Page 1: VGD-33 single unit upgrade to parallel system

VGD-33 single unit upgrade to parallel system

• All single units must work properly• Installation of the external cables and power cords: all

should be connected firmly.

Page 2: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0010N single unit PCB setting

• PCB P430 : CN26 pin 1-2

CN28 pin 1-2• PCB P386 : CN17 , CN27 , CN37 : short• PCB P428 : SW2-1 : short

SW2-2 : short

CN22 , CN23 : pin 2-3

Page 3: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0011N parallel system PCB setting

• PCB P267: Master UPS : SW1-1 : OFF

SW1-2 : ON Slave UPS : SW1-1 : ON

SW1-2 : OFF

• PCB P430 : CN26 : pin 2-3

CN28 : pin 2-3

• PCB P386 : CN17 , CN27 , CN37 : open

• PCB P428 : SW2-1 : open

SW2-2 : open

CN22 , CN23 : pin 1-2

Page 4: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0010N parallel system PCB placement

115-P390-011

111-P349-051

112-P263-011

Bridge diodeResister

Resister

Terminal block

110-P430-010

112-P428-021

Page 5: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0011N parallel system PCB placement

115-P390-011

111-P349-051

112-P263-011

Bridge diodeResister

Resister

Terminal block

110-P430-010

112-P428-021

110-P267-010

Page 6: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0010N single unitPCB placement photo

Page 7: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0011N parallel systemPCB placement photo

Bridge rectifier andGolden aluminum shelled resistors

Terminals

Page 8: VGD-33 single unit upgrade to parallel system

Parallel system cable connect

Page 9: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0010N single unit SCH.

Page 10: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0011N parallel system SCH-1.

Page 11: VGD-33 single unit upgrade to parallel system

VGD-40K3-DTT-0011N single unit SCH-2

Page 12: VGD-33 single unit upgrade to parallel system

Caution

• All cables should be connected correctly; tighten any loose connection.

• There should be no missing or loose parts found on the PC board.

If any of the above faulty circumstances occur, please

test again after completion of troubleshooting.

Page 13: VGD-33 single unit upgrade to parallel system

CAN BUS setting

• Disconnect P430 CN7 connector first• Turn on MST input power• Enter Paramt -> Communic menu for settings • Equipm. Address: 001 Metro Address : 001 CAN Address : 001• Turn on SLV input power• Enter Paramt -> Communic menu for settings • Equipm. Address: 002 Metro Address : 002 CAN Address : 002

Page 14: VGD-33 single unit upgrade to parallel system

Power-on without Main Power Supply

• Turn on MST and SLV EPO switches, panel ON.ON. Wait about 1 minute and the system will move to INV.Confirm MST panel is indicating Parallel_MST_OK and SLV panel is indicating Parallel_SLV_OKConfirm MST and SLV panel system is working in the INVERTER modeConfirm MST panel and SLV panel settings via Paramt-> Test PrmPDS=0POV=0PNU=2PBP=2PIV=2MST panel OFF, ON, and confirm MST and SLV are all wired to BYPASSTurn off EPO switchTurn off MST and SLV input power

• Disconnect the external CN4 25P connector of SLVTurn on MST and SLV input powerConfirm MST panel is indicating Parallel_MST_OK and SLV panel is indicating Parallel.BusTurn on EPO switch, panel ON.ONTurn off MST and SLV input power

• Re-connect CN4 25P connector and disconnect the external CN1 and CN2 connectors of SLVTurn on MST and SLV input powerTurn on EPO switch, panel ON.ONConfirm MST panel is indicating Parallel_MST_OK and SLV panel is indicating Parallel.BusTurn off MST and SLV input power

Page 15: VGD-33 single unit upgrade to parallel system

Power-on with Main Power Supply

• Confirm the phase is locked• Re-connect two 430 CN7 connectors• Two sets of UPS P428: SW2-1 OFF, SW2-2 ON• Turn on MST and SLV input power• Turn on EPO switch• Wait about 1 minute, two UPS INVERTERs will start operation• Confirm MST and SLV panels are working properly and do not

display any error message. MST panel is indicating Parallel_MST and SLV panel is indicating Parallel_SLV

• Turn on MST and SLV battery switches• Turn off input switches simultaneously• Confirm the two sets have the same output waveform, phase

and voltage

Page 16: VGD-33 single unit upgrade to parallel system

Power-on with Main Power Supply

• EPO, output switch and maintenance bypass switch are confirmed• MST EPO switch OFF, confirm MST and SLV outputs are all closed• MST EPO switch ON, wait for MST and SLV to turn to INVERTER• SLV EPO switch OFF , confirm MST and SLV outputs are all closed• SLV EPO switch ON , wait for MST and SLV to turn to INVERTER• Turn off MST output switch, and confirm MST is switched to SINGLE and SLV is switched to

MST• Turn on MST output switch, panel ON.ON, and wait for the original MST to be switched from

SINGLE to MST• Turn off SLV output switch, and confirm SLV is switched to SINGLE• Turn on SLV output switch, panel ON.ON, and wait for the original SLV to be switched from

SINGLE to SLV• MST panel OFF, ON, and confirm MST and SLV system is wired to bypass• Turn on MST maintenance bypass switch, and confirm MST and SLV panels are indicating

Parallel Sys., Manten. Byp• Turn off MST maintenance bypass switch• Turn on SLV maintenance bypass switch, and confirm MST and SLV panels are indicating

Parallel Sys., Manten. Byp• Turn off SLV maintenance bypass switch• Wait for the INVERTER of MST and SLV system to be reset• If all the above functions work properly, the parallel units may be operated properly.