Okkf.kT;&tks/kiqj [email protected];&tks/kiqj [email protected];&tks/kiqj [email protected];&tks/kiqj fMLdkWe@351351351351
Øekad % tksØekad % tksØekad % tksØekad % tks----fofofofo----fofofofo----fufufufu----fyfyfyfy----@@@@vvvv----çççç----fufufufu----@@@@eqeqeqeq----vvvv----¼lhih,e½@¼lhih,e½@¼lhih,e½@¼lhih,e½@vvvv----vvvv----¼vkj¼vkj¼vkj¼vkj----,,,,----okokokok----½Qk @çs½Qk @çs½Qk @çs½Qk @çs---- 1782178217821782 fnfnfnfn---- 0911.06
vkns”kvkns”kvkns”kvkns”k
fo"k;% fo"k;% fo"k;% fo"k;% dkVs gq, df̀’k Js.kh ds fo|qr dusD”kuksa dks iqu% tksM+us ckcr~AdkVs gq, df̀’k Js.kh ds fo|qr dusD”kuksa dks iqu% tksM+us ckcr~AdkVs gq, df̀’k Js.kh ds fo|qr dusD”kuksa dks iqu% tksM+us ckcr~AdkVs gq, df̀’k Js.kh ds fo|qr dusD”kuksa dks iqu% tksM+us ckcr~A
df̀’k Js.kh ds miHkksDrkvksa dks jkgr nsus ,oa fuxe dh cdk;k jkf”k dh olwyh gsrq
leUo; lfefr dh 97oha cSBd] tks fd 28 flrEcj 2006 dks gqbZ Fkh] esa bl fo’k; ij fopkj foe”kZ
fd;k x;kA bl cSBd esa dVs gq, df̀’k dusD”kuksa ls fuxe dh cdk;k jkf”k fd”rksa esa Lohdkj djds
iqu% dusD”ku tksM+us gsrq fuEufyf[kr fu.kZ; fy;s x;s%&
1- çFke fd”r ds :Ik esa ;Fkk lEHko dqy cdk;k jkf”k dh 50 çfr”kr jkf”k
tek djkus ds Ik”pkr~] fo|qr dusD”ku rqjUr tksM+ fn;s tkosaA
2- “ks’k 50 çfr”kr jkf”k gsrq] nks cjkcj ekfld fd”rsa Lohdr̀ dj nh tk;saA
mijksDr vkns”k dh ikyuk rqjUr dh tkosA
vkKk lsvkKk lsvkKk lsvkKk ls
¼,¼,¼,¼,----,e,e,e,e---- yksBkyksBkyksBkyksBk½½½½ eq[;eq[;eq[;eq[; vfHk;Urk ¼lhvfHk;Urk ¼lhvfHk;Urk ¼lhvfHk;Urk ¼lh----ihihihih----,e,e,e,e----½½½½ tks/kiqj fMLdkWe] tks/kiqjtks/kiqj fMLdkWe] tks/kiqjtks/kiqj fMLdkWe] tks/kiqjtks/kiqj fMLdkWe] tks/kiqj
COMML.JDP/352
JODHPUR VIDYUT VITARAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2006-07/D.1783 Dt.09-11-06
ORDER
Sub : Calculation of the requirement of additional security on
the basis of average consumption of electricity for the
preceding twelve months.
In accordance with the Clause-16(d) “Annual Review of
Security Amount” of TCS-04, the Nigam reviews at the beginning of each
financial year, the requirement of security amount from the consumer to
cover the average consumption of electricity for the preceding twelve
months. As per practice in vogue, the average consumption is taken for the
preceding period of billing months of April to March (i.e. consumption
months of March to April ) of every year.
Some of the consumers have represented against above
methodology. They have protested that the period of calculating the
average consumption of preceding 12 months should be considered as
consumption months of April to March of every year i.e. billing months of
May to April.
The matter was put up in 97th meeting of the Coordination
Committee held on 28-09-06. The Coordination Committee decided that
position be clarified for the information of field officers. Accordingly,
following procedure be adopted for calculating the additional amount of
security deposit :
The period for arriving at the amount of additional security
deposit be taken as consumption months of April to March i.e.
billing months of May to April of preceding twelve months, instead
of present practice of considering consumption months of March to
February i.e. billing months of April to March.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/353
JODHPUR VIDYUT VITARAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2006-07/D.1784 Dt.09-11-06
ORDER
Sub : Limitation prescribed by Law in raising Debits as a
consequence to meter found defective on testing-Debiting
the assessment within 2 years.
With regard to limitation of law applicable in the matter of
amount due from any consumer relating to Electricity Charges etc. Section
56(2) of the Electricity Act-03 is applicable. The same is reproduced
hereunder :-
Sec.56(2):
“Notwithstanding anything contained in any other law for the
time being in force, no sum, due from any consumer under this section,
shall be recoverable after a period of two years from the date when such
sum became first due unless such sum has been shown continuously as
recoverable, as arrear of charges for electricity supplied and the licensee
shall not cut off the supply of the electricity”.
On the basis of the provisions of the Electricity Act, similar
provision exists in the Electricity Supply Code notified by the R.E.R.C.
and also in the “Terms and Conditions for Supply of Electricity-04”. The
clause 39 of the Electricity Supply Code and the clause-49 of the TCS-04
is relevant on the subject matter. Clause 49 of TCS-04 is also reproduced
hereunder :-
Clause-49 of TCS-04 :
“No sum due from any consumers on account of charges for
electricity or any sum other than a charge for electricity shall be
Page 01 of 04
COMML.JDP/353
-: 2 :-
recoverable after a period of two years from the date when such sum
became first due unless such sum has been shown continuously as arrears
and the Nigam shall not cut off supply of electricity ”.
On perusal of the aforesaid provisions, it is clear that no sum
due from any consumer is recoverable after a period of two years from the
date when such sum become first due unless such sum has been shown
continuously as arrear of charges for Electricity Supply and the licensee
shall not cur off the supply of the electricity. It is, therefore, necessary to
know that if a period of two years has passed from the date any amount of
electricity charges becomes first due from any consumer and in case the
demand has not been raised within the prescribed two years period, the
same cannot be recovered.
If this provision is applied in cases where the metering
equipment of the consumer is checked by the meter wing officers and in
case the meter is found to be stopped or meter is declared as defective on
the basis of test report, in such cases, the assessment under clause-27 of the
TCS-04 or under clause 28 of the TCS-04 is required to be made. If the
assessing officer fails to assess the amount and debit the same in the bill of
the consumer and if a period of two years has passed from the date of
checking then the amount cannot be recovered in terms of Section-56(2) of
the Electricity Act-2003 as the same becomes time barred and there is no
provision in the Act for condoning the delay occurred in raising the
demand.
The State Regulatory Commission had also decided cases
involving delay in debiting assessment amount to Ajmer Discom in the
Page 02 of 04
COMML.JDP/353
-: 3 :-
petition No.RERC/90/06 and 91/06 in the matter of M/S Sisodia Marble
and Granites Pvt. Ltd. & M/S Sem Polymer Pvt. Ltd., Udaipur. Based on
the directions/orders of RERC as laid down while deciding aforesaid
petitions the sum becomes due from the date when the meter is found
defective or metering errors are detected as per test report whichever is
later, and the same is required to be debited within limitation period of two
years failing which the assessment would become time barred in terms of
Sec.56(2) of Electricity Act and hence not recoverable from consumer.
This matter was submitted for consideration of the
Coordination Committee in its 97th meeting held on 28
th Sept., 06. The
Coordination Committee noted the position brought out in the agenda note
and also noted that circular be issued by Discoms to sensitise the field
officers to take care of limitation bar in raising debits of assessment.
From the position submitted above, it is clear that if the
demand for electricity charges is raised after expiry of two years from the
date of testing, the same is not recoverable because of limitation prescribed
under the Electricity Act-2003 and therefore utmost care is necessarily
required in keeping watch over such demands to avoid these becoming
barred by limitation of law as prescribed by Electricity Act, and causing
further implications.
It is, therefore, enjoined upon all field officers to strictly
follow the instruction enumerated herein above.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/
JODHPUR VIDYUT VITARAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2006-07/D.1829 Dt.15.11.06
ORDER
Sub : Replacement of burnt/damaged Push Fit Energy
Meters.
Jodhpur Discom is installing Push Fit Static Energy Meters
through armoured cable/service lines to prevent unauthorized extraction of
energy by the miscreant consumers under Feeder Renovation Programme.
It has been reported that some of the consumers are approaching for
replacement of burnt/damaged push fit static meters at the cost of Nigam
being under guarantee period.
The matter was discussed in 97th Coordination Committee
Meeting held on dtd.28-09-2006 and it was decided that the burnt/damaged
Push Fit Static Meters of the consumers may be replaced at the cost of
Discom provided that these meters are covered under Guarantee Period
and no complaint/report regarding tempering or any vigilance report has
been lodged/pending against the consumer.
It is enjoined upon all the concerned to follow above direction
strictly.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/355
JODHPUR VIDYUT VITARAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2006-07/D.1830 Dt.15.11.06
ORDER
Sub : Replacement of burnt/damaged Service Lines.
At present the Jodhpur Discom is replacing the old
damaged/defective service lines of consumers through armoured cable to
prevent unauthorized extraction of energy as part of Feeder Renovation
Programme. It has been reported that some of the consumers are
approaching replacement of burnt/damaged service lines at the cost of
Nigam as these overhead service lines are to be maintained by Nigam.
The matter was discussed in 97th Coordination Committee
Meeting held on dated 28-09-2006 and it was decided that burnt /damaged
service lines of the consumer may be replaced at the cost of Discom
provided that recommendation of field officer is obtained in this regard and
such replacement is a part of F.R.P.
It is enjoined upon all the concerned to follow above direction
strictly.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/356
JODHPUR VIDYUT VITARAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2006-07/D.1831 Dt.15.11.06
ORDER
Sub :Laying of separate feeder for industrial and non-
domestic connections situated in rural areas for
connecting them from continuous supply feeders.
Any Industrial or Non-domestic consumers situated in the
rural areas, if wants to have direct feeder from Urban area supply for
continuous supply, the same can be allowed if the consumer deposits full
cost of the estimate of the 11 KV Line to be drawn in this regard. This
facility is prescribed for HT Supply consumers situated in the rural areas.
In such cases, the transformer is either provided by the consumer or the
same is installed by the Nigam and the rent of transformer is recovered as
per provisions of TCS-2004.
Presently, the Nigam is receiving distribution transformers
(upto 100 KVA) with welded meter boxes on the transformers for fixing
the meters. On consumer’s request these metered transformer can be
installed by the Nigam for releasing pending connections of consumers
requiring Urban supply by recovering transformer rent. As these meter
boxes are installed on the LT Side, the metering of such consumers can be
done on LT Side and 3% transformation losses shall be added for the
purposes of billing.
The above instructions shall come in force with immediate
effect.
This bears the approval of Hon’ble CMD, Jodhpur Discom.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/357
JODHPUR VIDYUT VITRAN NIGAM LIMITED
No.JdVVNL/CMD/CE(CPM)/SE(RA&C)/JU/2006-07/D.1957 Dt.28-11-06
ORDER
Sub: Reconstitutions of Corporate Level Settlement Committee
of Jodhpur Discom.
Consequent upon the re-designation of the post of Managing Director &
Chief Engineer (MM), the constitution of the existing Corporate Level Settlement
Committee of Jodhpur Discom is revised as under:-
1. Chairman & Managing Director : Chairman
2. Chief Engineer (CPM) : Member Secretary
3. F.A. & C.O.A. : Member
4. Zonal Chief Engineer(O&M-JDZ) : Member
(concerned cases)
5. Zonal Chief Engineer(O&M-BKZ) : Member
(concerned cases)
6. Chief Accounts Officer : Member
7. Incharge Legal Cell : Member
The terms and conditions and working guidelines, method and
procedure of the Corporate Level Settlement Committee shall be the same as already
prescribed in the past vide different orders. This order shall come into force with
immediate effect.
The above mentioned order is subject to ratification by the Board of
Director of Jodhpur Discom.
By order,
(A.M. LODHA)
CHIEF ENGINEER (CPM)
JODHPUR DISCOM, JODHPUR
COMML.JDP/358
- 1 -
JODHPUR VIDYUT VITRAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2005-06/D.1992 Dt.02-12-2006
ORDER
Sub: “Amnesty Scheme” for Agriculture category of consumers-
realization of outstanding dues thereof.
Consequent upon the decision of the 109th
Board of Directors Meeting
held on 01-12-2006, with a view to recover the outstanding dues from Agriculture
Consumers disconnected up to or before 31-03-06 and running consumers, it has been
decided to allow following concessional package to Agriculture Consumers of Bikaner
Circle only as a pilot project, for the period from 05th
Dec., 2006 to 20th
Dec., 2006 :
S.
N.
Brief Description Concessions allowed
1.
(i)
(ii)
Agriculture category of
consumers running as well as
disconnected. Clearance of
outstanding dues as on
31-03-2006 :
If the consumer deposits the
total outstanding dues in
lump sum on/or before 20th
Dec., 2006
If the consumer makes the
payment of outstanding dues
in installments.
For running connections:
Component of DPS in the outstanding amount
as on 31-03-2006 shall be waived off and only
principal amount of outstanding as on 31-03-
2006 shall be recovered. The principal amount
accumulated during 2006-07 shall also be
recovered alongwith DPS on full principal
amount for the period 01-04-2006 to date of
payment.
For disconnected connections:
Component of DPS/interest in the outstanding
amount as on 31-03-2006 shall be waived off.
The principal amount of outstanding dues as on
31-03-2006 shall be recovered alongwith
interest @ 6% per annum interest from 01-04-
2006 to date of payment.
For running connections
Component of DPS to the extent of 75% in the
outstanding amount as on 31-03-2006 shall be
waived off. The payment of principal dues as
COMML.JDP/358
- 2 -
on 31-03-2006 plus balance 25% DPS plus
principal amount of outstanding dues
accumulated alongwith DPS on full principal
amount for the period 01-04-2006 to date of
payment could be made in installments as
under :
(a) First installment would be 50% of the
amount calculated as above and is payable upto
20th
Dec., 2006.
(b) Balance amount is payable in Billing
Months of Jan., 2007 and Feb., 2007. This
balance amount shall attract interest @ 10% per
annum w.e.f. 01-04-2006.
For disconnected connections:
Component of DPS to the extent of 75%
/interest on outstanding dues on 31-03-2006 be
waived off. The payment could be made as
under :
a) First installment payable before 20th
Dec.,
2006 shall be 50% of dues as on 31-03-2006
plus interest @ 6% per annum on such dues
from 01-04-06 to date of payment.
b) Balance dues along with interest @ 10%
w.e.f. 01-04-2006 till date of payment in two
equal monthly installments payable in billing
months of Jan., 2007 and Feb., 2007.
Terms & Conditions :
(i) The scheme shall be made available for a period from 05th
Dec., 2006 to 20th
Dec., 2006.
(ii) Concerned Assistant Engineer is empowered for allowing rebate in
DPS/interest for Agriculture category of consumers
(iii) The scheme shall be applicable irrespective of whether the disconnected
consumer wants reconnection or not in light of Agriculture Policy.
(iv) To avail these concessions, the consumer shall voluntarily undertake to
withdraw all the Court Cases, if any, pending in any Court of Law/Consumer
Forum any other competent agency etc. related to the outstanding dues.
(v) If the consumer fails to deposit the amount as per agreed time schedule under
this concession package, this facility shall be withdrawn.
(vi) This concession package will not be applicable for the amount of assessment
made against theft of electricity &/or malpractice.
COMML.JDP/358
- 3 -
(vii) This scheme shall not be applicable for consumers who have availed benefits
under the earlier Amnesty Schemes announced during the years 2004-05 or
2005-06.
(viii) For availing the concession package, the consumer shall be required to apply
to the concerned Assistant Engineer in the format enclosed at Annexure-“A”.
(ix) The outstanding dues should be worked out without taking into consideration
the adjustment of existing security deposit. However, adjustment of security
deposit may be made for disconnected consumers in the dues so worked out
as on date of disconnection and from such consumers revised security deposit
shall be obtained as per rules before reconnection, if any, in light of
Agriculture Policy.
Encl.:Annexure-“A”.
By order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/358
- 4 -
Annexure –“A”
APPLICATION FORM FOR AMNESTY SCHEME- 2006
The Assistant Engineer( ),
Jodhpur Vidyut Vitaran Nigam Ltd., …………………….
Sir,
I/We want to avail the benefit under “AMNESTY SCHEME-2006”.
The details of my/our connection are as under :
1. Name and address of the consumer :
2. Category of consumer :
3. Account No. :
4. Name of the concerned office from :
where the bills are issued.
5. Connection is covered under concession :
package as at Sl.No.1 or 2
6. Certified that the outstanding is not :
against the assessment of theft of
electricity &/or malpractice
7. I/We also certify that there is no court :
case pending against this connection
OR
I/We agree to withdraw all the court
Cases pending in any Court of Laws
Related to this connection against
Jodhpur Discom
Place :
Dated :
Signature of the Applicant
COMML.JDP/359
JODHPUR VIDYUT VITARAN NIGAM LIMITED
No.JdVVNL/C&MD/CE(CPM)/SE(RA&C)/JU/2006-07/D.2020 Dt.05-12-06
ORDER
Sub : Unguarded electric lines passing over educational
institutions.
Some of the electric lines passing over schools are without
guarding due to which accidents can be occurred. In this context, it is
advised that after identification of such unguarded locations it must be
ensured that no electric line passing over the educational institution(s)
building remains unguarded. After completion of the job, the concerned
sub-divisional officers shall furnish a certificate that there is not a single
case where the overhead line is passing over educational institution and is
still unguarded. Such reports shall be compiled at circle level and circle
Superintending Engineer is expected to apprise the position to the Hon’ble
CMD in Circle level meetings.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM:JODHPUR
COMML.JDP/360
JODHPUR VIDYUT VITRAN NIGAM LIMITED
No.JdVVNL/CMD/CE(CPM)/SE(RA&C)/JU/2006-07/D.2023 Dt. 06-12-06
ORDER
Sub: Withdrawl of orders bearing No. Comml.JDP/345 dtd.
27.09.06 & Comml.JDP/347 dtd. 07.10.06.
While taking decision of extending time limit for reconnection
of Agriculture Consumers disconnected after 30.06.04 in the 109th Meeting
of the Board of Directors held on 1st December, 2006 it was decided to
withdraw the earlier orders issued by Jodhpur Discom for reconnection of
disconnected Agriculture Consumers in Barmer, Jalore, Pali & Jodhpur
District Circles.
Accordingly orders issued by Commercial Wing of Jodhpur
Discom bearing No. Comml.JDP/345 dtd. 27.09.06 & Comml.JDP/347 dtd.
07.10.06 stand withdrawn with immediate effect.
By Order,
(A.M. LODHA)
CHIEF ENGINEER(CPM)
JODHPUR DISCOM, JODHPUR