and
report accompanying the estimate dealt in detail the necessities and provisio
estimate.
Deputy Executive En
(R&B) Sub Division, ZA
Sangareddy,
7/27/2019 Venkats Master DATA2008 09New1
8/185
7/27/2019 Venkats Master DATA2008 09New1
9/185
Chittempally-
.
Hyderabad to
te.
neer,
ion of 3 vents
dist " for an
drawings . The
s made in the
gineer,
EERABAD
7/27/2019 Venkats Master DATA2008 09New1
10/185
7/27/2019 Venkats Master DATA2008 09New1
11/185
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
0
0
Specification report accompanying the Estimate " Improements to Zaheerabad - Bidar road from
KM 1/0 - 10/0 in Medak Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
"
Amount of Estimate : Rs.
L.S. for Price adjustment Road Work,
L.S. for change of SSR to 2007-08
L.S for Road Safety works,
Shamshabad - Shabad is an important link road radiating from NH 7 and connecting
other important roads. It is very near to International Airport at Shamshabad. The existing single lane
Bituminous road is damaged, carriageway edges reduced and the berms are not sufficient also the
C.D. works are narrow. All these bad conditions are creating problems to the road user and the
existing with is not catering to many fold increased traffic. The surface is no at all suitable for fast
moving vehicles.
In view of the above mentioned conditions of the Road and as per the instructions of
Higher officials a detailed _____ estimate for the Road is prepared to widen from existing singlelane to Double lane and bringing the total road to traffic worthy by strengthening , with the
following provisions.
Forming embankment with Side earth by mechanical means
Forming embankment with borrowed useful earth ,
Providing and laying of 50mm thick Bituminous Macadam,
Providing 25 mm thick compacted Semi-Dense Bituminous Concrete,
VAT on Part "A".
L.S for Quality control charges on Part "A",
L.S. for Avagahana sadassulu,
SPECIFICATION REPORT
Construction of Gravel base 300mm thick and 150 mm shoulders ,
Providing, Laying, Spreading of Wet Mix macadam,
Providing and applying Prime Coat with bitumen emulsion (Medium Setting),
Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk),
0
L.S for other unforeseen items, variation in quantities rates and rounding off.
The estimate is prepared based on common SSR 2008-09 . The quarries and their leads are
taken from approved Quarry and Lead Charts. The work will be carried out as per specifications and
codal guide lines and relevant circular instructions issued time - to -time.
Early approval to the estimate is solicited.
7/27/2019 Venkats Master DATA2008 09New1
12/185
Executive Engineer,
(R&B) Division, ___ ____ _____
Dy. Executive Engineer
R&B Sub-Division___ _____
Asst. Executive Engineer
R&B Section, ___ ___ ___
7/27/2019 Venkats Master DATA2008 09New1
13/185
7/27/2019 Venkats Master DATA2008 09New1
14/185
1 4
1 4000000
4000000
2 4.0% 160000
3 5.0% 200000
4 1.0% 54000
5 5000
7
6
7
4000000
L.S. for Avagahana sadassulu,
ROAD WORK Part "A"
L.S Amount for VAT on Part "A".
R&B Section, __ ____ ____
Dy. Executive Engineer
R&B Sub-Division, ___ ___ ____
L.S for Road Safety works for caution, junction boards, studs
etc.
L.S for variation in quantities and rounding off
NAME OF WORK :- Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in
Medak
GENERAL ABSTRACT
S.No Description
3
Remarks
2
(R&B) Division, _____ ___
Asst. Executive Engineer
Amount
(Rs.)
L.S. for Price adjustment Road Work,
Executive Engineer,
L.S for Quality control charges on Part "A",
Sub Total
Total Amount Rs.
L.S for Widening pipe culvert and rounding off.
7/27/2019 Venkats Master DATA2008 09New1
15/185
LENT BRDT DPT
1 2 4 5 6 8 9
1
1
1 Asssss - Mmmmmm Road 1 x 1 1000.00 1.00 1.000 1000.00 cum
1 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum
1 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum
1 1002.00
1 say 1002.00 cum 1,000.00 1.00 1002000
1
2
2
2 Asssss - Mmmmmm Road 1 x 1 1000.00 1.00 1.000 1000.00 cum
2 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum
2 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum
2 1002.00
2 say 1002.00 cum 1,000.00 1.00 1002000
2
3
3
3 Asssss - Mmmmmm Road 1 x 1 1000.00 1.00 1.000 1000.00 cum
3 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum
3 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum
Forming embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, includingall hire and operational charges of T&P and seigniorage charges, complete for finished item of work
as per MoRT&H specification 305 (4th
revision) (Payment will be made based on levels for finished
item of work).
Earthwork excavation in soils up to SDR by mechanical means including trimming bottom and side
slopes in accordance with requirements of lines , grades and cross sections etc., complete including
seigniorage charges for finished item of work for trench cutting as per MoRT&H specification
301(4th
Revision) and as directed by the Engineer-in-Charge
Amount
10
Forming embankment with Side earth by mechanical means up to SDR including pre-watering of
soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading
soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road
Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H
specification 305 (4th
revision) (Payment will be made based on levels for finished item of work).
Quantity Rate Per
3 7
No
Name of Work ::-
Sno Description
MEASUREMENTS
DETAILED ESTIMATE
Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in
Medak
7/27/2019 Venkats Master DATA2008 09New1
16/185
1 2 4 5 6 8 9 103 7
3 1002.00
3 say 1002.00 cum 1,000.00 1.00 1002000
3006000
3006000
4 VAT on Part "A". @ 4.00% Rs: 120200
5 L.S for Quality control charges on Part "A", @ 1.00% Rs: 30100
6 L.S. for Price adjustment Road Work, @ 3.00% Rs: 90200
7 L.S for Road Safety works for caution, junction boards, studs etc. Rs: 400000
8 L.S. for Avagahana sadassulu, Rs: 5000
9 L.S for other unforeseen Rs: 14648500
3
3
3 (R&B)Division,___ ___ ___
18300000Total Amount Rs. 1 83 00 000
Asst. Executive Engineer Dy. Executive Engineer Executive Engineer
Part " B "
3006000
3006000
3006000
R&B Section, ___ ___ ___ R&B Sub-Division___ ___ ___
Total Amount as Part "A"
7/27/2019 Venkats Master DATA2008 09New1
17/185
No LENT BRDT DPT
* * * *
* * * *
* * * *
* * * *
* * * *
* * * *
* * * *
* * * *
* * * *
CALCULATIONS
7/27/2019 Venkats Master DATA2008 09New1
18/185
7/27/2019 Venkats Master DATA2008 09New1
19/185
(i)
a) x = km
b) road km to km = km
c) road km to km = km
c) road km to km = km
c) road km to km = km
c) road km to km = km
c) road km to km = km
c) road km to km = km
km
d) km to km
e) (48.1 - 45) /2 = km
Total Lead = km= km
(i)
a) = km
b) road km to km = km
b) road km to km = km
b) road km to km = km
b) road km to km = km
c) km to km
d) (48.1 - 45) /2 = km
Total Lead = km
= km
0
0
45.00Wanaparthy - Jadcherla
0.00 45.00 45.00Wanaparthy - Jadcherla
Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak Dist.Improements to
Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
45.00Wanaparthy - Jadcherla
28.40
Cart Track
28.40 45.00 16.60Wanaparthy - Jadcherla
45.00 16.60Wanaparthy - Jadcherla
28.40 45.00 16.60Wanaparthy - Jadcherla
16.60Wanaparthy - Jadcherla
0.66
9.40 34.20 24.80
1.10 0.60
Site Spreads in 45.00 48.10
28.40 45.00
555.00Chennai - Wanaparthy
1.55
126.61
.WEIGHTED AVERAGE LEAD SAY 127.00
16.60Wanaparthy - Jadcherla
0.00 45.00
45.00
(B). WEIGHTED AVERAGE LEAD FOR BITUMEN ( REFINERY AT CHENNAI)
Reach km 45/0- 48/ 100
Site average Lead
Name of Work:-
Mahbubnagar - Mannanur
Wanaparthy - Jadcherla
Wanaparthy - Jadcherla
Site average Lead
(A) .WEIGHTED AVERAGE LEAD FOR CRUSHER
Reach km 45/0- 48/ 100
28.40 45.00
0.00 45.00
0.00 45.00
Site Spreads in
736.55
.WEIGHTED AVERAGE LEAD SAY 737.00
1.55
28.40 45.00 16.60
45.00 48.10
Asst. Executive Engineer
R&B Section, ___ ___ ___
Executive Engineer (R&B)
(R&B)Division, ___ ____ ___
Dy. Executive Engineer
R&B Sub-Division___
7/27/2019 Venkats Master DATA2008 09New1
20/185
km
km
km
%
%
Lead for Emulsion ( round the trip )::
Lead for Bulk Bitumen ( round the trip ) ::
Lead
1368.00
1368.00
--
--
2117.252061.70
Conveyance Rates
44462.25 30421.65
--
Name of Work:-
684.00STRAIGHT LEAD ::
Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
BITUMEN LEADS & RATES
1448.65
41234.00
1.50
1.50
42024.180.00
42024.18
44125.39
2101.21
--
--
--
43295.70
32473.6546514.3045347.70
CRMB
Gr 55
0.00
32473.6546514.2545347.70
2052.00
--
--
2052.00
46177.39
46177.39
Total
OR SAY
Lead charges for Emulsion 1.5 x 1368
Emulsion
(M.S)
28973.000.00
42345.00 28973.00
42345.00
TYPE OF BITUMEN
Initial cost (Ex. Chennai)
Excise Duty
2052.00
0.00
5.00
--
2052.00
Total
--
--
--
Bulk
(60/70)
41234.000.00
Lead charges for Bulk BT 1.5 x 1368
Add VAT @
Deduct loading
Deduct loading, Unloading & Stacking
Deduct cost of Empty Emulsion Drums
Bulk
(80/100)
Asst. Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)R&B Section, ___ ___ ___ R&B Sub-Division___ (R&B) Division, ___ ___ ___
7/27/2019 Venkats Master DATA2008 09New1
21/185
ame o or : :
Date :: SSR ::
Mac
hineCrushing
Charges
25%
(4-5) (7-5) on (9) % Value
1 3 4 5 6 7 8 9 10 11 12 13 14
1 0.00 0.00 8.70 21.50 225.00 -8.70 216.30 -- -- 0.00 0.0 0.00
2 0.00 0.00 8.70 21.50 234.00 -8.70 225.30 70.00 56.33 0.00 0.0 0.00
3 0.00 0.00 8.70 21.50 430.00 -8.70 421.30 70.00 105.33 0.00 0.0 0.00
4 0.00 0.00 8.70 21.50 560.00 -8.70 551.30 70.00 137.83 0.00 0.0 0.00
5 0.00 0.00 8.70 21.50 690.00 -8.70 681.30 70.00 170.33 0.00 0.0 0.00
6 0.00 0.00 8.70 21.50 845.00 -8.70 836.30 70.00 209.08 0.00 0.0 0.00
7 0.00 0.00 8.70 21.50 830.00 -8.70 821.30 70.00 205.33 0.00 0.0 0.00
8 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 122.83 0.00 0.0 0.00
1 0.00 0.00 8.70 21.50 225.00 -8.70 216.30 -- -- 0.00 0.0 0.00
2 0.00 0.00 8.70 21.50 234.00 -8.70 225.30 70.00 56.33 0.00 0.0 0.00
3 0.00 0.00 8.70 21.50 430.00 -8.70 421.30 70.00 105.33 0.00 0.0 0.00
4 0.00 0.00 8.70 21.50 560.00 -8.70 551.30 70.00 137.83 0.00 0.0 0.00
5 0.00 0.00 8.70 21.50 690.00 -8.70 681.30 70.00 170.33 0.00 0.0 0.00
6 0.00 0.00 8.70 21.50 845.00 -8.70 836.30 70.00 209.08 0.00 0.0 0.00
7 0.00 0.00 8.70 21.50 830.00 -8.70 821.30 70.00 205.33 0.00 0.0 0.00
8 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 122.83 0.00 0.0 0.00
10 0.00 0.00 8.70 21.50 390.00 -8.70 381.30 70.00 95.33 0.00 0.0 0.00
RMR.10-Aug-08
0
On (6+9)
S
tacking
C
harging
Loading&
unloa
dingcharges
Se
igniorage
Charges
5 mm to 7 mm M.C chips
9.5 mm to 11.2 mm M.C chips
Conve
yancerate(-)
Stack
ingCharges
InitialR
ateofMaterial
(-)StackingCharges
W
eighted
AverageLead
Co
nveyance
rate
12 mm to 14 mm M.C chips
19 mm to 22 mm M.C Metal
InitialRate
ofMaterial
IRC and MORT&H HBG/HBT METALS (CRUSHER LEADS)
IRC and MORT&H HBG/HBT METALS ( HMP LEADS)
40 mm to 45 mm M.C Metal
Below 2.36 mm (Dust)
2.36 mm to 5 mm
25 mm to 27 mm M.C Metal
S.No
2008-09
Nature of Metal
2
( 8
TO
BlastingCharges
Below 2.36 mm (Dust)
2.36 mm to 5 mm
5 mm to 7 mm M.C chips
9.5 mm to 11.2 mm M.C chips
12 mm to 14 mm M.C chips
19 mm to 22 mm M.C Metal
25 mm to 27 mm M.C Metal
40 mm to 45 mm M.C Metal
50 mm to 55 mm Metal
IRC and MORT&H HBG/HBT METALS (QUARRY LEADS)
Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak Dist.Improements to Zaheerabad - Bidar road from KM
7/27/2019 Venkats Master DATA2008 09New1
22/185
9 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 -- 0.00 0.0 0.00
10 0.00 0.00 8.70 21.50 390.00 -8.70 381.30 70.00 -- 0.00 0.0 0.00
11 0.00 0.00 8.70 21.50 360.00 -8.70 351.30 70.00 -- 0.00 0.0 0.00
12 0.00 0.00 8.70 21.50 95.00 -8.70 86.30 70.00 -- 0.00 0.0 0.00
13 0.00 0.00
0.00 0.00 8.70 21.50 39.75 -8.70 31.05 -- -- 0.00 0.0 0.00
14 0.00 0.00 8.70 21.50 82.00 -8.70 73.30 70.00 -- 0.00 0.0 0.00
0
0
1 0.00 0.00 8.70 21.50 430.00 -8.70 421.30 70.00 105.33 0.00 0.0 0.00
2 0.00 0.00 8.70 21.50 560.00 -8.70 551.30 70.00 137.83 0.00 0.0 0.00
3 0.00 0.00 8.70 21.50 690.00 -8.70 681.30 70.00 170.33 0.00 0.0 0.00
4 0.00 0.00 8.70 21.50 845.00 -8.70 836.30 70.00 209.08 0.00 0.0 0.00
5 0.00 0.00 8.70 21.50 830.00 -8.70 821.30 70.00 205.33 0.00 0.0 0.00
6 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 122.83 0.00 0.0 0.00
1 0.00 0.00 8.70 21.50 218.00 -8.70 209.30 69.00 -- 0.00 0.0 0.00
2 0.00 0.00 8.70 21.50 155.00 -8.70 146.30 67.00 -- 0.00 0.0 0.00
3 0.00 0.00 8.70 21.50 71.00 -8.70 62.30 67.00 -- 0.00 0.0 0.00
4 0.00 0.00 8.70 21.50 1050.00 -8.70 1041.30 0.00 -- 0.00 0.0 0.00
1 0.00 0.00 5.50 18.50 56.00 -5.50 50.50 -- -- 0.00 0.0 0.00
2 0.00 0.00 5.50 18.50 175.00 -5.50 169.50 -- -- 0.00 0.0 0.00
3 0.00 0.00 5.50 18.50 60.00 -5.50 54.50 -- -- 0.00 0.0 0.00
4
5
6
7
HBG/HBT SS 5 METALS (QUARRY LEADS)
43000.00
30200.00
40 mm to 45 mm Metal
50 mm to 55 mm Metal
47000.00
HBG/HBT SS 5 METALS ( CRUSHER LEADS)
4400.00
10 mm size M.C. Chips
150 mm soling stone HBG metal
12 mm size M.C. Chips
Asst. Executive Engineer
60 mm to 63 mm Metal
SS 300mm (HBG) for revetment
6 mm size M.C. Chips
Sand for Mortar
Gravel
20 mm size M.C. Metal
25 mm size M.C. Metal
40 mm size M.C. Metal
6 mm Mild Steel
Quarry spall( Field picked metal)
Av. Of rate 25mm & 40mm
Cost of each Bond Stone
Sand for Filling
Cement
CRS Stone
Dy. Executive Engineer Executive Engineer
R&B Section, ___ ___ ___ R&B Sub-Division___ (R&B) Division, ___ ___ ___
MS Steel
Rough stone
SS 225 mm
HYSD Steel
Bond Stones(600x200x200) 42 No
7/27/2019 Venkats Master DATA2008 09New1
23/185
7/27/2019 Venkats Master DATA2008 09New1
24/185
7/27/2019 Venkats Master DATA2008 09New1
25/185
Name of Work ::-
SSR :: 0.0%
SNo Quantity Unit Rate per
1 2 3 5 6
1
1
1
1
1
1 0.02 day 188.00 1.00 3.76
1 0.50 day 146.00 1.00 73.00
1 76.76
1 0.0 % 76.76 0.00
1 A = 76.76
1
1 100.00 cum 13.00 1.00 1300.00
1 1.00 hour 2600.00 1.00 2600.00
1 4.00 hour 345.00 1.00 1380.00
1 1.00 hour 1550.00 1.00 1550.00
1 B = 6830.00
1 6906.76
1
1 5.00 % 6906.76 345.34
1
1 10.00 % 7252.10 725.21
1
1
1 100.00 cum 0.00 1.00 0.001
1 100.00 cum 7977.31
1 79.77
1 80.00
1
1
1
1
1
1
Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak
Forming embankment with Side earthby mechanical means up to SDR including pre-watering of
soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading
soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road
Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and
operational charges of T&P and seigniorage charges, complete for finished item of work as per
MoRT&H specification 305 (4th
revision) (Payment will be made based on levels for finished item
of work).
(A) Labour
Mate
TOTAL
Page 70 of MoRT&H SDB
Unit : Cum
Taking out put = 100 Cum
Mazdoor unskilled
Municipal Area Allowance
Water tanker 6 KL
TOTAL
(E ) Seigniorage charges
Earth
(C) Over Head Charges on (A+B)
(D) Contractors Profit on (A+B+C)
Rate per 1 cum
R&B Section, ___ ___ ___
Dy. Executive Engineer
R&B Sub-Division___
TOTAL Cost for 100 cum = (A+B+C+D+E)
Rate per 1 cum
DATA
Date :: 10-Aug-08
Asst. Executive Engineer
Amount
7
(A + B )
(B) Machinery
Rate as per G.I. Ms. No 10, Dt 26/7/2005
Motor Graders for Grading @ 100 cum per hour
Description of Item
4
Vibratory roller 8T
Municipal Area Allowance ::2008-09
Executive Engineer (R&B)
(R&B) Roads, ___ ___ ___
7/27/2019 Venkats Master DATA2008 09New1
26/185
1 2 3 5 6 74
1
7/27/2019 Venkats Master DATA2008 09New1
27/185
1 2 3 5 6 74
1
7/27/2019 Venkats Master DATA2008 09New1
28/185
1 2 3 5 6 74
1
1
2
2
2
2
2
2 0.04 day 188.00 1.00 7.52
2 1.00 day 146.00 1.00 146.00
2 153.52
2 0.0 % 153.52 0.00
2 A = 153.52
2
2
2 100.00 cum 13.00 1.00 1300.00
2 160.00 t.km 4.50 t.km 720.00
2
2 72.00
2 0.50 hour 2760.00 1.00 1380.00
2 1.00 hour 2600.00 1.00 2600.00
2 4.00 hour 345.00 1.00 1380.00
2 1.00 hour 1550.00 1.00 1550.00
2 B = 9002.00
2 9155.52
2
2 5.00 % 9155.52 457.78
2
2 10.00 % 9613.30 961.33
2
2
2 100.00 cum 0.00 1.00 0.00
2
2 100.00 cum 10574.63
2
2 105.75
2 106.00
2
3
3
(D) Contractors Profit on (A+B+C+D)
TOTAL Cost for 100 cum = (A+B+C+D+E)
Earth
(A + B)
(C) Over Head Charges on (A+B)
Rate per 1 cum
Rate per 1 cum
Forming embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including
all hire and operational charges of T&P and seigniorage charges, complete for finished item of
work as per MoRT&H specification 305
Municipal Area Allowance
(E ) Seigniorage charges
(4th revision) With a lead of 0KM (Payment will be made based on levels for finished item of
work).
Forming embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including
all hire and operational charges of T&P and seigniorage charges, complete for finished item of
work as per MoRT&H specification 305 (4th revision) (Payment will be made based on levels for
finished item of work).
Page 68,69 of MoRT&H SDB
Taking out put = 100 Cum
(A) Labour
Tipper (for 1 Km = 160x1 = 160) t.km
Add 10% of cost of carriage to cover
cost of loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
(B) Machinery
Rate as per G.I. Ms. No 10, Dt 26/7/2005
Mate
Mazdoor unskilled
Motor Graders for Grading @ 100 cum per hour
Water tanker 6 KL
Vibratory roller 8T
TOTAL
Unit : Cum
TOTAL
7/27/2019 Venkats Master DATA2008 09New1
29/185
1 2 3 5 6 74
3
3
3
3
3 0.04 day 188.00 1.00 7.52
3 1.00 day 146.00 1.00 146.00
3 153.523 0.0 % 153.52 0.00
3 A = 153.52
3
3
3 100.00 cum 13.00 1.00 1300.00
3 0.00 t.km 4.50 t.km 0.00
3
3 0.00
3 0.50 hour 2760.00 1.00 1380.00
3 1.00 hour 2600.00 1.00 2600.00
3 4.00 hour 345.00 1.00 1380.00
3 1.00 hour 1550.00 1.00 1550.003 B = 8210.00
3 8363.52
3
3 5.00 % 8363.52 418.18
3
3 10.00 % 8781.70 878.17
3
3
3 100.00 cum 0.00 1.00 0.00
3
3 100.00 cum 9659.87
33 96.60
3 97.00
3
4
4
4
4
4
4 0.08 day 188.00 1.00 15.044 2.00 day 146.00 1.00 292.00
4 307.04
4 0.0 % 307.04 0.00
4 A = 307.04
4
4 180.00 cum 13.00 1.00 2340.00
4 B = 2340.00
4 2647.04
4
4 5.00 % 2647.04 132.35
4
TOTAL
(C) Over Head Charges on (A+B)
Dozer 80 HP for spreading @ 200 cum per hour
Motor Graders for Grading @ 100 cum per hour
(C) Over Head Charges on (A+B)
(A + B )
Mate
Page 68,69 of MoRT&H SDB
Unit : Cum
(D) Contractors Profit on (A+B+C)
Water tanker 6 KL
Vibratory roller 8TTOTAL
(A) Labour
Municipal Area Allowance
TOTAL
(B) Machinery
Taking out put = 100 Cum
(E ) Seigniorage charges
Earth
Page 50 of MoRT&H SDB
Mazdoor unskilled
Add 10% of cost of carriage to cover
cost of loading and unloading
Rate as per G.I. Ms. No 10, Dt 26/7/2005
Tipper ( for 0 Km = 160 x 0 = 0) t.km
Unit : Cum
TOTAL Cost for 100 cum = (A+B+C+D+E)
Rate per 1 cum
Taking out put = 180 Cum
Earthwork excavation in soils up to SDR by mechanical means including trimming bottom and
side slopes in accordance with requirements of lines , grades and cross sections etc., complete
including seigniorage charges for finished item of work for trench cutting as per MoRT&H
specification 301(4th
Revision) and as directed by the Engineer-in-Charge
Rate per 1 cum
(A + B )
(A) Labour
Mate
(B) Machinery
Mazdoor unskilled
Municipal Area Allowance
Rate as per G.I. Ms. No 10, Dt 26/7/2005
TOTAL
7/27/2019 Venkats Master DATA2008 09New1
30/185
1 2 3 5 6 74
4 10.00 % 2779.39 277.94
4
4
4 180.00 cum 0.00 1.00 0.00
4
4 180.00 cum 3057.33
4 16.994 17.00
4
5
5
5
5
5
5 0.08 day 188.00 1.00 15.04
5 2.00 day 146.00 1.00 292.005 307.04
5 0.0 % 307.04 0.00
5 A = 307.04
5
5
5 360.00 cum 13.00 1.00 4680.00
5 16.36 hour 575.00 1.00 9407.00
5 B = 14087.00
5 14394.04
5
5 5.00 % 14394.04 719.70
55 10.00 % 15113.74 1511.37
5
5
5 360.00 cum 0.00 1.00 0.00
5
5 360.00 cum 16625.11
5 46.18
5 46.20
5
6
6
6
6
6
6 1.80 day 188.00 1.00 338.40
6 45.00 day 146.00 1.00 6570.00
6 6908.40
6 0.0 % 6908.40 0.00
6 A = 6908.40
6
(D) Contractors Profit on (A+B+C)
Removal ofunserviceable soils up to SDR including excavation, loading and disposal up to 1000
m etc., complete including seigniorage charges for finished item of work as per MoRT&H
specification 301(4th Revision) and as directed by the Engineer-in-Charge
Page 58 of MoRT&H SDB
Unit : Cum
Taking out put = 360 Cum
(E ) Seigniorage charges
Earth
(A) Labour
TOTAL Cost for 180 cum = (A+B+C+D+E)
Rate per 1 cumRate per 1 cum
TOTAL
(B) Machinery
Rate as per G.I. Ms. No 10, Dt 26/7/2005
Mate
Mazdoor unskilled
Municipal Area Allowance
(A + B )
(C) Over Head Charges on (A+B)
Tippers 5.50 cum capacity
TOTAL
(A) Labour
Mate
(D) Contractors Profit on (A+B+C)
TOTAL Cost for 360 cum = (A+B+C+D+E)
Rate per 1 cum
Rate per 1 cum
(E ) Seigniorage charges
Removal ofunserviceable soils by Manual means up to SDR including excavation, loading and
disposal up to 1000 m etc., complete including seigniorage charges for finished item of work as
per MoRT&H specification 301(4th Revision) and as directed by the Engineer-in-Charge
Page 48 of MoRT&H SDB
Unit : Cum
Municipal Area Allowance
Taking out put = 120 Cum
Mazdoor unskilled
TOTAL
Earth
7/27/2019 Venkats Master DATA2008 09New1
31/185
1 2 3 5 6 74
6
6 10.00 hour 575.00 1.00 5750.00
6 B = 5750.00
6 12658.40
6
6 5.00 % 12658.40 632.92
66 10.00 % 13291.32 1329.13
6
6
6 120.00 cum 0.00 1.00 0.00
6
6 120.00 cum 14620.45
6 121.84
6 121.80
6
7
7
7
7
7
7
7 0.48 day 188.00 1.00 90.24
7 2.00 day 193.40 1.00 386.80
7 10.00 day 146.00 1.00 1460.00
7 1937.04
7 0.0 % 1937.04 0.00
7 A = 1937.04
7
7 6.00 hour 2600.00 1.00 15600.00
7 6.00 hour 1550.00 1.00 9300.00
7 12.00 hour 345.00 1.00 4140.00
7 3.00 hour 345.00 1.00 1035.00
7 B = 30075.00
7
7
7
7
7
7 192.00 cum 845.22 1.00 162282.56
7
7 76.00 cum 560.43 1.00 42592.68
7
7 115.20 cum 207.60 1.00 23915.52
7 C= 228790.76
7 260802.80
(C) Over Head Charges on (A+B)
(D) Contractors Profit on (A+B+C)
(A + B )
Tippers 5.50 cum capacity
(B) Machinery
TOTAL Cost for 120 cum = (A+B+C+D+E)
Rate per 1 cum
TOTAL
Rate per 1 cum
Motor grader 3.35M Blade @50 cum/Hr.
Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - I of
MoRT&H Table 400-1 including cost, seigniorage charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by approved means, on preparedsurface mixing by mix in place method with Rotavator / approved means at OMC and compacting
with vibratory roller to achieve the desired density etc., complete for finished item of work as per
MoRT&H Specification 401 (4th revision) and as directed by the Engineer-in-charge. ( Payment
will be made based on levels for finished item of work ).
By Mix in Place Method
Unit = cum
Page 94 of MoRT&H SDB
Mazdoor unskilled
Municipal Area Allowance
TOTAL
Taking output = 300 cum
(A) Labour
Mate
Mazdoor skilled
Tractor - Rotavator (223+11=234)
Vibratory roller 8T
Water tanker 6 KL
TOTAL
(C) Material
(A + B +C)
TOTAL
53-9.5mm IRC & MORT&H HBG/HBT Chips @ 50 %
9.5-2.36 mm IRC & MORT&H HBG/HBT Chips @ 20 %
(Rate of 2.36mm & below HBG/HBT metal)
Average rate of (9.5-12),(5-7)&(2.36-5)
Avg. rate of (50-55),(40-45),(25-27,(19-22),(12-14)&(9.5-12)
(E ) Seigniorage charges
Earth
2.36mm and below @30%
Close graded Granular sub-base material as per
Table 400-1, Grading I material of MORT&H
(B) Machinery
7/27/2019 Venkats Master DATA2008 09New1
32/185
1 2 3 5 6 74
7
7 5.00 % 260802.80 13040.14
7
7 10.00 % 273842.94 27384.29
7
7
7 383.20 cum 0.00 1.00 0.007
7 300.00 cum 301227.23
7 1004.09
7 1004.00
7
8
8
8
8
8
8
8 0.40 day 188.00 1.00 75.20
8 2.00 day 193.40 1.00 386.80
8 8.00 day 146.00 1.00 1168.00
8 1630.00
8 0.0 % 1630.00 0.00
8 A = 1630.008
8 6.00 hour 2600.00 1.00 15600.00
8 6.00 hour 1550.00 1.00 9300.00
8 12.00 hour 345.00 1.00 4140.00
8 3.00 hour 345.00 1.00 1035.00
8 B = 30075.00
8
8
8
8
8
8 134.40 cum 735.32 1.00 98827.018
8 172.80 cum 798.14 1.00 137918.30
8
8 76.80 cum 207.60 1.00 15943.68
8 C= 252688.99
8 284393.99
8
8 5.00 % 284393.99 14219.70
8
8 10.00 % 298613.69 29861.37
8
Metal
TOTAL Cost for 300 cum = (A+B+C+D+E+F)
Rate per 1 cum
(D) Over Head Charges on (A+B+C)
Rate per 1 cum
(E) Contractors Profit on (A+B+C+D)
Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - I of
MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting
with vibratory roller to achieve the desired density etc., complete for finished item of work as per
MoRT&H Specification 401 (4th revision) and as directed by the Engineer-in-charge. ( Payment
will be made based on levels for finished item of work ).
By Mix in Place Method
Unit = cum
Page 94 of MoRT&H SDB
(C) Material
Mazdoor unskilled
Municipal Area Allowance
TOTAL
Taking output = 300 cum
(A) Labour
Mate
Mazdoor skilled
2.36mm and below @30%
Coarse graded Granular sub-base material as per
Table 400-2, Grading I material of MORT&H
(B) Machinery
Motor grader 3.35M Blade @50 cum/Hr.
Tractor - Rotavator (223+11=234)
Vibratory roller 8T
Water tanker 6 KL
TOTAL
(A + B +C)
(D) Over Head Charges on (A+B+C)
TOTAL
53-26.5 mm IRC & MORT&H HBG/HBT Chips @ 35 %
26.5 to 4.75 mm IRC & MORT&H HBG/HBT Chips @ 45 %
(Rate of 2.36mm & below HBG/HBT metal)
Average rate of (25-27),(19-22),(12-14),(9.5-11.2),(5-7),(2.36-5)
Avg. rate of (50-55),(40-45),(25-27)
(E) Contractors Profit on (A+B+C+D)
(F ) Seigniorage charges
7/27/2019 Venkats Master DATA2008 09New1
33/185
1 2 3 5 6 74
8
8 384.00 cum 0.00 1.00 0.00
8
8 300.00 cum 328475.06
8 1094.92
8 1095.00
89
9
9
99
9 0.40 day 188.00 1.00 75.20
9 2.00 day 193.40 1.00 386.80
9 8.00 day 146.00 1.00 1168.00
9 1630.00
9 0.0 % 1630.00 0.00
9 A = 1630.00
9
9 6.00 hour 2600.00 1.00 15600.00
9 12.00 hour 345.00 1.00 4140.00
9 6.00 hour 1550.00 1.00 9300.00
9 3.00 hour 345.00 1.00 1035.009 B = 30075.00
9
9
9
9
9
9 255.00 cum 560.43 1.00 142909.65
9
9 129.00 cum 207.60 1.00 26780.40
9 C= 169690.05
9 201395.05
99 5.00 % 201395.05 10069.75
9
9 10.00 % 211464.80 21146.48
9
9
9 384.00 cum 0.00 1.00 0.00
9
9 300.00 cum 232611.28
9 775.37
9 775.00
9
2.36mm and below @34%
Municipal Area Allowance
TOTAL
(B) Machinery
Motor grader 3.35M Blade @50 cum/Hr.
Tractor - Rotavator (223+11=234)
Water tanker 6 KL
Coarse graded Granular sub-base material as per
Mate
Mazdoor skilled
Mazdoor unskilled
Vibratory roller 8T
Table 400-2 of MORT&H
TOTAL
(C) Material
Average rate of (9.5-11.2),( 5-7)&(2.36-5)
(A) Labour
(F ) Seigniorage charges
Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - III
of MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting
with vibratory roller to achieve the desired density etc., complete for finished item of work as per
MoRT&H Specification 401 (4th revision) and as directed by the Engineer-in-charge. ( Payment
will be made based on levels for finished item of work ).
9.5-4.75mm IRC & MORT&H HBG/HBT Chips @ 66%
Rate of 2.36mm & below HBG/HBT metal
Unit = cum
Taking output = 300 cum
Page 95 of MoRT&H SDB
TOTAL Cost for 300 cum = (A+B+C+D+E+F)
TOTAL
(A + B +C)
(D) Over Head Charges on (A+B+C)
Metal
(E) Contractors Profit on (A+B+C+D)
Rate per 1 cum
Rate per 1 cum
Rate per 1 cum
TOTAL Cost for 300 cum = (A+B+C+D+E+F)
Rate per 1 cum
(F ) Seigniorage charges
Metal
7/27/2019 Venkats Master DATA2008 09New1
34/185
1 2 3 5 6 74
10
10
10
1010
10 0.20 day 188.00 1.00 37.60
10 5.00 day 146.00 1.00 730.00
10 5.00 cum 21.50 1.00 -107.50
10 660.10
10 0.0 % 660.10 0.00
10 A = 660.10
10 660.10
10
10 5.00 % 660.10 33.01
10
10 10.00 % 693.11 69.3110
10 100.00 sqm 762.42
10 7.62
10 7.60
10
11
11
11
1111
11 0.01 day 188.00 1.00 1.88
11 0.25 day 146.00 1.00 36.50
11 38.38
11 0.0 % 38.38 0.00
11 A = 38.38
11
11 0.08 hour 345.00 1.00 27.60
11 0.20 hour 1320.00 1.00 264.00
11 0.23 hour 575.00 1.00 132.25
11 B = 423.85
11 462.2311
11 5.00 % 462.23 23.11
11
11 10.00 % 485.34 48.53
11
11 100.00 sqm 533.87
11 5.34
11 5.30
11
Municipal Area Allowance
Mazdoor including loading & unloading
TOTAL
(A )
(B) Machinery
(A + B )
Municipal Area Allowance
TOTAL
(C) Over Head Charges on (A+B)
(D) Contractors Profit on (A+B+C)
(A) Labour
Front end loader 1 cum capacity
TOTAL Cost for 100 sqm = (A+B+C+D)
Rate per 1 sqm
Rate per 1 sqm
TOTAL
Page 67 of MoRT&H SDB
Scarifying the existing granular surface to a depth of 50 mm by Manual means including all
labour charges etc., complete as per MoRT&H (4th
Revision) Specn. No.305.4.3 for finished item
of work.
Unit = sqm
Deduct for loading & unloading
Taking output = 100 sqm(A) Labour
Mate
TOTAL Cost for 100 sqm = (A+B+C)
Rate per 1 sqm
Rate per 1 sqm
(B) Over Head Charges on (A)
(C) Contractors Profit on (A+B)
Page 67,68 of MoRT&H SDB
Unit = sqm
Taking output = 100 sqm
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of
scarified material with all leads and lifts up to 1000 m as per MoRT&H (4th
Revision) Specn.
No.305.4.3
Tipper 5.50 cum capacity, 4 trips/Hour
Mate
Mazdoor
Tractor with ripper attachment @ 60 cum per hour
7/27/2019 Venkats Master DATA2008 09New1
35/185
1 2 3 5 6 74
12
12
12
12
12
12 10.08 nos. 188.00 1.00 1895.04
12 2.00 nos. 193.40 1.00 386.80
12 250.00 nos. 146.00 1.00 36500.00
12 38781.84
12 0.0 % 38781.84 0.00
12 A = 38781.84
12
12 12.00 hour 540.00 1.00 6480.00
12 24.00 hour 345.00 1.00 8280.00
12 B = 14760.00
12
12 217.80 cum 412.60 1.00 89864.28
12 200.38 cum 552.60 1.00 110729.99
12 17.42 cum 1106.68 1.00 19278.37
12
12 57.60 cum 669.18 1.00 38544.77
12
12 28.80 cum 207.60 1.00 5978.88
12 C = 264396.29
12 317938.13
12
12 5.00 % 317938.13 15896.91
12
12 10.00 % 333835.04 33383.50
12
12
12 522.00 cum 0.00 1.00 0.00
1212 360.00 cum 367218.54
12 1020.05
12 1020.00
12
(A) Labour
Mate
Mazdoor skilled
Rate per 1 cum
Taking output = 360 cum
Page 104,105,106 of MoRT&H SDB
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as per
Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam
specification including cost, conveyance and seigniorage charges and spreading in uniform
thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages to proper grade
and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and
binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4
threvision) and as
directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of
work)
Unit = cum
(B) Machinery
smooth wheeled roller 8 Ton
water tanker 6 KL
TOTAL
Mazdoor
Municipal Area Allowance
TOTAL
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
(F ) Seigniorage charges
Metal
Rate per 1 cum
(C) Material
63mm IRC HBG/HBT metal
45mm IRC HBG/HBT metal
22.40 mm IRC HBG/HBT M/C metal
(Ave of 9.5-11.2 mm & 5-7 mm M/C )
Binding material @ 0.06 cum / 10sqm
(Rate of 2.36mm & Below)
Screenings 13.2mm@ 0.12cum/10sqm
TOTAL
(A + B +C)
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
7/27/2019 Venkats Master DATA2008 09New1
36/185
1 2 3 5 6 74
13
13
13
13
13
13 10.08 nos. 188.00 1.00 1895.04
13 2.00 nos. 193.40 1.00 386.80
13 250.00 nos. 146.00 1.00 36500.00
1338781.84
13 0.0 % 38781.84 0.00
13 A = 38781.84
13
13 12.00 hour 540.00 1.00 6480.00
13 24.00 hour 345.00 1.00 8280.00
13 B = 14760.00
13
13 357.19 cum 552.60 1.00 197383.19
13 78.41 cum 1106.68 1.00 86774.78
13
13 86.40 cum 275.27 1.00 23782.90
13
13 28.80 cum 207.60 1.00 5978.88
13 C = 313919.75
13 367461.59
13
13 5.00 % 367461.59 18373.08
13
13 10.00 % 385834.67 38583.47
13
13
13 550.80 cum 0.00 1.00 0.00
13
13 360.00 cum 424418.14
13 1178.94
13 1179.00
13
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - III -HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as
per Table 400-7& 9 of MoRT&H Specification 404 of 4th revision forWater Bound Macadam
specification including cost, conveyance and seigniorage charges and spreading in uniform
thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages to proper grade
and camber applying and brooming requisite type ' B ' screenings as per table 400-8&9 and
binding materials to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4
threvision) and as
directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of
work)
TOTAL
(A + B +C)
Mate
Page 104,105,106 of MoRT&H SDB
Municipal Area Allowance
TOTAL
(B) Machinery
smooth wheeled roller 8 Ton
Unit = cum
Taking output = 360 cum
(A) Labour
Mazdoor skilled
Mazdoor
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
Rate per 1 cum
Metal
Rate per 1 cum
water tanker 6 KL
(Rate of 2.36mm & Below)
TOTAL
(C) Material
45mm IRC HBG/HBT metal
(F ) Seigniorage charges
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
22.40mm IRC HBG/HBT M/C metal
Avg. of (2.36-5),( 2.36mm & below)
Binding material @ 0.06 cum / 10sqm
Screenings 11.2mm @0.18cum/10sqm
7/27/2019 Venkats Master DATA2008 09New1
37/185
1 2 3 5 6 74
14
14
14
14
14
14 10.08 nos. 188.00 1.00 1895.04
14 2.00 nos. 193.40 1.00 386.80
14 250.00 nos. 146.00 1.00 36500.00
14 38781.8414 0.0 % 38781.84 0.00
14 A = 38781.84
14
14 12.00 hour 540.00 1.00 6480.00
14 24.00 hour 345.00 1.00 8280.00
14 B = 14760.00
14
14 217.80 cum 412.60 1.00 89864.28
14 200.38 cum 675.43 1.00 135342.66
14 17.42 cum 1106.68 1.00 19278.37
14
14 57.60 cum 669.18 1.00 38544.7714
14 28.80 cum 207.60 1.00 5978.88
14 C = 289008.96
14 342550.80
14
14 5.00 % 342550.80 17127.54
14
14 10.00 % 359678.34 35967.83
14
14
14 522.00 cum 0.00 1.00 0.00
14
14 360.00 cum 395646.17
14 1099.02
14 1099.00
14
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 45mm and below) as per
Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam
specification including cost, conveyance and seigniorage charges and spreading in uniform
thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages to proper grade
and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and
binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4
threvision) and as
directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of
work)
(B) Machinery
water tanker 6 KL
TOTAL
(C) Material
smooth wheeled roller 8 Ton
63mm IRC HBG/HBT metal
(A) Labour
Mate
Mazdoor skilled
Municipal Area Allowance
TOTAL
Page 104,105,106 of MoRT&H SDB
Unit = cum
Mazdoor
Taking output = 360 cum
45mm IRC HBG/HBT M/C metal
22.40 mm IRC HBG/HBT M/C metal
TOTAL
(A + B +C)
Screenings 13.2mm@ 0.12cum/10sqm
(Ave of 9.5-11.2 mm & 5-7 mm M/C )Binding material @ 0.06 cum / 10sqm
(Rate of 2.36mm & Below)
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
Rate per 1 cum
Rate per 1 cum
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
(F ) Seigniorage charges
Metal
7/27/2019 Venkats Master DATA2008 09New1
38/185
1 2 3 5 6 74
15
15
15
15
15
15 10.08 nos. 188.00 1.00 1895.04
15 2.00 nos. 193.40 1.00 386.80
15 250.00 nos. 146.00 1.00 36500.00
15 38781.84
15 0.0 % 38781.84 0.00
15 A = 38781.84
15
15 12.00 hour 540.00 1.00 6480.00
15 24.00 hour 345.00 1.00 8280.00
15 B = 14760.00
15
15 357.19 cum 675.4300 1.00 241256.84
15 78.41 cum 1106.68 1.00 86774.78
15
15 86.40 cum 275.27 1.00 23782.90
15
15 28.80 cum 207.60 1.00 5978.8815 C = 357793.40
15 411335.24
15
15 5.00 % 411335.24 20566.76
15
15 10.00 % 431902.00 43190.20
15
15
15 550.80 cum 0.00 1.00 0.00
15
15 360.00 cum 475092.20
15 1319.7015 1320.00
15
Screenings 11.2mm @0.18cum/10sqm
Avg. of (2.36-5),( 2.36mm & below)
Binding material @ 0.06 cum / 10sqm
(Rate of 2.36mm & Below)
Page 104,105,106 of MoRT&H SDB
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - III - HBG/HBT ( IRC ) Machine crushed metal as per Table 400-7& 9 of MoRT&H
Specification 404 of 4th revision for Water Bound Macadam specification including cost,
conveyance and seigniorage charges and spreading in uniform thickness, hand packing, rolling
with Power Road Roller 8- 10 Tonnes in stages to proper grade and camber applying and
brooming requisite type ' B ' screenings as per table 400-8&9 and binding materials to fill up the
interstices of coarse aggregates, watering and compacting to the required density for finished itemof work as per MoRT&H specification 404 (4
threvision) and as directed by the Engineer-in-
Charge (Payment will be made based on levels for finished item of work)
(A) Labour
Mate
Mazdoor skilled
Unit = cum
Taking output = 360 cum
smooth wheeled roller 8 Ton
water tanker 6 KL
TOTAL
Mazdoor
Municipal Area Allowance
TOTAL
(C) Material
45mm IRC HBG/HBT M/C metal
22.40mm IRC HBG/HBT M/C metal
Rate per 1 cum
TOTAL
(A + B +C)
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
Rate per 1 cum
(F ) Seigniorage charges
Metal
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
(B) Machinery
7/27/2019 Venkats Master DATA2008 09New1
39/185
1 2 3 5 6 74
16
16
16
16
16
16 10.08 nos. 188.00 1.00 1895.04
16 2.00 nos. 193.40 1.00 386.80
16 250.00 nos. 146.00 1.00 36500.00
16 38781.8416 0.0 % 38781.84 0.00
16 A = 38781.84
16
16 6.00 hour 1550.00 1.00 9300.00
16 24.00 hour 345.00 1.00 8280.00
16 B = 17580.00
16
16 217.80 cum 412.60 1.00 89864.28
16 200.38 cum 552.60 1.00 110729.99
16 17.42 cum 1106.68 1.00 19278.37
16
16 57.60 cum 669.18 1.00 38544.7716
16 28.80 cum 207.60 1.00 5978.88
16 C = 264396.29
16 320758.13
16
16 5.00 % 320758.13 16037.91
16
16 10.00 % 336796.04 33679.60
16
16
16 522.00 cum 0.00 1.00 0.00
1616 360.00 cum 370475.64
16 1029.10
16 1029.00
16
(D) Over Head Charges on (A+B+C)
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
Rate per 1 cum
Rate per 1 cum
(E) Contractors Profit on (A+B+C+D)
(A) Labour
Page 104,105,106 of MoRT&H SDB
Unit = cum
Taking output = 360 cum
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as per
Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam
specification including cost, conveyance and seigniorage charges and spreading in uniform
thickness, hand packing, rolling with Vibratory Road Roller 8- 10 Tonnes in stages to proper
grade and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and
binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4
threvision) and as
directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of
work)
(B) Machinery
Mazdoor
Municipal Area Allowance
TOTAL
Mate
Mazdoor skilled
water tanker 6 KL
TOTAL
(C) Material
63mm IRC HBG/HBT metal
Vibratory road roller 8 Ton
45mm IRC HBG/HBT metal
22.40 mm IRC HBG/HBT M/C metal
Screenings 13.2mm@ 0.12cum/10sqm
(Ave of 9.5-11.2 mm & 5-7 mm M/C )Binding material @ 0.06 cum / 10sqm
(Rate of 2.36mm & Below)
TOTAL
(A + B +C)
(F ) Seigniorage charges
Metal
7/27/2019 Venkats Master DATA2008 09New1
40/185
1 2 3 5 6 74
17
17
17
17
17
17 10.08 nos. 188.00 1.00 1895.04
17 2.00 nos. 193.40 1.00 386.80
17 250.00 nos. 146.00 1.00 36500.00
17 38781.8417 0.0 % 38781.84 0.00
17 A = 38781.84
17
17 6.00 hour 1550.00 1.00 9300.00
17 24.00 hour 345.00 1.00 8280.00
17 B = 17580.00
17
17 357.19 cum 552.60 1.00 197383.19
17 78.41 cum 1106.68 1.00 86774.78
17
17 86.40 cum 275.27 1.00 23782.90
1717 28.80 cum 207.60 1.00 5978.88
17 C = 313919.75
17 370281.59
17
17 5.00 % 370281.59 18514.08
17
17 10.00 % 388795.67 38879.57
17
17
17 550.80 cum 0.00 1.00 0.00
17
17 360.00 cum 427675.2417 1187.99
17 1188.00
17
(A) Labour
Mate
Mazdoor skilled
Taking output = 360 cum
Page 104,105,106 of MoRT&H SDB
Unit = cum
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - III - HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as
per Table 400-7& 9 of MoRT&H Specification 404 of 4th revision forWater Bound Macadam
specification including cost, conveyance and seigniorage charges and spreading in uniform
thickness, hand packing, rolling with Vibratory Road Roller 8- 10 Tonnes in stages to proper
grade and camber applying and brooming requisite type ' B ' screenings as per table 400-8&9 and
binding materials to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4
threvision) and as
directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of
work)
Mazdoor
Vibratory road roller 8 Ton
water tanker 6 KL
TOTAL
(C) Material
Municipal Area Allowance
TOTAL
(B) Machinery
45mm IRC HBG/HBT metal
22.40mm IRC HBG/HBT M/C metal
TOTAL
(A + B +C)
Screenings 11.2mm @0.18cum/10sqm
Avg. of (2.36-5),( 2.36mm & below)
Binding material @ 0.06 cum / 10sqm(Rate of 2.36mm & Below)
(E) Contractors Profit on (A+B+C+D)
TOTAL Cost for 360 cum = (A+B+C+D+E+F)Rate per 1 cum
Rate per 1 cum
(D) Over Head Charges on (A+B+C)
(F ) Seigniorage charges
Metal
7/27/2019 Venkats Master DATA2008 09New1
41/185
1 2 3 5 6 74
18
18
18
18
18
18 10.08 nos. 188.00 1.00 1895.04
18 2.00 nos. 193.40 1.00 386.80
18 250.00 nos. 146.00 1.00 36500.00
18 38781.8418 0.0 % 38781.84 0.00
18 A = 38781.84
18
18 6.00 hour 1550.00 1.00 9300.00
18 24.00 hour 345.00 1.00 8280.00
18 B = 17580.00
18
18 217.80 cum 412.60 1.00 89864.28
18 200.38 cum 675.43 1.00 135342.66
18 17.42 cum 1106.68 1.00 19278.37
18
18 57.60 cum 669.18 1.00 38544.7718
18 28.80 cum 207.60 1.00 5978.88
18 C = 289008.96
18 345370.80
18
18 5.00 % 345370.80 17268.54
18
18 10.00 % 362639.34 36263.93
18
18
18 522.00 cum 0.00 1.00 0.00
18
18 360.00 cum 398903.27
18 1108.06
18 1108.00
18
Screenings 13.2mm@ 0.12cum/10sqm
(Ave of 9.5-11.2 mm & 5-7 mm M/C )Binding material @ 0.06 cum / 10sqm
Page 104,105,106 of MoRT&H SDB
Unit = cum
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 45mm and below) as per
Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam
specification including cost, conveyance and seigniorage charges and spreading in uniform
thickness, hand packing, rolling with Vibratory Road Roller 8- 10 Tonnes in stages to proper
grade and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and
binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4
threvision) and as
directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of
work)
Mazdoor
Municipal Area Allowance
TOTAL
Taking output = 360 cum
(A) Labour
Mate
Mazdoor skilled
(C) Material
63mm IRC HBG/HBT metal
45mm IRC HBG/HBT M/C metal
22.40 mm IRC HBG/HBT M/C metal
(B) Machinery
Vibratory road roller 8 Ton
water tanker 6 KL
TOTAL
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
TOTAL
(Rate of 2.36mm & Below)
(A + B +C)
(F ) Seigniorage charges
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
Rate per 1 cum
Rate per 1 cum
Metal
7/27/2019 Venkats Master DATA2008 09New1
42/185
1 2 3 5 6 74
19
19
19
19
19
19 10.08 nos. 188.00 1.00 1895.04
19 2.00 nos. 193.40 1.00 386.80
19 250.00 nos. 146.00 1.00 36500.00
19 38781.8419 0.0 % 38781.84 0.00
19 A = 38781.84
19
19 6.00 hour 1550.00 1.00 9300.00
19 24.00 hour 345.00 1.00 8280.00
19 B = 17580.00
19
19 357.19 cum 675.43 1.00 241256.84
19 78.41 cum 1106.68 1.00 86774.78
19
19 86.40 cum 275.27 1.00 23782.90
1919 28.80 cum 207.60 1.00 5978.88
19 C = 357793.40
19 414155.24
19
19 5.00 % 414155.24 20707.76
19
19 10.00 % 434863.00 43486.30
19
19
19 550.80 cum 0.00 1.00 0.00
19
19 360.00 cum 478349.3019 1328.75
19 1329.00
19
20
Page 104,105,106 of MoRT&H SDB
Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of
Grade - III - HBG/HBT. ( IRC ) Machine crushed metal as per Table 400-7& 9 of MoRT&H
Specification 404 of 4th revision for Water Bound Macadam specification including cost,
conveyance and seigniorage charges and spreading in uniform thickness, hand packing, rolling
with Vibratory Road Roller 8- 10 Tonnes in stages to proper grade and camber applying and
brooming requisite type ' B ' screenings as per table 400-8&9 and binding materials to fill up the
interstices of coarse aggregates, watering and compacting to the required density for finished itemof work as per MoRT&H specification 404 (4
threvision) and as directed by the Engineer-in-
Charge (Payment will be made based on levels for finished item of work)
Unit = cum
Taking output = 360 cum
Municipal Area Allowance
TOTAL
(B) Machinery
(A) Labour
Mate
Mazdoor skilled
Mazdoor
Screenings 11.2mm @0.18cum/10sqm
Avg. of (2.36-5),( 2.36mm & below)
Binding material @ 0.06 cum / 10sqm(Rate of 2.36mm & Below)
Vibratory road roller 8 Ton
water tanker 6 KL
TOTAL
(C) Material
(E) Contractors Profit on (A+B+C+D)
TOTAL Cost for 360 cum = (A+B+C+D+E+F)
45mm IRC HBG/HBT M/C metal
22.40mm IRC HBG/HBT M/C metal
(D) Over Head Charges on (A+B+C)
TOTAL
(A + B +C)
Rate per 1 cum
Rate per 1 cum
Providing, Laying, Spreading and compacting graded HBG/HBT crushed stone aggregate to Wet
Mix macadam specification including cost, seigniorage of all materials and including premixing
the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to
site , laying in uniform layers with paver in base courses on well prepared surface and compacting
with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (4th revision) for finished item of work. (Payment will be made
based on levels for finished item of work)
(F ) Seigniorage charges
Metal
7/27/2019 Venkats Master DATA2008 09New1
43/185
1 2 3 5 6 74
20
20
20
20
20 0.48 nos. 188.00 1.00 90.24
20 2.00 nos. 193.40 1.00 386.80
20 10.00 nos. 146.00 1.00 1460.0020 1937.04
20 0.0 % 1937.04 0.00
20 A = 1937.04
20
20 6.60 hour 1320.00 1.00 8712.00
20 6.00 hour 1090.00 1.00 6540.00
20 6.00 hour 1320.00 1.00 7920.00
20 6.00 hour 1090.00 1.00 6540.00
20 3.90 hour 1550.00 1.00 6045.00
20 3.00 hour 345.00 1.00 1035.00
20 B = 36792.00
2020
20 89.10 cum 956.68 1.00 85240.19
20
20 118.80 cum 740.18 1.00 87933.38
20
20 89.10 cum 207.60 1.00 18497.16
20 C = 191670.73
20 230399.77
20
20 5.00 % 230399.77 11519.99
20
20 10.00 % 241919.76 24191.9820
20
20 297.00 cum 0.00 1.00 0.00
20
20 225.00 cum 266111.74
20 1182.72
20 1183.00
20
21
21
21
21
21
21 0.44 nos. 188.00 1.00 82.72
21 9.00 nos. 146.00 1.00 1314.00
21 2.00 nos. 193.40 1.00 386.80
21 1783.52
(E) Contractors Profit on (A+B+C+D)
TOTAL
(A + B +C)
(D) Over Head Charges on (A+B+C)
TOTAL
Mate
Wet mix plant of 60 ton hr. capacity
Electric generating set 125 KVA
Municipal Area Allowance
Mazdoor
Taking output = 225 cum
(A) Labour
Page 110,111 of MoRT&H SDB
Vibratory roller 8-10 T
Water tanker
TOTAL
(C) Material
Unit = cum
front end loader 1 cum capacity
Mechanical Paver finisher 100 TPH
Mazdoor skilled
(B) Machinery
TOTAL Cost for 225 cum = (A+B+C+D+E+F)
Rate per 1 cum
Rate per 1 cum
45 to 22.40mm IRC HBG/HBT metal @ 30%
Avg. rate of (40-45), (25-27), (19-22mm )
2.36mm to 75 micron @ 30%
(2.36mm & below)
22.4-2.36mm IRC HBG/HBT metal @ 40%
Avg. rate of (19-22),(12-14),(9.5-11.2),(5-7),(2.36mm & below)
(A) Labour
Mate
Mazdoor
Mazdoor skilled
Page 141,142 of MoRT&H SDB
Unit = sqm
Taking output = 9000 sqm
Providing and laying surface dressing in single coat using 6 mm nominal size IRC HBG/HBT
machine crushed stone aggregates @ 0.004 cum / sqm on a layer of bitumen binder of 80/100
grade @ 0.75 kg / sqm including cost, seigniorage and conveyance of all materials to work site
and laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for
finished item of work as per MoRT&H Specification 510 (4th Revision) and as directed by the
Engineer-in-charge.
Metal
(F ) Seigniorage charges
7/27/2019 Venkats Master DATA2008 09New1
44/185
1 2 3 5 6 74
21 0.0 % 1783.52 0.00
21 A = 1783.52
21
21 7.20 hour 290.00 1.00 2088.00
21 7.20 hour 370.00 1.00 2664.00
21
21 6.00 hour 2070.00 1.00 12420.0021
21 6.00 hour 575.00 1.00 3450.00
21 6.00 hour 1320.00 1.00 7920.00
21 6.00 hour 940.00 1.00 5640.00
21 6.00 hour 540.00 1.00 3240.00
21 B = 37422.00
21
21 6.75 MT 46177.39 1.00 311697.38
21
21 36.00 cum 587.93 1.00 21165.48
21 C = 332862.86
21 372068.3821
21 5.00 % 372068.38 18603.42
21
21 10.00 % 390671.80 39067.18
21
21
21 36.00 cum 0.00 1.00 0.00
21
21 9000.00 sqm 429738.98
21 47.75
21 47.70
2122
22
22
22
22
22 0.44 nos. 188.00 1.00 82.72
22 9.00 nos. 146.00 1.00 1314.0022 2.00 nos. 193.40 1.00 386.80
22 1783.52
22 0.0 % 1783.52 0.00
22 A = 1783.52
22
22 7.20 hour 290.00 1.00 2088.00
22 7.20 hour 370.00 1.00 2664.00
22 6.00 hour 2070.00 1.00 12420.00
22
22 6.00 hour 575.00 1.00 3450.00
Taking output = 9000 sqm
(A) Labour
Tipper 10Tonne capacity for carriage of stone chips
from stock pile on road side to chip spreader
Municipal Area Allowance
TOTAL
(B) Machinery
smooth wheeled roller 8 Ton
TOTAL
(C) Material
Bitumen 80/100 @ 0.75 Kg/sqm
Mechanical broom @ 1250 sqm/hr.
Air compressor 250 cfm
Front end loader 1 cum bucket capacity
Bitumen pressure distributor @1750 sqm/hr.
chip spreader @ 1500 sqm/hr.
Hydraulic self propelled
TOTAL Cost for 9000 sqm = (A+B+C+D+E+F)
Rate per 1 sqm
Rate per 1 sqm
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
Mate
MazdoorMazdoor skilled
Page 141,142 of MoRT&H SDB
Unit = sqm
Providing and laying surface dressing in single coat using 6 mm nominal size IRC HBG/HBT
machine crushed stone aggregates @ 0.004 cum / sqm on a layer of bitumen binder of 60/70
grade @ 0.75 kg / sqm including cost, seigniorage and conveyance of all materials to work site
and laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for
finished item of work as per MoRT&H Specification 510 (4th Revision) and as directed by the
Engineer-in-charge.
Municipal Area Allowance
TOTAL
(B) Machinery
Mechanical broom @ 1250 sqm/hr.
Air compressor 250 cfm
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Tipper 10Tonne capacity for carriage of stone chips
from stock pile on road side to chip spreader
(F ) Seigniorage charges
Metal
Crushed stone chippings 6 mm
nominal size @0.004 cum/sqm
TOTAL
(A + B +C)
7/27/2019 Venkats Master DATA2008 09New1
45/185
1 2 3 5 6 74
22 6.00 hour 1320.00 1.00 7920.00
22 6.00 hour 940.00 1.00 5640.00
22 6.00 hour 540.00 1.00 3240.00
22 B = 37422.00
22
22 6.75 MT 45347.70 1.00 306096.98
2222 36.00 cum 587.93 1.00 21165.48
22 B = 327262.46
22 366467.98
22
22 5.00 % 366467.98 18323.40
22
22 10.00 % 384791.38 38479.14
22
22
22 36.00 cum 0.00 1.00 0.00
22
22 9000.00 sqm 423270.5222 47.03
22 47.00
22
23
23
23
23
2323 0.08 nos. 188.00 1.00 15.04
23 2.00 nos. 146.00 1.00 292.00
23 307.04
23 0.0 % 307.04 0.00
23 A = 307.04
23
23 2.80 hour 290.00 1.00 812.00
23 2.80 hour 370.00 1.00 1036.00
23 2.00 hour 690.00 1.00 1380.00
23 1.00 hour 345.00 1.00 345.00
23 B = 3573.00
2323 2.10 MT 32473.65 1.00 68194.67
23 C = 68194.67
23 72074.71
23
23 5.00 % 72074.71 3603.74
23
23 10.00 % 75678.45 7567.85
23
23 3500.00 sqm 83246.30
23 23.78
23 23.80
(F ) Seigniorage charges
Metal
(A) LabourMate
Taking output = 3500 sqm
Crushed stone chippings 6 mm
Front end loader 1 cum bucket capacity
Bitumen pressure distributor @1750 sqm/hr.
smooth wheeled roller 8 Ton
TOTAL
(C) Material
Bitumen 60/70 @ 0.75 Kg / sqm
Rate per 1 sqm
Rate per 1 sqm
TOTAL Cost for 9000 sqm = (A+B+C+D+E+F)
nominal size @0.004 cum/sqm
(A + B +C)
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
TOTAL
Page 123 of MoRT&H SDB
Emulsion pressure distributor @1750 sqm/hr.
water tanker 6 KL
TOTAL
Mazdoor
Unit = sqm
Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emulsion
pressure distributor on prepared surface of Granular base including cleaning of road surface and
spraying emulsion at the rate of 0.60 Kg/sqm using emulsion pressure distributor for finished item
of work etc., complete for finished item of work as per MoRT&H Specification 502 (4th Revision)
and as directed by the Engineer-in-charge.
Municipal Area Allowance
(C) Material
TOTAL
(B) Machinery
Mechanical broom @ 1250 sqm/hr.
Air compressor 250 cfm
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
Bitumen Emulsion @ 0.60 Kgs/sqm
TOTAL
(A + B +C)
TOTAL Cost for 3500 sqm = (A+B+C+D+E)
Rate per 1 sqm
Rate per 1 sqm
7/27/2019 Venkats Master DATA2008 09New1
46/185
1 2 3 5 6 74
23
24
24
24
24
24
24 0.08 no 188.00 1.00 15.04
24 2.00 no 146.00 1.00 292.00
24 307.04
24 0.0 % 307.04 0.00
24 A = 307.04
24
24 2.80 hour 290.00 1.00 812.00
24 2.80 hour 370.00 1.00 1036.00
24 2.00 hour 690.00 1.00 1380.00
24 B = 3228.00
24
24 0.700 MT 32473.65 1.00 22731.56
24 C = 22731.56
24 26266.60
24
24 5.00 % 26266.60 1313.33
24
24 10.00 % 27579.93 2757.99
24
24 3500.00 sqm 30337.92
24 8.6724 8.70
24
25
25
25
25
25
25 0.08 no 188.00 1.00 15.0425 2.00 no 146.00 1.00 292.00
25 307.04
25 0.0 % 307.04 0.00
25 A = 307.04
25
25 2.80 hour 290.00 1.00 812.00
25 2.80 hour 370.00 1.00 1036.00
25 2.00 hour 690.00 1.00 1380.00
25 B = 3228.00
25
Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using Emulsion
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface
cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4th
revision) and as directed by the Engineer-in-Charge.
Taking output = 3500 sqm
(A) Labour
Mate
Mazdoor
Page 124 of MoRT&H SDB
unit = sqm
Air compressor 250 cfm
Emulsion pressure distributor @1750 sqm/hr.
TOTAL
(C) Material
Municipal Area Allowance
TOTAL
(B) Machinery
Mechanical broom Hydraulic @ 1250 sqm/hr.
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
Bitumen Emulsion @ 0.20 Kgs/sqm
TOTAL
(A + B +C)
TOTAL Cost for 3500 sqm = (A+B+C+D+E)
Rate per 1 sqmRate per 1 sqm
Page 124 of MoRT&H SDB
unit = sqm
Municipal Area Allowance
TOTAL
(B) Machinery
Mechanical broom Hydraulic @ 1250 sqm/hr.
Air compressor 250 cfm
Emulsion pressure distributor @1750 sqm/hr.
TOTAL
(C) Material
Providing and applying tack coat with bitumen 80/100 Grade using Bitumen pressure distributor
at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with
mechanical broom for finished item of work as per MoRT&H Specification 503 (4th
revision) and
as directed by the Engineer-in-Charge.
Taking output = 3500 sqm
(A) Labour
MateMazdoor
7/27/2019 Venkats Master DATA2008 09New1
47/185
1 2 3 5 6 74
25 0.700 MT 46177.39 1.00 32324.17
25 C = 32324.17
25 35859.21
25
25 5.00 % 35859.21 1792.96
25
25 10.00 % 37652.17 3765.2225
25 3500.00 sqm 41417.39
25 11.83
25 11.80
25
26
26
26
26
26
26 0.84 nos. 188.00 1.00 157.92
26
26
26 14.00 nos. 146.00 1.00 2044.00
26 5.00 nos. 193.40 1.00 967.00
26 3168.9226 0.0 % 3168.92 0.00
26 A = 3168.92
26
26
26 12.00 hour 15525.00 1.00 186300.00
26 6.00 hour 1550.00 1.00 9300.00
26 6.00 hour 1320.00 1.00 7920.00
26 6.00 hour 1090.00 1.00 6540.00
26 6.00 hour 540.00 1.00 3240.00
26 B = 213300.00
26
26 19.48 M.T 45347.70 1.00 883373.2026
26
26
26
26
26
26 276.75 cum 560.36 1.00 155080.74
26 C = 1038453.94
26 1254922.86
26
26 5.00 % 1254922.86 62746.14
Smooth wheeled roller 8-10 Tonnes
TOTAL
(C) Material
(i) Bitumen 60/70 Grade @19 kg per 10 sqm
and 2.36mm & below)
Mechanical Paver finisher @ 100 TPH
Front end loader 1 cum capacity
TOTAL
(A + B +C)
Average rate of IRC HBG/HBT M/C metal of sizes
13.2mm to 0.09mm @ 0.27 cum per 10 sqm
(A) Labour
Mate
Skilled Mazdoor for checking line and levels.
Avg. of (19-22, 12-14, 9.5-11.2, 5-7mm
(ii) Aggregate
Mazdoor working with HMP, Mechanical broom,
TOTAL
TOTAL
(B) Machinery
Generator 250 KVA
paver, roller, asphalt cutter and assistance for
setting outlines, levels and layout of construction.
For Type 'B' HBG/HBT M/C aggregates
Hot mix plant 40 to 60 TPH
Municipal Area Allowance
Page 146,147 of MoRT&H SDB
Unit = sqm
Taking output = 10250 sqm (205 cum) (450 tones.)
Providing , laying ofclose graded premix surfacing material ( Mixed seal surfacing) of 20 mm
thickness by hot mix plant using HBG/HBT crushed aggregates of 13.2mm to 0.09mm (Type 'B')
as per table 500-26 of specification 512 of MoRT&H (4th
Revision), premixed with bituminous
binder 60/70 grade @ 19 Kg per 10 Sqm area, including cost and seigniorage of all materials and
transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H
Specification 512 (4th
Revision) complete for finished item of work in all respects as directed byEngineer-in-charge.
(12-14)(9.5-11.2)(5-7)(2.36-5)( 2.36mm&below)
(D) Over Head Charges on (A+B+C)
Rate per 1 sqm
(E) Contractors Profit on (A+B+C+D)
Bitumen 80/100 @ 0.20 Kg/sqm
TOTAL Cost for 3500 sqm = (A+B+C+D+E)
Rate per 1 sqm
TOTAL
(A + B +C)
(D) Over Head Charges on (A+B+C)
7/27/2019 Venkats Master DATA2008 09New1
48/185
1 2 3 5 6 74
26
26 10.00 % 1317669.00 131766.90
26
26
26 276.75 cum 0.00 1.00 0.00
26
26 10250.00 sqm 1449435.9026 141.41
26 141.00
26
27
27
27
27
27
27 0.84 nos. 188.00 1.00 157.92
27
27
27 14.00 nos. 146.00 1.00 2044.00
27 5.00 nos. 193.40 1.00 967.00
27 3168.92
27 0.0 % 3168.92 0.00
27 A = 3168.9227
27
27 12.00 hour 15525.00 1.00 186300.00
27 6.00 hour 1550.00 1.00 9300.00
27 6.00 hour 1320.00 1.00 7920.00
27 4.80 hour 1090.00 1.00 5232.00
27 6.00 hour 540.00 1.00 3240.00
27 B = 211992.00
27
27 19.48 M.T 45347.70 1.00 883373.20
27
2727
27
27
27
27 276.75 cum 560.36 1.00 155080.74
27 C = 1038453.94
27 1253614.86
27
27 5.00 % 1253614.86 62680.74
27
27 10.00 % 1316295.60 131629.56
Metal
Mate
Mazdoor working with HMP, Mechanical broom,
paver, roller, asphalt cutter and assistance for
setting outlines, levels and layout of construction.
Skilled Mazdoor for checking line and levels.
Providing , laying ofclose graded premix surfacing material ( Mixed seal surfacing) of 25 mm
thickness by hot mix plant using HBG/HBT crushed aggregates of 13.2mm to 0.09mm (Type 'B')
as per table 500-26 of specification 512 of MoRT&H (4th
Revision), premixed with bituminous
binder 60/70 grade @ 23.75 Kg per 10 Sqm area, including cost and seigniorage of all materials
and transporting the hot mix to work site, laying with mechanical paver finisher to the required
grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H
Specification 512 (4th
Revision) complete for finished item of work in all respects as directed by
Engineer-in-charge.
Page 146,147 of MoRT&H SDB
Unit = sqm
Taking output = 205 cum (450 tones.)
(A) Labour
(F ) Seigniorage charges
(E) Contractors Profit on (A+B+C+D)
TOTAL Cost for 10250 sqm = (A+B+C+D+E+F)Rate per 1 sqm
Rate per 1 sqm
Front end loader 1 cum capacity
Mechanical Paver finisher @ 100 TPH
Municipal Area Allowance
TOTALTOTAL
(B) Machinery
Hot mix plant 40 to 60 TPH
Generator 250 KVA
Smooth wheeled roller 8-10 Tonnes
TOTAL
(C) Material
(i) Bitumen 60/70 Grade @23.75 kg per 10 sqm
and 2.36mm & below)
For Type 'B' HBG/HBT M/C aggregates
(ii) Aggregate
Avg. of (19-22, 12-14, 9.5-11.2, 5-7mm
13.2mm to 0.09mm @ 0.27 cum per 10 sqm
Average rate of IRC HBG/HBT M/C metal of sizes
(A + B +C)
(12-14)(9.5-11.2)(5-7)(2.36-5)( 2.36mm&below)
TOTAL
(D) Over Head Charges on (A+B+C)
(E) Contractors Profit on (A+B+C+D)
7/27/2019 Venkats Master DATA2008 09New1
49/185
1 2 3 5 6 74
27
27
27 276.75 cum 0.00 1.00 0.00
27
27 205.00 cum 1447925.16
27 7063.05
27 176.5827 177.00
27
28
2828
28
28
28 0.84 nos. 188.00 1.00 157.92
28
28
28 14.00 nos. 146.00 1.00 2044.00
28 5.00 nos. 193.40 1.00 967.00
28 3168.92
28 0.0 % 3168.92 0.00
28 A = 3168.92
2828
28 12.00 hour 15525.00 1.00 186300.00
28 6.00 hour 1550.00 1.00 9300.00
28 6.00 hour 1320.00 1.00 7920.00
28 4.80 hour 1090.00 1.00 5232.00
28 6.00 hour 540.00 1.00 3240.00
28 B = 211992.00
28
28 19.48 M.T 46514.30 1.00 906098.56
28
28
2828
28
28
28 276.75 cum 560.36 1.00 155080.74
28 C = 1061179.30
28 1276340.22
28
28 5.00 % 1276340.22 6381