VT 100 over the Mad River Bridge Replacement July 13, 2015

Embed Size (px)

DESCRIPTION

VT 100 over the Mad River Bridge Replacement Agenda Introductions Existing Bridge Condition Proposed Structure Proposed Closure Date & Duration Proposed Detour Route Questions