7
Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research Group

Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

Embed Size (px)

Citation preview

Page 1: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

Warm Winterized Steel Frame ShelterPakistan case

Parallel Prototyping

Department Architecture Building & Planning

Chair: Product Development

Shelter Research Group

Page 2: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

OF 6Department ABP – Chair Product Development PAGE 221-04-23

TU/e Shelter Research Group

• Shelter Research Group

• Peter Erkelens • [email protected]

• Eelko Brouwer• [email protected]

• Mark Cox• [email protected]

• Tim de Haas• [email protected]

• Vince Limpens• [email protected]

• Mi-Sue Akkerman• [email protected]

Page 3: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

OF 6Department ABP – Chair Product Development PAGE 321-04-23

Background Pakistan Case

• Assignment of the Dutch Red Cross: • Steel frame winterized

solution for IDPs in Pakistan

• Start: Mid-July 2009• End: October 2009

First Pakistan prototype

Page 4: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

OF 6Department ABP – Chair Product Development PAGE 421-04-23

Method – Parallel Prototyping

• Pakistan• Upgraded tent• Experience based design

• TU/e• Storm proof dwelling• Evidence based design

Page 5: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

OF 6Department ABP – Chair Product Development PAGE 521-04-23

Evaluation & Products

• Pakistan Shelter• Light structure 80 kg• Welding • Transport• Voluminous package• Upgraded tent

• TU/e Shelter• Heavy structure 400 kg• Plates, bolts and nuts • Wind & snow load resistant• Small package• Building

Page 6: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

OF 6Department ABP – Chair Product Development PAGE 621-04-23

Evaluation & Process

• Positive points• Transfer of knowledge through Parallel Prototyping process

• General idea of the steel frame

• Cooperation between university and NGO

• First steps of sharing knowledge

• Points of improvement• Intercultural communication problematic

• Clarity on the nature of the assignment

• Clarity of the points of departure and general objectives

• Clarity on the final product

• Demand of access to all information available

Page 7: Warm Winterized Steel Frame Shelter Pakistan case Parallel Prototyping Department Architecture Building & Planning Chair: Product Development Shelter Research

OF 6Department ABP – Chair Product Development PAGE 721-04-23

Recommendations – Shadow of the future

• Shelter Design Method (SDM)• Guideline into shelter design of:

− Materials− Geometry− Possible solutions − Etc. as a result of:

− availability of materials; − climate; − culture; − Politics;− Etc.

• (Description of SDM)• 1 Global design requirements• 2 Conversion of local data into design requirements• 3 Calculations, Analysis, Design & Prototyping