Upload
debra-holmes
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Company Mission
“ To provide impeccable professional and advice, to produce high quality electronic products”
● To produce high quality products● To be committed to manufacturing
and product quality assurance● To give total Customer Satisfaction
Background●1988 Established in Hong Kong● 1991 Plant built in China (Shen Zhen) and register
UL & cUL● 1997 ISO 9002 approved● 2000 QS 9000 approved● 2002 ISO 9001:2000 approved● 2005 Chemical testing laboratory setup● 2006 ISO/TS16949 approved● 2006 ISO14000 environmental protection
approved● 2007 RoHS testing laboratory setup● Production factory of 30000M2 800 employee
Sale Operation Flow ChartCustomer Request
New Customer Existing Customer
Credit Check
Quotation
Sample
PO
Production QA Warehouse Shipment
OK
OK
Return to CustomerStop
NO
Production Equipment ListItem QTY
Injection Molding Machine 21
Electronics Cutting Machine 15
Crimping Machine 39
Stripping Machine 7
Automatic Crimping Machine 3
Reliability Equipment List Item QTY
Atomic Absorption Spectrophotometer
1
Oscilloscope 2
RLC Meter 1
DC Resistance Tester 4
Milli-Ohm-Meter 2
Insulation Tester 10
Projection Instrument 1
Network Analyzer 1
QA Reliability Flow Chart1.Environment Control/Test2.MRB Decision3.RMA Procedure
1.FIFO (First In First Out)
1.First Check2.In-Process Check3.LOT.No.Management
1. F/G Spot-Check2.Environment Test
1.Spot -Check2.Shipment Audit3.Environment Material
Receiving
IQC
Warehouse
Product IPQC
100% FQC
Packing
OQC
Shipment
Rework
MRBRTV
NG
NGNO
Use as isOK
OK
OK
Walex Recent Development
QA System – ISO Authentication ISO/TS 16949 approved ISO 14000 approved Planning QC080000 Authentication (RoHS)
in 2007
Walex Recent Development
RoHS Laboratory Setup 6 Elements Analyzer Non-Metal Tester(GCMS-2010P) Metal Tester(AA-6300)
Walex Recent Development
Engineering Automation
Crimping & soldering on wire-harness Crimping workmanship
Terminal control – width & height though cross section analytics