PG&E2016 ES RFO

Offer Package Checklist

These checklists are to aid Participants in ensuring that all required materials are included in the Offer Package to be submitted to PG&E for the 2016 Energy Storage Request for Offers by January 31, 2017 by 1:00 PM PPT. All information provided should be consistent across all documents and files (i.e., Offer and variations listed in the Introductory Letter should match the number of submitted Offer Forms, Project address/coordinates in the Offer Form should match site control details, etc.)

Non-Utility Ownership & Utility Ownership Projects

□ Introductory Letter(Each Participant must submit an Introductory Letter per Offer, providing summary

information about the Offer and subsequent Variations of the Offer, Project, etc.)

□ Appendix A – Offer Form (Each unique offer and variation requires a separately completed Offer Form)

□ Appendix B1 – Project Description

□ Appendix B2 – Site Control

□ Appendix B3 – Project Milestone Schedule

□ Appendix B4 – Experience Qualifications

□ Appendix B5 – Electric Interconnection

□ Appendix B6 – Organizational and Finance Information

□ Appendix C – FERC 717 Waiver

Additional Document for Utility Ownership Projects

□ Appendix B7 – PSA Additional Information