17
42A04NWM29 2 .6140 SEWELL 010 REPORT ON A V.L.F. SURVEY SEWELL 1-81 SEWELL TOWNSHIP NORTHERN ONTARIO Brian Groves Noranda Exploration Co. Ltd. November 30, 1983 Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION

VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

  • Upload
    leduong

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

42A04NWM29 2 .6140 SEWELL 010

REPORT ON A V.L.F. SURVEY

SEWELL 1-81

SEWELL TOWNSHIP

NORTHERN ONTARIO

Brian Groves

Noranda Exploration Co. Ltd.

November 30, 1983

Timmins, Ontario.

RECEIVEDDEC

MINING IANDS SECTION

Page 2: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

42AMNWee29 2.6146 SEWELL O1OC

TABLE OF CONTENTS

PAGE

1. Introduction

2. Location

3. Property Geology

h. Survey Specifications

5. Data Presentation

6. Discussion of Results

T. Conclusions

l

l

l

l

1

2

2

LIST OF MAPS

Map l V.L.F. Profile Map

Map 2 Fraser Filter Map

Page 3: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

SEWELL l-8l

1. INTRODUCTION:

During the period 2 March, 1983 to 9 March, 1983, a very low frequency E.M. (V.L.F.) survey was completed over claims in Sewell Township.

2. LOCATION;

The sixteen claims covered by this report are: P-6221^3 to P-622157 inclusive and P-628ol*7. The claims are located in central Sewell Township, Porcupine Mining Division, approximately 50 km southwest of Timmins.

3. PROPERTY GEOLOGY:

Very little outcrop is exposed on the property. Previous drilling by Noranda indicates numerous shear zones in highly altered intermediate volcanics on the north side of a gabbroic plug.

It. SURVEY SPECIFICATIONS:

The V.L.F. survey was performed along north-north-westerly oriented grid lines spaced ^00' apart. Station spacings along the grid lines were 100'.

A Geonics E.M.-16 V.L.F. instrument was employed for the survey. The instrument measures the in-phase and quadrature components of a vertical magnetic field as a percentage of the horizontal primary field with an accuracy of 1#. In-phase data was converted to degrees (dip angle). The transmitter station used for the survey was Seattle, Washington which operates at a frequency of 2^.8 kHz.

A total of 12.8 line miles of V.L.F. surveying was completed over the grid.

5. DATA PRESENTATION:

The in-phase components of the secondary E.M. field for the V.L.F. survey are plotted in profile form in Map l at a scale of l inch - 20 . Fraser filtered data are presented in contoured plan form in Map 2.

... 2

Page 4: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

-2-

6. DISCUSSION OF RESULTS:

The V.L.F. data are characterized, in general, by low angle cross

overs and low magnitude Fraser filter anomalies.

The Fraser filter data have outlined three low amplitude zones

displaying strike extents of 1600 feet. These zones are located in claims

P-622152 and P-622153 and would appear to have causative sources at shallow

depth.

The remaining data over the claim group are weak single line

responses which may be related to overburden sources.

T. CONCLUSIONS:

The V.L.F. survey has defined three zones which may have bedrock

causative sources at shallow depth. Detailed geological surveys should be

carried out in the vicinity of the responses. Drill evaluation of the

responses may then be warranted.

Respectfully submitted,

B.J. Groves

Page 5: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

Ministry ofNaturalResources

Ontario

Report of Work{Geophysical, Geological, Geochemical and Expenditures) #

The Min.42AMNWe*29 2.6140 SEWELL 900

Type of Survey(s)

GClaim HolderU^

v\.Township or Area

ospector'i Licence No.

A-'o- v\ o^ Os. C—Address

c y o vxXc . QSurvey Company

C-

T \ 0Date of Survey (from Si to)Ot 6 3 ,.Day l Mo. | Vr.

o*\ o3 , , Day l Mo. l Yr,

Name and Address of Author (of Geo-Techmcal report)

G-x-t^e-t "SP . O . ' C\

l H

v CV.T \ OCredits Requested per Each Claim in Columns at right

Special Provisions

For f irst survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

A Enter 20 days (for each)

Man Days

Complete reverse side and enter total(s) here

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Electromagnetic

Magnetometer

Radiometric

Claim

Z-0

Days per; Ciaim

l

l

j

Days per Claim

j l

Sxpenditures (excludes power stripping)Type of Work Performed

Performed on Claim(s)

Calculation of Expenditure Days Credits Total

Total Expenditures Days Credit!

S H- 15 =

Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected In columns at right.

Date

e-\ - l f *

Recorded Holder or Agent (Signature)

Certification Verifying Report of Work

Mining Claims Traversed (List in numerical sequence)Mining Claim

Prefix Number

\ 5

Expend. Days Cr.

l *—

Mining ClaimPrefix Number

/* 3V

E O

l OCT12

C B D E l i

kecelpt Nbr

-rr-rfe

li

.M

ES

GOT \

Expend. Days Cr.

Total number of mining claims covered by this report of work.

\ t \ **

l hereby certify that l have a personal and intimate knowledge of the facts setKorth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

0 .

\ \ V*'\ \'N", V V* ^, *

Date Certified Certified by (Signature)

tv*. C-

Page 6: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

File.

GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION. CONCLUSIONS ETC.

Type of Township or Claim

Ground V.L.F. Survey

Sewell Twp.

Noranda Exploration Co. Ltd.

Author of Rppnrt Brian J. GrovesP.O. Box 1203. Timmins, Ont. P**N 7J5

2 March - Q March 10.83Covering Dates of(linccutting to office)

Total Miles of Line mt Approx. 16 miles over claims

SPECIAL PROVISIONS CREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.

Geophysical

—Electromagnetic.

—Magnetometer-——Radiometric——

—Other——————

DAYS per claim

20

Geological.Geochemical.

AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)

Magnetometer Electromagnetic Radiometric

DATR- 30

(enter days per claim)

SIGNATURE:^x*JCu)Ajf/f Report or Agent

PROJECTS SECTION Res. Geol. ^^____ Qualifications. p.Previous Surveys

Checked by. .date.

MINING CLAIMS TRAVERSED List numerically

(nmber)

6221U7

62211+8

62211*9

622150

622151

622152

622153

62215^

622155

GEOLOGICAL BRANCH.

622156

622157

6280^7

RECEIVED

, Approved by. .date.IING LANDS SECTION

GEOLOGICAL BRANCH.

Approved by. -date.TOTAL CLAIMS. 16

Page 7: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

Show instrument technical data in each space for type of survey submitted or indicate "not applicable"

GEOPHYSICAL TECHNICAL DATA

QROUND SURVEYS

Number of Station interval Line spacing—

100 Feet.Number of Readings

1+00 FeetProfile scale or Contour interval* V-L.F. Profile - l inch * 20

MAGNETIC

(specify for each type of lurvey)

Instrument.Accuracy - Scale constant - Diurnal correction method. Base station location.———

ELECTROMAGNETIC

Instrument. Geonics EM-16 V.L.F.

iffmCoil configuration.

Coil separation

Accuracy————— Method:

Vertical

li;? - Frequency.d5 Fixed transmitter Seattle, Washington

Q Shoot back - 2U.8 k Hz

D Inline D Parallel line

(specify V.L.F. station)Parameters measured In-Phase ft Quadrature Components of Secondary E.M. Field

GRAVITY

Instrument.Scale constant.Corrections made.

Base station value and location.

Elevation accuracy—————————————————INDUCED POLARIZATION - RESISTIVITYInstrument_____'.______ -;—-——.Time domain. Frequency_ Power.^——.

Frequency domain. . Range———————

li l Electrode array——t:4,Electrode spacing.

li l Type of electrode.

Page 8: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

SELF POTENTIAL Instrument————— Survey Method——

Range.

Corrections made.

RADIOMETRIC Instrument———Values measured.

Energy windows (levels). Height of instrument—— Size of detector——-——-

.Background Count.

Overburden.(type, depth — include outcrop map)

PHERS (SEISMIC, DRILL WELL LOGGING ETC.) Type of survey—————————————————————— ..Instrument _______________________

E Accuracy————————————————————————Parameters measured.

|[: Additional information (for understanding results).

AIRBORNE SURVEYSType of survey(s). Instrument(s) —

Accuracy————(specify for each type of survey)

(specify for each type of survey)

Aircraft used.Sensor altitude.

.Navigation and flight path recovery method.

Aircraft altitude.Miles flown over total area.

.Line Sparing

.Over claims only.

sg*.;

Page 9: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

GEOCHEMICAL SURVEY - PROCEDURE RECORD

Numbers of claims from which samples taken.

•f-': -'t-:- -

Total Number of Samples. Type of Sample.

(Nature of Material)Average Sample Weight————^—— Method of Collection——^——^—

Soil Horizon Sampled. Horizon Development- Sample Depth—-——— Terrain———————

Drainage Development—^^————^—— Estimated Range of Overburden Thickness.

ANALYTICAL METHODSValues expressed in: per cent

p.p. m. p. p. b.

D D D

Cu, Pb, Zn, Ni, Co, Ag, Mo, As.-(circle)

Others __________________________Field Analysis {.

Extraction Method. Analytical Method- Reagents Used——

Field Laboratory AnalysisNo. —————^^——

SAMPLE PREPARATION(Includes drying, screening, crushing, ashing)

Mesh size of fraction used for analysis -^—^—

Extraction Method. Analytical Method . Reagents Used.——

Commercial Laboratory (. Name of Laboratory—

Extraction Method.—. Analytical Method ——Reagents Used—————

.tests)

.tests

.tests)

General. General.

Page 10: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

Ministry ofNaturalRes^ces

GeotechnicalReportApproval

Fit*

Mining Lands Comments

To: Geophysics . j?Comments

proved Q Wish to see again with corrections

To: Geology- Expenditures

Comments

Approved |~j Wish to see again with correctionsDate Signature

To: Geochemistry

Comments

Approved Wish to see agai n with correctionsDate Signature

jTo: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

Page 11: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

o c •o ~J,

o QJ r*- ro t/i ro 3 H-

F*

Oro

c

o -

o0 -"

ta

o-i.

O)

W

r-t-

r* r

o VJ ro 3 r*

^W ^

re -

o3

T3

rt-

1 OO

<

C.

Q)

rt-

— '

D) -h C+ ro -s

z o H-

—4.

0 ro o -h 1—4

3 rf- ro

VI

5*

ro ^

o3

-a

r*-

-S 0O

<

c

ro~

r*-

CL 33 ro -o o -J

^p t/t

t/Y ro vi VI ro CL

73 9 O

o ro o.

ro

o

ro

3

r*- re Q.

O -t

tu O ro

o

ro

I'T

1

l

t

r C5 S* t r^

Page 12: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

1983 12 14 Your File: #315

Our File: 2.6140

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

We have received reports and maps for a Geophysical (Electromagnetic) survey submitted under Special Provisions (credit for Performance and Coverage) on mining claims P 622143 et al in the Township of Sewell.

This material will be examined and assessed and a statement of assessment work credits will be issued.

Yours very truly,

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario H7A 1W3 Phone:(416)965-1380

A. Barr:mc

cc: Noranda Exploration Co. Ltd Suite 400 55 Yonge Street Toronto, Ontario M5E 1J4

cc: Noranda Exploration Co. Ltd P.O. Box 1205 Timmins, Ontario P4N 7J5 Attention: Brian Grover

Page 13: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

Noranda Exploration Company, Limited (no personal liability}

P.O. Box 1205,Timmins,Ont. P4N 7J5

noranda

December T, 1983

Mr. F.W. Mathews,Lands Management Branch,Whitney Block, Room 61*50,Queen's Park,Toronto, Ontario.M7A 1W3

RECEIVEDDEC 91983

MINING LANDS SECTION

Dear Sir:

Enclosed is a report in two copies covering the results of geophysical

surveys performed over claims P-6221**3 to P-622157 inclusive and P-628oU7 in

Sevell Township.

Yours truly,

NORANDA EXPLORATION COMPANY, LIMITED

B. J. Groves

BJG/drm encls.

Page 14: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

^ j yv 1" C3 1 Geological.

.cal and Expenditures)

The Mining Act

Please lypt or print. If number of mining claims traversed exceeos ipace on thit form, attach a lift. Only days credits calculated in the "Expenditures" section may be entered in the "Expend. Days Cr." columns. Do not use shaded areas below.

j^^T ". r. ,A ^- VA. (MX-^N ^tWt\\

^[Name and

1cSb *" *

A rv C— ^ c-" \ c y ivA v t W C- c . \.rV o. '

rrospector t Licence No.

^X-i'i ^ *^ ————— ———————— —— ^ w —————— ———————————————————— - —————— - ————

\v. ^-V tru .^^ N/cx-vnC^ ^"\ . \ ^ y c vsA t ( Q v\\ ft. T \ ompany ' ' — Date of Survey (from

\ r- i O t. 63 ft^ liw,x\}w.0v. L-.Vt.NN Day | Mo. | Vr. |Address of Author (of Geo-Technical report)

tk w V3" x- t "J 6. t. s K-"1 . C . ^"*~^ c. y, \ f^ C 'o \ \ vv^ v^r% v v.JL. v D vC^

Bi to) Total Miles of line CutS*\ OS fi .^ ^. Day j Mo. | Vr. \ i . \ e, **.\ K^J^I \ tvOk.

. . ?** ^-v*- Jv.

^ Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

Geophy,,c.l P-'

For each additional survey: , using the same grid: ;\ ' - O ther

Enter 20 days (for each)

Geological

Geochemicaf

• Electromagnetic i -f r.

- Magnetometer '

' Radiometric

Man Days

Complete reverse side end enter total(s) here

GeophysicalDav, per

Cla , m

j - Raoiometric

j - Other

i Geological

lGeochemical

Airborne C'eoits

lNote: Special provisions ; Electromagnetic

credits do not apply j to Airborne Surveys. Magnetometer

Rabiometric

Days pe' Claim

f Expenditures (excludes power stripping)Type ol Work Perlormed

Performed on Claim(s)

Calculation Di E xpenditure Days Credits

Total ExpendituresTotal

Days Credits

instructions, Total Deyt Credits may be apportioned at the claim holder's

choice. Enter number of days credits per claim selected in columns at right.

Date

VU\ . "1 ' \i*i

Recoroed Holder or Agent (Signature)

~^- C. -T3US V- ——— !T-— -- ————— \.V-

Certification Verifyinq Report of Work

Mming Claims Traversed

IS

i

l QCT l S1583!

leceipt Kc*r^4

il:

C OT ij t

Total number of mining claims covered by this report of work.

1 hereby certify that 1 have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having pITformjH the work or witnessed same during and/or after its completion and the annexed icport is true.

Name and Postal Address of Person Certifying

\ V.

Date Certified Certified by (Signature)

Page 15: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

ro 0 0N

EE

VbS

PI

ILLA

RY

TW

PK

EE

FER

TW

P

M-2

90

^ —

*

'X

!' *'.

/' N

X

--' *-

- '-'

,

l —

Y

~.~

~.

' r

- -

-, C

i--

i

/••--.

) J

K^

; :

~*

,-,

' *

~,

* "~

K

j /"

\fs

s -

i 9.

^ c

O

•'--

' '"'•

^ 'r

t '..

w

O

k

r:. -

?

: a

S >

. -c

l l"

. '^

i"

F-*-!.

'"'

"-'

"J

' *

A

~"

I?

; 'T

O.

: w

- -

o 2

S-.

J:,

- j-

rt .

z —

S

^ S

- -"

X

P

-

tf*

ft

.,J

f, -f

., -

-, - -

- *f

. J

-

' --

'*-

-

' .^.

-, *

^.-

c

^—

^ J"

* *

"^—

-^

p

^ "

- {

:. "

-. i

^sS

2 ^

.-,.

- -

-:-

' '-

' 2

5' a

i 2.

^ .-

^ -

5" ^

^

-i ^

f w

a ^

s n

- ^

Ul

~

W

•2

"4~

"*

1~J

1"

" ' '

- — ,

"*

a

b rr

*-^

o ^

3 ,r

n'

'^ o

-' ' r

i1 -

" v"*

i*

si

** - '

Jf ;

-1 *

o*

2~

-. --

:' ^

c ~'

" ' '

' 3

" -~-)

-B :^

J-'

. :

,i

- ~J

*-

' .-

-~

,

-V-

*--

J "J

'Y

y -

CL

"*

- -

* 8

? -

.:"

" T

C1

-X-

^ ' ^

*-'

;.

-—*

W

~"*

Jl

^~^-

r*

s-1

-•.

C

C"

' '

r *;

1

CANCELLED

PATENTED f

REGISTERED

~si

r .

JS*

Oz ' * CI C '

. ^c g •S i : 1

S+,

f-.

| O

P

f 'I

fi S

* 2

SI

* S

*

Z

3*|

3B

S

r~

ffi

5* s

s t

* s5

3 g

c *

x 0

3 a

* ^ -

*S

i O

3D

w

m

*f

rt

. C

t/i

. -5

2f-

4L

it*

5 S

S x

x y*

m

*flo

,..-r,

-* n

i!

l .-

s ;

i M

*-

..' *

-'

- ' V

-i

"afe

" '

" '

i V

^T

t i

*

x w*

z i~

jr

?is

ag

S 5

5 S

5 W

S 0S

55

x . 3

* o

-Cs

S *

5 s

-^ -fc

T

os

o-4

O

i"

OQ

n

o S

Ss

5 5

^

-H

- o

; z

- i t,- #T

. *-

*•T

R -w

r

" '~

1 --

.- c

fr

S3

?

HI

r 0

' .,* S r

--'" J

*- w

S•^

^

'p.

m

ffT]

!O '

;m !z "Q

* r..-•-.

f.

,C

; c-

?;

(T; O > r ^

I -

DH*^

e—

r

f: "O

; ;

5 zo

^i

/fe

O

33

" t: "

:O

s-

*.

' X

•W

r-

"

V

*

fV

*'*

, v

——

J

, jp

-*i

/™-"

0*^

/"

"t,

^ ^••

•l

.-^'

~1

^

:..^ ^

i ^^

,, —

- ""

1-'

.i,-*

^. -y

j

-^\

. f r

. ^1-

^

x: m

;-

o/"

"i

W(

; 7"

-

-—t^

*-,.

— *- > *i'*^- z l f

; -

~**'

If O

Page 16: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

56W

6OW

64W

42A

04N

W00

29S

EW

ELL

210

16E

2O

E 24

E

28E

32

E

36E

4O

E

16 W

52W

48

W

44W

,-*i

8

\;f}

622M

l,'

6j

** k-^

'-v. _ \i

J —

— -.

28W

4OW

36

W

32W

S(

fc.v-

—-—

iT t

i.*

PS

63

22

O i

\ 1

\6 \

*

\ -*\ V

" P -

' l

^**s

-

V'-^

, V

^—

r- \

-^r -

-V - *

-4r-

~

•N^x

LOC

AT

ION

P

LAN

S

ew

ell

1-8

1

RE

VIS

ED

PROJ

. Ng.

.j?.i^

N.T

.S,

DWG.

N2

5#*r

*//

1-81

On

tari

o

PR

OJE

CT:

SURV

EYED

BY

L-.

__..._

..—

DA

TE

:...,

^^

DAAW

N B

Y*.

.-. t^

i!--*

S^*

.^__

SC

ALE

.^/.'

l

NORA

NDA

EXPL

ORAT

ION

CO. L

TD]

OFF

ICE:

^

...^

..,_

__._

_._

_M..

......

1 ^i?-

-*-

:^

' L

Page 17: VLF SUR SEWELL 1-81 - Search GeologyOntario · SEWELL 1-81 SEWELL TOWNSHIP ... Timmins, Ontario. RECEIVED DEC MINING IANDS SECTION. 42AMNWee29 2.6146 SEWELL O1OC TABLE OF CONTENTS

52W

56 W

6OW

64

W

12W

8W

4W

O

O

4E12

E

16E

2O

E 24

E

28E

32

E

36E

4O

E

48W

44

W\

8

tt P

62

2

\\iP

622J3&

^622 J4

#,

663220,

T*.

-VV

P&

86

32

22

.\'-V

•V

*

F 3

^66322 7*

T.* T

-v^

.

/'•X'

, 66

32

24

*

RE

VIS

ED

Sew

ell

1-81

PR

OJE

CT:

SURV

EYED

BY:

..M...

......

.....™

....,.

., D

ATE

:DR

AWN

BY

v......^

.Jt^

^L.-

.,.

SC

ALE

:

NORA

NDA

EXPL

ORAT

ION

CO.L

TD

WG

.N?

OFF

ICE

:IT

* 9

*1

9t

XV

TV

MA

ffT

H

-- f