Venkats Master DATA2008 09New1

Embed Size (px)

Citation preview

  • 7/27/2019 Venkats Master DATA2008 09New1

    1/185

    1 2

    V. VENKATA NARAYANA 9440818440, 07799139399

    Amount EARTH WORKS FOR ROADS

    0.00 0.00 ADDRESSES D

    0.00 0.00 1 Forming embankmentwith Side Earth PA

    0.00 0.00 2 Forming embankmentwith Borrowed Soils 1000m Lead PA

    0.00 0.00 3 Forming embankment with Borrowed Soils 0 KM Lead P

    0.00 0.00 4 E/W for Trenchcutting PA

    0.00 0.00 5 Removal of soils by Mechanical means & carting1000 M P

    Varies with pipe dia. 100.00 6 Removal of soils by Manual Means & carting 1000 M P

    GRANULAR BASES and SUB BASES

    684.00 7 Granular Sub-basewith Grade I (Table 400 -1) type material PA

    42024.18 8 Granular Sub-basewith Grade I (Table 400-2)type material PA

    41234.00 9 Granular Sub-basewith Grade III (Table 400-2)type material PA

    42345.00 10 Scarifying the existinggranular surface P

    28973.00 11 Scarifyingthe existing BT surface P

    12 WBM Gr II with MC metal 22.4 mm & belowand PRR PA

    4400.00 13 WBM Gr III with MC metal 22.4 mm & below and PRR PA

    47000.00 14 WBM Gr II withMC metal 45 mm & belowand PRR PA

    43000.00 15 WBM Gr III with MC metal 45 mm & belowand PRR PA

    30200.00 16 WBM Gr II with MC metal 22.4 mm & below and VRR PA

    17 WBM Gr III with MC metal 22.4 mm & belowand VRR PA

    Place ITEM 18 WBM Gr II with MC metal 45 mm & belowand VRR PA

    DATA Labour 0.00 % 19 WBM Gr III with MC metal 45 mm & belowand VRR PA

    RMR Metal % 20 Wet Mix Macadam PA

    RMR Gravel % BITUMINOUS SUB BASES, BASES and SURFACING

    RMR Sand 0.00 % 21 Single coat surface dressingwith 80/100 grade Bitumen PA

    5.00 % 22 Single coat surface dressingwith 60/70 grade Bitumen PA

    20.00 % 23 Prime Coatwith BT Emulsion (MS) PA

    10.00 % 24 Tack Coatwith BT Emulsion (MS) PA

    0.00 % 25 Tack Coatwith BT 80/100 Grade A

    Local Entry % 26 Mix seal 20 mm with BT 60/ 70 Grade PA

    27 Mix seal 25 mm with BT 60/ 70 Grade N

    28 Mix seal 25 mm with BT CRMB N

    29 Macadam 50 mm with BT 60/70 Grade PA

    30 Macadam 50 mm with BT 80/100 Grade PA

    Name of Work :: Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in M

    Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    Embankment Earth

    CONVEYANCE & RATES OF MATERIALS

    Details

    S.No

    Specification in Brief

    BITUMEN

    HMP

    Crusher

    Metal/ Stone Qry

    Gravel

    8/10/2008

    Hume Pipes

    Overhead Charges ( R)

    Value

    Rates

    Rates

    Leads

    10-Aug-08

    Municipal Area Allowance

    Sand

    VAT

    Grade 60/70

    Emulsion (MS)

    Contractors Profit

    Name

    ALLOWANCES

    HYSD Steel

    Overhead Charges ( B)

    Hy

    to

    Centering Charges

    CEMENT / STEEL

    CRMB 55 Grade

    LEAD

    6 mm Mild Steel

    Grade 80/100

    MS STEEL

    MASTER DATA FOR

    ROADSFOR THE YEAR 2008-09

    Date (dd/mm/yy)

    of Preparation of Estimate

    CEMENT

  • 7/27/2019 Venkats Master DATA2008 09New1

    2/185

    31 Dense Graded Bituminous Macadam with BT 60/70 Grade

    32 SDBC 25 mm with BT 60/70 Grade

    33 Bituminous Concretewith BT CRMB 55 Grade

    34 Gravel Shoulders

    C.C. BASE COURSE and WEARING COARSE

    35 VCC(1:4:8) Base course below CC Pavement

    36 VCC(1:3:6) Base coursebelow CC Pavement

    37 VCC M35 for C.C. Pavement 38 VCC(1:3:6) Base course with FLY ASH & Sand

    39 VCC M35 for C.C. Pavement with FLY ASH & Sand

    CULVERTS, BRIDGES Foundations, Substructures & Superstructure

    40 EW for Foundation of Structures by Mechanical Means

    41 EW for Foundation of Structures by Manual Means

    42 Granular Bedding Below Pipes

    43 VCC (1:3:6) for Foundations

    44 VCC(1:3:6) for Body Walls

    45 Cost and Conveyance of 600 mmDia Hume pipes to Site

    46 Cost, conveyance and Laying of 600Dia Hume Pipes

    47 Cost and Conveyance of 800 mmDia Hume pipes to Site

    48 Cost, conveyance and Laying of 800 Dia Hume Pipes

    49 Cost and Conveyance of 1000 mmDia Hume pipes to Site

    50 Cost, conveyance and Laying of 1000 Dia Hume Pipes

    51 Cost and Conveyance of 1200 mmDia Hume pipes to Site

    52 Cost, conveyance and Laying of 1200Dia Hume Pipes

    53 Filling between Body walls with Gravel

    54 Rough Stone Revetment with 300 mmHBG Stone

    55 Filter Material with Gravel underneath Pitching

    56 VCC M15 Grade CC with 40 mm metal for Raft Foundation

    57 VCC M15 Grade CC with 40 mm metal for Sub Structure

    58 VCC M20 Grade CC with 40 mm metal for Raft Foundation

    59 VCC M20Grade CC with 40 mm metal for Sub Structure

    60 VRCC M20 Grade CC for Bed blocks & Backing walls

    61 VRCC M20 Grade CC with 20 mm metal for Deck Slab

    62 VRCC M30 Grade CC with 20 mm metal forWearing Coat

    63 VRCC M25 Grade CC with 20 mm metal for Approach Slab

    64 VRCC M20 Grade CC with 12 mm metal for Railing

    -- DO -- -- DO --

    65 VCC M15 Grade CC with 40 mm metal for leveling course

    66 Grouted Revetmentwith 300 mm HBG stone + CC(1:4:8)

    67 Back filling behind Abutments with gravel

    68 Providing and laying of filter media using 150 mm IRC stone

    69 Providing HYSD ( Fe-415 ) forSuper structureof R.C.C items.

    70 Providing HYSD ( Fe-415 ) for Sub structureof R.C.C items.

    71 Providing HYSD ( Fe-415 ) for Foundation of R.C.C items.

    72 Providing MS ( Fe-250 ) for all RCC Items

  • 7/27/2019 Venkats Master DATA2008 09New1

    3/185

    MISCELLANEOUS ITEMS

    73 Sand filling in foundation

    74 Providing 100 mm dia AC Weep holesin VCC Abutment

    75 VCC M 15 Grade CC using 40 - 10 mm metal for Dividers

    76 VRCC M 20 Grade forCover Slabsover Side Drains

    77 Plasteringin CM(1:5) 12 mm thick ( Rate per 10 sqm )

    78 Paintingtwo coats to new plastered surface

    79 Built-up-spray grout layer 75 mm thick with BT 80/100 Grade

    80 Providing BT Patch work using 40 mm metal& BT 80/100

    81 Providing BT Patch work using 9.5 to11.2mm metal& BT 80/100

    82 Patch work 50 - 70 mm depth using 40-10 mm metal & 80/100 BT

    83 Patch work 25 - 35 mmdepth using 25-10 mm metal & 80/100 BT

    84 Patch work 15 - 25 mm depth using 12-10 mm metal & 80/100 BT

    85 RR Masonry in CM(1:3) for Foundation.

    86 RR Masonry in CM(1:3) for Substructure

    87 Dismantlingculverts & bridges in CC M15- M20

    88 Dismantlingculverts & bridges in Ruble Masonary in CM

    89 25.4 mm Mastic padfor Longitudinal & Transversal Expansion joints

    90 12.7 mm Mastic padfor Transversal Contraction joints.

    91 Penetration macadam 50 mmthick

    92 Penetration macadam 75 mmthick

    93 Open-graded premix carpet of 20 mm thick with 80/100 BT

    94 Providing and laying type B seal coat simultaneously with 80/100 BT

    95 Hot Applied Thermopalstic Compound

    V. VENKATA NARAYANA 94408 18440, 07799139399

  • 7/27/2019 Venkats Master DATA2008 09New1

    4/185

    Rs

    ::

    ::

    Lakhs

    D. P. R.

    GOVERNMENT OF

    ANDHRA PRADESH

    IMPROEMENTS TO ZAHEERABAD - BIDAR ROAD

    FROM KM 1/0 - 10/0 IN MEDAK DIST.IMPROEMENTS

    TO ZAHEERABAD - BIDAR ROAD FROM KM 1/0 -

    10/0 IN MEDAK

    ROADS & BUILDINGS

    DEPARTMENT

    HYDERABAD - INDIA

    (R&B) Division

    SANGAREDDY.

    SANGAREDDY.

    AMOUNT OF ESTIMATE

    (R&B) Circle

  • 7/27/2019 Venkats Master DATA2008 09New1

    5/185

    Factor Quantity Factor Quantity Factor Quantity

    1 4 5 6 7 8 9 10

    1 1 cum 1.000 0.000

    2 1 cum 1.280 0.00

    3 1 cum 1.450 0.00

    4 1 cum 1.530 0.00

    5 1 cum 1.320 0.00

    6 1 sqm 0.004 0.00

    7 1 sqm

    8 1 sqm

    9 1 cum 0.027 0.00

    10 1 cum 1.462 0.00

    11 1 cum 1.415 0.00

    12 1 cum 1.280 0.00013 1 cum 0.900 0.00 0.450 0.00

    14 1 cum 0.900 0.00 0.450 0.00

    15 1 cum 0.900 0.00 0.450 0.00

    16 1 cum 0.900 0.00 0.450 0.00

    17 1 cum 0.900 0.00 0.450 0.00

    18 1 cum 0.900 0.00 0.450 0.00

    19 1 cum 0.900 0.00 0.450 0.00

    20 1 cum

    21 1 cum 1.200 0.000

    22 1 cum 1.200 0.000

    23 1 cum 1.200 0.00

    24 1 cum 1.200 0.000

    25 1 cum 1.180 0.00 0.090 0.00

    26 1 cum

    27 1 cum 1.200 0.000

    28 1 cum 1.200 0.000

    29 1 m 0.002 0.000

    30 1 sqm 0.151 0.000

    31 1 sqm 0.113 0.00

    32 1 cum 1.330 0.00

    33 1 sqm 0.078 0.00

    34 1 sqm 0.040 0.00

    35 1 sqm 0.030 0.00

    36 1 cum 1.258 0.00 0.326 0.00

    37 1 cum 1.158 0.00 0.347 0.00

    0.00 0.00 0.00

    Rate 22.00 50.00 40.00

    Amount Rs 0.00 0.00 0.00

    S.No Unit

    3

    Earth/ Gravel

    cum

    2

    Metal/ Stone

    cum

    Sand

    cumSpecification in Brief Quantity

    E/W for Trench cutting/Embankment

    Granular Sub-base

    WBM Gr II

    WBM Gr III

    Wet Mix Macadam

    Single coat surface dressing

    Prime Coat with BT Emulsion

    Tack Coat with BT Emulsion

    Mix seal 20 mm with BT 60/ 70

    SDBC 25 mm with BT 60/70

    Macadam 50 mm with BT 80/100

    Gravel ShouldersVCC(1:4:8)

    VCC(1:3:6)

    VCC M15 Grade CC

    VRCC M20 Grade CC

    VRCC M25 Grade CC

    VRCC M30 Grade CC

    VCC M35 Grade CC

    VRCC M20 Grade CC for Railing

    Granular Bedding Below Pipes

    Filling between Body walls

    Rough Stone Revetment

    BT Patch work using 40 mm metal

    Patch work 50 - 70 mm depth

    Patch work 25 - 35 mm depth

    Patch work 15 - 25 mm depth

    Filter Material with Gravel

    Grouted Revetment with CC(1:4:8)

    Back filling with gravel

    Filter media using 150 mm stone

    Sand filling in foundation

    100 mm dia AC Weep holes

    RR Masonry in CM(1:3) foundation

    Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak Dist.Improements to Zaheerabad - Bidar road

    from KM 1/0 - 10/0 in Medak

    Name of Work :-

    Total Quantity

    Total Amount Rs 0.00

    RR Masonry in CM(1:3) substructure

    Plastering in CM(1:5) 12 mm

    BUSG 75 mm thick with BT 80/100

  • 7/27/2019 Venkats Master DATA2008 09New1

    6/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    7/185

    Sir,

    Sub :-

    GOVERNMENT OF ANDHRA PRADESH

    ROADS AND BUILDINGS DEPARTMENT.

    Sri V. VENKATA NARAYANA, B.E., D.A.C.

    Deputy Executive Engineer,

    MEDAK Dist.

    Letter No. DEE/ZHB/2012-13 Date :12-05-2010

    Construction of 3 vents of 8.0 m Bridge at km 3/4-6 on

    Koukuntla Road in Rangareddy dist. - Estimate submitted - Re

    1) Report, Estimates, RMR, Drawings.

    From To

    Enclosures ::

    I request the Superintending Engineer (R&B) Rural Circle,

    kindly obtain necessary approval from the competent authority and communic

    Yours faithfull

    (R&B) Sub Division,ZAHEERABAD

    The Executive Engi

    (R&B) Division,

    I am herewith submitting an estimate for the work "Construc

    of 8.0 m Bridge at km 3/4-6 on Chittempally- Koukuntla Road in Rangaredd

    amount of Rs 165.00 Lakhs along with Report, data, lead statement, RMR and

    report accompanying the estimate dealt in detail the necessities and provisio

    estimate.

    Deputy Executive En

    (R&B) Sub Division, ZA

    Sangareddy,

  • 7/27/2019 Venkats Master DATA2008 09New1

    8/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    9/185

    Chittempally-

    .

    Hyderabad to

    te.

    neer,

    ion of 3 vents

    dist " for an

    drawings . The

    s made in the

    gineer,

    EERABAD

  • 7/27/2019 Venkats Master DATA2008 09New1

    10/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    11/185

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    0

    0

    Specification report accompanying the Estimate " Improements to Zaheerabad - Bidar road from

    KM 1/0 - 10/0 in Medak Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    "

    Amount of Estimate : Rs.

    L.S. for Price adjustment Road Work,

    L.S. for change of SSR to 2007-08

    L.S for Road Safety works,

    Shamshabad - Shabad is an important link road radiating from NH 7 and connecting

    other important roads. It is very near to International Airport at Shamshabad. The existing single lane

    Bituminous road is damaged, carriageway edges reduced and the berms are not sufficient also the

    C.D. works are narrow. All these bad conditions are creating problems to the road user and the

    existing with is not catering to many fold increased traffic. The surface is no at all suitable for fast

    moving vehicles.

    In view of the above mentioned conditions of the Road and as per the instructions of

    Higher officials a detailed _____ estimate for the Road is prepared to widen from existing singlelane to Double lane and bringing the total road to traffic worthy by strengthening , with the

    following provisions.

    Forming embankment with Side earth by mechanical means

    Forming embankment with borrowed useful earth ,

    Providing and laying of 50mm thick Bituminous Macadam,

    Providing 25 mm thick compacted Semi-Dense Bituminous Concrete,

    VAT on Part "A".

    L.S for Quality control charges on Part "A",

    L.S. for Avagahana sadassulu,

    SPECIFICATION REPORT

    Construction of Gravel base 300mm thick and 150 mm shoulders ,

    Providing, Laying, Spreading of Wet Mix macadam,

    Providing and applying Prime Coat with bitumen emulsion (Medium Setting),

    Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk),

    0

    L.S for other unforeseen items, variation in quantities rates and rounding off.

    The estimate is prepared based on common SSR 2008-09 . The quarries and their leads are

    taken from approved Quarry and Lead Charts. The work will be carried out as per specifications and

    codal guide lines and relevant circular instructions issued time - to -time.

    Early approval to the estimate is solicited.

  • 7/27/2019 Venkats Master DATA2008 09New1

    12/185

    Executive Engineer,

    (R&B) Division, ___ ____ _____

    Dy. Executive Engineer

    R&B Sub-Division___ _____

    Asst. Executive Engineer

    R&B Section, ___ ___ ___

  • 7/27/2019 Venkats Master DATA2008 09New1

    13/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    14/185

    1 4

    1 4000000

    4000000

    2 4.0% 160000

    3 5.0% 200000

    4 1.0% 54000

    5 5000

    7

    6

    7

    4000000

    L.S. for Avagahana sadassulu,

    ROAD WORK Part "A"

    L.S Amount for VAT on Part "A".

    R&B Section, __ ____ ____

    Dy. Executive Engineer

    R&B Sub-Division, ___ ___ ____

    L.S for Road Safety works for caution, junction boards, studs

    etc.

    L.S for variation in quantities and rounding off

    NAME OF WORK :- Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in

    Medak

    GENERAL ABSTRACT

    S.No Description

    3

    Remarks

    2

    (R&B) Division, _____ ___

    Asst. Executive Engineer

    Amount

    (Rs.)

    L.S. for Price adjustment Road Work,

    Executive Engineer,

    L.S for Quality control charges on Part "A",

    Sub Total

    Total Amount Rs.

    L.S for Widening pipe culvert and rounding off.

  • 7/27/2019 Venkats Master DATA2008 09New1

    15/185

    LENT BRDT DPT

    1 2 4 5 6 8 9

    1

    1

    1 Asssss - Mmmmmm Road 1 x 1 1000.00 1.00 1.000 1000.00 cum

    1 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum

    1 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum

    1 1002.00

    1 say 1002.00 cum 1,000.00 1.00 1002000

    1

    2

    2

    2 Asssss - Mmmmmm Road 1 x 1 1000.00 1.00 1.000 1000.00 cum

    2 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum

    2 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum

    2 1002.00

    2 say 1002.00 cum 1,000.00 1.00 1002000

    2

    3

    3

    3 Asssss - Mmmmmm Road 1 x 1 1000.00 1.00 1.000 1000.00 cum

    3 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum

    3 Asssss - Mmmmmm Road 1 x 1 1.00 1.00 1.000 1.00 cum

    Forming embankment with borrowed useful earth from outside road boundary by mechanical

    means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of

    top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the

    embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10

    Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, includingall hire and operational charges of T&P and seigniorage charges, complete for finished item of work

    as per MoRT&H specification 305 (4th

    revision) (Payment will be made based on levels for finished

    item of work).

    Earthwork excavation in soils up to SDR by mechanical means including trimming bottom and side

    slopes in accordance with requirements of lines , grades and cross sections etc., complete including

    seigniorage charges for finished item of work for trench cutting as per MoRT&H specification

    301(4th

    Revision) and as directed by the Engineer-in-Charge

    Amount

    10

    Forming embankment with Side earth by mechanical means up to SDR including pre-watering of

    soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading

    soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road

    Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational

    charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H

    specification 305 (4th

    revision) (Payment will be made based on levels for finished item of work).

    Quantity Rate Per

    3 7

    No

    Name of Work ::-

    Sno Description

    MEASUREMENTS

    DETAILED ESTIMATE

    Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in

    Medak

  • 7/27/2019 Venkats Master DATA2008 09New1

    16/185

    1 2 4 5 6 8 9 103 7

    3 1002.00

    3 say 1002.00 cum 1,000.00 1.00 1002000

    3006000

    3006000

    4 VAT on Part "A". @ 4.00% Rs: 120200

    5 L.S for Quality control charges on Part "A", @ 1.00% Rs: 30100

    6 L.S. for Price adjustment Road Work, @ 3.00% Rs: 90200

    7 L.S for Road Safety works for caution, junction boards, studs etc. Rs: 400000

    8 L.S. for Avagahana sadassulu, Rs: 5000

    9 L.S for other unforeseen Rs: 14648500

    3

    3

    3 (R&B)Division,___ ___ ___

    18300000Total Amount Rs. 1 83 00 000

    Asst. Executive Engineer Dy. Executive Engineer Executive Engineer

    Part " B "

    3006000

    3006000

    3006000

    R&B Section, ___ ___ ___ R&B Sub-Division___ ___ ___

    Total Amount as Part "A"

  • 7/27/2019 Venkats Master DATA2008 09New1

    17/185

    No LENT BRDT DPT

    * * * *

    * * * *

    * * * *

    * * * *

    * * * *

    * * * *

    * * * *

    * * * *

    * * * *

    CALCULATIONS

  • 7/27/2019 Venkats Master DATA2008 09New1

    18/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    19/185

    (i)

    a) x = km

    b) road km to km = km

    c) road km to km = km

    c) road km to km = km

    c) road km to km = km

    c) road km to km = km

    c) road km to km = km

    c) road km to km = km

    km

    d) km to km

    e) (48.1 - 45) /2 = km

    Total Lead = km= km

    (i)

    a) = km

    b) road km to km = km

    b) road km to km = km

    b) road km to km = km

    b) road km to km = km

    c) km to km

    d) (48.1 - 45) /2 = km

    Total Lead = km

    = km

    0

    0

    45.00Wanaparthy - Jadcherla

    0.00 45.00 45.00Wanaparthy - Jadcherla

    Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak Dist.Improements to

    Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    45.00Wanaparthy - Jadcherla

    28.40

    Cart Track

    28.40 45.00 16.60Wanaparthy - Jadcherla

    45.00 16.60Wanaparthy - Jadcherla

    28.40 45.00 16.60Wanaparthy - Jadcherla

    16.60Wanaparthy - Jadcherla

    0.66

    9.40 34.20 24.80

    1.10 0.60

    Site Spreads in 45.00 48.10

    28.40 45.00

    555.00Chennai - Wanaparthy

    1.55

    126.61

    .WEIGHTED AVERAGE LEAD SAY 127.00

    16.60Wanaparthy - Jadcherla

    0.00 45.00

    45.00

    (B). WEIGHTED AVERAGE LEAD FOR BITUMEN ( REFINERY AT CHENNAI)

    Reach km 45/0- 48/ 100

    Site average Lead

    Name of Work:-

    Mahbubnagar - Mannanur

    Wanaparthy - Jadcherla

    Wanaparthy - Jadcherla

    Site average Lead

    (A) .WEIGHTED AVERAGE LEAD FOR CRUSHER

    Reach km 45/0- 48/ 100

    28.40 45.00

    0.00 45.00

    0.00 45.00

    Site Spreads in

    736.55

    .WEIGHTED AVERAGE LEAD SAY 737.00

    1.55

    28.40 45.00 16.60

    45.00 48.10

    Asst. Executive Engineer

    R&B Section, ___ ___ ___

    Executive Engineer (R&B)

    (R&B)Division, ___ ____ ___

    Dy. Executive Engineer

    R&B Sub-Division___

  • 7/27/2019 Venkats Master DATA2008 09New1

    20/185

    km

    km

    km

    %

    %

    Lead for Emulsion ( round the trip )::

    Lead for Bulk Bitumen ( round the trip ) ::

    Lead

    1368.00

    1368.00

    --

    --

    2117.252061.70

    Conveyance Rates

    44462.25 30421.65

    --

    Name of Work:-

    684.00STRAIGHT LEAD ::

    Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    BITUMEN LEADS & RATES

    1448.65

    41234.00

    1.50

    1.50

    42024.180.00

    42024.18

    44125.39

    2101.21

    --

    --

    --

    43295.70

    32473.6546514.3045347.70

    CRMB

    Gr 55

    0.00

    32473.6546514.2545347.70

    2052.00

    --

    --

    2052.00

    46177.39

    46177.39

    Total

    OR SAY

    Lead charges for Emulsion 1.5 x 1368

    Emulsion

    (M.S)

    28973.000.00

    42345.00 28973.00

    42345.00

    TYPE OF BITUMEN

    Initial cost (Ex. Chennai)

    Excise Duty

    2052.00

    0.00

    5.00

    --

    2052.00

    Total

    --

    --

    --

    Bulk

    (60/70)

    41234.000.00

    Lead charges for Bulk BT 1.5 x 1368

    Add VAT @

    Deduct loading

    Deduct loading, Unloading & Stacking

    Deduct cost of Empty Emulsion Drums

    Bulk

    (80/100)

    Asst. Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)R&B Section, ___ ___ ___ R&B Sub-Division___ (R&B) Division, ___ ___ ___

  • 7/27/2019 Venkats Master DATA2008 09New1

    21/185

    ame o or : :

    Date :: SSR ::

    Mac

    hineCrushing

    Charges

    25%

    (4-5) (7-5) on (9) % Value

    1 3 4 5 6 7 8 9 10 11 12 13 14

    1 0.00 0.00 8.70 21.50 225.00 -8.70 216.30 -- -- 0.00 0.0 0.00

    2 0.00 0.00 8.70 21.50 234.00 -8.70 225.30 70.00 56.33 0.00 0.0 0.00

    3 0.00 0.00 8.70 21.50 430.00 -8.70 421.30 70.00 105.33 0.00 0.0 0.00

    4 0.00 0.00 8.70 21.50 560.00 -8.70 551.30 70.00 137.83 0.00 0.0 0.00

    5 0.00 0.00 8.70 21.50 690.00 -8.70 681.30 70.00 170.33 0.00 0.0 0.00

    6 0.00 0.00 8.70 21.50 845.00 -8.70 836.30 70.00 209.08 0.00 0.0 0.00

    7 0.00 0.00 8.70 21.50 830.00 -8.70 821.30 70.00 205.33 0.00 0.0 0.00

    8 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 122.83 0.00 0.0 0.00

    1 0.00 0.00 8.70 21.50 225.00 -8.70 216.30 -- -- 0.00 0.0 0.00

    2 0.00 0.00 8.70 21.50 234.00 -8.70 225.30 70.00 56.33 0.00 0.0 0.00

    3 0.00 0.00 8.70 21.50 430.00 -8.70 421.30 70.00 105.33 0.00 0.0 0.00

    4 0.00 0.00 8.70 21.50 560.00 -8.70 551.30 70.00 137.83 0.00 0.0 0.00

    5 0.00 0.00 8.70 21.50 690.00 -8.70 681.30 70.00 170.33 0.00 0.0 0.00

    6 0.00 0.00 8.70 21.50 845.00 -8.70 836.30 70.00 209.08 0.00 0.0 0.00

    7 0.00 0.00 8.70 21.50 830.00 -8.70 821.30 70.00 205.33 0.00 0.0 0.00

    8 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 122.83 0.00 0.0 0.00

    10 0.00 0.00 8.70 21.50 390.00 -8.70 381.30 70.00 95.33 0.00 0.0 0.00

    RMR.10-Aug-08

    0

    On (6+9)

    S

    tacking

    C

    harging

    Loading&

    unloa

    dingcharges

    Se

    igniorage

    Charges

    5 mm to 7 mm M.C chips

    9.5 mm to 11.2 mm M.C chips

    Conve

    yancerate(-)

    Stack

    ingCharges

    InitialR

    ateofMaterial

    (-)StackingCharges

    W

    eighted

    AverageLead

    Co

    nveyance

    rate

    12 mm to 14 mm M.C chips

    19 mm to 22 mm M.C Metal

    InitialRate

    ofMaterial

    IRC and MORT&H HBG/HBT METALS (CRUSHER LEADS)

    IRC and MORT&H HBG/HBT METALS ( HMP LEADS)

    40 mm to 45 mm M.C Metal

    Below 2.36 mm (Dust)

    2.36 mm to 5 mm

    25 mm to 27 mm M.C Metal

    S.No

    2008-09

    Nature of Metal

    2

    ( 8

    TO

    BlastingCharges

    Below 2.36 mm (Dust)

    2.36 mm to 5 mm

    5 mm to 7 mm M.C chips

    9.5 mm to 11.2 mm M.C chips

    12 mm to 14 mm M.C chips

    19 mm to 22 mm M.C Metal

    25 mm to 27 mm M.C Metal

    40 mm to 45 mm M.C Metal

    50 mm to 55 mm Metal

    IRC and MORT&H HBG/HBT METALS (QUARRY LEADS)

    Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak Dist.Improements to Zaheerabad - Bidar road from KM

  • 7/27/2019 Venkats Master DATA2008 09New1

    22/185

    9 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 -- 0.00 0.0 0.00

    10 0.00 0.00 8.70 21.50 390.00 -8.70 381.30 70.00 -- 0.00 0.0 0.00

    11 0.00 0.00 8.70 21.50 360.00 -8.70 351.30 70.00 -- 0.00 0.0 0.00

    12 0.00 0.00 8.70 21.50 95.00 -8.70 86.30 70.00 -- 0.00 0.0 0.00

    13 0.00 0.00

    0.00 0.00 8.70 21.50 39.75 -8.70 31.05 -- -- 0.00 0.0 0.00

    14 0.00 0.00 8.70 21.50 82.00 -8.70 73.30 70.00 -- 0.00 0.0 0.00

    0

    0

    1 0.00 0.00 8.70 21.50 430.00 -8.70 421.30 70.00 105.33 0.00 0.0 0.00

    2 0.00 0.00 8.70 21.50 560.00 -8.70 551.30 70.00 137.83 0.00 0.0 0.00

    3 0.00 0.00 8.70 21.50 690.00 -8.70 681.30 70.00 170.33 0.00 0.0 0.00

    4 0.00 0.00 8.70 21.50 845.00 -8.70 836.30 70.00 209.08 0.00 0.0 0.00

    5 0.00 0.00 8.70 21.50 830.00 -8.70 821.30 70.00 205.33 0.00 0.0 0.00

    6 0.00 0.00 8.70 21.50 500.00 -8.70 491.30 70.00 122.83 0.00 0.0 0.00

    1 0.00 0.00 8.70 21.50 218.00 -8.70 209.30 69.00 -- 0.00 0.0 0.00

    2 0.00 0.00 8.70 21.50 155.00 -8.70 146.30 67.00 -- 0.00 0.0 0.00

    3 0.00 0.00 8.70 21.50 71.00 -8.70 62.30 67.00 -- 0.00 0.0 0.00

    4 0.00 0.00 8.70 21.50 1050.00 -8.70 1041.30 0.00 -- 0.00 0.0 0.00

    1 0.00 0.00 5.50 18.50 56.00 -5.50 50.50 -- -- 0.00 0.0 0.00

    2 0.00 0.00 5.50 18.50 175.00 -5.50 169.50 -- -- 0.00 0.0 0.00

    3 0.00 0.00 5.50 18.50 60.00 -5.50 54.50 -- -- 0.00 0.0 0.00

    4

    5

    6

    7

    HBG/HBT SS 5 METALS (QUARRY LEADS)

    43000.00

    30200.00

    40 mm to 45 mm Metal

    50 mm to 55 mm Metal

    47000.00

    HBG/HBT SS 5 METALS ( CRUSHER LEADS)

    4400.00

    10 mm size M.C. Chips

    150 mm soling stone HBG metal

    12 mm size M.C. Chips

    Asst. Executive Engineer

    60 mm to 63 mm Metal

    SS 300mm (HBG) for revetment

    6 mm size M.C. Chips

    Sand for Mortar

    Gravel

    20 mm size M.C. Metal

    25 mm size M.C. Metal

    40 mm size M.C. Metal

    6 mm Mild Steel

    Quarry spall( Field picked metal)

    Av. Of rate 25mm & 40mm

    Cost of each Bond Stone

    Sand for Filling

    Cement

    CRS Stone

    Dy. Executive Engineer Executive Engineer

    R&B Section, ___ ___ ___ R&B Sub-Division___ (R&B) Division, ___ ___ ___

    MS Steel

    Rough stone

    SS 225 mm

    HYSD Steel

    Bond Stones(600x200x200) 42 No

  • 7/27/2019 Venkats Master DATA2008 09New1

    23/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    24/185

  • 7/27/2019 Venkats Master DATA2008 09New1

    25/185

    Name of Work ::-

    SSR :: 0.0%

    SNo Quantity Unit Rate per

    1 2 3 5 6

    1

    1

    1

    1

    1

    1 0.02 day 188.00 1.00 3.76

    1 0.50 day 146.00 1.00 73.00

    1 76.76

    1 0.0 % 76.76 0.00

    1 A = 76.76

    1

    1 100.00 cum 13.00 1.00 1300.00

    1 1.00 hour 2600.00 1.00 2600.00

    1 4.00 hour 345.00 1.00 1380.00

    1 1.00 hour 1550.00 1.00 1550.00

    1 B = 6830.00

    1 6906.76

    1

    1 5.00 % 6906.76 345.34

    1

    1 10.00 % 7252.10 725.21

    1

    1

    1 100.00 cum 0.00 1.00 0.001

    1 100.00 cum 7977.31

    1 79.77

    1 80.00

    1

    1

    1

    1

    1

    1

    Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    Dist.Improements to Zaheerabad - Bidar road from KM 1/0 - 10/0 in Medak

    Forming embankment with Side earthby mechanical means up to SDR including pre-watering of

    soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading

    soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road

    Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and

    operational charges of T&P and seigniorage charges, complete for finished item of work as per

    MoRT&H specification 305 (4th

    revision) (Payment will be made based on levels for finished item

    of work).

    (A) Labour

    Mate

    TOTAL

    Page 70 of MoRT&H SDB

    Unit : Cum

    Taking out put = 100 Cum

    Mazdoor unskilled

    Municipal Area Allowance

    Water tanker 6 KL

    TOTAL

    (E ) Seigniorage charges

    Earth

    (C) Over Head Charges on (A+B)

    (D) Contractors Profit on (A+B+C)

    Rate per 1 cum

    R&B Section, ___ ___ ___

    Dy. Executive Engineer

    R&B Sub-Division___

    TOTAL Cost for 100 cum = (A+B+C+D+E)

    Rate per 1 cum

    DATA

    Date :: 10-Aug-08

    Asst. Executive Engineer

    Amount

    7

    (A + B )

    (B) Machinery

    Rate as per G.I. Ms. No 10, Dt 26/7/2005

    Motor Graders for Grading @ 100 cum per hour

    Description of Item

    4

    Vibratory roller 8T

    Municipal Area Allowance ::2008-09

    Executive Engineer (R&B)

    (R&B) Roads, ___ ___ ___

  • 7/27/2019 Venkats Master DATA2008 09New1

    26/185

    1 2 3 5 6 74

    1

  • 7/27/2019 Venkats Master DATA2008 09New1

    27/185

    1 2 3 5 6 74

    1

  • 7/27/2019 Venkats Master DATA2008 09New1

    28/185

    1 2 3 5 6 74

    1

    1

    2

    2

    2

    2

    2

    2 0.04 day 188.00 1.00 7.52

    2 1.00 day 146.00 1.00 146.00

    2 153.52

    2 0.0 % 153.52 0.00

    2 A = 153.52

    2

    2

    2 100.00 cum 13.00 1.00 1300.00

    2 160.00 t.km 4.50 t.km 720.00

    2

    2 72.00

    2 0.50 hour 2760.00 1.00 1380.00

    2 1.00 hour 2600.00 1.00 2600.00

    2 4.00 hour 345.00 1.00 1380.00

    2 1.00 hour 1550.00 1.00 1550.00

    2 B = 9002.00

    2 9155.52

    2

    2 5.00 % 9155.52 457.78

    2

    2 10.00 % 9613.30 961.33

    2

    2

    2 100.00 cum 0.00 1.00 0.00

    2

    2 100.00 cum 10574.63

    2

    2 105.75

    2 106.00

    2

    3

    3

    (D) Contractors Profit on (A+B+C+D)

    TOTAL Cost for 100 cum = (A+B+C+D+E)

    Earth

    (A + B)

    (C) Over Head Charges on (A+B)

    Rate per 1 cum

    Rate per 1 cum

    Forming embankment with borrowed useful earth from outside road boundary by mechanical

    means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of

    top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the

    embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10

    Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including

    all hire and operational charges of T&P and seigniorage charges, complete for finished item of

    work as per MoRT&H specification 305

    Municipal Area Allowance

    (E ) Seigniorage charges

    (4th revision) With a lead of 0KM (Payment will be made based on levels for finished item of

    work).

    Forming embankment with borrowed useful earth from outside road boundary by mechanical

    means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of

    top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the

    embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10

    Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including

    all hire and operational charges of T&P and seigniorage charges, complete for finished item of

    work as per MoRT&H specification 305 (4th revision) (Payment will be made based on levels for

    finished item of work).

    Page 68,69 of MoRT&H SDB

    Taking out put = 100 Cum

    (A) Labour

    Tipper (for 1 Km = 160x1 = 160) t.km

    Add 10% of cost of carriage to cover

    cost of loading and unloading

    Dozer 80 HP for spreading @ 200 cum per hour

    (B) Machinery

    Rate as per G.I. Ms. No 10, Dt 26/7/2005

    Mate

    Mazdoor unskilled

    Motor Graders for Grading @ 100 cum per hour

    Water tanker 6 KL

    Vibratory roller 8T

    TOTAL

    Unit : Cum

    TOTAL

  • 7/27/2019 Venkats Master DATA2008 09New1

    29/185

    1 2 3 5 6 74

    3

    3

    3

    3

    3 0.04 day 188.00 1.00 7.52

    3 1.00 day 146.00 1.00 146.00

    3 153.523 0.0 % 153.52 0.00

    3 A = 153.52

    3

    3

    3 100.00 cum 13.00 1.00 1300.00

    3 0.00 t.km 4.50 t.km 0.00

    3

    3 0.00

    3 0.50 hour 2760.00 1.00 1380.00

    3 1.00 hour 2600.00 1.00 2600.00

    3 4.00 hour 345.00 1.00 1380.00

    3 1.00 hour 1550.00 1.00 1550.003 B = 8210.00

    3 8363.52

    3

    3 5.00 % 8363.52 418.18

    3

    3 10.00 % 8781.70 878.17

    3

    3

    3 100.00 cum 0.00 1.00 0.00

    3

    3 100.00 cum 9659.87

    33 96.60

    3 97.00

    3

    4

    4

    4

    4

    4

    4 0.08 day 188.00 1.00 15.044 2.00 day 146.00 1.00 292.00

    4 307.04

    4 0.0 % 307.04 0.00

    4 A = 307.04

    4

    4 180.00 cum 13.00 1.00 2340.00

    4 B = 2340.00

    4 2647.04

    4

    4 5.00 % 2647.04 132.35

    4

    TOTAL

    (C) Over Head Charges on (A+B)

    Dozer 80 HP for spreading @ 200 cum per hour

    Motor Graders for Grading @ 100 cum per hour

    (C) Over Head Charges on (A+B)

    (A + B )

    Mate

    Page 68,69 of MoRT&H SDB

    Unit : Cum

    (D) Contractors Profit on (A+B+C)

    Water tanker 6 KL

    Vibratory roller 8TTOTAL

    (A) Labour

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    Taking out put = 100 Cum

    (E ) Seigniorage charges

    Earth

    Page 50 of MoRT&H SDB

    Mazdoor unskilled

    Add 10% of cost of carriage to cover

    cost of loading and unloading

    Rate as per G.I. Ms. No 10, Dt 26/7/2005

    Tipper ( for 0 Km = 160 x 0 = 0) t.km

    Unit : Cum

    TOTAL Cost for 100 cum = (A+B+C+D+E)

    Rate per 1 cum

    Taking out put = 180 Cum

    Earthwork excavation in soils up to SDR by mechanical means including trimming bottom and

    side slopes in accordance with requirements of lines , grades and cross sections etc., complete

    including seigniorage charges for finished item of work for trench cutting as per MoRT&H

    specification 301(4th

    Revision) and as directed by the Engineer-in-Charge

    Rate per 1 cum

    (A + B )

    (A) Labour

    Mate

    (B) Machinery

    Mazdoor unskilled

    Municipal Area Allowance

    Rate as per G.I. Ms. No 10, Dt 26/7/2005

    TOTAL

  • 7/27/2019 Venkats Master DATA2008 09New1

    30/185

    1 2 3 5 6 74

    4 10.00 % 2779.39 277.94

    4

    4

    4 180.00 cum 0.00 1.00 0.00

    4

    4 180.00 cum 3057.33

    4 16.994 17.00

    4

    5

    5

    5

    5

    5

    5 0.08 day 188.00 1.00 15.04

    5 2.00 day 146.00 1.00 292.005 307.04

    5 0.0 % 307.04 0.00

    5 A = 307.04

    5

    5

    5 360.00 cum 13.00 1.00 4680.00

    5 16.36 hour 575.00 1.00 9407.00

    5 B = 14087.00

    5 14394.04

    5

    5 5.00 % 14394.04 719.70

    55 10.00 % 15113.74 1511.37

    5

    5

    5 360.00 cum 0.00 1.00 0.00

    5

    5 360.00 cum 16625.11

    5 46.18

    5 46.20

    5

    6

    6

    6

    6

    6

    6 1.80 day 188.00 1.00 338.40

    6 45.00 day 146.00 1.00 6570.00

    6 6908.40

    6 0.0 % 6908.40 0.00

    6 A = 6908.40

    6

    (D) Contractors Profit on (A+B+C)

    Removal ofunserviceable soils up to SDR including excavation, loading and disposal up to 1000

    m etc., complete including seigniorage charges for finished item of work as per MoRT&H

    specification 301(4th Revision) and as directed by the Engineer-in-Charge

    Page 58 of MoRT&H SDB

    Unit : Cum

    Taking out put = 360 Cum

    (E ) Seigniorage charges

    Earth

    (A) Labour

    TOTAL Cost for 180 cum = (A+B+C+D+E)

    Rate per 1 cumRate per 1 cum

    TOTAL

    (B) Machinery

    Rate as per G.I. Ms. No 10, Dt 26/7/2005

    Mate

    Mazdoor unskilled

    Municipal Area Allowance

    (A + B )

    (C) Over Head Charges on (A+B)

    Tippers 5.50 cum capacity

    TOTAL

    (A) Labour

    Mate

    (D) Contractors Profit on (A+B+C)

    TOTAL Cost for 360 cum = (A+B+C+D+E)

    Rate per 1 cum

    Rate per 1 cum

    (E ) Seigniorage charges

    Removal ofunserviceable soils by Manual means up to SDR including excavation, loading and

    disposal up to 1000 m etc., complete including seigniorage charges for finished item of work as

    per MoRT&H specification 301(4th Revision) and as directed by the Engineer-in-Charge

    Page 48 of MoRT&H SDB

    Unit : Cum

    Municipal Area Allowance

    Taking out put = 120 Cum

    Mazdoor unskilled

    TOTAL

    Earth

  • 7/27/2019 Venkats Master DATA2008 09New1

    31/185

    1 2 3 5 6 74

    6

    6 10.00 hour 575.00 1.00 5750.00

    6 B = 5750.00

    6 12658.40

    6

    6 5.00 % 12658.40 632.92

    66 10.00 % 13291.32 1329.13

    6

    6

    6 120.00 cum 0.00 1.00 0.00

    6

    6 120.00 cum 14620.45

    6 121.84

    6 121.80

    6

    7

    7

    7

    7

    7

    7

    7 0.48 day 188.00 1.00 90.24

    7 2.00 day 193.40 1.00 386.80

    7 10.00 day 146.00 1.00 1460.00

    7 1937.04

    7 0.0 % 1937.04 0.00

    7 A = 1937.04

    7

    7 6.00 hour 2600.00 1.00 15600.00

    7 6.00 hour 1550.00 1.00 9300.00

    7 12.00 hour 345.00 1.00 4140.00

    7 3.00 hour 345.00 1.00 1035.00

    7 B = 30075.00

    7

    7

    7

    7

    7

    7 192.00 cum 845.22 1.00 162282.56

    7

    7 76.00 cum 560.43 1.00 42592.68

    7

    7 115.20 cum 207.60 1.00 23915.52

    7 C= 228790.76

    7 260802.80

    (C) Over Head Charges on (A+B)

    (D) Contractors Profit on (A+B+C)

    (A + B )

    Tippers 5.50 cum capacity

    (B) Machinery

    TOTAL Cost for 120 cum = (A+B+C+D+E)

    Rate per 1 cum

    TOTAL

    Rate per 1 cum

    Motor grader 3.35M Blade @50 cum/Hr.

    Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - I of

    MoRT&H Table 400-1 including cost, seigniorage charges and conveyance of all materials to

    work site and spreading in uniform layers with motor grader or by approved means, on preparedsurface mixing by mix in place method with Rotavator / approved means at OMC and compacting

    with vibratory roller to achieve the desired density etc., complete for finished item of work as per

    MoRT&H Specification 401 (4th revision) and as directed by the Engineer-in-charge. ( Payment

    will be made based on levels for finished item of work ).

    By Mix in Place Method

    Unit = cum

    Page 94 of MoRT&H SDB

    Mazdoor unskilled

    Municipal Area Allowance

    TOTAL

    Taking output = 300 cum

    (A) Labour

    Mate

    Mazdoor skilled

    Tractor - Rotavator (223+11=234)

    Vibratory roller 8T

    Water tanker 6 KL

    TOTAL

    (C) Material

    (A + B +C)

    TOTAL

    53-9.5mm IRC & MORT&H HBG/HBT Chips @ 50 %

    9.5-2.36 mm IRC & MORT&H HBG/HBT Chips @ 20 %

    (Rate of 2.36mm & below HBG/HBT metal)

    Average rate of (9.5-12),(5-7)&(2.36-5)

    Avg. rate of (50-55),(40-45),(25-27,(19-22),(12-14)&(9.5-12)

    (E ) Seigniorage charges

    Earth

    2.36mm and below @30%

    Close graded Granular sub-base material as per

    Table 400-1, Grading I material of MORT&H

    (B) Machinery

  • 7/27/2019 Venkats Master DATA2008 09New1

    32/185

    1 2 3 5 6 74

    7

    7 5.00 % 260802.80 13040.14

    7

    7 10.00 % 273842.94 27384.29

    7

    7

    7 383.20 cum 0.00 1.00 0.007

    7 300.00 cum 301227.23

    7 1004.09

    7 1004.00

    7

    8

    8

    8

    8

    8

    8

    8 0.40 day 188.00 1.00 75.20

    8 2.00 day 193.40 1.00 386.80

    8 8.00 day 146.00 1.00 1168.00

    8 1630.00

    8 0.0 % 1630.00 0.00

    8 A = 1630.008

    8 6.00 hour 2600.00 1.00 15600.00

    8 6.00 hour 1550.00 1.00 9300.00

    8 12.00 hour 345.00 1.00 4140.00

    8 3.00 hour 345.00 1.00 1035.00

    8 B = 30075.00

    8

    8

    8

    8

    8

    8 134.40 cum 735.32 1.00 98827.018

    8 172.80 cum 798.14 1.00 137918.30

    8

    8 76.80 cum 207.60 1.00 15943.68

    8 C= 252688.99

    8 284393.99

    8

    8 5.00 % 284393.99 14219.70

    8

    8 10.00 % 298613.69 29861.37

    8

    Metal

    TOTAL Cost for 300 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    (D) Over Head Charges on (A+B+C)

    Rate per 1 cum

    (E) Contractors Profit on (A+B+C+D)

    Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - I of

    MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all materials to

    work site and spreading in uniform layers with motor grader or by approved means, on prepared

    surface mixing by mix in place method with Rotavator / approved means at OMC and compacting

    with vibratory roller to achieve the desired density etc., complete for finished item of work as per

    MoRT&H Specification 401 (4th revision) and as directed by the Engineer-in-charge. ( Payment

    will be made based on levels for finished item of work ).

    By Mix in Place Method

    Unit = cum

    Page 94 of MoRT&H SDB

    (C) Material

    Mazdoor unskilled

    Municipal Area Allowance

    TOTAL

    Taking output = 300 cum

    (A) Labour

    Mate

    Mazdoor skilled

    2.36mm and below @30%

    Coarse graded Granular sub-base material as per

    Table 400-2, Grading I material of MORT&H

    (B) Machinery

    Motor grader 3.35M Blade @50 cum/Hr.

    Tractor - Rotavator (223+11=234)

    Vibratory roller 8T

    Water tanker 6 KL

    TOTAL

    (A + B +C)

    (D) Over Head Charges on (A+B+C)

    TOTAL

    53-26.5 mm IRC & MORT&H HBG/HBT Chips @ 35 %

    26.5 to 4.75 mm IRC & MORT&H HBG/HBT Chips @ 45 %

    (Rate of 2.36mm & below HBG/HBT metal)

    Average rate of (25-27),(19-22),(12-14),(9.5-11.2),(5-7),(2.36-5)

    Avg. rate of (50-55),(40-45),(25-27)

    (E) Contractors Profit on (A+B+C+D)

    (F ) Seigniorage charges

  • 7/27/2019 Venkats Master DATA2008 09New1

    33/185

    1 2 3 5 6 74

    8

    8 384.00 cum 0.00 1.00 0.00

    8

    8 300.00 cum 328475.06

    8 1094.92

    8 1095.00

    89

    9

    9

    99

    9 0.40 day 188.00 1.00 75.20

    9 2.00 day 193.40 1.00 386.80

    9 8.00 day 146.00 1.00 1168.00

    9 1630.00

    9 0.0 % 1630.00 0.00

    9 A = 1630.00

    9

    9 6.00 hour 2600.00 1.00 15600.00

    9 12.00 hour 345.00 1.00 4140.00

    9 6.00 hour 1550.00 1.00 9300.00

    9 3.00 hour 345.00 1.00 1035.009 B = 30075.00

    9

    9

    9

    9

    9

    9 255.00 cum 560.43 1.00 142909.65

    9

    9 129.00 cum 207.60 1.00 26780.40

    9 C= 169690.05

    9 201395.05

    99 5.00 % 201395.05 10069.75

    9

    9 10.00 % 211464.80 21146.48

    9

    9

    9 384.00 cum 0.00 1.00 0.00

    9

    9 300.00 cum 232611.28

    9 775.37

    9 775.00

    9

    2.36mm and below @34%

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    Motor grader 3.35M Blade @50 cum/Hr.

    Tractor - Rotavator (223+11=234)

    Water tanker 6 KL

    Coarse graded Granular sub-base material as per

    Mate

    Mazdoor skilled

    Mazdoor unskilled

    Vibratory roller 8T

    Table 400-2 of MORT&H

    TOTAL

    (C) Material

    Average rate of (9.5-11.2),( 5-7)&(2.36-5)

    (A) Labour

    (F ) Seigniorage charges

    Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - III

    of MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all materials to

    work site and spreading in uniform layers with motor grader or by approved means, on prepared

    surface mixing by mix in place method with Rotavator / approved means at OMC and compacting

    with vibratory roller to achieve the desired density etc., complete for finished item of work as per

    MoRT&H Specification 401 (4th revision) and as directed by the Engineer-in-charge. ( Payment

    will be made based on levels for finished item of work ).

    9.5-4.75mm IRC & MORT&H HBG/HBT Chips @ 66%

    Rate of 2.36mm & below HBG/HBT metal

    Unit = cum

    Taking output = 300 cum

    Page 95 of MoRT&H SDB

    TOTAL Cost for 300 cum = (A+B+C+D+E+F)

    TOTAL

    (A + B +C)

    (D) Over Head Charges on (A+B+C)

    Metal

    (E) Contractors Profit on (A+B+C+D)

    Rate per 1 cum

    Rate per 1 cum

    Rate per 1 cum

    TOTAL Cost for 300 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    (F ) Seigniorage charges

    Metal

  • 7/27/2019 Venkats Master DATA2008 09New1

    34/185

    1 2 3 5 6 74

    10

    10

    10

    1010

    10 0.20 day 188.00 1.00 37.60

    10 5.00 day 146.00 1.00 730.00

    10 5.00 cum 21.50 1.00 -107.50

    10 660.10

    10 0.0 % 660.10 0.00

    10 A = 660.10

    10 660.10

    10

    10 5.00 % 660.10 33.01

    10

    10 10.00 % 693.11 69.3110

    10 100.00 sqm 762.42

    10 7.62

    10 7.60

    10

    11

    11

    11

    1111

    11 0.01 day 188.00 1.00 1.88

    11 0.25 day 146.00 1.00 36.50

    11 38.38

    11 0.0 % 38.38 0.00

    11 A = 38.38

    11

    11 0.08 hour 345.00 1.00 27.60

    11 0.20 hour 1320.00 1.00 264.00

    11 0.23 hour 575.00 1.00 132.25

    11 B = 423.85

    11 462.2311

    11 5.00 % 462.23 23.11

    11

    11 10.00 % 485.34 48.53

    11

    11 100.00 sqm 533.87

    11 5.34

    11 5.30

    11

    Municipal Area Allowance

    Mazdoor including loading & unloading

    TOTAL

    (A )

    (B) Machinery

    (A + B )

    Municipal Area Allowance

    TOTAL

    (C) Over Head Charges on (A+B)

    (D) Contractors Profit on (A+B+C)

    (A) Labour

    Front end loader 1 cum capacity

    TOTAL Cost for 100 sqm = (A+B+C+D)

    Rate per 1 sqm

    Rate per 1 sqm

    TOTAL

    Page 67 of MoRT&H SDB

    Scarifying the existing granular surface to a depth of 50 mm by Manual means including all

    labour charges etc., complete as per MoRT&H (4th

    Revision) Specn. No.305.4.3 for finished item

    of work.

    Unit = sqm

    Deduct for loading & unloading

    Taking output = 100 sqm(A) Labour

    Mate

    TOTAL Cost for 100 sqm = (A+B+C)

    Rate per 1 sqm

    Rate per 1 sqm

    (B) Over Head Charges on (A)

    (C) Contractors Profit on (A+B)

    Page 67,68 of MoRT&H SDB

    Unit = sqm

    Taking output = 100 sqm

    Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of

    scarified material with all leads and lifts up to 1000 m as per MoRT&H (4th

    Revision) Specn.

    No.305.4.3

    Tipper 5.50 cum capacity, 4 trips/Hour

    Mate

    Mazdoor

    Tractor with ripper attachment @ 60 cum per hour

  • 7/27/2019 Venkats Master DATA2008 09New1

    35/185

    1 2 3 5 6 74

    12

    12

    12

    12

    12

    12 10.08 nos. 188.00 1.00 1895.04

    12 2.00 nos. 193.40 1.00 386.80

    12 250.00 nos. 146.00 1.00 36500.00

    12 38781.84

    12 0.0 % 38781.84 0.00

    12 A = 38781.84

    12

    12 12.00 hour 540.00 1.00 6480.00

    12 24.00 hour 345.00 1.00 8280.00

    12 B = 14760.00

    12

    12 217.80 cum 412.60 1.00 89864.28

    12 200.38 cum 552.60 1.00 110729.99

    12 17.42 cum 1106.68 1.00 19278.37

    12

    12 57.60 cum 669.18 1.00 38544.77

    12

    12 28.80 cum 207.60 1.00 5978.88

    12 C = 264396.29

    12 317938.13

    12

    12 5.00 % 317938.13 15896.91

    12

    12 10.00 % 333835.04 33383.50

    12

    12

    12 522.00 cum 0.00 1.00 0.00

    1212 360.00 cum 367218.54

    12 1020.05

    12 1020.00

    12

    (A) Labour

    Mate

    Mazdoor skilled

    Rate per 1 cum

    Taking output = 360 cum

    Page 104,105,106 of MoRT&H SDB

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as per

    Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam

    specification including cost, conveyance and seigniorage charges and spreading in uniform

    thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages to proper grade

    and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and

    binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4

    threvision) and as

    directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of

    work)

    Unit = cum

    (B) Machinery

    smooth wheeled roller 8 Ton

    water tanker 6 KL

    TOTAL

    Mazdoor

    Municipal Area Allowance

    TOTAL

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    (F ) Seigniorage charges

    Metal

    Rate per 1 cum

    (C) Material

    63mm IRC HBG/HBT metal

    45mm IRC HBG/HBT metal

    22.40 mm IRC HBG/HBT M/C metal

    (Ave of 9.5-11.2 mm & 5-7 mm M/C )

    Binding material @ 0.06 cum / 10sqm

    (Rate of 2.36mm & Below)

    Screenings 13.2mm@ 0.12cum/10sqm

    TOTAL

    (A + B +C)

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

  • 7/27/2019 Venkats Master DATA2008 09New1

    36/185

    1 2 3 5 6 74

    13

    13

    13

    13

    13

    13 10.08 nos. 188.00 1.00 1895.04

    13 2.00 nos. 193.40 1.00 386.80

    13 250.00 nos. 146.00 1.00 36500.00

    1338781.84

    13 0.0 % 38781.84 0.00

    13 A = 38781.84

    13

    13 12.00 hour 540.00 1.00 6480.00

    13 24.00 hour 345.00 1.00 8280.00

    13 B = 14760.00

    13

    13 357.19 cum 552.60 1.00 197383.19

    13 78.41 cum 1106.68 1.00 86774.78

    13

    13 86.40 cum 275.27 1.00 23782.90

    13

    13 28.80 cum 207.60 1.00 5978.88

    13 C = 313919.75

    13 367461.59

    13

    13 5.00 % 367461.59 18373.08

    13

    13 10.00 % 385834.67 38583.47

    13

    13

    13 550.80 cum 0.00 1.00 0.00

    13

    13 360.00 cum 424418.14

    13 1178.94

    13 1179.00

    13

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - III -HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as

    per Table 400-7& 9 of MoRT&H Specification 404 of 4th revision forWater Bound Macadam

    specification including cost, conveyance and seigniorage charges and spreading in uniform

    thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages to proper grade

    and camber applying and brooming requisite type ' B ' screenings as per table 400-8&9 and

    binding materials to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4

    threvision) and as

    directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of

    work)

    TOTAL

    (A + B +C)

    Mate

    Page 104,105,106 of MoRT&H SDB

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    smooth wheeled roller 8 Ton

    Unit = cum

    Taking output = 360 cum

    (A) Labour

    Mazdoor skilled

    Mazdoor

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    Metal

    Rate per 1 cum

    water tanker 6 KL

    (Rate of 2.36mm & Below)

    TOTAL

    (C) Material

    45mm IRC HBG/HBT metal

    (F ) Seigniorage charges

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    22.40mm IRC HBG/HBT M/C metal

    Avg. of (2.36-5),( 2.36mm & below)

    Binding material @ 0.06 cum / 10sqm

    Screenings 11.2mm @0.18cum/10sqm

  • 7/27/2019 Venkats Master DATA2008 09New1

    37/185

    1 2 3 5 6 74

    14

    14

    14

    14

    14

    14 10.08 nos. 188.00 1.00 1895.04

    14 2.00 nos. 193.40 1.00 386.80

    14 250.00 nos. 146.00 1.00 36500.00

    14 38781.8414 0.0 % 38781.84 0.00

    14 A = 38781.84

    14

    14 12.00 hour 540.00 1.00 6480.00

    14 24.00 hour 345.00 1.00 8280.00

    14 B = 14760.00

    14

    14 217.80 cum 412.60 1.00 89864.28

    14 200.38 cum 675.43 1.00 135342.66

    14 17.42 cum 1106.68 1.00 19278.37

    14

    14 57.60 cum 669.18 1.00 38544.7714

    14 28.80 cum 207.60 1.00 5978.88

    14 C = 289008.96

    14 342550.80

    14

    14 5.00 % 342550.80 17127.54

    14

    14 10.00 % 359678.34 35967.83

    14

    14

    14 522.00 cum 0.00 1.00 0.00

    14

    14 360.00 cum 395646.17

    14 1099.02

    14 1099.00

    14

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 45mm and below) as per

    Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam

    specification including cost, conveyance and seigniorage charges and spreading in uniform

    thickness, hand packing, rolling with Power Road Roller 8- 10 Tonnes in stages to proper grade

    and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and

    binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4

    threvision) and as

    directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of

    work)

    (B) Machinery

    water tanker 6 KL

    TOTAL

    (C) Material

    smooth wheeled roller 8 Ton

    63mm IRC HBG/HBT metal

    (A) Labour

    Mate

    Mazdoor skilled

    Municipal Area Allowance

    TOTAL

    Page 104,105,106 of MoRT&H SDB

    Unit = cum

    Mazdoor

    Taking output = 360 cum

    45mm IRC HBG/HBT M/C metal

    22.40 mm IRC HBG/HBT M/C metal

    TOTAL

    (A + B +C)

    Screenings 13.2mm@ 0.12cum/10sqm

    (Ave of 9.5-11.2 mm & 5-7 mm M/C )Binding material @ 0.06 cum / 10sqm

    (Rate of 2.36mm & Below)

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    Rate per 1 cum

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    (F ) Seigniorage charges

    Metal

  • 7/27/2019 Venkats Master DATA2008 09New1

    38/185

    1 2 3 5 6 74

    15

    15

    15

    15

    15

    15 10.08 nos. 188.00 1.00 1895.04

    15 2.00 nos. 193.40 1.00 386.80

    15 250.00 nos. 146.00 1.00 36500.00

    15 38781.84

    15 0.0 % 38781.84 0.00

    15 A = 38781.84

    15

    15 12.00 hour 540.00 1.00 6480.00

    15 24.00 hour 345.00 1.00 8280.00

    15 B = 14760.00

    15

    15 357.19 cum 675.4300 1.00 241256.84

    15 78.41 cum 1106.68 1.00 86774.78

    15

    15 86.40 cum 275.27 1.00 23782.90

    15

    15 28.80 cum 207.60 1.00 5978.8815 C = 357793.40

    15 411335.24

    15

    15 5.00 % 411335.24 20566.76

    15

    15 10.00 % 431902.00 43190.20

    15

    15

    15 550.80 cum 0.00 1.00 0.00

    15

    15 360.00 cum 475092.20

    15 1319.7015 1320.00

    15

    Screenings 11.2mm @0.18cum/10sqm

    Avg. of (2.36-5),( 2.36mm & below)

    Binding material @ 0.06 cum / 10sqm

    (Rate of 2.36mm & Below)

    Page 104,105,106 of MoRT&H SDB

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - III - HBG/HBT ( IRC ) Machine crushed metal as per Table 400-7& 9 of MoRT&H

    Specification 404 of 4th revision for Water Bound Macadam specification including cost,

    conveyance and seigniorage charges and spreading in uniform thickness, hand packing, rolling

    with Power Road Roller 8- 10 Tonnes in stages to proper grade and camber applying and

    brooming requisite type ' B ' screenings as per table 400-8&9 and binding materials to fill up the

    interstices of coarse aggregates, watering and compacting to the required density for finished itemof work as per MoRT&H specification 404 (4

    threvision) and as directed by the Engineer-in-

    Charge (Payment will be made based on levels for finished item of work)

    (A) Labour

    Mate

    Mazdoor skilled

    Unit = cum

    Taking output = 360 cum

    smooth wheeled roller 8 Ton

    water tanker 6 KL

    TOTAL

    Mazdoor

    Municipal Area Allowance

    TOTAL

    (C) Material

    45mm IRC HBG/HBT M/C metal

    22.40mm IRC HBG/HBT M/C metal

    Rate per 1 cum

    TOTAL

    (A + B +C)

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    (F ) Seigniorage charges

    Metal

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    (B) Machinery

  • 7/27/2019 Venkats Master DATA2008 09New1

    39/185

    1 2 3 5 6 74

    16

    16

    16

    16

    16

    16 10.08 nos. 188.00 1.00 1895.04

    16 2.00 nos. 193.40 1.00 386.80

    16 250.00 nos. 146.00 1.00 36500.00

    16 38781.8416 0.0 % 38781.84 0.00

    16 A = 38781.84

    16

    16 6.00 hour 1550.00 1.00 9300.00

    16 24.00 hour 345.00 1.00 8280.00

    16 B = 17580.00

    16

    16 217.80 cum 412.60 1.00 89864.28

    16 200.38 cum 552.60 1.00 110729.99

    16 17.42 cum 1106.68 1.00 19278.37

    16

    16 57.60 cum 669.18 1.00 38544.7716

    16 28.80 cum 207.60 1.00 5978.88

    16 C = 264396.29

    16 320758.13

    16

    16 5.00 % 320758.13 16037.91

    16

    16 10.00 % 336796.04 33679.60

    16

    16

    16 522.00 cum 0.00 1.00 0.00

    1616 360.00 cum 370475.64

    16 1029.10

    16 1029.00

    16

    (D) Over Head Charges on (A+B+C)

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    Rate per 1 cum

    (E) Contractors Profit on (A+B+C+D)

    (A) Labour

    Page 104,105,106 of MoRT&H SDB

    Unit = cum

    Taking output = 360 cum

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as per

    Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam

    specification including cost, conveyance and seigniorage charges and spreading in uniform

    thickness, hand packing, rolling with Vibratory Road Roller 8- 10 Tonnes in stages to proper

    grade and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and

    binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4

    threvision) and as

    directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of

    work)

    (B) Machinery

    Mazdoor

    Municipal Area Allowance

    TOTAL

    Mate

    Mazdoor skilled

    water tanker 6 KL

    TOTAL

    (C) Material

    63mm IRC HBG/HBT metal

    Vibratory road roller 8 Ton

    45mm IRC HBG/HBT metal

    22.40 mm IRC HBG/HBT M/C metal

    Screenings 13.2mm@ 0.12cum/10sqm

    (Ave of 9.5-11.2 mm & 5-7 mm M/C )Binding material @ 0.06 cum / 10sqm

    (Rate of 2.36mm & Below)

    TOTAL

    (A + B +C)

    (F ) Seigniorage charges

    Metal

  • 7/27/2019 Venkats Master DATA2008 09New1

    40/185

    1 2 3 5 6 74

    17

    17

    17

    17

    17

    17 10.08 nos. 188.00 1.00 1895.04

    17 2.00 nos. 193.40 1.00 386.80

    17 250.00 nos. 146.00 1.00 36500.00

    17 38781.8417 0.0 % 38781.84 0.00

    17 A = 38781.84

    17

    17 6.00 hour 1550.00 1.00 9300.00

    17 24.00 hour 345.00 1.00 8280.00

    17 B = 17580.00

    17

    17 357.19 cum 552.60 1.00 197383.19

    17 78.41 cum 1106.68 1.00 86774.78

    17

    17 86.40 cum 275.27 1.00 23782.90

    1717 28.80 cum 207.60 1.00 5978.88

    17 C = 313919.75

    17 370281.59

    17

    17 5.00 % 370281.59 18514.08

    17

    17 10.00 % 388795.67 38879.57

    17

    17

    17 550.80 cum 0.00 1.00 0.00

    17

    17 360.00 cum 427675.2417 1187.99

    17 1188.00

    17

    (A) Labour

    Mate

    Mazdoor skilled

    Taking output = 360 cum

    Page 104,105,106 of MoRT&H SDB

    Unit = cum

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - III - HBG/HBT ( IRC ) Metal (Machine crushed metal for 22.40mm and below) as

    per Table 400-7& 9 of MoRT&H Specification 404 of 4th revision forWater Bound Macadam

    specification including cost, conveyance and seigniorage charges and spreading in uniform

    thickness, hand packing, rolling with Vibratory Road Roller 8- 10 Tonnes in stages to proper

    grade and camber applying and brooming requisite type ' B ' screenings as per table 400-8&9 and

    binding materials to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4

    threvision) and as

    directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of

    work)

    Mazdoor

    Vibratory road roller 8 Ton

    water tanker 6 KL

    TOTAL

    (C) Material

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    45mm IRC HBG/HBT metal

    22.40mm IRC HBG/HBT M/C metal

    TOTAL

    (A + B +C)

    Screenings 11.2mm @0.18cum/10sqm

    Avg. of (2.36-5),( 2.36mm & below)

    Binding material @ 0.06 cum / 10sqm(Rate of 2.36mm & Below)

    (E) Contractors Profit on (A+B+C+D)

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)Rate per 1 cum

    Rate per 1 cum

    (D) Over Head Charges on (A+B+C)

    (F ) Seigniorage charges

    Metal

  • 7/27/2019 Venkats Master DATA2008 09New1

    41/185

    1 2 3 5 6 74

    18

    18

    18

    18

    18

    18 10.08 nos. 188.00 1.00 1895.04

    18 2.00 nos. 193.40 1.00 386.80

    18 250.00 nos. 146.00 1.00 36500.00

    18 38781.8418 0.0 % 38781.84 0.00

    18 A = 38781.84

    18

    18 6.00 hour 1550.00 1.00 9300.00

    18 24.00 hour 345.00 1.00 8280.00

    18 B = 17580.00

    18

    18 217.80 cum 412.60 1.00 89864.28

    18 200.38 cum 675.43 1.00 135342.66

    18 17.42 cum 1106.68 1.00 19278.37

    18

    18 57.60 cum 669.18 1.00 38544.7718

    18 28.80 cum 207.60 1.00 5978.88

    18 C = 289008.96

    18 345370.80

    18

    18 5.00 % 345370.80 17268.54

    18

    18 10.00 % 362639.34 36263.93

    18

    18

    18 522.00 cum 0.00 1.00 0.00

    18

    18 360.00 cum 398903.27

    18 1108.06

    18 1108.00

    18

    Screenings 13.2mm@ 0.12cum/10sqm

    (Ave of 9.5-11.2 mm & 5-7 mm M/C )Binding material @ 0.06 cum / 10sqm

    Page 104,105,106 of MoRT&H SDB

    Unit = cum

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - II - HBG/HBT ( IRC ) Metal (Machine crushed metal for 45mm and below) as per

    Table 400-7&9 of MoRT&H Specification 404 of 4th revision for Water Bound Macadam

    specification including cost, conveyance and seigniorage charges and spreading in uniform

    thickness, hand packing, rolling with Vibratory Road Roller 8- 10 Tonnes in stages to proper

    grade and camber applying and brooming requisite type ' A ' screenings as per table 400-8&9 and

    binding materials as to fill up the interstices of coarse aggregates, watering and compacting to therequired density for finished item of work as per MoRT&H specification 404 (4

    threvision) and as

    directed by the Engineer-in-Charge (Payment will be made based on levels for finished item of

    work)

    Mazdoor

    Municipal Area Allowance

    TOTAL

    Taking output = 360 cum

    (A) Labour

    Mate

    Mazdoor skilled

    (C) Material

    63mm IRC HBG/HBT metal

    45mm IRC HBG/HBT M/C metal

    22.40 mm IRC HBG/HBT M/C metal

    (B) Machinery

    Vibratory road roller 8 Ton

    water tanker 6 KL

    TOTAL

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    TOTAL

    (Rate of 2.36mm & Below)

    (A + B +C)

    (F ) Seigniorage charges

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    Rate per 1 cum

    Metal

  • 7/27/2019 Venkats Master DATA2008 09New1

    42/185

    1 2 3 5 6 74

    19

    19

    19

    19

    19

    19 10.08 nos. 188.00 1.00 1895.04

    19 2.00 nos. 193.40 1.00 386.80

    19 250.00 nos. 146.00 1.00 36500.00

    19 38781.8419 0.0 % 38781.84 0.00

    19 A = 38781.84

    19

    19 6.00 hour 1550.00 1.00 9300.00

    19 24.00 hour 345.00 1.00 8280.00

    19 B = 17580.00

    19

    19 357.19 cum 675.43 1.00 241256.84

    19 78.41 cum 1106.68 1.00 86774.78

    19

    19 86.40 cum 275.27 1.00 23782.90

    1919 28.80 cum 207.60 1.00 5978.88

    19 C = 357793.40

    19 414155.24

    19

    19 5.00 % 414155.24 20707.76

    19

    19 10.00 % 434863.00 43486.30

    19

    19

    19 550.80 cum 0.00 1.00 0.00

    19

    19 360.00 cum 478349.3019 1328.75

    19 1329.00

    19

    20

    Page 104,105,106 of MoRT&H SDB

    Providing, Laying, Spreading for a compacted thickness of 75 mm, using stone aggregates of

    Grade - III - HBG/HBT. ( IRC ) Machine crushed metal as per Table 400-7& 9 of MoRT&H

    Specification 404 of 4th revision for Water Bound Macadam specification including cost,

    conveyance and seigniorage charges and spreading in uniform thickness, hand packing, rolling

    with Vibratory Road Roller 8- 10 Tonnes in stages to proper grade and camber applying and

    brooming requisite type ' B ' screenings as per table 400-8&9 and binding materials to fill up the

    interstices of coarse aggregates, watering and compacting to the required density for finished itemof work as per MoRT&H specification 404 (4

    threvision) and as directed by the Engineer-in-

    Charge (Payment will be made based on levels for finished item of work)

    Unit = cum

    Taking output = 360 cum

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    (A) Labour

    Mate

    Mazdoor skilled

    Mazdoor

    Screenings 11.2mm @0.18cum/10sqm

    Avg. of (2.36-5),( 2.36mm & below)

    Binding material @ 0.06 cum / 10sqm(Rate of 2.36mm & Below)

    Vibratory road roller 8 Ton

    water tanker 6 KL

    TOTAL

    (C) Material

    (E) Contractors Profit on (A+B+C+D)

    TOTAL Cost for 360 cum = (A+B+C+D+E+F)

    45mm IRC HBG/HBT M/C metal

    22.40mm IRC HBG/HBT M/C metal

    (D) Over Head Charges on (A+B+C)

    TOTAL

    (A + B +C)

    Rate per 1 cum

    Rate per 1 cum

    Providing, Laying, Spreading and compacting graded HBG/HBT crushed stone aggregate to Wet

    Mix macadam specification including cost, seigniorage of all materials and including premixing

    the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to

    site , laying in uniform layers with paver in base courses on well prepared surface and compacting

    with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and

    as per MoRT&H specification.406 (4th revision) for finished item of work. (Payment will be made

    based on levels for finished item of work)

    (F ) Seigniorage charges

    Metal

  • 7/27/2019 Venkats Master DATA2008 09New1

    43/185

    1 2 3 5 6 74

    20

    20

    20

    20

    20 0.48 nos. 188.00 1.00 90.24

    20 2.00 nos. 193.40 1.00 386.80

    20 10.00 nos. 146.00 1.00 1460.0020 1937.04

    20 0.0 % 1937.04 0.00

    20 A = 1937.04

    20

    20 6.60 hour 1320.00 1.00 8712.00

    20 6.00 hour 1090.00 1.00 6540.00

    20 6.00 hour 1320.00 1.00 7920.00

    20 6.00 hour 1090.00 1.00 6540.00

    20 3.90 hour 1550.00 1.00 6045.00

    20 3.00 hour 345.00 1.00 1035.00

    20 B = 36792.00

    2020

    20 89.10 cum 956.68 1.00 85240.19

    20

    20 118.80 cum 740.18 1.00 87933.38

    20

    20 89.10 cum 207.60 1.00 18497.16

    20 C = 191670.73

    20 230399.77

    20

    20 5.00 % 230399.77 11519.99

    20

    20 10.00 % 241919.76 24191.9820

    20

    20 297.00 cum 0.00 1.00 0.00

    20

    20 225.00 cum 266111.74

    20 1182.72

    20 1183.00

    20

    21

    21

    21

    21

    21

    21 0.44 nos. 188.00 1.00 82.72

    21 9.00 nos. 146.00 1.00 1314.00

    21 2.00 nos. 193.40 1.00 386.80

    21 1783.52

    (E) Contractors Profit on (A+B+C+D)

    TOTAL

    (A + B +C)

    (D) Over Head Charges on (A+B+C)

    TOTAL

    Mate

    Wet mix plant of 60 ton hr. capacity

    Electric generating set 125 KVA

    Municipal Area Allowance

    Mazdoor

    Taking output = 225 cum

    (A) Labour

    Page 110,111 of MoRT&H SDB

    Vibratory roller 8-10 T

    Water tanker

    TOTAL

    (C) Material

    Unit = cum

    front end loader 1 cum capacity

    Mechanical Paver finisher 100 TPH

    Mazdoor skilled

    (B) Machinery

    TOTAL Cost for 225 cum = (A+B+C+D+E+F)

    Rate per 1 cum

    Rate per 1 cum

    45 to 22.40mm IRC HBG/HBT metal @ 30%

    Avg. rate of (40-45), (25-27), (19-22mm )

    2.36mm to 75 micron @ 30%

    (2.36mm & below)

    22.4-2.36mm IRC HBG/HBT metal @ 40%

    Avg. rate of (19-22),(12-14),(9.5-11.2),(5-7),(2.36mm & below)

    (A) Labour

    Mate

    Mazdoor

    Mazdoor skilled

    Page 141,142 of MoRT&H SDB

    Unit = sqm

    Taking output = 9000 sqm

    Providing and laying surface dressing in single coat using 6 mm nominal size IRC HBG/HBT

    machine crushed stone aggregates @ 0.004 cum / sqm on a layer of bitumen binder of 80/100

    grade @ 0.75 kg / sqm including cost, seigniorage and conveyance of all materials to work site

    and laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for

    finished item of work as per MoRT&H Specification 510 (4th Revision) and as directed by the

    Engineer-in-charge.

    Metal

    (F ) Seigniorage charges

  • 7/27/2019 Venkats Master DATA2008 09New1

    44/185

    1 2 3 5 6 74

    21 0.0 % 1783.52 0.00

    21 A = 1783.52

    21

    21 7.20 hour 290.00 1.00 2088.00

    21 7.20 hour 370.00 1.00 2664.00

    21

    21 6.00 hour 2070.00 1.00 12420.0021

    21 6.00 hour 575.00 1.00 3450.00

    21 6.00 hour 1320.00 1.00 7920.00

    21 6.00 hour 940.00 1.00 5640.00

    21 6.00 hour 540.00 1.00 3240.00

    21 B = 37422.00

    21

    21 6.75 MT 46177.39 1.00 311697.38

    21

    21 36.00 cum 587.93 1.00 21165.48

    21 C = 332862.86

    21 372068.3821

    21 5.00 % 372068.38 18603.42

    21

    21 10.00 % 390671.80 39067.18

    21

    21

    21 36.00 cum 0.00 1.00 0.00

    21

    21 9000.00 sqm 429738.98

    21 47.75

    21 47.70

    2122

    22

    22

    22

    22

    22 0.44 nos. 188.00 1.00 82.72

    22 9.00 nos. 146.00 1.00 1314.0022 2.00 nos. 193.40 1.00 386.80

    22 1783.52

    22 0.0 % 1783.52 0.00

    22 A = 1783.52

    22

    22 7.20 hour 290.00 1.00 2088.00

    22 7.20 hour 370.00 1.00 2664.00

    22 6.00 hour 2070.00 1.00 12420.00

    22

    22 6.00 hour 575.00 1.00 3450.00

    Taking output = 9000 sqm

    (A) Labour

    Tipper 10Tonne capacity for carriage of stone chips

    from stock pile on road side to chip spreader

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    smooth wheeled roller 8 Ton

    TOTAL

    (C) Material

    Bitumen 80/100 @ 0.75 Kg/sqm

    Mechanical broom @ 1250 sqm/hr.

    Air compressor 250 cfm

    Front end loader 1 cum bucket capacity

    Bitumen pressure distributor @1750 sqm/hr.

    chip spreader @ 1500 sqm/hr.

    Hydraulic self propelled

    TOTAL Cost for 9000 sqm = (A+B+C+D+E+F)

    Rate per 1 sqm

    Rate per 1 sqm

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    Mate

    MazdoorMazdoor skilled

    Page 141,142 of MoRT&H SDB

    Unit = sqm

    Providing and laying surface dressing in single coat using 6 mm nominal size IRC HBG/HBT

    machine crushed stone aggregates @ 0.004 cum / sqm on a layer of bitumen binder of 60/70

    grade @ 0.75 kg / sqm including cost, seigniorage and conveyance of all materials to work site

    and laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for

    finished item of work as per MoRT&H Specification 510 (4th Revision) and as directed by the

    Engineer-in-charge.

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    Mechanical broom @ 1250 sqm/hr.

    Air compressor 250 cfm

    Hydraulic self propelled chip spreader @ 1500 sqm/hr.

    Tipper 10Tonne capacity for carriage of stone chips

    from stock pile on road side to chip spreader

    (F ) Seigniorage charges

    Metal

    Crushed stone chippings 6 mm

    nominal size @0.004 cum/sqm

    TOTAL

    (A + B +C)

  • 7/27/2019 Venkats Master DATA2008 09New1

    45/185

    1 2 3 5 6 74

    22 6.00 hour 1320.00 1.00 7920.00

    22 6.00 hour 940.00 1.00 5640.00

    22 6.00 hour 540.00 1.00 3240.00

    22 B = 37422.00

    22

    22 6.75 MT 45347.70 1.00 306096.98

    2222 36.00 cum 587.93 1.00 21165.48

    22 B = 327262.46

    22 366467.98

    22

    22 5.00 % 366467.98 18323.40

    22

    22 10.00 % 384791.38 38479.14

    22

    22

    22 36.00 cum 0.00 1.00 0.00

    22

    22 9000.00 sqm 423270.5222 47.03

    22 47.00

    22

    23

    23

    23

    23

    2323 0.08 nos. 188.00 1.00 15.04

    23 2.00 nos. 146.00 1.00 292.00

    23 307.04

    23 0.0 % 307.04 0.00

    23 A = 307.04

    23

    23 2.80 hour 290.00 1.00 812.00

    23 2.80 hour 370.00 1.00 1036.00

    23 2.00 hour 690.00 1.00 1380.00

    23 1.00 hour 345.00 1.00 345.00

    23 B = 3573.00

    2323 2.10 MT 32473.65 1.00 68194.67

    23 C = 68194.67

    23 72074.71

    23

    23 5.00 % 72074.71 3603.74

    23

    23 10.00 % 75678.45 7567.85

    23

    23 3500.00 sqm 83246.30

    23 23.78

    23 23.80

    (F ) Seigniorage charges

    Metal

    (A) LabourMate

    Taking output = 3500 sqm

    Crushed stone chippings 6 mm

    Front end loader 1 cum bucket capacity

    Bitumen pressure distributor @1750 sqm/hr.

    smooth wheeled roller 8 Ton

    TOTAL

    (C) Material

    Bitumen 60/70 @ 0.75 Kg / sqm

    Rate per 1 sqm

    Rate per 1 sqm

    TOTAL Cost for 9000 sqm = (A+B+C+D+E+F)

    nominal size @0.004 cum/sqm

    (A + B +C)

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    TOTAL

    Page 123 of MoRT&H SDB

    Emulsion pressure distributor @1750 sqm/hr.

    water tanker 6 KL

    TOTAL

    Mazdoor

    Unit = sqm

    Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emulsion

    pressure distributor on prepared surface of Granular base including cleaning of road surface and

    spraying emulsion at the rate of 0.60 Kg/sqm using emulsion pressure distributor for finished item

    of work etc., complete for finished item of work as per MoRT&H Specification 502 (4th Revision)

    and as directed by the Engineer-in-charge.

    Municipal Area Allowance

    (C) Material

    TOTAL

    (B) Machinery

    Mechanical broom @ 1250 sqm/hr.

    Air compressor 250 cfm

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    Bitumen Emulsion @ 0.60 Kgs/sqm

    TOTAL

    (A + B +C)

    TOTAL Cost for 3500 sqm = (A+B+C+D+E)

    Rate per 1 sqm

    Rate per 1 sqm

  • 7/27/2019 Venkats Master DATA2008 09New1

    46/185

    1 2 3 5 6 74

    23

    24

    24

    24

    24

    24

    24 0.08 no 188.00 1.00 15.04

    24 2.00 no 146.00 1.00 292.00

    24 307.04

    24 0.0 % 307.04 0.00

    24 A = 307.04

    24

    24 2.80 hour 290.00 1.00 812.00

    24 2.80 hour 370.00 1.00 1036.00

    24 2.00 hour 690.00 1.00 1380.00

    24 B = 3228.00

    24

    24 0.700 MT 32473.65 1.00 22731.56

    24 C = 22731.56

    24 26266.60

    24

    24 5.00 % 26266.60 1313.33

    24

    24 10.00 % 27579.93 2757.99

    24

    24 3500.00 sqm 30337.92

    24 8.6724 8.70

    24

    25

    25

    25

    25

    25

    25 0.08 no 188.00 1.00 15.0425 2.00 no 146.00 1.00 292.00

    25 307.04

    25 0.0 % 307.04 0.00

    25 A = 307.04

    25

    25 2.80 hour 290.00 1.00 812.00

    25 2.80 hour 370.00 1.00 1036.00

    25 2.00 hour 690.00 1.00 1380.00

    25 B = 3228.00

    25

    Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using Emulsion

    pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface

    cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4th

    revision) and as directed by the Engineer-in-Charge.

    Taking output = 3500 sqm

    (A) Labour

    Mate

    Mazdoor

    Page 124 of MoRT&H SDB

    unit = sqm

    Air compressor 250 cfm

    Emulsion pressure distributor @1750 sqm/hr.

    TOTAL

    (C) Material

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    Mechanical broom Hydraulic @ 1250 sqm/hr.

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

    Bitumen Emulsion @ 0.20 Kgs/sqm

    TOTAL

    (A + B +C)

    TOTAL Cost for 3500 sqm = (A+B+C+D+E)

    Rate per 1 sqmRate per 1 sqm

    Page 124 of MoRT&H SDB

    unit = sqm

    Municipal Area Allowance

    TOTAL

    (B) Machinery

    Mechanical broom Hydraulic @ 1250 sqm/hr.

    Air compressor 250 cfm

    Emulsion pressure distributor @1750 sqm/hr.

    TOTAL

    (C) Material

    Providing and applying tack coat with bitumen 80/100 Grade using Bitumen pressure distributor

    at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with

    mechanical broom for finished item of work as per MoRT&H Specification 503 (4th

    revision) and

    as directed by the Engineer-in-Charge.

    Taking output = 3500 sqm

    (A) Labour

    MateMazdoor

  • 7/27/2019 Venkats Master DATA2008 09New1

    47/185

    1 2 3 5 6 74

    25 0.700 MT 46177.39 1.00 32324.17

    25 C = 32324.17

    25 35859.21

    25

    25 5.00 % 35859.21 1792.96

    25

    25 10.00 % 37652.17 3765.2225

    25 3500.00 sqm 41417.39

    25 11.83

    25 11.80

    25

    26

    26

    26

    26

    26

    26 0.84 nos. 188.00 1.00 157.92

    26

    26

    26 14.00 nos. 146.00 1.00 2044.00

    26 5.00 nos. 193.40 1.00 967.00

    26 3168.9226 0.0 % 3168.92 0.00

    26 A = 3168.92

    26

    26

    26 12.00 hour 15525.00 1.00 186300.00

    26 6.00 hour 1550.00 1.00 9300.00

    26 6.00 hour 1320.00 1.00 7920.00

    26 6.00 hour 1090.00 1.00 6540.00

    26 6.00 hour 540.00 1.00 3240.00

    26 B = 213300.00

    26

    26 19.48 M.T 45347.70 1.00 883373.2026

    26

    26

    26

    26

    26

    26 276.75 cum 560.36 1.00 155080.74

    26 C = 1038453.94

    26 1254922.86

    26

    26 5.00 % 1254922.86 62746.14

    Smooth wheeled roller 8-10 Tonnes

    TOTAL

    (C) Material

    (i) Bitumen 60/70 Grade @19 kg per 10 sqm

    and 2.36mm & below)

    Mechanical Paver finisher @ 100 TPH

    Front end loader 1 cum capacity

    TOTAL

    (A + B +C)

    Average rate of IRC HBG/HBT M/C metal of sizes

    13.2mm to 0.09mm @ 0.27 cum per 10 sqm

    (A) Labour

    Mate

    Skilled Mazdoor for checking line and levels.

    Avg. of (19-22, 12-14, 9.5-11.2, 5-7mm

    (ii) Aggregate

    Mazdoor working with HMP, Mechanical broom,

    TOTAL

    TOTAL

    (B) Machinery

    Generator 250 KVA

    paver, roller, asphalt cutter and assistance for

    setting outlines, levels and layout of construction.

    For Type 'B' HBG/HBT M/C aggregates

    Hot mix plant 40 to 60 TPH

    Municipal Area Allowance

    Page 146,147 of MoRT&H SDB

    Unit = sqm

    Taking output = 10250 sqm (205 cum) (450 tones.)

    Providing , laying ofclose graded premix surfacing material ( Mixed seal surfacing) of 20 mm

    thickness by hot mix plant using HBG/HBT crushed aggregates of 13.2mm to 0.09mm (Type 'B')

    as per table 500-26 of specification 512 of MoRT&H (4th

    Revision), premixed with bituminous

    binder 60/70 grade @ 19 Kg per 10 Sqm area, including cost and seigniorage of all materials and

    transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,

    level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H

    Specification 512 (4th

    Revision) complete for finished item of work in all respects as directed byEngineer-in-charge.

    (12-14)(9.5-11.2)(5-7)(2.36-5)( 2.36mm&below)

    (D) Over Head Charges on (A+B+C)

    Rate per 1 sqm

    (E) Contractors Profit on (A+B+C+D)

    Bitumen 80/100 @ 0.20 Kg/sqm

    TOTAL Cost for 3500 sqm = (A+B+C+D+E)

    Rate per 1 sqm

    TOTAL

    (A + B +C)

    (D) Over Head Charges on (A+B+C)

  • 7/27/2019 Venkats Master DATA2008 09New1

    48/185

    1 2 3 5 6 74

    26

    26 10.00 % 1317669.00 131766.90

    26

    26

    26 276.75 cum 0.00 1.00 0.00

    26

    26 10250.00 sqm 1449435.9026 141.41

    26 141.00

    26

    27

    27

    27

    27

    27

    27 0.84 nos. 188.00 1.00 157.92

    27

    27

    27 14.00 nos. 146.00 1.00 2044.00

    27 5.00 nos. 193.40 1.00 967.00

    27 3168.92

    27 0.0 % 3168.92 0.00

    27 A = 3168.9227

    27

    27 12.00 hour 15525.00 1.00 186300.00

    27 6.00 hour 1550.00 1.00 9300.00

    27 6.00 hour 1320.00 1.00 7920.00

    27 4.80 hour 1090.00 1.00 5232.00

    27 6.00 hour 540.00 1.00 3240.00

    27 B = 211992.00

    27

    27 19.48 M.T 45347.70 1.00 883373.20

    27

    2727

    27

    27

    27

    27 276.75 cum 560.36 1.00 155080.74

    27 C = 1038453.94

    27 1253614.86

    27

    27 5.00 % 1253614.86 62680.74

    27

    27 10.00 % 1316295.60 131629.56

    Metal

    Mate

    Mazdoor working with HMP, Mechanical broom,

    paver, roller, asphalt cutter and assistance for

    setting outlines, levels and layout of construction.

    Skilled Mazdoor for checking line and levels.

    Providing , laying ofclose graded premix surfacing material ( Mixed seal surfacing) of 25 mm

    thickness by hot mix plant using HBG/HBT crushed aggregates of 13.2mm to 0.09mm (Type 'B')

    as per table 500-26 of specification 512 of MoRT&H (4th

    Revision), premixed with bituminous

    binder 60/70 grade @ 23.75 Kg per 10 Sqm area, including cost and seigniorage of all materials

    and transporting the hot mix to work site, laying with mechanical paver finisher to the required

    grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H

    Specification 512 (4th

    Revision) complete for finished item of work in all respects as directed by

    Engineer-in-charge.

    Page 146,147 of MoRT&H SDB

    Unit = sqm

    Taking output = 205 cum (450 tones.)

    (A) Labour

    (F ) Seigniorage charges

    (E) Contractors Profit on (A+B+C+D)

    TOTAL Cost for 10250 sqm = (A+B+C+D+E+F)Rate per 1 sqm

    Rate per 1 sqm

    Front end loader 1 cum capacity

    Mechanical Paver finisher @ 100 TPH

    Municipal Area Allowance

    TOTALTOTAL

    (B) Machinery

    Hot mix plant 40 to 60 TPH

    Generator 250 KVA

    Smooth wheeled roller 8-10 Tonnes

    TOTAL

    (C) Material

    (i) Bitumen 60/70 Grade @23.75 kg per 10 sqm

    and 2.36mm & below)

    For Type 'B' HBG/HBT M/C aggregates

    (ii) Aggregate

    Avg. of (19-22, 12-14, 9.5-11.2, 5-7mm

    13.2mm to 0.09mm @ 0.27 cum per 10 sqm

    Average rate of IRC HBG/HBT M/C metal of sizes

    (A + B +C)

    (12-14)(9.5-11.2)(5-7)(2.36-5)( 2.36mm&below)

    TOTAL

    (D) Over Head Charges on (A+B+C)

    (E) Contractors Profit on (A+B+C+D)

  • 7/27/2019 Venkats Master DATA2008 09New1

    49/185

    1 2 3 5 6 74

    27

    27

    27 276.75 cum 0.00 1.00 0.00

    27

    27 205.00 cum 1447925.16

    27 7063.05

    27 176.5827 177.00

    27

    28

    2828

    28

    28

    28 0.84 nos. 188.00 1.00 157.92

    28

    28

    28 14.00 nos. 146.00 1.00 2044.00

    28 5.00 nos. 193.40 1.00 967.00

    28 3168.92

    28 0.0 % 3168.92 0.00

    28 A = 3168.92

    2828

    28 12.00 hour 15525.00 1.00 186300.00

    28 6.00 hour 1550.00 1.00 9300.00

    28 6.00 hour 1320.00 1.00 7920.00

    28 4.80 hour 1090.00 1.00 5232.00

    28 6.00 hour 540.00 1.00 3240.00

    28 B = 211992.00

    28

    28 19.48 M.T 46514.30 1.00 906098.56

    28

    28

    2828

    28

    28

    28 276.75 cum 560.36 1.00 155080.74

    28 C = 1061179.30

    28 1276340.22

    28

    28 5.00 % 1276340.22 6381