Ventura Regional Sanitation District Operations Plan 2005

Ventura Regional Sanitation District - VRSD...2.2.1 Lake Sherwood Pump Station ... Ventura Regional Sanitation District personnel shall be trained to respond to disasters within a

Embed Size (px)

Citation preview

Ventura Regional Sanitation District

Operations Plan

2005

Ventura Regional Sanitation District

Operations Plan

2005

Prepared by

Fred Drennan, Team Safety, Inc.1001A Creekside Way Ojai, CA 93023 805.646.3050

VRSD - Disaster Operations Plan - iii

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

1. Plan Overview .................................................................................................................................................. 11.1 Purpose ................................................................................................................................................................................ 21.2 Scope ................................................................................................................................................................................ 21.3 Policy ................................................................................................................................................................................ 21.4 Definition ................................................................................................................................................................................ 21.5 Responsibility ................................................................................................................................................................................ 2

1.5.1 Chain of Command ......................................................................................................................................................... 21.5.2 Disaster Response Team ................................................................................................................................................ 21.5.3 All Other Personnel ......................................................................................................................................................... 2

1.6 Operations Overview ...................................................................................................................................................................... 51.7 Disaster Vulnerability Analysis ........................................................................................................................................................ 5

2. Water and Wastewater Vulnerability and Damage Assessment .................................................................... 62.1 Triunfo Sanitation District - Oak Park Water Service ................................................................................................................. 8

2.1.1 Overview ......................................................................................................................................................................... 82.1.2 Deerhill Office/Shop and Pump Station ......................................................................................................................... 102.1.3 Deerhill Critical Operation Valve System ...................................................................................................................... 132.1.4 Deerhill Water Tank ....................................................................................................................................................... 142.1.5 Savoy Pump Station ...................................................................................................................................................... 152.1.6 Savoy Water Tank ......................................................................................................................................................... 162.1.7 Lambourne Booster Station ........................................................................................................................................... 172.1.8 Smoketree Booster Station ........................................................................................................................................... 192.1.9 Conifer Water Tank ........................................................................................................................................................ 202.1.10 Lindero Pump Station .................................................................................................................................................... 212.1.11 Kilburn Water Storage Tank ........................................................................................................................................... 23

2.2 Triunfo Sanitation District Lift Stations ................................................................................................................................... 252.2.1 Lake Sherwood Pump Station ....................................................................................................................................... 262.2.2 Lake Sherwood Polo Field Pump Station ...................................................................................................................... 272.2.3 Bell Canyon Pump station ............................................................................................................................................. 282.2.4 Westlake Pump Station ................................................................................................................................................. 292.2.5 North Ranch Pump Station ........................................................................................................................................... 30

2.3 Piru Treatment Plant ................................................................................................................................................................... 322.3.1 Piru Office and Treatment Facility ................................................................................................................................. 332.3.2 Aeration, Clarifier, and Digester Tanks .......................................................................................................................... 342.3.3 Digester Tanks ............................................................................................................................................................... 352.3.4 Biosolids Bed and Perimeter Walls ............................................................................................................................... 362.3.5 Piru Wells ...................................................................................................................................................................... 372.3.6 Piru Lift Station .............................................................................................................................................................. 38

Contents

VRSD - Disaster Operations Plan - iv

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

2.4 Montalvo Municipal Improvement District ............................................................................................................................... 392.4.1 Boardroom and Operations Building ..................................................................................................................... 422.4.2 Montalvo Dial Alarm and SCADA System............................................................................................................. 432.4.3 MCC and Main Power Disconnect ........................................................................................................................ 412.4.4 Headworks and Emergency Storage Basin .......................................................................................................... 442.4.5 Dry Well ................................................................................................................................................................ 452.4.6 Aeration and Clarifier ............................................................................................................................................ 462.4.7 Digester ................................................................................................................................................................. 472.4.8 Maintenance Building ............................................................................................................................................ 482.4.9 Main Power Lines ................................................................................................................................................. 492.4.10 Emergency Backup Generator .............................................................................................................................. 50

2.5 Saticoy Wastewater Treatment Plant ......................................................................................................................................... 522.5.1 SCADA and Headworks ........................................................................................................................................ 542.5.2 Odor Scrubbers ..................................................................................................................................................... 552.5.3 Sequencing Batch Reactors .................................................................................................................................. 562.5.4 Blower Motors ....................................................................................................................................................... 572.5.5 Digester ................................................................................................................................................................. 582.5.6 Emergency Backup Generator .............................................................................................................................. 592.5.7 Instrument Air ........................................................................................................................................................ 60

2.6 North Coast Lift Stations ............................................................................................................................................................ 612.6.1 Solimar Lift Station ................................................................................................................................................ 632.6.2 Faria Beach Lift Station ........................................................................................................................................ 652.6.3 Seacliff Lift Station ................................................................................................................................................ 662.6.4 Muscle Shoals Lift Station .................................................................................................................................... 67

2.7 Thomas Aquinas Water and Wastewater Treatment Plant ...................................................................................................... 682.7.1 Thomas Aquinas Treatment Plant ......................................................................................................................... 70

2.8 Rio Manor Mutual Water Co. ...................................................................................................................................................... 712.8.1 Rio Manor Well #1 ................................................................................................................................................ 732.8.2 Rio Manor Well #2 ................................................................................................................................................ 74

3. Solid Waste Facilities Vulnerability and Damage Assessment .................................................................... 753.1 Toland Landfill .................................................................................................................................................................... 76

3.1.1 Gasoline/Diesel Fuel Storage Tank ....................................................................................................................... 783.1.2 Toland Deep Well .................................................................................................................................................. 793.1.3 Toland Water Storage Tank ................................................................................................................................... 803.1.4 Flare System and Leachate Tanks ........................................................................................................................ 813.1.5 Water Truck Water Supply .................................................................................................................................... 823.1.6 Operations and Administration Building ................................................................................................................ 833.1.7 Pole Barn Vehicle Maintenance Building .............................................................................................................. 84

3.2 Bailard and Coastal Landfills Vulnerability and Damage Assessment ......................................................................... 863.2.1 Bailard Landfill Site ............................................................................................................................................... 873.2.2 Bailard Operations & Maintenance Center ........................................................................................................... 883.2.3 Bailard Water Tank ................................................................................................................................................ 893.2.4 Bailard Condensate Storage Tanks ....................................................................................................................... 90

VRSD - Disaster Operations Plan - v

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

3.2.5 Bailard Water Wells .............................................................................................................................................. 913.2.6 Electrical Power Transmission Lines .................................................................................................................... 923.2.7 VRSD Communications System ........................................................................................................................... 933.2.8 Coastal Flare ......................................................................................................................................................... 943.2.9 Coastal Flare Station ............................................................................................................................................ 95

4. Administration Offices Vulnerability and Damage Assessment .................................................................. 964.1 Site Description .................................................................................................................................................................. 97

APPENDICESAPPENDIX A - Zone Valve Opening Procedures ................................................................................................................. A-1APPENDIX B - Disaster Coordinator MASTER Damage Assessment Log ....................................................................... B-1APPENDIX C - Water and Wastewater Damage Assessment Log ..................................................................................... C-1APPENDIX D - Solid Waste Facilities Damage Assessment Log ...................................................................................... D-1APPENDIX E - Administrative Offices Damage Assessment Log ...................................................................................... E-1APPENDIX F - Site Coordinator Damage Assessment Log ................................................................................................ F-1

VRSD - Disaster Operations Plan - 1

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

Plan Overview

VRSD - Disaster Operations Plan - 2

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

1.1 PurposeThe number one problem affecting the outcome of adisaster is poor management of the event. The purposeof this Disaster Operations Plan is to prevent injury, savelives, limit damage to the environment and property, andrestore business operations as soon as possible during orafter a disaster.

California’s Title 8 (Cal-OSHA’s General Industry SafetyOrder [GISO] §3221) requires each employer to developan “Emergency Action Plan” (EAP). This plan fulfills thatobligation.

The Ventura Regional Sanitation District (VRSD) is alsosignatory to the Standardized Emergency ManagementSystem (SEMS) with the Office of Emergency Services.Even though this plan is not intended to meet the re-quirements of the SEMS program, it is mentioned asreference only.

Finally, this plan is intended to be a “living document,”constantly evolving as equipment and processes changeand as regulations evolve in regards to acts of terrorismand sabotage.

1.2 ScopeThis Disaster Operations Plan is intended for use byVRSD personnel and local response agencies in dealingwith disaster situations which may arise involving theDistrict’s operations.

1.3 PolicyVentura Regional Sanitation District personnel shall betrained to respond to disasters within a limited scope. Atno time shall personnel put themselves in danger.Their duties are to control incidental releases of hazard-ous materials, fires, flooding, and other events for thepurpose of protecting personnel, property, and theenvironment.

This plan should not be enacted to deal with an emer-gency such as an accident, injury, fire or isolated eventthat does not have the potential to affect the entireorganization. It is the responsibility of the DisasterCoordinator to assess the situation and decide whether toactivate the Disaster Operations Plan.

Each employee must be familiar with the guidelines toensure proper actions are taken in a timely manner.

1.4 DefinitionFor the purposes of this Plan, a disaster is defined as anevent that has the potential to affect the entire operation,its personnel, equipment, and the entire community; forexample, an earthquake, flood, or other major event.

1.5 ResponsibilityThe General Manager is ultimately responsible to ensurethat the content of this plan is reviewed and trainedannually with all VRSD employees.

In the event of a disaster, Senior personnel are respon-sible to assist in the control of the incident by coordinat-ing the activities with VRSD personnel and other emer-gency crews and agencies as necessary.

This analysis can not cover every situation that couldarise. Therefore, it is imperative that responsible person-nel use good judgment when making an operational ordamage assessment.

1.5.1 Chain of CommandA chain of command has been established with clearlines of authority that may be different from theorganization’s customary chain of command, seePage 3.

1.5.2 Disaster Response TeamThe VRSD has established a Disaster Response Team(DRT) made up of the senior, most experienced operat-ing personnel with broad knowledge of District opera-tions, see Team Responsibility chart on Page 4. During adisaster, the Disaster Response Team is responsible to(1) assess damage, (2) mitigate further damage toequipment, buildings and environment, prevent potentialinjury to personnel; and (3) start the recovery process.

1.5.3 All Other Personnel

All personnel who are not assigned to the DisasterResponse Team shall follow instructions from theirimmediate supervisor. If ordered to evacuate, theyshould do so in an orderly fashion.

1. Plan Overview

VRSD - Disaster Operations Plan - 3

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

DisasterCoordinator

Bill Smith

Asst. DisasterCoordinatorWater and

WastewaterGary Haden

Asst. DisasterCoordinator

AdministrationOffices

Sherrill Smith

Asst. DisasterCoordinator

Solid WasteGary Haden

Board MembersPublic Relations

*Alternate

SiteCoord.

Oak ParkWasteWater

Bob Pettitt

SiteCoord.SaticoyWasteWaterRaudelJuarez

Site Coord.(Active Landfill)

TolandRay Mel

Lloyd

Site Coord.(Inactive Landfills)Bailard, Coastal,Santa Clara, &Tierra RejadaPete Chariter

DISASTER RESPONSE TEAMCHAIN OF COMMAND

Disaster Response Coordinators

SiteCoord.

Oak ParkWater

Bob Pettitt

SiteCoord.

MontalvoMunicp.Improv-

mentNacho Godinez

VRSD - Disaster Operations Plan - 4

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

INDIVIDUALS IN CHARGE

Disaster CoordinatorBill Smith

Assistant Disaster CoordinatorWater and Wastewater: Gary HaydenAdministration Offices: Sherrill SmithSolid Waste: Gary Hayden

Site Disaster CoordinatorsAndy Hovey - BailardRay Mel Lloyd - TolandBob Pettit - Oak Park WaterJimmy Buckley -

Oak Park, Westlake,Bell Canyon, No. Ranch,and Lake Sherwood Waste Water

Doug Hansen (Montalvo)

RESPONSIBILITIES

1. Assess and determine when a major disaster exists.2. Terminate work operation and activate Disaster Response

Team.3. Receive assessment reports from all Assistant Disaster

Coordinators.4. Assist and coordinate recovery process.5. Conduct liaison with outside authorities.6. Brief board members on assessment reports.7. Brief news media.8. Prepare final Disaster Assessment and Recovery Report.

1. In a disaster, assume leadership role for coordinatingdisaster crews.

2. Authorize personnel assignments.3. Coordinate recovery process.

1. Account for personnel and if needed, arrange for move-ment of injured personnel.

2. Assess operational integrity and structural damage andreport to DC.

3. Take action to ensure and maintain emergency operation.4. Coordinate and direct emergency crews and contractors.5. Provide access to emergency breakout kits.6. If necessary, prepare injury and investigation reports.

TEAM RESPONSIBILITIES

VRSD - Disaster Operations Plan - 5

Ventura Regional Sanitation District

Disaster Operations Plan

1. Plan Overview

1.6 Operations Overview

The VRSD provides disposal of solid waste, the treat-ment of wastewater, and the delivery of potable water.The District serves 600,000 persons in Ventura County.The administrative offices are located at 1001 PartridgeDrive, Ventura, CA.

VRSD provides services to:

Eight cities:Camarillo, Fillmore, Ojai, Oxnard, PortHueneme, San Buenaventura, Santa Paula andThousand Oaks.

Nine special districts:Camarillo Sanitary, Camrosa Water, ChannelIslands Beach Community Services, MontalvoMunicipal Improvement, Ojai Valley Sanitary,Saticoy Sanitary, Triunfo Sanitation and VenturaCounty Waterworks Nos. 1 (Moorpark) and 16(Piru).

VRSD operates and maintains the following solidwaste sites:

Toland Landfill (Active)Bailard, Coastal, Santa Clara, and Tierra Rejadalandfills (inactive)

VRSD operates and maintains the following waterand wastewater Facilities:

4 Wastewater Treatment FacilitiesMontalvoThomas AquinasPiruSaticoy

6 Sewer Collections systemsTriunfo

5 Potable water systemsOak Park Water ServiceThomas AquinasRio Manor Mutual Water Co.

1 Recycled water system

1.7 Disaster Vulnerability AnalysisAll facilities are vulnerable to some extent to any numberof disasters. This plan was developed by Senior opera-tors along with the consulting firm of Team Safety, Inc.Together, they have evaluated the potential harm topeople, property, and the environment from all types ofpotential disaster. Each facility was assessed for poten-tial fire hazards, potential for hazardous material release,water damage, computer damage, and environmentalexposures. Each site was photographed and criticalprocess equipment was identified. Then a plan of actionwas developed, as appropriate for each site.

VRSD - Disaster Operations Plan - 6

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Water and Wastewater Services

Vulnerability and

Damage Assessment

VRSD - Disaster Operations Plan - 7

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Triunfo Sanitation DistrictOak Park Water Service

Vulnerability and

Damage Assessment

VRSD - Disaster Operations Plan - 8

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1 Triunfo Sanitary District - Oak ParkWater Services2.1.1 OverviewVRSD operates and maintains the Oak Park WaterService located in the unincorporated areas NearAgoura. The Triunfro Sanitation District owns the OakPark Water Service and it has its own board of directors.The facilities operated and maintained by the districtinclude:

• Approximately 60 miles of potable water lines, fourpotable water storage tanks (4,660,000 gallons),three pump stations, and two booster stations for theresidents of Oak Park.

• VRSD bills and collects user fees for over 4,600meters to cover operational costs of the district.

2. Water and Wastewater Services

UPPER DEERHILLZONE &LAMBOURNE

• In addition to providing potable water, the waterdistribution system has 419 fire hydrants and 32backflow systems for fire-fighting service.

Oak Park Water Service Facilities:

Deerhill Office & Pump Station Page 10Deerhill Water Tank Page 14Savoy Pump Station Page 15Savoy Water Tank Page 16Lambourne Booster Station Page 17Smoketree Booster Station Page 19Conifer Water Tank Page 20Lindero Pump Station Page 21Kilburn Water Tank Page 23

TO LOWER ZONE

VRSD - Disaster Operations Plan - 9

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

LOWER ZONESKILBURN &SAVOY

VRSD - Disaster Operations Plan - 10

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.2 Deerhill Office/Shop and Pump Station

The Deerhill Office/shop and Pump Station are locatedtogether near the cross streets of Doubletree Rd. andBishopwood Dr. The office and maintenance shop isopen 7:00 a.m. to 3:30 p.m., Monday through Friday.Two to three operators report to the office at 7:00 a.m.,then leave for the field. The buildings are constructed ofbrick.

This water pump station supplies water to the Deerhillwater storage tank which supplies 837 residences in theupper and lower Deerhill zone. At times, the Deerhilltank (see site map, page 8) also supplies 1550 resi-dences in the Conifer zones.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Inspect for structural damage to walls and

building.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Deerhill Office, Shop and Pump Station

OFFICE & SHOP

PUMP STATION

Isolation valve from the Doubletree turnout

Pump Station

Isolation valvelocated in street

Office & Shop

VRSD - Disaster Operations Plan - 11

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Deerhill Office and Pump Station (Cont)

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of equipment

for broken mounts or leaks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Surge tanks and hydro-pneumatic vesselsLower Deerhill Zone meter and 10-in. line

VRSD - Disaster Operations Plan - 12

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Deerhill Office and Pump Station (Cont)

POTENTIAL HAZARDS:Personnel: Potential exposure to 480 volt electrical.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Determine if operating on primary utility power

or emergency backup. May have to reset powerswitch.

2. Check status of flows at Logic Control.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

4. Inspect for equipment damage: Leaks, mountsand piping.

5 Manually operate pumps to ensure operation.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Deerhill project logic control

Deerhill master pump control center Deerhill water pumps and motors to fill Deerhill tank

Deerhill backup generator

VRSD - Disaster Operations Plan - 13

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.3 Deerhill Critical Operation Valve System

The Deerhill water tank can be isolated from the rest ofthe system using the Deerhill isolation valve. Close thisvalve to prevent water from draining out of the Deerhilltank if the system is damaged below the isolation valve.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Inspect for structural damage to walls and floor.

2. Inspect piping for leaks or other damage.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Deerhill dry well Vault interior - Isolation valves

Deerhill Water Tank

Dry well vault

VRSD - Disaster Operations Plan - 14

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.4 Deerhill Water Tank

This 2.1 million gallon concrete tank feeds the upper andlower Deerhill Zones to 1,100 Oak Park residents.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental:

Close proximity to residences poses threat offlooding.Local population water supply contamination.Soil erosion.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Park at Gate #2, not rooftop parking (Gate #1)

2. Walk to tank and inspect for obvious structuraldamage such as cracks or leaks.

3. Inspect Deerhill vault at Gate #2.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Deerhill water storage tank

Deerhill water storage tankrooftop parking

Gate 1 - Do not park here during disaster conditions

View from adjacent residences

VRSD - Disaster Operations Plan - 15

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.5 Savoy Pump Station

The Savoy Pump Station supplies water to the SavoyWater Tank. The isolation valve for this pump station isjust inside the pump station gate on the left.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Slip on vault entrance stairway.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Open vault and visually inspect before entering.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit, loss of power.

4. Inspect for equipment damage: Mounts andpiping.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Savoy vault entrance Doubletree turnout from the Savoy tank access road

Closer view

Vault Interior

VRSD - Disaster Operations Plan - 16

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.6 Savoy Water Tank

The 1.6 million gallon Savoy water storage tank supplies270 Savoy residents, 750 Lindero residents in the MonteCarlo tract, Oak Hills Elementary school, the EpiscopalChurch, and Tract 4354.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personal: No obvious hazards.Environmental:

Close proximity to residences poses threat offlooding.Local population water supply contamination.Soil erosion.

Savoy water storage tank

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Inspect for obvious structural damage such as

cracks or leaks, especially at the base of thetank.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

VRSD - Disaster Operations Plan - 17

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.7 Lambourne Booster Station

The Lambourne Booster Station is located in Oak Parkat Upper Deerhill Zone. This walled booster pumpstation supplies boosted water pressure to approximately50 residences on Lambourne and the upper sections ofDeerhill and Balantine roads.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of site.

2. Inspect for electrical damage: smoke, fire,arcing, damaged conduit, loss of power.

3. Inspect for equipment damage: Mounts andpiping.

4. Manually operate pumps to ensure they areoperational.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Lambourne booster water pump station Lambourne booster water pumpstation control panel

Vault interior

VRSD - Disaster Operations Plan - 18

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Lambourne Booster Station (Cont)

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:No significant hazards.

Lambourne surge tanks

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection for structural

damage: tanks, mounts, piping, wall.

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

VRSD - Disaster Operations Plan - 19

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.8 Smoketree Booster Station

The Smoketree Booster Station maintains high waterpressure to the Conifer Zone. It supplies water to 90residents from upper section of Smoketree and Button-wood down to Peregrine Road.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of building.

2. Inspect for electrical damage: smoke, fire,arcing, damaged conduit, loss of power.

3. Inspect for equipment damage: Mounts andpiping.

4. Manually operate pumps to ensure they areoperational.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Smoktree booster station entrance Smoketree facility structure

Smoketree facility pumpsand motors

VRSD - Disaster Operations Plan - 20

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.9 Conifer Water Tank

This one million gallon steel water tank supplies water toConifer zone for 1,300 Oak Park residents.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental:

Close proximity to residences poses threat offlooding.Local population water supply contamination.Soil erosion.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of the facility.

2. Inspect for obvious structural damage such ascracks or leaks, especially at the base of thetank.

3. Lift vault hatch door and look for leaks, brokenpiping inside vault.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Conifer water storage tank Conifer water tank vault entrance

Vault Interior

VRSD - Disaster Operations Plan - 21

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.10 Lindero Pump Station

The Lindero pump station fills the Kilburn water tankwhich supplies water to the Kilburn zone of about 520residences.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Determine if operating on primary utility poweror emergency backup.

3. Inspect for electrical damage: smoke, arcing.

4. Inspect for equipment damage: pumps, motors,mounts, flooding

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Lindero pump station entrance and facility structure Power to automatic-start backup generator

VRSD - Disaster Operations Plan - 22

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Lindero Pump Station (cont)

This pump station is equipped with a Data TerminalAccess Module (DTAM).

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential for exposure to 480v electrical.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

3. Inspect for electrical damage: smoke, arching.

4. Inspect for equipment damage: pumps, motors,mounts, flooding

5. Check operational flow status at DTAM.

6. Manually operate pumps to ensure they areoperational.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Lindero Interior water pumps and motors Master pump control panels

DTAM Information Panel

VRSD - Disaster Operations Plan - 23

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.1.11 Kilburn Water Storage Tank

The 860,000 gallon Kilburn water storage tank supplies520 residences.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personal: No obvious hazards.Environmental:

Close proximity to residences poses threat offlooding.Local population water supply contamination.Soil erosion.

Kilburn water storage tank

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Park at gate.

2. Walk to site. Perform a quick visual inspectionof facility.

3. Inspect for obvious structural damage such ascracks or leaks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

VRSD - Disaster Operations Plan - 24

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Triunfo Sanitation District

Lift Stations

Vulnerability andDamage Assessment

VRSD - Disaster Operations Plan - 25

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.2 Triunfo Sanitation District Lift StationsVRSD operates and maintains facilities at the followingTriunfo Sanitation District lift stations:

Lake Sherwood Pump Station Page 28662 Lake Sherwood DriveHidden Valley, CA 91361Polo Field Pump Station Page 292121 Stafford RoadHidden Valley, CA 91361Bell Canyon Pump Station Page 3062 1/2 Buckskin Rd.Bell Canyon, CA 91307

Westlake Pump Station Page 31Triunfo Canyon & Westshore LaneWestlake Village, CA 91361North Ranch Pump Station Page 32499 Country Valley RoadNorth Ranch, CA 91362

Each was assessed for critical process ranking (CPR),potential hazards, assets allocation, and correctiveactions.

NOTE: The Bell Canyon Site is not shown on this map.See page 30 for directions to site.

VRSD - Disaster Operations Plan - 26

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.2.1 Lake Sherwood Pump Station

The Lake Sherwood Pump Station is located directlyadjacent to the lake. The site consists of a pump station,bioxide chemical tank, backup generator, and electricalcontrol panel. This pump station is equipped with a DataTerminal Access Station (DTAM).

The CPR is rated “High” because of its proximity to thelake.

CRITICAL PROCESS RANKING:

Low Medium High

David Road Gate Combination: 4411 ____________

POTENTIAL HAZARDS:Personnel: Potential for exposure to chemical, gases,and electrical hazards.Environmental: Raw sewage spill directly into the lake.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Determine if operating on primary utility power oremergency backup.

3. Check DTAM for alarms and wet well fluid level.

4. Manually operate pump to ensure it is opera-tional.

5. Using gas detector, open wet well and check forhazardous atmosphere.

6. When safe, open wet well and visually confirmfluid level matches DTAM reading.

7. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

8. Inspect for equipment damage: Mounts, piping,tanks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Lake Sherwood - Lake Station

Chemical disinfectant

VRSD - Disaster Operations Plan - 27

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.2.2 Lake Sherwood Polo Field PumpStation

The Lake Serwood Polo Field pump station consists of alift station, backup generator, and electrical control panel.This pump station is equipped with a Data TerminalAccess Station (DTAM).

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: Raw sewage spill.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of facility.

2. Determine if operating on primary utility power oremergency backup.

3. Check DTAM for alarms and wet well fluid level.

4. Manually operate pump to ensure it is opera-tional.

5. Open wet well to visually confirm fluid levelmatches DTAM reading.

6. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

7. Inspect for equipment damage: Mounts, piping,tanks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Lake Sherwood - Polo field pump station

VRSD - Disaster Operations Plan - 28

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.2.3 Bell Canyon Pump Station

This pump station is equipped with a Data TerminalAccess Station (DTAM).

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No potential hazards.Environmental: Raw sewage spill into nearby resi-dences.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of the facility.

2. Determine if operating on primary utility power oremergency backup.

3. Check DTAM for alarms and wet well fluid level.

4. Manually run compressors.

5. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

6. Inspect for equipment damage: Mounts, piping,tanks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Bell Canyon pump station Bell Canyon - inside perimeter fence

VRSD - Disaster Operations Plan - 29

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.2.4 Westlake Pump Station

The Westlake Lift Station consists of a lift station, wetwell, and electrical control panel.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential for exposure to hazardous gases,and electrical hazards.Environmental: Raw sewage spill.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Determine if operating on primary utility power oremergency backup.

3. Open panel box and check wet well level gauge.

4. Manually operate pump to ensure it is opera-tional.

5. Using gas detector, open wet well and check forhazardous atmosphere.

6. When safe, open wet well and visually confirmfluid level matches DTAM reading.

7. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

8. Inspect for equipment damage: Mounts, piping,tanks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Westlake pump station

VRSD - Disaster Operations Plan - 30

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.2.5 North Ranch Pump Station

The North Ranch Pump Station consists of a Lift stationwith a backup generator and electrical control panel. Thispump station is equipped with a Data Terminal AccessStation (DTAM).

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential for exposure to hazardous gases,and electrical hazards.Environmental: Raw sewage spill into the nearby creek.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Determine if operating on primary utility power oremergency backup.

3. Check DTAM for alarms and wet well fluid level.

4. Manually operate pump to ensure it is opera-tional.

5. Using gas detector, open wet well and check forhazardous atmosphere.

6. When safe, open wet well and visually confirmfluid level matches DTAM reading.

7. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

8. Inspect for equipment damage: Mounts, piping,tanks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

North Ranch pump station Automatic startup backup generator

VRSD - Disaster Operations Plan - 31

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Piru Treatment PlantVulnerability and Damage Assessment

VRSD - Disaster Operations Plan - 32

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3 Piru Treatment Plant

The Piru Tretment Plant is owned by the County ofVentura. It processes 220, 000 gpd for 688 residences.An operator is on site Monday and Thursday for fourhours in the morning. VRSD operates and maintainsfacilities at the following Piru Treatment Plant facilities:

Piru Office & Treatment Facility Page 33Aeration, Clarifier and Digester Page 34Digester Tanks Page 35Bio Solids Bed andPerimeter walls Page 36Dry Well and Lift Station Page 37

VRSD - Disaster Operations Plan - 33

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3.1 Piru Office and Treatment Facility

The building is cinder block construction with primaryutility power.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator

1. Perform quick visual inspection of facility.

2. Determine if operating on primary utility power oremergency backup.

3. Check for obvious damage to building andpermeter walls.

4. Check blower room for equipment damage, fire,smoke, or electrical arching.

5. Check SCADA for alarms.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Blower roomPiru treatment facility and offices

Aeration

VRSD - Disaster Operations Plan - 34

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3.2 Aeration, Clarifier, and Digester Tanks

The Aeration are located together in one tank, with theDigester tanks nearby.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: Raw sewage spill

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of aeration,

clarifier, and digester tanks for operational andstructural damage.

2. Check for obvious damage to perimeter wallsand catwalks.

3. Determine if operating on primary utility power oremergency backup.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Aeration, Clarifier, and Digester Tanks

AERATION

CLARIFIER

DIGESTERTANKS

VRSD - Disaster Operations Plan - 35

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3.3 Digester Tanks

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: Raw Sewage spill.

DAMAGE ASSESSMENT

Site Disaster Coordinator

1. Perform a quick visual inspection.

2. Check for obvious damage to piplines.

3. Visually inspect for leaks and damage especiallyaround base of tank.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Digester Tanks

VRSD - Disaster Operations Plan - 36

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3.4 Biosolids Bed and Perimeter Walls

Open area used to dry out biosolids.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator

1. Perform a quick visual inspection of the facility.

2. Visually inspect perimeter wall for cracks ordamage.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Digester Tanks

VRSD - Disaster Operations Plan - 37

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3.5 Piru Influent Wells

This site contains both a dry and wet well.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential for exposure to hazardous gasesand electrical hazards.Environmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator

1. Perform a quick visual inpection of the facility.

2. Open dry well and inspect for damage and fluid.

3. Using gas detector, open wet well and check forhazardous atmosphere.

4. When safe, visually confirm fluid level.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Wells and headworks

VRSD - Disaster Operations Plan - 38

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.3.6 Piru Lift Station

This site contains a wet well, a dry well, and an electricalcontrol panel.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential for exposure to hazardous gasesand electrical hazards.Environmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator

1. Perform a quick visual inpection of the facility.

2. Determine if operating on primary utility power oremergency backup.

3. Open dry well and inspect for damage and fluid.

4. Check lift station for structural damage andoperating utility power.

5. Using gas detector, open wet well and check forhazardous atmosphere.

6. When safe, open wet well and visually confirmfluid level matches DTAM reading.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Piru lift station

VRSD - Disaster Operations Plan - 39

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Montalvo Municipal Improvement DistrictVulnerability and

Damage Assessment

VRSD - Disaster Operations Plan - 40

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4 Montalvo Municipal ImprovementDistrictThe Montalvo Municipal Improvement District is located at3555 Ventura Road, Ventura, CA. The District is man-aged by an elected board. It consists of a treatment plantand collection system that process 250,000 gallons ofwaste water per day. Maintenance crews operate sevendays a week; Monday through Friday from 7:00 a.m. to3:30 p.m. and Saturday through Sunday from 7:00 a.m. to11:00 a.m.

Additionally, Montalvo houses maintenance crews,collection crews and administrative staff that serve theNorth Coast, Piru, Saticoy, Thatcher, and St. ThomasAquinas lift stations.

VRSD - Disaster Operations Plan - 41

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.1 Boardroom and Operations Building

The “Boardroom” is of brick construction located near themain entrance to the Montalvo site. It houses the MotorControl Center (MCC), Supervisory Control and DataAcquisition (SCADA), and the Main Power Disconnectpanels.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Check for obvious structural damage.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit, loss of power.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Boardroom and operations building

VRSD - Disaster Operations Plan - 42

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.2 Montalvo Dial Alarm and SCADA System

The Dial Alarm and SCADA System are used to verifyplant integrity.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for electrical damage: smoke, fire,arcing, damaged conduit, loss of power

3. Check Dial Alarm system for plant integrity (redflashing light).

4. Check SCADA system to determine operationalstatus.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Dial Alarm SCADA System

MCC and SCADA System

VRSD - Disaster Operations Plan - 43

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.3 MCC and Main Power Disconnect

The Motor Control Center (MCC) and Main PowerDisconnect are located inside Boardroom/Operationsbuilding.

POTENTIAL HAZARD:Personnel: Exposure to electrical hazards.Environmental: No obvious hazards.

Emergency ShutdownIn the event of a disaster, it is not only important to shutdown power to damaged areas, but also to maintainpower to all functional operating systems. Electrical linesand circuits could become damaged causing shorts orfires. In addition, continued operation of pumps andmotors could cause spills and further equipment damage.

Main Power Disconnect

Individual EquipmentBreakers

EMERGENCY SHUT DOWN PROCEDURES:Responsible personnel must quickly identify the source ofequipment damage to determine the appropriate shut-down point. Electrical shutdown shall be controlled in thefollowing order:

1. At the source closest to the location of damage,typically a Hand/Off/Auto (HOA) switch.

2. At the MCC individual equipment breaker that con-trols the damaged equipment (labeled).

3. At the Main Power Disconnect. Use ONLY if theutility cannot be controlled at a source closer tothe actual damage.

The MCC and Main Power Disconnect are located insideOperations building.

VRSD - Disaster Operations Plan - 44

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.4 Headworks and Emergency Storage Basin

The influent pump structure or “headworks” receive allraw sewage entering the plant. This is the treatmentplant’s most critical process area. Fluid levels are moni-tored by the SCADA system.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of headworks.

2. Check fluid level in headworks to verify SCADAsystem reading.

3. Check for obvious structural damage.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Headworks - InteriorHeadworks - Top View

Emergency Storage Basin

VRSD - Disaster Operations Plan - 45

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.5 Dry Well

The Montalvo site has an open dry well configuration,accessible by a stairway.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Slip and fall on stairs, possible exposure toH2S, rotating shaft, loose equipment, raw sewage.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of the facility.

2. Verify ventilation is operating before entering thewell, or test atmosphere prior to entry.

3. Check for structural damage: cracks in walls,floor.

4. Inspect for electrical damage: smoke, fire,arcing, damaged conduit

5. Inspect for equipment damage: pumps, motors,piping.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Dry well stairway entry

Rotating shaft

VRSD - Disaster Operations Plan - 46

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.6 Aeration and Clarifier Equipment

The blower equipment, aeration tank, and clarifier arelocated together at this site. The blower equipmentsupplies air to the aeration tank as part of the process tosettle biosolids out of the waste stream.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of equipment.

2. Check fluid levels and operational integrity.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit

4. Inspect for equipment damage: pumps, motors,piping.

5. Inspect for structural damage: Blowers, struc-tural supports

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Aeration and clarifier tanks Blower equipment and electrical control panelBlower Equipment

VRSD - Disaster Operations Plan - 47

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.7 Digester

The Montalvo site has three separate digesters. Thedigesters contain microorganisms that further breakdownbiosolids in the waste stream.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Check fluid levels.

3. Inspect for equipment damage: pumps, motors,piping.

4. Inspect for structural damage: Look for obviousdamage to concrete wall and leaks.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Three digesters are located adjacent to one another

VRSD - Disaster Operations Plan - 48

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.4.8 Maintenance Building

The maintenance building is not used by VRSD. It is ofbrick construction and has been stripped of any equip-ment.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Check for obvious structural damage. Do not goinside.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Maintenance building is out of use and not part of Montalvo Operation

VRSD - Disaster Operations Plan - 49

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of overhead

power lines before entering the facility.

2. Inspect for electrical damage: smoke, fire,arcing, damaged transformer, loss of power.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.4.9 Main Power Lines

The main power lines supply 16,500 volts to the Montalvosite at the operations building.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: If power lines are down, danger of electricalshock or fire.Environmental: If power lines are downed, possible firehazard.

VRSD - Disaster Operations Plan - 50

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection.

2. Listen for operation.

3. Check for obvious structural damage: fuel leaks,mounts.

4. Inspect for electrical damage: smoke, fire,arcing, damaged transformer.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.4.10 Emergency Backup Generator

The emergency backup generator is located adjacent tothe office/changing room. This generator starts automati-cally if utility power goes down.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: Possible diesel fuel leak if damaged.

Backup Generator

Diesel Fuel Storage

VRSD - Disaster Operations Plan - 51

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Saticoy Wastewater Treatment PlantVulnerability and

Damage Assessment

VRSD - Disaster Operations Plan - 52

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.5 Saticoy Wastewater Treatment PlantThe Saticoy Wastewater Treatment Plant is located at1419 1/2 Lirio St., Saticoy, CA 93004. The plant pro-cesses approximately 250,000 GPM of waste water andserves 190 residences.

VRSD - Disaster Operations Plan - 53

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

PERCOLATIONPONDS

(Not to scale)

DIGESTER

Saticoy Wastewater Treatment Plant (Cont)

Site Map

VRSD - Disaster Operations Plan - 54

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of facility.

2. Check the SCADA for fluid levels in theheadworks

3. Enter headworks and lift grating to verify fluidlevels.

4. Check for obvious structural damage.

5. Check for equipment damage: piping, valves,pumps

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.5.1 SCADA and Headworks

The Supervisory Control and Data Acquisition (SCADA)and headworks are located within the operations buildingjust inside the facility gate. The influent pumps andstructure or “headworks” receive all raw sewage enteringthe plant.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential exposure to electrical hazardsEnvironmental: No obvious hazards

SCADA Headworks stairway and interior

Headworks grating

VRSD - Disaster Operations Plan - 55

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of equipment.

2. Check for obvious structural damage.

3. Inspect for electrical damage: smoke, fire,arcing, damaged transformer.

4. Inspect for equipment damage: leaks, piping,mounts.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.5.2 Odor Scrubbers

The odor scrubbers are located adjacent to the Sequenc-ing Batch Reactor Tanks.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: No obvious hazards

Odor Scrubbers

VRSD - Disaster Operations Plan - 56

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of equipment.

2. Check for obvious structural damage to stairs,catwalks, tank walls before climbing to reactor.

3. Check to see that motor-driven stir paddle isoperating.

4. Inspect for electrical damage: wiring, smoke,fire, arcing.

5. Inspect for equipment damage: leaks, piping,mounts.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.5.3 Sequencing Batch Reactors

The Sequencing Batch Reactors (SBRs) operate asoxidation and clarifying areas to settle biosolids out of thewaste stream. The Digester is located underground,immediately adjacent to the SBRs.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Slip and fall on stairway.Environmental: Leak could release untreated sewagespill into facility.

Reactor Tanks

Underground Digester

SBRs Catwalk

Digester

Stir Motor

VRSD - Disaster Operations Plan - 57

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of equipment.

2. Check for obvious structural damage to mounts,surrounding walls.

3. Inspect for electrical damage: wiring, conduit,smoke, fire, arcing.

4. Inspect for equipment damage: piping, mounts.

5. Manually cycle on to ensure operable.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.5.4 Blower Motors

The blower motors, which start automatically, supply airto the SBRs as part of the biosolids settling process.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential exposure to electrical hazardsEnvironmental: No obvious hazards

VRSD - Disaster Operations Plan - 58

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform quick visual inspection of equipment.

2. Check for obvious structural damage: cracks inconcrete decking.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

2.5.5 Digester

The digester contains biorganisms to breakdownbiosolids in the waste strream. The digester at theSaticoy site is located underground, below metal panels.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Slip and fall if decking damagedEnvironmental: No obvious hazards

Digester below metal panels

VRSD - Disaster Operations Plan - 59

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.5.6 Emergency Backup Generator

The emergency generator runs on natural gas and startsautomatically if utility power goes off line.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: Possible natural gas leak if damaged

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection.

2. Listen for operation.

3. Check for obvious structural damage: gas leaks,mounts.

4. Inspect for electrical damage: smoke, fire,arcing.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

VRSD - Disaster Operations Plan - 60

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.5.7 Instrument Air

This unit provides air for pneumatic instruments.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection.

2. Listen for operation.

3. Check for obvious structural damage: fittings,mounts.

4. Inspect for electrical damage: smoke, fire,arcing.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

VRSD - Disaster Operations Plan - 61

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

North Coast Lift StationsVulnerability and

Damage Assessment

VRSD - Disaster Operations Plan - 62

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.6 North Coast Lift StationsThe VRSD operates and maintains four lift stations thatserve the beach communities from Solimar Beach toMuscle Shoals. Waste water pumped from these liftstations travels south down the coast and is finallyprocessed at the City of Ventura Sanitation facility. Theselift stations are serviced by maintenance crews based atthe Montalvo site.

The photographs taken inside the Solimar Dry Well arerepresentative of the interior of all the wet wells at theselift stations.

CAUTION: Each North Coast Lift Station contains asealed wet well under pressure to the force main thatmust not be opened.

Solimar Lift Station Page 642945 Solimar Rd.Faria Beach Lift Station Page 634057 Faria Rd.Seacliff Lift Station Page 664057 Faria Rd.Mussel Shoals Lift Station Page 676210 Pacific Coast Hwy.

VRSD - Disaster Operations Plan - 63

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.6.1 Solimar Lift Station

The Solimar Lift Station contains a dry well with interiorelectrical control panel, piping and fluid level instrumenta-tion; a sealed, pressurized wet well, and a backupgenerator.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential exposure to hazardous gasses,raw sewage, and electrical hazards.Environmental: Raw sewage backup into residences.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Open dry well and test for hazardous atmo-sphere using a gas detector.

3. When safe, enter the dry well and inspect forelectrical damage: smoke, arcing.

4. Inspect for equipment damage: pumps, fluidleaks.

5. DO NOT OPEN wet well. (Under 80 # pressureseal; opening will cause overflow of wastewater.)

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Entrance from Pacific Coast Highway

Electrical control panels inside dry well

Dry well

Dry well interior - piping

VRSD - Disaster Operations Plan - 64

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Solimar Lift Station (Cont)

Fluid level instrument panel

VRSD - Disaster Operations Plan - 65

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.6.2 Faria Beach Lift Station

The Faria Beach Lift station contains a dry well, a sealedwet well, electrical control panel, and backup generator.The gate code is required for residential site entrance.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential exposure to hazardous gasses,raw sewage, and electrical hazards.Environmental: Raw sewage backup into residences.

GATE ACCESS CODE: _______________________

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Open dry well and test for hazardous atmo-sphere using a gas detector.

3. When safe, enter the dry well and inspect forelectrical damage: smoke, arcing.

4. Inspect for equipment damage: pumps, fluidlevels.

5. DO NOT OPEN wet well. (Under 80 # pressureseal; opening will cause overflow of wastewater.)

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Faria Beach residential gate access key pad Faria Lift Station keyed site entrance gate

Electrical control panel, backup generator, and dry well

Dry Well

VRSD - Disaster Operations Plan - 66

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.6.3 Seacliff Lift Station

The Seacliff Lift station is located at 4057 Faria Road. Itcontains a dry well, a sealed wet well, electrical controlpanel, and backup generator.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential exposure to hazardous gasses,raw sewage, and electrical hazards.Environmental: Raw sewage backup into residences.

GATE ACCESS CODE: _______________________(Same as Faria)

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Open dry well and test for hazardous atmo-sphere using a gas detector.

3. When safe, enter the dry well and inspect forelectrical damage: smoke, arcing.

4. Inspect for equipment damage: pumps, fluidlevels.

5. DO NOT OPEN wet well. (Under 80 # pressureseal; opening will cause overflow of wastewater.)

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Seacliff Lift Station site entrance gate Seacliff electrical control panel and backup generator

VRSD - Disaster Operations Plan - 67

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.6.4 Muscle Shoals Lift Station

The Muscle Shoals Lift station contains a dry well, asealed wet well, electrical control panel, and backupgenerator. This station is at the end of the North Coastline. If any of its processes shut down, there is no realimpact on the other lift stations; hence the “low” CPRranking.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Potential exposure to hazardous gasses,raw sewage, and electrical hazards.Environmental: Raw sewage backup into residences.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Open dry well and test for hazardous atmo-sphere using a gas detector.

3. When safe, enter the dry well and inspect forelectrical damage: smoke, arcing.

4. Inspect for equipment damage: pumps, fluidlevels.

5. DO NOT OPEN wet well. (Under 80 # pressureseal; opening will cause overflow of wastewater.)

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Muscle Shoals Lift Station site entrance gate Muscle Shoals site interior - electrical control panel

VRSD - Disaster Operations Plan - 68

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Thomas Aquinas Water and Waste WaterTreatment Plant

Vulnerability andDamage Assessment

VRSD - Disaster Operations Plan - 69

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.7 Thomas Aquinas Water and WastewaterTreatment PlantThe Thomas Aquinas Water and Wastewater plant islocated on the property of Thomas Aquinas College at10000 No. Ojai Road in Santa Paula. Enter the site viathe main entrance and proceed to the treatment plant site.

VRSD - Disaster Operations Plan - 70

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.7.1 Thomas Aquinas Wastewater Treatment Plant

The Thomas Aquinas Treatment Plant processes 22,000gallons of wastewater per day, serving 417 students andfaculty at the facility. It contains a below-ground digesterand aeration vaults, two water wells, and a new watertank installation. VRSD maintains and operates thetreatment plant.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazardsEnvironmental: Raw sewage backup into residencesand facility.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Check to ensure backup power is operating.

3. Inspect for structural damage: building, conduits,concrete walls.

4. Inspect for electrical damage: smoke, arcing.

5. Inspect for equipment damage: pumps, piping,mounts.

6. Inspect hazardous chemical storage: odors,leaks

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Treatment plant entrance Below-ground digester and aeration vaults

Water well #1 Water well #2

Hazardous chemicalcontainers

VRSD - Disaster Operations Plan - 71

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

Rio Manor Mutual Water Co.Vulnerability and

Damage Assessment

VRSD - Disaster Operations Plan - 72

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.8 Rio Manor Mutual Water Co.The Rio Manor Mutual Water Co. has two water wellslocated on St. Mary Dr., Oxnard. These wells serve 295residents.

The photo of the chemical storage tank at well #1 isrepresentative of the tank at well #2.

If power goes down, there is enough pressure in the5,000 water to maintain temporary service to residentsuntil power can be restored. If power cannot be immedi-ately restored, it will be necessary to bring a portablepower supply on site.

151 and 395 St. Mary Dr.

VRSD - Disaster Operations Plan - 73

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.8.1 Rio Manor Well #1

Rio Manor well #1 is located at 151 St. Mary Dr. The sitehas a water well, a 5,000 gal water storage tank, achemical storage unit inside a small wood structure, andan electrical control panel.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Exposure to electrical hazards from over-head power lines.Environmental: Potential chemical spill.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for downed overhead power lines beforeentering site.

3. Inspect chemical storage tank for damage:Leaks, odor, secondary containment integrity.

4. Manually run well pump to ensure it is opera-tional. Set Hand On Auto (HOA) to “Hand”.

5. Inspect for equipment damage: pumps, piping,building structure.

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Well #1 site entrance Chemical storage unit (Sodium Hypochlorite)

Secondarycontainment

Well #1 piping, water tank, and electrical control panel

VRSD - Disaster Operations Plan - 74

Ventura Regional Sanitation District

Disaster Operations Plan

2. Water and Wastewater Facilities

2.8.2 Rio Manor Well #2

Rio Manor well #2 is located at 395 St. Mary Dr. The sitehas a water well, a 5,000 gal water storage tank, achemical storage unit inside a small wood structure, andan electrical control panel. (The chemical storage, watertank, and electrical control panel are identical to those atthe well #1 site and are not pictured separately here.)

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Exposure to electrical hazards from over-head power lines.Environmental: Potential chemical spill.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for downed overhead power lines beforeentering site.

3. Inspect chemical storage tank for damage:Leaks, odor, secondary containment integrity.

4. Manually run well pump to ensure it is opera-tional. Set Hand On Auto (HOA) to “Hand”.

5. Inspect for equipment damage: pumps, piping,building structure.

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Well #2 site entrance Well #2 gate

MCC

Ventura Regional Sanitation District - Disaster Operations Plan - 75

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

Solid Waste FacilitiesVulnerability and Damage Assessment

Ventura Regional Sanitation District - Disaster Operations Plan - 76

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3. Solid Waste Facilities

Ventura Regional Sanitation District operates and main-tains the following solid waste sites:

Toland Landfill (active)Bailard Landfill (inactive)Coastal Landfill (inactive)Santa Clara Landfill (inactive)Tierra Rejada Landfill Landfill (inactive)

Each was assessed for critical process ranking (CPR),potential hazards, assets allocation, and correctiveactions.

The following sections present a detailed analysis andphotographs of critical processes, facilities and buildingsthat, if compromised, present the greatest threat toemployees, equipment, systems, and the community.

Toland Landfill Location Map

Ventura Regional Sanitation District - Disaster Operations Plan - 77

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1 Toland LandfillThe Toland Landfill is located at the end of Toland Rd., atthe Toland Road turnoff near the city of Santa Paula. Inthe event of a disaster, the primary areas of concern arethe prevention of fire, gas leaks, and the continuation oflandfill operations.

Ventura Regional Sanitation District - Disaster Operations Plan - 78

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.1 Gasoline/Diesel Fuel Storage Tank

The fuel storage tank supplies fuel to the landfill equip-ment. It is of metal construction, surrounded by a cementcontainment wall.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazards, unless spill.Environmental: A failure in the fuel storage facility couldcause a spill, contamination, fire, or explosion.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage to mounts.

3. Inspect for fuel leaks.

4. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

5. Inspect for equipment damage: pumps, motorsand piping.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Ventura Regional Sanitation District - Disaster Operations Plan - 79

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.2 Toland Deep Well

The water well and pump supply the entire Toland facility.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazards.Environmental: A failure in the pump or water supplycould prevent environmentally safe operation of thelandfill.

ENTRANCE CODE: ___________________________

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage: mounts, leaks.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

4. Inspect for equipment damage: pumps, motorsand piping.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Water well enclosure Well pump and manifold

Pump control panel

Water pump main power disconnect

Ventura Regional Sanitation District - Disaster Operations Plan - 80

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.3 Toland Water Storage Tank

This 600,000 gallon water storage tank provides all waterneeds for the landfill: fire utility, potable water for adminis-tration building, and dust control.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazards.Environmental: Flooding, soil erosion.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage: mounts, leaks,especially around base.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Toland Water Storage Tank

Ventura Regional Sanitation District - Disaster Operations Plan - 81

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.4 Flare System and Leachate Tanks

The flare system burns off landfill gas to control gasmigration. The leachate tanks collect landfill water toprevent ground water contamination.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: Possible exposure to gas or flash fire.Environmental: Air pollution from landfill gas andpossible groundwater contamination.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage: mounts, leaks.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

4. Inspect for equipment damage: pumps, motorsand piping.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Leachate water collection tanks Landfill gas flare system

Micro turbine power generator

Ventura Regional Sanitation District - Disaster Operations Plan - 82

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.5 Water Truck Water Supply

This facility supplies water to the water trucks for dustsuppression.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: Possible electrical or falling hazards frompump, motors, and tank.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage: mounts, supports,leaks.

3. Inspect for equipment damage: pumps, motorsand piping.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Ventura Regional Sanitation District - Disaster Operations Plan - 83

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.6 Operations and Administration Building

This modular building contains the administrative office,break room and personnel dressing area. It is occupiedfrom 6:00 a.m. to 5:00 p.m., Monday through Friday.About 20 employees are on site at any given time.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage: broken glass,exterior walls.

3. Inspect for fire system for leaks or damage.

4. Inspect potable water system for leaks ordamage.

Action:

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Mechanics building Fire sprinkler system

Administrtive building Fire protection control system

Ventura Regional Sanitation District - Disaster Operations Plan - 84

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.1.7 Pole Barn Vehicle Maintenance Building

This facility provides all vehicle maintenance for thelandfill.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: Possible falling hazards, such as roof mate-rial or overhead lights.Environmental: Possible small spills from fuels orlubricants.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.

2. Inspect for structural damage: mounts, concretepilings, overhead lighting.

3. Inspect for electrical damage: smoke, fire,arcing.

4. Inspect motor oil drum storage area for leaks.

5. Inspect for damage to gas cylinders.

Report findings and actions to Water & WastewaterAsst. Disaster Coordinator.

Ventura Regional Sanitation District - Disaster Operations Plan - 85

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

Bailard and Coastal LandfillsVulnerability and Damage Assessment

Ventura Regional Sanitation District - Disaster Operations Plan - 86

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2 Bailard Landfill and Coastal Flare

The Bailard Landfill and Coastal Flare are located Nearthe Santa Clara River bed off Victoria and at the corner ofVictoria and Gonzales streets in the city of Ventura. Theyare closed to public use; however, the facilities are stillsubject to environmental monitoring for ground waterwells, gas migration monitoring, surface gas monitoringand storm water run off.

The OMC building at the Bailard site, is the only structureon any of these sites that houses personnel. Fourpersonnel are permanently assigned.

Key areas of assessment at the Bailard and Coastal sitesare identified in the following sections.

Ventura Regional Sanitation District - Disaster Operations Plan - 87

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.1 Bailard Landfill Site

The Bailard Landfill site is inactive; however, VRSDpersonnel continue to monitor leachate and other mainte-nance operations. The site contains gas collection lines,water wells, a propane tank, telecommunication equip-ment, and operation and maintenance center.

The site is transected by major utility transmission lines.

Ventura Regional Sanitation District - Disaster Operations Plan - 88

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.2 Bailard Operations & Maintenance Center(OMC)

This facility contains offices, laboratory, and maintenancefacility. The propane gas tank is located adjacent to thefacility.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: Exposure to electrical hazards, propane gasleak.Environmental: Possible propane gas explosion.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection.

2. Inspect for downed overhead power lines beforeentering site.

Report findings to Solid Waste Plant DisasterCoordinator.

Operations building

Operations Building Main Electrical Panel (located behindbuilding)

Propane fuel tank

Ventura Regional Sanitation District - Disaster Operations Plan - 89

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.3 Bailard Water Tank

The water tank is located next to the condensate tankfacility. While this tank is no longer in use, it couldbecome a hazard if structurally damaged.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of tank.2. Check for structural damage to supports.

Action:

Report findings to Solid Waste Plant DisasterCoordinator.

Ventura Regional Sanitation District - Disaster Operations Plan - 90

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.4 Bailard Condensate Storage Tanks

The condensate tanks trap any condensed liquids comingoff the landfill gas collection lines. Pneumatic pumpssupply air to the condensate tanks.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazards.Environmental: No obvious hazards.

Condensate tanks

DAMAGE ASSESSMENT

Site Disaster Coordinator1. Perform a quick visual inspection of facility.2. Inspect for Structural damage: leaks, piping,

tank, mounts.

Action:Report findings to Solid Waste Plant DisasterCoordinator.

Pneumatic pumps

Ventura Regional Sanitation District - Disaster Operations Plan - 91

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.5 Bailard Water Wells

Each water well site contains a well, a pump unit, and theelectrical control panel.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: Exposure to electrical hazards.Environmental: No obvious hazards.

DAMAGE ASSESSMENT

1. Perform a quick visual inspection of facility.2. Look for downed power lines near facility.3. Inspect for Structural damage: leaks, piping,

tank, mounts.4. Inspect for electrical damage: arching, fire

Action:Report findings to Solid Waste Plant DisasterCoordinator.

Well 30 K 1 pump unit

Water Well 30 L 2 Well pump and electrical control panel

Well electrical control panel

Ventura Regional Sanitation District - Disaster Operations Plan - 92

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.6 Electrical Power Transmission Lines

These lines cross the Bailard Landfill diagonally on aneasement.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: Exposure to electrical hazards.Environmental: Downed power lines could cause fire.

DAMAGE ASSESSMENT

Disaster Coordinator1. Perform a quick visual inspection for downed or

damaged power lines.

Action:Report findings to Solid Waste Plant DisasterCoordinator.

Gas Collection Lines

Electrical Transmisison Lines

Ventura Regional Sanitation District - Disaster Operations Plan - 93

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.7 VRSD Communications Compound

This is the communication link to other VRSD facilities.All site computers are linked via this station. Loss ofcomputer communication in a disaster could present amajor problem if not immediately mitigated.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: No obvious hazards

.

DAMAGE ASSESSMENT

Disaster Coordinator1. Perform a quick visual inspection of facility.2. Inspect for structural damage: broken lines,

dishes.3. Inspect for electrical damage: arching, damaged

conduit.

Action:Report findings to Solid Waste Plant DisasterCoordinator.

Ventura Regional Sanitation District - Disaster Operations Plan - 94

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.8 Coastal Flare

The Coastal Flare Station is located across Victoria Ave.from the Bailard Landfill. This facility starts automati-cally to burn excess landfill gas if the power plant shutsdown. The flare burns gas to prevent gas migration.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: No obvious hazards.Environmental: Possible air pollution from escapinglandfill gas.

.

DAMAGE ASSESSMENT

Disaster Coordinator1. Perform a quick visual inspection of facility.2. Inspect for structural damage: tanks, mounts,

conduit3. Inspect for electrical damage: arching, smoke

Action:Report findings to Solid Waste Plant DisasterCoordinator.

Instrument air Electrical control panel and power disconnects

Coastal Flare location (not to scale)

Ventura Regional Sanitation District - Disaster Operations Plan - 95

Ventura Regional Sanitation District

Disaster Operations Plan

3. Solid Waste Facilities

3.2.9 Coastal Flare Station

This site contains the gas compressors and motors forflare operation.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARDS:Personnel: Exposure to electric shock and gas.Environmental: Possible air pollution from gas leaks.

DAMAGE ASSESSMENT

Disaster Coordinator1. Perform a quick visual inspection of facility.2. Inspect for electrical damage: arching, damaged

conduit.3. Inspect for equipment damage: piping, listen and

smell for gas leaks.

Action:Report findings to Solid Waste Plant DisasterCoordinator.

Gas compressors and motors Flare, gas compressors and motors

Ventura Regional Sanitation District - Disaster Operations Plan - 96

Ventura Regional Sanitation District

Disaster Operations Plan

4. Administrative Offices

Administrative OfficesVulnerability and Damage Assessment

Ventura Regional Sanitation District - Disaster Operations Plan - 97

Ventura Regional Sanitation District

Disaster Operations Plan

4. Administrative Offices

4. Administrative Offices Vulnerability Assessment

4.1 Site Description

The VRSD administrative office is located in leased spaceat 1001 Partridge Lane, Ventura, 93003. The facility isshared by other tenants and maintained by Ardent RealtyCo. (Ardent). Ardent is ultimately responsibile to assessvulnerability and damage to the building in the event of adisaster. Tenants are required to follow the ArdentEmergency Preparedness Plan, as necessary.

VRSD houses 23 full-time managerial, technical, andclerical staff at this location, including the principals of theDisaster Response Team (DRT). In the event of adisaster, the DRT is responsible to coordinate damageassessment for all District operations, and to ensure thesafe evacuation of administrative personnel if necessary.

CRITICAL PROCESS RANKING:

Low Medium High

POTENTIAL HAZARD:Personnel: No obvious hazardsEnvironmental: No obvious hazards.

DAMAGE ASSESSMENT

Disaster Coordinator and Asst. DisasterCoordinators1. Perform a quick visual inspection of facility.

2. Inspect for structural damage.

3. Inspect for electrical damage: smoke, fire,arcing, damaged conduit.

4. Determine if evacuation is necessary.

5. Ensure all staff are accounted for in the event ofan evacuation.

Action:

Report damage to the Ardent representative, or call911 for Fire or emergency assistance, as necessary.

Ventura Regional Sanitation District - Disaster Operations Plan A-1

Ventura Regional Sanitation District

Disaster Operations Plan

Zone Valve Opening Procedures

APPENDIX ASECONDARY/BACKUP WATER SUPPLIES

“Zone Valve Opening Procedures”

The following zone valve opening procedures will provide secondary/backupwater supplies to the tank that is off line either by disaster or intent.

NOTE: If the backup water supply system does not function,affected residents will be supplied with bottled water.

Ventura Regional Sanitation District - Disaster Operations Plan A-2

Ventura Regional Sanitation District

Disaster Operations Plan

Zone Valve Opening Procedures

APPENDIX A

BACKUP WATER FOR SAVOY TANK (Plan A) - Oak Park Water Services

PURPOSE Provide secondary/backup water to Savoy andLindero Zones when Savoy Tank is offline.

OPERATION Open intertie at Kanan and ChurchwoodRoads.(Note: See Savoy Tank (Plan B) if Kananand Churchwood intertie is damaged.)

PRIMARY ZONE Savoy

SECONDARY Lindero and Kilburn zones supplied byZONE Lindero Pump Station

APPROVAL: ____________________________________________________ DATE: ________________________

STEP SEQUENCE POTENTIAL HAZARDS

1. Check SCADA system foroperations status.

2. Go to intersection of Kananand Churchwood roads andopen red-painted valve.

3. Verify pressure at hydrantlocated on churchwood nextto school.

1. None

2. Traffic

3. None

1. Check SCADA system for operationsstatus.

2. a.) Wear reflective vest.b.) Use Stop/slow sign.c.) Use two-man crew if

available.d.) Spot vehicle in

intersection with flashers on.

3. None

PIPING COLOR CODE

Blue - Water

Purple - Reclaimed

Red - Zone valves (closed)

RECOMMENDED SAFETYACTION OR PROCEDURE

Kanan Intertie

Ventura Regional Sanitation District - Disaster Operations Plan A-3

Ventura Regional Sanitation District

Disaster Operations Plan

Zone Valve Opening Procedures

APPENDIX A

BACKUP WATER FOR SAVOY TANK (Plan B) - Oak Park Water Services

PURPOSE Provide secondary/backup water to Savoy Zonewhen Savoy Tank is offline and Kanan andChurchwood intertie is damaged.

OPERATION Open intertie at Cremona and Hawthorn (Back upplan if Kanan and Churchwood intertie is dam-aged).

PRIMARY ZONE Savoy

SECONDARY Lindero and Kilburn zones supplied byZONE Lindero Pump Station

APPROVAL: ____________________________________________________ DATE: ________________________

STEP SEQUENCE POTENTIAL HAZARDS

1. Force open turnout at SCADA

2. Notify Calleguas to manuallyopen the turnout.

3. Open red valve at Cremonaand Hawthorn.

1. None

2. Black Widow Spiders

3. None

1. None

2. None

3. None

PIPING COLOR CODE

Blue - Water

Purple - Reclaimed

Red - Zone valves (closed)

PREVENTION

Ventura Regional Sanitation District - Disaster Operations Plan A-4

Ventura Regional Sanitation District

Disaster Operations Plan

Zone Valve Opening Procedures

APPENDIX A

BACKUP WATER FOR DEERHILL 2 ZONE - Oak Park Water Services

PURPOSE Provide secondary/backup water to DeerhillLower Zone when Deerhill 2 Tank is off line.

OPERATION Open bypass pressure reducing valve (PRV) atDeerhill and Deerbrook vault.

PRIMARY ZONE Deerhill 2 Zone

SECONDARYZONE

APPROVAL: ____________________________________________________ DATE: ________________________

STEP SEQUENCE POTENTIAL HAZARDS

1. Change pump 5 setting atcontrol panel at Deerhill pumpstation (lowest setting, i.e.100 gpm).

2. Enter vault

3. Open gate valve.

1. None

2. Black Widow Spiders

3. None

1. None

2. Look for spiders before entering vault.

3. None

PIPING COLOR CODE

Blue - Water

Purple - Reclaimed

Red - Zone valves (closed)

PREVENTION

Lower Deerhill Hydrant Intertie Locations

Ventura Regional Sanitation District - Disaster Operations Plan B - 1Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator

MASTER

Damage Assessment Log

Ventura Regional Sanitation District - Disaster Operations Plan B - 2Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Oak Park Water

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Deerhill Office & Pump Station (High)All personnel accountedPower/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Deerhill Water Tank (High)StructureVaultOther

Savoy Pump Station (High)Electrical EquipmentPiping SystemOther

Savoy Water Tank (High)StructureOther

Lambourne Booster Station (Low)Power/BackupStructureFluid LevelsElectrical EquipmentPiping SystemOther

Smoketree Booster Station (Low)StructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 3Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Oak Park Water (Cont.)

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Conifer Water Tank (High)StructureVaultOther

Lindero Pump Station (High)Electrical EquipmentPiping SystemOther

Kilburn Water Tank (High)StructureOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 4Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Lift Stations

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Lake Sherwood Pump Station (High)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Polo Field Pump Station (High)Power/BackupChain LInk FencingFlowsElectrical EquipmentPiping SystemOther

Bell Canyon Pump Station (High)Power/BackupBuilding/wallsFluid LevelsElectrical EquipmentPiping SystemOther

Lindero Pump Station (High)VaultElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 5Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Lift Stations (Cont.)

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Westlake Pump Station (Medium)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

North Ranch Pump Station (Low)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 6Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogPIRU TREATMENT PLANT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Office and Treatment Facility (Medium)Power/BackupStructureElectrical EquipmentPiping SystemOther

Aeration, Clarifier, and Digester (High)Power/BackupStructuralElectrical EquipmentPiping SystemOther

Digester Tanks (Medium)StructureEquipmentPiping SystemOther

Biosolids Bed and Perimeter Walls (Low)StructuralOther

Lift StationFlowsElectrical EquipmentPiping System

Other

Ventura Regional Sanitation District - Disaster Operations Plan B - 7Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogMONTALVO MUNICIPAL IMPROVEMENT DISTRICT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Operations/Maintenance Buildings (Low)All personnel accountedStructuresPower/BackupPower LinesElectrical EquipmentDial AlarmSCADA SystemOther

Headworks and Emergency Basin (Med)FlowsStructuralElectrical EquipmentOther

Dry Well (Medium)FlowsStructureElectrical EquipmentOther

SBR and Blowers (High)StructuralElectrical EquipmentPumps/motorsOther

Digester (Low)FlowsStructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 8Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogSATICOY WASTEWATER TREATMENT PLANT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

SCADA and Headworks (High)StructuralPower/BackupElectrical EquipmentSCADA SystemOther

SBR and Blowers (High)StructuralElectrical EquipmentOther

Digester (Low)Fluid LevelsStructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 9Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogNORTH COAST LIFT STATIONS

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Solimar Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Faria Beach Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Seacliff Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Muscle Shoals Lift Station (Low)StructurePower/BackupElectrical EquipmentPiping System

Other

Ventura Regional Sanitation District - Disaster Operations Plan B - 10Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogTHOMAS AQUINAS WATER AND WASTEWATER

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Digester and Aeration Vaults (high)StructurePower/BackupElectrical EquipmentPiping SystemOther

Water WellsPower/BackupElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 11Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Master Damage Assessment LogRIO MANOR MUTUAL WATER COMPANY

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Rio Manor Water Well #1StructurePower/BackupElectrical EquipmentPiping SystemChemical Disinfectant StorageOther

Rio Manor Water Well #2StructurePower/BackupElectrical EquipmentPiping SystemChemical Disinfectant StorageOther

Ventura Regional Sanitation District - Disaster Operations Plan B - 12Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX B

Disaster Coordinator – Solid Waste Damage Assessment LogTOLAND LANDFILL

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Gasoline/Diesel Fuel Storage (High)Power/BackupStructuralElectricalEquipment

Deep Well (High)StructuralElectricalEquipment

Water Storage Tank (Medium)StructuralEquipmentLeaks

Flare and Leachate Tanks (High)StructuralElectricalEquipmentCogen

Water Truck Water Supply (Medium)StructuralEquipment

Admin & Ops. (Low)All personnel accountedStructuralEquipment

Pole Barn (Low)All personnel accountedStructuralEquipment

Ventura Regional Sanitation District - Disaster Operations Plan B - 13Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX BVENTURA REGIONAL SANITATION DISTRICT

Disaster Coordinator – Solid Waste Damage Assessment LogBAILARD AND COASTAL LANDFILLS

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

BAILARD LANDFILLAdmin & Ops. (Low)

All personnel accountedStructuralEquipment

Water Storage Tank (Medium)StructuralEquipmentLeaks

Condensate Storage Tanks (Low)Power/BackupStructuralElectricalEquipment

Water Wells (Low)StructuralElectricalEquipment

Power Transmission Lines (Low)Structural

COASTAL FLAREStructuralElectricalEquipment

Ventura Regional Sanitation District - Disaster Operations Plan C - 1Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator

Damage Assessment Log

Ventura Regional Sanitation District - Disaster Operations Plan C - 2Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Oak Park Water

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Deerhill Office & Pump Station (High)All personnel accountedPower/BackupStructureFlowsElectricalEquipmentOther

Deerhill Water Tank (High)StructureVaultOther

Savoy Pump Station (High)Electrical EquipmentPiping SystemOther

Savoy Water Tank (High)StructureOther

Lambourne Booster Station (Low)Power/BackupStructureFluid LevelsElectricalEquipmentOther

Smoketree Booster Station (Low)StructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 3Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Oak Park Water (Cont.)

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Conifer Water Tank (High)StructureVaultOther

Lindero Pump Station (High)Electrical EquipmentPiping SystemOther

Kilburn Water Tank (High)StructureOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 4Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Lift Stations

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Lake Sherwood Pump Station (High)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Polo Field Pump Station (High)Power/BackupChain LInk FencingFlowsElectrical EquipmentPiping SystemOther

Bell Canyon Pump Station (High)Power/BackupBuilding/wallsFluid LevelsElectrical EquipmentPiping SystemOther

Lindero Pump Station (High)VaultElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 5Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogTRIUNFO SANITARY DISTRICT - Lift Stations (Cont.)

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Westlake Pump Station (Medium)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

North Ranch Pump Station (Low)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 6Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogPIRU TREATMENT PLANT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Office and Treatment Facility (Medium)Power/BackupStructureElectrical EquipmentPiping SystemOther

Aeration, Clarifier, and Digester (High)Power/BackupStructuralElectrical EquipmentPiping SystemOther

Digester Tanks (Medium)StructureEquipmentPiping SystemOther

Biosolids Bed and Perimeter Walls (Low)StructuralOther

Lift StationFlowsElectrical EquipmentPiping System

Other

Ventura Regional Sanitation District - Disaster Operations Plan C - 7Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogMONTALVO MUNICIPAL IMPROVEMENT DISTRICT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Operations/Maintenance Buildings (Low)All personnel accountedStructuresPower/BackupPower LinesElectrical EquipmentDial AlarmSCADA SystemOther

Headworks and Emergency Basin (Med)FlowsStructuralElectrical EquipmentOther

Dry Well (Medium)FlowsStructureElectrical EquipmentOther

SBR and Blowers (High)StructuralElectrical EquipmentPumps/motorsOther

Digester (Low)FlowsStructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 8Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogSATICOY WASTEWATER TREATMENT PLANT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

SCADA and Headworks (High)StructuralPower/BackupElectrical EquipmentSCADA SystemOther

SBR and Blowers (High)StructuralElectrical EquipmentOther

Digester (Low)Fluid LevelsStructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 9Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogNORTH COAST LIFT STATIONS

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Solimar Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Faria Beach Lift Station (High)Structure

Power/BackupElectrical EquipmentPiping SystemOther

Seacliff Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Muscle Shoals Lift Station (Low)StructurePower/BackupElectrical EquipmentPiping System

Other

Ventura Regional Sanitation District - Disaster Operations Plan C - 10Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogTHOMAS AQUINAS WATER AND WASTEWATER

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Digester and Aeration Vaults (high)StructurePower/BackupElectricalEquipmentOther

Water WellsPower/BackupElectricalEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan C - 11Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX C

Assistant Disaster Coordinator – Master Damage Assessment LogRIO MANOR MUTUAL WATER COMPANY

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Rio Manor Water Well #1StructurePower/BackupElectrical EquipmentPiping SystemChemical Disinfectant StorageOther

Rio Manor Water Well #2StructurePower/BackupElectrical EquipmentPiping SystemChemical Disinfectant StorageOther

Ventura Regional Sanitation District - Disaster Operations Plan D - 1Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX D

Assistant Disaster Coordinator

Solid Waste Facilities

Damage Assessment Logs

Ventura Regional Sanitation District - Disaster Operations Plan D - 2Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX D

Assistant Disaster Coordinator – Solid Waste Damage Assessment LogTOLAND LANDFILL

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Gasoline/Diesel Fuel Storage (High)Power/BackupStructuralElectrical Equipment

Deep Well (High)StructuralElectrical EquipmentPiping System

Water Storage Tank (Medium)StructuralElectrical EquipmentLeaks

Flare and Leachate Tanks (High)StructuralElectrical EquipmentPiping System

Water Truck Water Supply (Medium)StructuralEquipment

Admin & Ops. (Low)All personnel accountedStructuralElectrical

Pole Barn (Low)All personnel accountedStructuralElectrical EquipmentChemical Storage

Ventura Regional Sanitation District - Disaster Operations Plan D - 3Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX D

Assistant Disaster Coordinator – Solid Waste Damage Assessment LogBAILARD, COASTAL AND SANTA CLARA LANDFILLS

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

BAILARD LANDFILLAdmin & Ops. (Low)

All personnel accountedStructuralEquipment

Water Storage Tank (Medium)StructuralEquipmentLeaks

Condensate Storage Tanks (Low)Power/BackupStructuralElectricalEquipment

Water Wells (Low)StructuralElectricalEquipment

Power Transmission Lines (Low)Structural

COASTAL FLAREStructuralElectricalEquipment

Ventura Regional Sanitation District - Disaster Operations Plan E - 1Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX E

Assistant Disaster Coordinator

Administrative Office - 1001 Partridge

Damage Assessment Logs

Ventura Regional Sanitation District - Disaster Operations Plan E - 2Assistant Disaster Coordinator Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX EVENTURA REGIONAL SANITATION DISTRICT

Assistant Disaster Coordinator – Solid Waste Damage Assessment LogADMINISTRATIVE OFFICES - 1001 PARTRIDGE

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Admin & Ops. (Low)All personnel accountedStructuralElectricalEquipmentComputersOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 1Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator

Damage Assessment Log

Ventura Regional Sanitation District - Disaster Operations Plan F - 2Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogTRIUNFO SANITARY DISTRICT - Oak Park Water

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Deerhill Office & Pump Station (High)All personnel accountedPower/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Deerhill Water Tank (High)StructureVaultOther

Savoy Pump Station (High)Electrical EquipmentPiping SystemOther

Savoy Water Tank (High)StructureOther

Lambourne Booster Station (Low)Power/BackupStructureFluid LevelsElectrical EquipmentPiping SystemOther

Smoketree Booster Station (Low)StructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 3Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogTRIUNFO SANITARY DISTRICT - Oak Park Water (Cont.)

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Conifer Water Tank (High)StructureVaultOther

Lindero Pump Station (High)Electrical EquipmentPiping SystemOther

Kilburn Water Tank (High)StructureOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 4Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogTRIUNFO SANITARY DISTRICT - Lift Stations

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Lake Sherwood Pump Station (High)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Polo Field Pump Station (High)Power/BackupChain LInk FencingFlowsElectrical EquipmentPiping SystemOther

Bell Canyon Pump Station (High)Power/BackupBuilding/wallsFluid LevelsElectrical EquipmentPiping SystemOther

Lindero Pump Station (High)VaultElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 5Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogTRIUNFO SANITARY DISTRICT - Lift Stations (Cont.)

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Westlake Pump Station (Medium)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

North Ranch Pump Station (Low)Power/BackupStructureFlowsElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 6Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogPIRU TREATMENT PLANT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Office and Treatment Facility (Medium)Power/BackupStructureElectrical EquipmentPiping SystemOther

Aeration, Clarifier, and Digester (High)Power/BackupStructuralElectrical EquipmentPiping SystemOther

Digester Tanks (Medium)StructureEquipmentPiping SystemOther

Biosolids Bed and Perimeter Walls (Low)StructuralOther

Lift StationFlowsElectrical EquipmentPiping System

Other

Ventura Regional Sanitation District - Disaster Operations Plan F - 7Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogMONTALVO MUNICIPAL IMPROVEMENT DISTRICT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Operations/Maintenance Buildings (Low)All personnel accountedStructuresPower/BackupPower LinesElectrical EquipmentDial AlarmSCADA SystemOther

Headworks and Emergency Basin (Med)FlowsStructuralElectrical EquipmentOther

Dry Well (Medium)FlowsStructureElectrical EquipmentOther

SBR and Blowers (High)StructuralElectrical EquipmentPumps/motorsOther

Digester (Low)FlowsStructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 8Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogSATICOY WASTEWATER TREATMENT PLANT

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

SCADA and Headworks (High)StructuralPower/BackupElectrical EquipmentSCADA SystemOther

SBR and Blowers (High)StructuralElectrical EquipmentOther

Digester (Low)Fluid LevelsStructureEquipmentOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 9Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogNORTH COAST LIFT STATIONS

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Solimar Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Faria Beach Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Seacliff Lift Station (High)StructurePower/BackupElectrical EquipmentPiping SystemOther

Muscle Shoals Lift Station (Low)StructurePower/BackupElectrical EquipmentPiping System

Other

Ventura Regional Sanitation District - Disaster Operations Plan F - 10Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogTHOMAS AQUINAS WATER AND WASTEWATER

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Digester and Aeration Vaults (high)StructurePower/BackupElectrical EquipmentPiping SystemOther

Water WellsPower/BackupElectrical EquipmentPiping SystemOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 11Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogRIO MANOR MUTUAL WATER COMPANY

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Rio Manor Water Well #1StructurePower/BackupElectrical EquipmentPiping SystemChemical Disinfectant StorageOther

Rio Manor Water Well #2StructurePower/BackupElectrical EquipmentPiping SystemChemical Disinfectant StorageOther

Ventura Regional Sanitation District - Disaster Operations Plan F - 12Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX F

Site Disaster Coordinator – Damage Assessment LogTOLAND LANDFILL

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

Gasoline/Diesel Fuel Storage (High)Power/BackupStructuralElectricalEquipment

Deep Well (High)StructuralElectricalEquipment

Water Storage Tank (Medium)StructuralEquipmentLeaks

Flare and Leachate Tanks (High)StructuralElectricalEquipmentCogen

Water Truck Water Supply (Medium)StructuralEquipment

Admin & Ops. (Low)All personnel accountedStructuralEquipment

Pole Barn (Low)All personnel accountedStructuralEquipment

Ventura Regional Sanitation District - Disaster Operations Plan F - 13Site Disaster Coordinator Master Disaster Logs

Ventura Regional Sanitation District

Disaster Operations Plan

APPENDIX FVENTURA REGIONAL SANITATION DISTRICT

Disaster Coordinator – Solid Waste Damage Assessment LogBAILARD AND COASTAL LANDFILLS

PLANT PERSONNEL & EQUIPMENT OK Not OK COMMENT

BAILARD LANDFILLAdmin & Ops. (Low)

All personnel accountedStructuralEquipment

Water Storage Tank (Medium)StructuralEquipmentLeaks

Condensate Storage Tanks (Low)Power/BackupStructuralElectricalEquipment

Water Wells (Low)StructuralElectricalEquipment

Power Transmission Lines (Low)Structural

COASTAL FLAREStructuralElectricalEquipment