20
SHEET 2 SHEET 3 SHEET 4 SHEET 5 SHEET 6 SHEET 7 SHEET 8 SHEET 9 SHEET 10 SHEET 11 SHEET 12 SHEET 13 SHEET 14 SHEET 15 SHEET 16 SHEET 17 SHEET 18 SHEET 19 SHEET 20 ROLLOVER KERB AND CHANNEL TO COUNCIL STANDARD DRAWING SD B1 EXISTING PAVEMENT 100mm DIA SUB-SURFACE DRAIN, CLASS 400 30mm MIN COMPACTED DEPTH OF 10mm NOMINAL SIZE TYPE H ASPHALT WEARING COURSE VARYING DEPTH OF 14mm NOMINAL SIZE TYPE H ASPHALT REGULATION COURSE FULL DEPTH ASPHALT INFILL NOT TO SCALE GENERALLY IN ACCORDANCE WITH STANDARD COUNCIL DRAWING SD D5 600mm VARIES 50mm (MIN) COMPACTED DEPTH 20mm CLASS 3 CRUSHED ROCK 300mm BACKFILL WITH 20mm SCREENINGS PAVEMENT DETAIL FOR PAVEMENT WIDENING GENERAL 1. THE CONTRACTOR IS TO VERIFY THE LOCATION AND DEPTH OF ALL UTILITY SERVICES PRIOR TO CARRYING OUT WORKS BY TELEPHONING 1100 "DIAL BEFORE YOU DIG". 2. DISCREPANCIES BETWEEN PLANS AND EXISTING CONDITIONS ARE TO BE REPORTED IMMEDIATELY TO THE COUNCIL'S SUPERVISING ENGINEER. 3. ALL SURPLUS EXCAVATED MATERIAL REMAINS THE PROPERTY OF THE CONTRACTOR UNLESS SPECIFIED OTHERWISE OR ADVISED BY THE COUNCIL'S SUPERVISING ENGINEER. 4. "REMOVE" SHALL MEAN REMOVE OFF-SITE AND DISPOSE OF AT AN APPROVED DISPOSAL SITE AT THE CONTRACTOR'S EXPENSE, UNLESS SPECIFIED OTHERWISE. 5. ON COMPLETION OF CONSTRUCTION ALL WORK AREA ARE TO BE CLEANED UP & REINSTATED TO THE SATISFACTION OF THE COUNCIL'S SUPERVISING ENGINEER. PAVEMENT 6. ROAD CROSSFALL TO BE 1 in 36 FALLING TOWARDS THE TABLE DRAIN OR KERB AND CHANNEL UNLESS SPECIFIED OTHERWISE. 7. AT NEW FILL AREAS THE TOPSOIL SHALL BE STRIPPED AND FILLING MATERIAL PLACED IN 150mm THICK LAYER AND COMPACTED TO 95% A.A.S.H.O. COMPACTION TEST, THE TOPSOIL IS THEN RE-SPREAD ON THE BATTER AREAS. 8. NEW CONCRETE FOOTPATH PAVING TO BE 32 MPa STRENGTH. 9. TACTILE GROUND SURFACE INDICATOR (TGSI) PAVERS ARE TO BE 300mm x 300mm x 40mm PRE-CAST CONCRETE PAVERS AND SHALL HAVE A MINIMUM LUMINANCE CONTRAST OF 30% COMPARED TO THE AMOUNT OF LIGHT REFLECTED FROM THE ADJACENT SURFACE. ROADSIDE 10. EXISTING DRIVEWAY ENTRANCES TO BE REINSTATED AND SEALED FOR 1.0m FROM EDGE OF SEAL WITH 50mm COMPACTED DEPTH 10mm TYPE N ASPHALT ON A BASE OF 100mm COMPACTED DEPTH CLASS 2 FINE CRUSHED ROCK. 11. EXISTING DRIVEWAYS ARE TO BE REINSTATED FROM BACK OF KERB OR EDGE OF SEAL AT A MAXIMUM GRADE OF 1 in 8 FOR 2.0m THEN 1 in 4 THEREAFTER WITH A TRANSITION OF 1 in 6 FOR 2.0m IS PREFERRED WHERE POSSIBLE AS PER: 11.a. GRAVEL DRIVEWAY WITH 50mm COMPACTED DEPTH OF 3% CEMENT TREATED CRUSHED ROCK UNLESS SPECIFIED OTHERWISE. 11.b. ASPHALT DRIVEWAYS WITH 50mm COMPACTED DEPTH 10mm NOMINAL SIZE ASPHALT ON A BASE OF 100mm COMPACTED DEPTH CLASS 2 FINE CRUSHED ROCK. 11.c. CONCRETE DRIVEWAYS WITH 150mm DEPTH CONCRETE PAVING ON A BASE OF 50mm COMPACTED DEPTH CLASS 2 FINE CRUSHED ROCK. 11.d. BRICK PAVER DRIVEWAYS WITH SUITABLE HEAVY DUTY BRICK PAVERS ON 30mm OF BEDDING SAND ON A BASE OF 100mm COMPACTED DEPTH CLASS 2 FINE CRUSHED ROCK. 12. TABLE DRAIN TO BE CLEANED, REDEFINED OR DEFINED AS NECESSARY ALONG THE HIGH SIDE OF THE ROADWAY, REFER TO TYPE OF SECTION FOR TABLE DRAIN PROFILE, MINIMUM DEPTH 300mm. DRAINAGE 13. ALL DRAINAGE PIPES TO BE CLASS 2 RUBBER RING JOINTED SPIGOT AND SOCKET UNLESS SPECIFIED OTHERWISE. 14. ALL PROPERTY STORM WATER OUTLETS WITHIN 3.0m OF THE NEW DRAIN OR KERB ARE TO BE CONNECTED TO UNDERGROUND DRAINAGE PIPES WHERE AVAILABLE, OR BACK OF KERB WHERE UNDERGROUND DRAINAGE PIPES ARE NOT AVAILABLE. 15. DRAINAGE PITS GREATER THAN 1.0m IN DEPTH TO BE PROVIDED WITH STEP IRONS AT 300mm CENTRES VERTICALLY. 16. A.G. DRAIN PLACED BEHIND KERB AND CHANNEL AS SHOWN ON PLAN IF WITHIN 3.0m OF ANY TREE EXCAVATION TO BE HAND DUG OR BORED TO MINIMISE ROOT DAMAGE OF TREE. VEGETATION 17. TREE PROTECTION ZONES (TPZ) HAVE BEEN SHOWN FOR ALL TREES LOCATED CLOSE TO THE WORKS AREA. WORKS AND ANY STOCKPILES OF CONSTRUCTION EQUIPMENT AND MATERIAL ARE TO BE CONTAINED OUTSIDE THE TPZ UNLESS SPECIFICALLY APPROVED BY THIS PLAN. PRIOR APPROVAL MUST BE SOUGHT FOR ANY WORKS NOT SPECIFIED AND APPROVED BY THIS PLAN THAT ARE TO BE CONDUCTED WITHIN THE TPZ OF ANY TREE. 18. ONLY TREES SHOWN TO BE REMOVED ON THIS PLAN CAN BE REMOVED. ANY DAMAGE TO THE BARK, BRANCHES, TRUNKS OR ROOTS OF OTHER TREES SHOULD BE IMMEDIATELY REPORTED TO COUNCIL'S CONSTRUCTION SURVEILLANCE OFFICER BEFORE ANY WORKS CONTINUE AROUND THE SUBJECT VEGETATION. ANCILLARY 19. ALL EXISTING SIGNS AND POSTS REMAIN THE PROPERTY OF THE COUNCIL. NOTES VER DESCRIPTION DATE 00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018 VERSION 04 DWG No. PC1720-DD-04 SHEET No. OF 58 PROJECT No. PC1720 ROAD WIDENING WORKS DETAILED DESIGN SHEFFIELD ROAD, MONTROSE CLIENT CLIENT PROJECT MANAGER / CONTACT Committment | Communication | Collaboration PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL PROCIVIL CONSULTING PTY LTD ABN 51 759 386 092 SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134 PO BOX 164, RINGWOOD VIC 3134 P: (03) 8644 6834 E: [email protected] www.procivil.com.au CIVIL ENGINEERING DESIGN DW REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEW CHRIS PROCTOR CONSULTANT ENGINEER SHIRE OF YARRA RANGES LOCAL GOVERNMENT AREA ORIENTATION HEIGHT DATUM AHD COORDINATE DATUM MGA 94 ZONE 55 OR AS SHOWN SURVEY DATE 09-02-2018 AERIAL IMAGE DATE 23-11-2017 ORIGINAL SCALE & SHEET SIZE AS SHOWN @ A1 01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018 02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019 03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019 04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019 WARNING BEWARE OF UNDERGROUND SERVICES THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN. NOT TO SCALE ROAD WIDENING WORKS SHEFFIELD ROAD, MONTROSE BETWEEN OLD COACH ROAD & GLASGOW ROAD 40 80 0 80 160 1:4,000 @ A1 1:8,000 @ A3 3. 2. 1. No. SHEET DRAWING TITLE TITLE SHEET - NOTES, LOCALITY PLAN, DRAWING INDEX & OVERALL PLAN LAYOUT PLAN CH 00.000 - CH 40.000 4. 5. 15. 11. 10. 6. 7. 8. 9. 14. 12. 13. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. LAYOUT PLAN CH 45.631 - CH 180.000 LAYOUT PLAN CH 190.000 - CH 330.000 LAYOUT PLAN CH 340.000 - CH 503.532 LAYOUT PLAN CH 508.907 - CH 640.000 LAYOUT PLAN CH 650.000 - CH 790.000 LAYOUT PLAN CH 790.000 - CH 940.000 LAYOUT PLAN CH 950.000 - CH 1081.959 LAYOUT PLAN CH 1085.912 - CH 1218.565 No. SHEET 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. LAYOUT PLAN CH 1230.000 - CH 1370.000 LAYOUT PLAN CH 1380.000 - CH 1530.000 LAYOUT PLAN CH 1537.502 - CH 1670.000 LAYOUT PLAN CH 1680.000 - CH 1819.881 LAYOUT PLAN CH 1830.000 - CH 1960.000 LAYOUT PLAN CH 1970.000 - CH 2100.000 LAYOUT PLAN CH 2111.130 - CH 2240.000 LAYOUT PLAN CH 2250.000 - CH 2380.000 LAYOUT PLAN CH 2390.000 - CH 2520.000 LAYOUT PLAN CH 2526.666 - CH 2576.538 LONGITUDINAL SECTIONS CH 00.000 - CH 403.198 LONGITUDINAL SECTIONS CH 407.498 - CH 863.943 LONGITUDINAL SECTIONS CH 871.519 - CH 1170.000 LONGITUDINAL SECTIONS CH 1171.739 - CH 1460.000 DRAWING TITLE 27. 28. LONGITUDINAL SECTIONS CH 1491.005 - CH 1805.908 LONGITUDINAL SECTIONS CH 1810.116 - CH 2100.629 LONGITUDINAL SECTIONS CH 2111.130 - CH 2576.538 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 29. 30. 55. 56. CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS CROSS-SECTIONS 57. 58. CROSS-SECTIONS CROSS-SECTIONS LOCALITY MAP DRAWING INDEX OVERALL PLAN TITLE SHEET - NOTES, LOCALITY PLAN, DRAWING INDEX & OVERALL PLAN 01 -

WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

S

H

E

E

T

2

S

H

E

E

T

3

S

H

E

E

T

4

S

H

E

E

T

5

S

H

E

E

T

6

S

H

E

E

T

7

SHEET 8 SHEET 9 SHEET 10 SHEET 11 SHEET 12

SHEET 13

SHEET 14

SHEET 15

SHEET 16

SHEET 17 SHEET 18 SHEET 19 SHEET 20

ROLLOVER KERB AND CHANNEL TO

COUNCIL STANDARD DRAWING SD B1

EXISTING PAVEMENT

100mm DIA SUB-SURFACE

DRAIN, CLASS 400

30mm MIN COMPACTED DEPTH OF

10mm NOMINAL SIZE TYPE H ASPHALT

WEARING COURSE

VARYING DEPTH OF 14mm NOMINAL

SIZE TYPE H ASPHALT REGULATION

COURSE

FULL DEPTH

ASPHALT INFILL

NOT TO SCALE

GENERALLY IN ACCORDANCE WITH STANDARD COUNCIL DRAWING SD D5

600mm VARIES

50mm (MIN) COMPACTED

DEPTH 20mm CLASS 3

CRUSHED ROCK

300mm

BACKFILL WITH 20mm

SCREENINGS

PAVEMENT DETAIL FORPAVEMENT WIDENING

GENERAL

1. THE CONTRACTOR IS TO VERIFY THE LOCATION AND DEPTH OF ALL UTILITY

SERVICES PRIOR TO CARRYING OUT WORKS BY TELEPHONING 1100 "DIAL

BEFORE YOU DIG".

2. DISCREPANCIES BETWEEN PLANS AND EXISTING CONDITIONS ARE TO BE

REPORTED IMMEDIATELY TO THE COUNCIL'S SUPERVISING ENGINEER.

3. ALL SURPLUS EXCAVATED MATERIAL REMAINS THE PROPERTY OF THE

CONTRACTOR UNLESS SPECIFIED OTHERWISE OR ADVISED BY THE COUNCIL'S

SUPERVISING ENGINEER.

4. "REMOVE" SHALL MEAN REMOVE OFF-SITE AND DISPOSE OF AT AN APPROVED

DISPOSAL SITE AT THE CONTRACTOR'S EXPENSE, UNLESS SPECIFIED

OTHERWISE.

5. ON COMPLETION OF CONSTRUCTION ALL WORK AREA ARE TO BE CLEANED UP &

REINSTATED TO THE SATISFACTION OF THE COUNCIL'S SUPERVISING ENGINEER.

PAVEMENT

6. ROAD CROSSFALL TO BE 1 in 36 FALLING TOWARDS THE TABLE DRAIN OR KERB

AND CHANNEL UNLESS SPECIFIED OTHERWISE.

7. AT NEW FILL AREAS THE TOPSOIL SHALL BE STRIPPED AND FILLING MATERIAL

PLACED IN 150mm THICK LAYER AND COMPACTED TO 95% A.A.S.H.O.

COMPACTION TEST, THE TOPSOIL IS THEN RE-SPREAD ON THE BATTER AREAS.

8. NEW CONCRETE FOOTPATH PAVING TO BE 32 MPa STRENGTH.

9. TACTILE GROUND SURFACE INDICATOR (TGSI) PAVERS ARE TO BE 300mm x

300mm x 40mm PRE-CAST CONCRETE PAVERS AND SHALL HAVE A MINIMUM

LUMINANCE CONTRAST OF 30% COMPARED TO THE AMOUNT OF LIGHT

REFLECTED FROM THE ADJACENT SURFACE.

ROADSIDE

10. EXISTING DRIVEWAY ENTRANCES TO BE REINSTATED AND SEALED FOR 1.0m

FROM EDGE OF SEAL WITH 50mm COMPACTED DEPTH 10mm TYPE N ASPHALT ON

A BASE OF 100mm COMPACTED DEPTH CLASS 2 FINE CRUSHED ROCK.

11. EXISTING DRIVEWAYS ARE TO BE REINSTATED FROM BACK OF KERB OR EDGE OF

SEAL AT A MAXIMUM GRADE OF 1 in 8 FOR 2.0m THEN 1 in 4 THEREAFTER WITH A

TRANSITION OF 1 in 6 FOR 2.0m IS PREFERRED WHERE POSSIBLE AS PER:

11.a. GRAVEL DRIVEWAY WITH 50mm COMPACTED DEPTH OF 3% CEMENT

TREATED CRUSHED ROCK UNLESS SPECIFIED OTHERWISE.

11.b. ASPHALT DRIVEWAYS WITH 50mm COMPACTED DEPTH 10mm NOMINAL SIZE

ASPHALT ON A BASE OF 100mm COMPACTED DEPTH CLASS 2 FINE CRUSHED

ROCK.

11.c. CONCRETE DRIVEWAYS WITH 150mm DEPTH CONCRETE PAVING ON A BASE

OF 50mm COMPACTED DEPTH CLASS 2 FINE CRUSHED ROCK.

11.d. BRICK PAVER DRIVEWAYS WITH SUITABLE HEAVY DUTY BRICK PAVERS ON

30mm OF BEDDING SAND ON A BASE OF 100mm COMPACTED DEPTH CLASS 2

FINE CRUSHED ROCK.

12. TABLE DRAIN TO BE CLEANED, REDEFINED OR DEFINED AS NECESSARY ALONG

THE HIGH SIDE OF THE ROADWAY, REFER TO TYPE OF SECTION FOR TABLE

DRAIN PROFILE, MINIMUM DEPTH 300mm.

DRAINAGE

13. ALL DRAINAGE PIPES TO BE CLASS 2 RUBBER RING JOINTED SPIGOT AND

SOCKET UNLESS SPECIFIED OTHERWISE.

14. ALL PROPERTY STORM WATER OUTLETS WITHIN 3.0m OF THE NEW DRAIN OR

KERB ARE TO BE CONNECTED TO UNDERGROUND DRAINAGE PIPES WHERE

AVAILABLE, OR BACK OF KERB WHERE UNDERGROUND DRAINAGE PIPES ARE

NOT AVAILABLE.

15. DRAINAGE PITS GREATER THAN 1.0m IN DEPTH TO BE PROVIDED WITH STEP

IRONS AT 300mm CENTRES VERTICALLY.

16. A.G. DRAIN PLACED BEHIND KERB AND CHANNEL AS SHOWN ON PLAN IF WITHIN

3.0m OF ANY TREE EXCAVATION TO BE HAND DUG OR BORED TO MINIMISE ROOT

DAMAGE OF TREE.

VEGETATION

17. TREE PROTECTION ZONES (TPZ) HAVE BEEN SHOWN FOR ALL TREES LOCATED

CLOSE TO THE WORKS AREA. WORKS AND ANY STOCKPILES OF CONSTRUCTION

EQUIPMENT AND MATERIAL ARE TO BE CONTAINED OUTSIDE THE TPZ UNLESS

SPECIFICALLY APPROVED BY THIS PLAN. PRIOR APPROVAL MUST BE SOUGHT

FOR ANY WORKS NOT SPECIFIED AND APPROVED BY THIS PLAN THAT ARE TO BE

CONDUCTED WITHIN THE TPZ OF ANY TREE.

18. ONLY TREES SHOWN TO BE REMOVED ON THIS PLAN CAN BE REMOVED. ANY

DAMAGE TO THE BARK, BRANCHES, TRUNKS OR ROOTS OF OTHER TREES

SHOULD BE IMMEDIATELY REPORTED TO COUNCIL'S CONSTRUCTION

SURVEILLANCE OFFICER BEFORE ANY WORKS CONTINUE AROUND THE SUBJECT

VEGETATION.

ANCILLARY

19. ALL EXISTING SIGNS AND POSTS REMAIN THE PROPERTY OF THE COUNCIL.

NOTES

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

NOT TO SCALE

ROAD WIDENING WORKSSHEFFIELD ROAD, MONTROSE

BETWEEN OLD COACH ROAD & GLASGOW ROAD

4080 0 80 160 1:4,000 @ A11:8,000 @ A3

3.

2.

1.

No.

SHEET

DRAWING TITLE

TITLE SHEET - NOTES, LOCALITY PLAN, DRAWING INDEX & OVERALL PLAN

LAYOUT PLAN CH 00.000 - CH 40.000

4.

5.

15.

11.

10.

6.

7.

8.

9.

14.

12.

13.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

LAYOUT PLAN CH 45.631 - CH 180.000

LAYOUT PLAN CH 190.000 - CH 330.000

LAYOUT PLAN CH 340.000 - CH 503.532

LAYOUT PLAN CH 508.907 - CH 640.000

LAYOUT PLAN CH 650.000 - CH 790.000

LAYOUT PLAN CH 790.000 - CH 940.000

LAYOUT PLAN CH 950.000 - CH 1081.959

LAYOUT PLAN CH 1085.912 - CH 1218.565

No.

SHEET

44.

45.

46.

47.

48.

49.

50.

51.

52.

53.

54.

LAYOUT PLAN CH 1230.000 - CH 1370.000

LAYOUT PLAN CH 1380.000 - CH 1530.000

LAYOUT PLAN CH 1537.502 - CH 1670.000

LAYOUT PLAN CH 1680.000 - CH 1819.881

LAYOUT PLAN CH 1830.000 - CH 1960.000

LAYOUT PLAN CH 1970.000 - CH 2100.000

LAYOUT PLAN CH 2111.130 - CH 2240.000

LAYOUT PLAN CH 2250.000 - CH 2380.000

LAYOUT PLAN CH 2390.000 - CH 2520.000

LAYOUT PLAN CH 2526.666 - CH 2576.538

LONGITUDINAL SECTIONS CH 00.000 - CH 403.198

LONGITUDINAL SECTIONS CH 407.498 - CH 863.943

LONGITUDINAL SECTIONS CH 871.519 - CH 1170.000

LONGITUDINAL SECTIONS CH 1171.739 - CH 1460.000

DRAWING TITLE

27.

28.

LONGITUDINAL SECTIONS CH 1491.005 - CH 1805.908

LONGITUDINAL SECTIONS CH 1810.116 - CH 2100.629

LONGITUDINAL SECTIONS CH 2111.130 - CH 2576.538

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

29.

30.

55.

56.

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

CROSS-SECTIONS

57.

58.

CROSS-SECTIONS

CROSS-SECTIONS

LOCALITY MAP

DRAWING INDEX

OVERALL PLAN

TITLE SHEET - NOTES, LOCALITY PLAN, DRAWING INDEX & OVERALL PLAN

01

-

Page 2: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

EX G

EX G

EX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX T

EX T

EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX

T

EX

T

EX

T

EX TEX T EX T

EX T EX TEX T EX T EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

E

X

T

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

UN

SE

ALE

D

VE

HIC

LE

X

-O

VE

R

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

C

O

N

C

R

ET

E

FO

O

TP

AT

H

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

UNSEALED

ROAD AND

CARPARK

CH

0.000

CH

0.000

CH

10.000

CH

12.037

CH

12.037

CH

13.190

CH

13.190

CH

13.190

CH

19.534

CH

19.534

CH

19.534

CH

30.000

CH

35.858

CH

35.858

CH

35.858

CH

40.000

200

SHEFFIELD ROAD

202

204 206

208

G

LA

S

G

O

W

R

O

A

D

36

205

E

X

T

E

N

T

O

F

W

O

R

K

S

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

2.75 m

2.75 m

REMOVE SHORT SECTION OF EXISTING

KERB AND TRANSITION IN NEW KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

MATCH NEW ROLLOVER KERB &

CHANNEL TO EXISTING

ROLLOVER KERB & CHANNEL

PROFILE EXISTING ASPHALT BY A MINIMUM

OF 30mm AND MATCH NEW ASPHALT

LEVELS TO EXISTING LEVELS

HOUSE DRAINS TO BE REGRADED TO

NEW 150Ø DRAINAGE PIPE BEHIND KERB

CH

0.000

CH

0.000

CH

10.000

CH

12.037

CH

12.037

CH

13.190

CH

13.190

CH

13.190

CH

19.534

CH

19.534

CH

19.534

CH

30.000

CH

35.858

CH

35.858

CH

35.858

CH

40.000

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 00.000 - CH 40.000

CO

NT

IN

UE

D O

N S

HE

ET

3

04 1:200 @ A14 821:400 @ A3

02

GENERAL LAYOUT PLAN

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

-

Page 3: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX TEX T EX T

EX TEX T

EX T

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

UNSEALED

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

CONCRETE

FOOTPATH

CONCRETE

VEHICLE X-OVER

CONCRETE

FOOTPATH CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CH

45.631

CH

45.631

CH

50.000

CH

60.000

CH

70.414

CH

80.000

CH

90.414

CH

100.000

CH

105.167

CH

110.000

CH

120.000

CH

120.875

CH

120.875

CH

130.000

CH

138.170

CH

138.170

CH

140.000

CH

150.000

CH

157.789

CH

160.000

CH

170.000

CH

180.000

210212

214216

218

205

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE

SAWCUT, REMOVED AND REINSTATED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

45.631

CH

45.631

CH

50.000

CH

60.000

CH

70.414

CH

80.000

CH

90.414

CH

100.000

CH

105.167

CH

110.000

CH

120.000

CH

120.875

CH

120.875

CH

130.000

CH

138.170

CH

138.170

CH

140.000

CH

150.000

CH

157.789

CH

160.000

CH

170.000

CH

180.000

T#75

REMOVE TREE FROM

ROAD CLEARANCE

ENVELOPE (TREE #75)

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 45.631 - CH 180.000

CO

NT

IN

UE

D O

N S

HE

ET

4

CO

NT

IN

UE

D O

N S

HE

ET

2

03

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 4: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX WEX W

E

X

W

E

X

W

E

X

W

EX

W

EX

W

EX

W

EX

W

EX

W

EX

W

/

/

/

/

/

/

UNSEALED

VEHICLE X-OVER

U

N

S

E

A

L

E

D

V

E

H

IC

L

E

X

-

O

V

E

R

UN

SE

ALE

D

VE

HIC

LE

X

-O

VE

R

BITUMEN

VEHICLE X-OVER

U

N

S

E

A

LE

D

V

E

H

IC

LE

X

-O

V

E

R

UNSEALED

VEHICLE X-OVER

U

N

SE

ALE

D

V

E

H

IC

LE

X

-O

V

E

R

UNSEALED

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

CONCRETE

FOOTPATHCONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CH

190.000

CH

200.000

CH

210.000

CH

211.231

CH

220.000

CH

227.435

CH

230.000

CH

240.000

CH

250.000

CH

256.158

CH

256.158

CH

298.063

CH

298.063

CH

300.000

CH

306.592

CH

310.000

CH

320.000

CH

320.973

CH

330.000

218-220

222

224

226

228

229219

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

MATCH NEW ROLLOVER KERB

& CHANNEL TO EXISTING

ROLLOVER KERB & CHANNEL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

190.000

CH

200.000

CH

210.000

CH

211.231

CH

220.000

CH

227.435

CH

230.000

CH

240.000

CH

250.000

CH

256.158

CH

256.158

CH

298.063

CH

298.063

CH

300.000

CH

306.592

CH

310.000

CH

320.000

CH

320.973

CH

330.000

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 190.000 - CH 330.000

CO

NT

IN

UE

D O

N S

HE

ET

5

CO

NT

IN

UE

D O

N S

HE

ET

3

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

03

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 5: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

E

X

W

E

X

W

E

X

W

EX

W

EX

W

EX

W

EX

W

EX

W

EX

W

/

/

/

/

R

I

V

L

1

0

A

T

1

.

6

VEHICLE X-OVER

U

N

S

E

A

L

E

D

V

E

H

IC

L

E

X

-O

V

E

R

BIT

UM

EN

VE

HIC

LE

X

-O

VE

R

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

CONCRETE

VEHICLE X-OVER

CONCRETE

VEHICLE X-OVER

BIT

UM

EN

VE

HIC

LE

X

-O

VE

R

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

CO

NC

RE

TE

FO

OT

PA

TH

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CH

340.000

CH

350.000

CH

352.561

CH

356.592

CH

360.000

CH

370.000

CH

376.592

CH

379.354

CH

379.354

CH

428.901

CH

428.901

CH

429.854

CH

429.854

CH

440.000

C

H

4

5

0

.0

0

0

C

H

4

6

0

.0

0

0

C

H

4

6

9

.

5

3

3

C

H

4

6

9

.

5

3

3

C

H

4

8

0

.

0

0

0

C

H

4

8

5

.

9

1

6

C

H

4

8

5

.

9

1

6

C

H

4

9

0

.0

0

0

C

H

4

9

8

.3

2

7

C

H

4

9

8

.3

2

7

C

H

4

9

8

.3

2

7

C

H

5

0

0

.0

0

0

C

H

503.532

C

H

503.532

C

H

503.532

236

H

A

K

E

A

D

R

I

V

E

230

232

238

240

239

233

HOUSE DRAINS TO BE REGRADED TO

NEW 150Ø DRAINAGE PIPE BEHIND KERB

EXISTING CONCRETE CROSSOVER TO BE

SAWCUT, REMOVED AND REINSTATED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED TO

PROPERTY BOUNDARY AS DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED TO PROPERTY

BOUNDARY OR AS DIRECTED BY COUNCIL

MATCH NEW ROLLOVER KERB

& CHANNEL TO EXISTING

ROLLOVER KERB & CHANNEL

E

X

T

E

N

T

O

F

W

O

R

K

S

CONSTRUCT GRATED SIDE ENTRY PIT TO NEW

LEVELS IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD P3,

AND CONNECT EXISTING PIPES

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2

.

7

5

m

2

.

7

5

m

CH

340.000

CH

350.000

CH

352.561

CH

356.592

CH

360.000

CH

370.000

CH

376.592

CH

379.354

CH

379.354

CH

428.901

CH

428.901

CH

429.854

CH

429.854

CH

440.000

C

H

4

5

0

.0

0

0

C

H

4

6

0

.0

0

0

C

H

4

6

9

.

5

3

3

C

H

4

6

9

.

5

3

3

C

H

4

8

0

.

0

0

0

C

H

4

8

5

.

9

1

6

C

H

4

8

5

.

9

1

6

C

H

4

9

0

.0

0

0

C

H

4

9

8

.3

2

7

C

H

4

9

8

.3

2

7

C

H

4

9

8

.3

2

7

C

H

5

0

0

.0

0

0

C

H

503.532

C

H

503.532

C

H

503.532

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 340.000 - CH 503.532

CO

NT

IN

UE

D O

N S

HE

ET

6

CO

NT

IN

UE

D O

N S

HE

ET

4

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

05

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 6: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

//

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

B

R

IC

K

P

A

V

E

D

D

R

IV

E

W

A

Y

P

A

V

E

D

D

R

I

V

E

W

A

Y

C

O

N

C

R

E

T

E

V

E

H

I

C

L

E

X

-

O

V

E

R

B

IT

U

M

E

N

V

E

H

IC

LE

X

-O

V

E

R

U

N

S

E

A

L

E

D

V

E

H

IC

L

E

X

-O

V

E

R

BIT

UM

EN

VE

HIC

LE

X

-O

VE

R

BIT

UM

EN

VE

HIC

LE

X

-O

VE

R

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

B

IT

U

M

E

N

V

E

H

IC

LE

X

-O

V

E

R

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

CONCRETE

FOOTPATH

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

CONCRETE

FOOTPATH

CONCRETE

FOOTPATH

CH

508.907

CH

508.907

CH

510.000

CH

520.401

CH

520.401

CH

530.000

CH

533.110

CH

533.110

CH

533.110

CH

540.000

C

H

550.000

C

H

551.292

C

H

551.292

C

H

551.292

C

H

5

6

0

.0

0

0

C

H

5

6

2

.3

6

7

C

H

5

6

2

.3

6

7

C

H

5

6

2

.3

6

7

C

H

5

7

0

.0

0

0

C

H

5

7

2

.1

9

9

C

H

5

7

2

.1

9

9

C

H

5

8

0

.0

0

0C

H

5

8

0

.8

6

1

C

H

5

8

0

.8

6

1

C

H

5

9

0

.0

0

0

C

H

5

9

4

.1

7

2

C

H

5

9

4

.1

7

2

C

H

5

9

4

.1

7

2

C

H

600.000

CH

605.512

CH

605.512

CH

605.512

CH

610.000

CH

620.000

CH

622.848

CH

622.848

CH

630.000

CH

640.000

CH

650.000

240

242

244

246

248250

252

251

243

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED TO BACK OF EXISTING

FOOTPATH OR AS DIRECTED BY COUNCIL

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED TO

BACK OF FOOTPATH AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

508.907

CH

508.907

CH

510.000

CH

520.401

CH

520.401

CH

530.000

CH

533.110

CH

533.110

CH

533.110

CH

540.000

C

H

550.000

C

H

551.292

C

H

551.292

C

H

551.292

C

H

5

6

0

.0

0

0

C

H

5

6

2

.3

6

7

C

H

5

6

2

.3

6

7

C

H

5

6

2

.3

6

7

C

H

5

7

0

.0

0

0

C

H

5

7

2

.1

9

9

C

H

5

7

2

.1

9

9

C

H

5

8

0

.0

0

0C

H

5

8

0

.8

6

1

C

H

5

8

0

.8

6

1

C

H

5

9

0

.0

0

0

C

H

5

9

4

.1

7

2

C

H

5

9

4

.1

7

2

C

H

5

9

4

.1

7

2

C

H

600.000

CH

605.512

CH

605.512

CH

605.512

CH

610.000

CH

620.000

CH

622.848

CH

622.848

CH

630.000

CH

640.000

CH

650.000

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

CO

NT

IN

UE

D O

N S

HE

ET

7

CO

NT

IN

UE

D O

N S

HE

ET

5

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

06

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

LAYOUT PLAN CH 508.907 - CH 640.000

-

Page 7: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX G

EX G

EX G

EX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX TEX T

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

EX W

EX W

EX W

EX W

EX WEX W

EX W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

G

E

X

G

E

X

G

EX

G

E

X

G

E

X

G

E

X

G

E

X

G

// /

//

//

/

/

/

/

/

/ / / /

/

/

/

/ / / / / // /

/ / //

// /

/

/

/

/

/

/

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

B

IT

U

M

E

N

V

E

H

IC

L

E

X

-O

V

E

R

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

CARPARK

CONCRETE

FOOTPATH

CH

650.000

CH

660.000

CH

665.794

CH

670.000

CH

680.000

CH

690.000

CH

700.000

CH

710.593

CH

710.593

CH

720.000

CH

730.000

C

H

7

4

0

.0

0

0

C

H

7

4

5

.0

0

0

C

H

7

8

3

.

2

6

1

C

H

7

8

3

.

2

6

1

C

H

7

8

3

.

2

6

1

C

H

7

9

0

.

0

0

0 C

H

7

9

6

.

7

7

6

C

H

7

9

6

.

7

7

6

C

H

8

0

0

.

0

0

0

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

MATCH NEW ROLLOVER KERB & CHANNEL

LEVELS TO EXISTING BARRIER KERB &

CHANNEL AND TRANSITION OVER 1m

REINSTATE LANE ARROW PAVEMENT MARKINGS AND

LANE DIVIDERS AS SHOWN IN ACCORDANCE WITH

VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

E

X

T

E

N

T

O

F

W

O

R

K

S

PROVIDE DASHED EDGELINE ACROSS

INTERSECTION IN ACCORDANCE WITH VICROADS

TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, 1.0m DASH WITH 3.0m GAP)

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

650.000

CH

660.000

CH

665.794

CH

670.000

CH

680.000

CH

690.000

CH

700.000

CH

710.593

CH

710.593

CH

720.000

CH

730.000

C

H

7

4

0

.0

0

0

C

H

7

4

5

.0

0

0

C

H

7

8

3

.

2

6

1

C

H

7

8

3

.

2

6

1

C

H

7

8

3

.

2

6

1

C

H

7

9

0

.

0

0

0 C

H

7

9

6

.

7

7

6

C

H

7

9

6

.

7

7

6

C

H

8

0

0

.

0

0

0

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 650.000 - CH 790.000

CO

NT

IN

UE

D O

N S

HE

ET

8

CO

NT

IN

UE

D O

N S

HE

ET

6

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

07

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 8: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

E

X

G

E

X

G

E

X

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX T

EX T

EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX W EX W EX W EX W EX W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

EX WEX W EX W

EX W EX WEX W EX W

EX W EX WEX W EX W

EX W EX W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

/

/

/

/

/

/

/

UNSEALED

VEHICLE X-OVER

BITUMEN

CARPARK

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

B

I

T

U

M

E

N

F

O

O

T

P

A

T

H

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

CH

790.000

CH

796.776

CH

796.776

CH

800.000

CH

810.000

CH

820.000

CH

830.000

CH

840.000

CH

848.448

CH

848.448

CH

887.796

CH

887.796

CH

890.000

CH

900.000

CH

901.118

CH

904.517

CH

910.000

CH

920.000

CH

930.000

CH

940.000

CONSTRUCT NEW GRATED SIDE ENTRY PIT TO NEW LEVELS IN

ACCORDANCE WITH THE SHIRE OF YARRA RANGES STANDARD

DRAWING SD P3, AND CONNECT EXISTING 450Ø PIPE

EXISTING BITUMEN CHILDRENS CROSSING PRAM

CROSSING TO BE SAWCUT AND RECONSTRUCTED

OVER A MINIMUM OF 2m ACCORDING TO THE SHIRE

OF YARRA RANGES STANDARD DRAWING SD B4

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

MATCH NEW ROLLOVER KERB & CHANNEL

LEVELS TO EXISTING BARRIER KERB &

CHANNEL AND TRANSITION OVER 1m

MATCH NEW ROLLOVER KERB & CHANNEL

LEVELS TO EXISTING BARRIER KERB &

CHANNEL AND TRANSITION OVER 1m

EXISTING BITUMEN CHILDRENS CROSSING PRAM

CROSSING TO BE SAWCUT AND RECONSTRUCTED

OVER A MINIMUM OF 3m ACCORDING TO THE SHIRE

OF YARRA RANGES STANDARD DRAWING SD B4

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE GIVE WAY STATCON CONTINUITY LINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(150mm WIDE, 600mm DASH WITH 600mm GAP)

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE WITH

VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN)

PROVIDE STOP LINES AND CROSSWALK LINE FOR A

CHILDRENS CROSSING IN ACCORDANCE WITH VICROADS

TRAFFIC ENGINEERING MANUAL VOL 1.

(STOP LINE 600mm WIDE, CROSSWALK LINE 150mm WIDE)

PROVIDE "KEEP CLEAR" AND TRANSVERSE LINES ON SOUTH

BOUND LANE IN ACCORDANCE WITH VICROADS TRAFFIC

ENGINEERING MANUAL VOL 2.

2.75 m

2.75 m

CH

790.000

CH

796.776

CH

796.776

CH

800.000

CH

810.000

CH

820.000

CH

830.000

CH

840.000

CH

848.448

CH

848.448

CH

887.796

CH

887.796

CH

890.000

CH

900.000

CH

901.118

CH

904.517

CH

910.000

CH

920.000

CH

930.000

CH

940.000

T#9

T#10

T#7

T#8

T#12

T#14

T#11

T#6

T#5

T#4

T#3

T#2

T#1

T#15

T#16

T#22

T#17

T#18

T#19

T#21

T#23

T#24

T#25

REMOVE TREE #24

REMOVE

TREE #21

T#26

T#27

T#13

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 790.000 - CH 940.000

CO

NT

IN

UE

D O

N S

HE

ET

9

CO

NT

IN

UE

D O

N S

HE

ET

7

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

08

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 9: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

E

X

T

EX T EX T EX T EX T EX T EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX W EX WEX W EX W EX W EX W EX W EX W EX W EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX WEX W EX W EX W

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

H

U

N

S

E

A

L

E

D

P

A

T

H

UNSEALED PATH

CH

950.000

CH

960.000

CH

970.022

CH

980.000

CH

984.615

CH

990.000

CH

996.072

CH

1000.000

CH

1010.000

CH

1013.081

CH

1020.000

CH

1030.000

CH

1036.072

CH

1040.000

CH

1050.000

CH

1051.914

CH

1051.914

CH

1057.593

CH

1057.593

CH

1057.593

CH

1060.000

CH

1060.542

CH

1060.542

CH

1070.000

CH

1073.469

CH

1073.469

CH

1080.000

CH

1080.912

CH

1080.912

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 5m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

950.000

CH

960.000

CH

970.022

CH

980.000

CH

984.615

CH

990.000

CH

996.072

CH

1000.000

CH

1010.000

CH

1013.081

CH

1020.000

CH

1030.000

CH

1036.072

CH

1040.000

CH

1050.000

CH

1051.914

CH

1051.914

CH

1057.593

CH

1057.593

CH

1057.593

CH

1060.000

CH

1060.542

CH

1060.542

CH

1070.000

CH

1073.469

CH

1073.469

CH

1080.000

CH

1080.912

CH

1080.912

T#28

T#29

T#31

T#30

T#33T#32

T#34 T#35

REMOVE TREES

#30, #31, #32 & #33

T#76

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 950.000 - CH 1081.959

CO

NT

IN

UE

D O

N S

HE

ET

1

0

CO

NT

IN

UE

D O

N S

HE

ET

8

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

09

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 10: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX T

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

EX

T

EX

T

EX

T

E

X

T

E

X

T

EX T EX T EX T EX T EX T EX T EX T EX T EX T

E

X

T

E

X

T

E

X

T

EX W EX W EX W EX W EX WEX W EX W EX W EX W EX W EX W EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

/

/

/

/

/

UNSEALED

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER CONCRETE

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED PATH

UNSEALED PATH UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

UN

SE

ALE

D P

AT

H

U

N

S

E

A

LE

D

P

A

TH

UNSEALED PATH

UNSEALED PATH

CH

1084.865

CH

1089.659

CH

1089.659

CH

1090.000

CH

1092.721

CH

1092.721

CH

1100.000

CH

1110.000

CH

1112.070

CH

1120.000

CH

1126.608

CH

1126.608

CH

1130.000

CH

1134.412

CH

1134.412

CH

1140.000

CH

1146.935

CH

1146.935

CH

1150.000

CH

1160.000

CH

1164.512

CH

1164.512

CH

1170.000

CH

1180.000

CH

1190.563

CH

1190.563

CH

1192.752

CH

1192.752

CH

1192.752

CH

1200.000

CH

1207.031

CH

1207.031

CH

1210.000

CH

1217.517

CH

1220.000

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

EXISTING CONCRETE CROSSOVER TO BE

SAWCUT, REMOVED AND REINSTATED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

1084.865

CH

1089.659

CH

1089.659

CH

1090.000

CH

1092.721

CH

1092.721

CH

1100.000

CH

1110.000

CH

1112.070

CH

1120.000

CH

1126.608

CH

1126.608

CH

1130.000

CH

1134.412

CH

1134.412

CH

1140.000

CH

1146.935

CH

1146.935

CH

1150.000

CH

1160.000

CH

1164.512

CH

1164.512

CH

1170.000

CH

1180.000

CH

1190.563

CH

1190.563

CH

1192.752

CH

1192.752

CH

1192.752

CH

1200.000

CH

1207.031

CH

1207.031

CH

1210.000

CH

1217.517

CH

1220.000

T#77

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1085.912 - CH 1218.565

CO

NT

IN

UE

D O

N S

HE

ET

1

1

CO

NT

IN

UE

D O

N S

HE

ET

9

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

10

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 11: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

E

X

G

E

X

G

EX TEX T EX T EX T EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX T

EX T

EX T

EX TEX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX

W

EX

W

EX

W

EX

W

EX

W

EX

W

EX

W

EX W

/

/

/

/

/

/

/

/

/

/

/

/

/

L

6

A

T

1

.

6

O

S

1

.

8

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

VEHICLE X-OVER

CONCRETE

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

H

UNSEALED PATH

UNSEALED PATH

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

H

U

N

S

E

A

L

E

D

P

A

T

H

UN

SE

ALE

D P

AT

H

CH

1230.000

CH

1240.000

CH

1250.000

CH

1260.000

CH

1263.117

CH

1270.000

CH

1276.059

CH

1280.000

CH

1290.000

CH

1300.000

CH

1302.640

CH

1310.000

CH

1320.000

CH

1330.000

CH

1331.736

CH

1331.736

CH

1339.873

CH

1339.873

CH

1343.514

CH

1343.514

CH

1349.109

CH

1349.109

CH

1349.109

CH

1360.000

CH

1370.000

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

OVERLAY EXISTING SIDE ROAD A MINIMUM

2m FROM NEW EDGELINE OR AS DIRECTED

BY COUNCIL. PROFILE EXISTING ASPHALT

BY A MINIMUM OF 30mm AND MATCH NEW

ASPHALT LEVELS TO EXISTING LEVELS

EXISTING CONCRETE CROSSOVER TO BE

SAWCUT, REMOVED AND REINSTATED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 5m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

1230.000

CH

1240.000

CH

1250.000

CH

1260.000

CH

1263.117

CH

1270.000

CH

1276.059

CH

1280.000

CH

1290.000

CH

1300.000

CH

1302.640

CH

1310.000

CH

1320.000

CH

1330.000

CH

1331.736

CH

1331.736

CH

1339.873

CH

1339.873

CH

1343.514

CH

1343.514

CH

1349.109

CH

1349.109

CH

1349.109

CH

1360.000

CH

1370.000

T#36

T#37

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1230.000 - CH 1370.000

CO

NT

IN

UE

D O

N S

HE

ET

1

2

CO

NT

IN

UE

D O

N S

HE

ET

1

0

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

11

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 12: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

E

X

G

E

X

G

E

X

G

E

X

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX T EX T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX T EX TEX T EX T

EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX T EX T EX T EX T EX T EX T EX T EX T

EX T

EX T

EX T

EX T

EX T EX T EX T

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX WEX W

EX W

EX W

EX W

EX WEX W EX W

L

6

A

T

1

.

6

BITU

ME

N

VEHICLE X-OVER

B

ITU

M

E

N

V

E

H

IC

LE

X

-O

V

E

R

B

IT

U

M

E

N

V

E

H

IC

L

E

X

-O

V

E

R

BIT

UM

EN

VE

HIC

LE X

-OV

ER

B

IT

U

M

E

N

V

E

H

IC

L

E

X

-O

V

E

R

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

UN

SEALED PATH

UNSEALED PATH

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

H

U

N

S

E

A

LE

D

P

A

TH

UNSEALED PATH

CH

1380.000

CH

1390.000

C

H

1400.000

C

H

1402.362

C

H

1402.362

C

H

1410.000

C

H

1420.000

C

H

1430.000

C

H

1440.000

C

H

1450.000

C

H

1452.207

C

H

1452.207

CH

1460.000

CH

1470.000

CH

1471.117

CH

1471.117

CH

1471.117

CH

1501.691

CH

1501.691

CH

1501.691

C

H

1

5

1

0

.0

0

0

C

H

1

5

1

9

.

7

4

8

C

H

1

5

1

9

.

7

4

8

C

H

1

5

3

0

.

0

0

0

REMOVE & DISPOSE OF

EXISTING 300Ømm PIPE

CONSTRUCT NEW GRATED SIDE ENTRY PIT TO NEW LEVELS IN

ACCORDANCE WITH THE SHIRE OF YARRA RANGES STANDARD

DRAWING SD P3, AND CONNECT NEW 300Ø PIPE

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROFILE EXISTING ASPHALT BY A MINIMUM

OF 30mm AND MATCH NEW ASPHALT

LEVELS TO EXISTING LEVELS

MATCH NEW KERB TO EXISTING LEVELS

AND RESHAPE SURROUNDING AREA TO

DIRECT SURFACE WATER TO KERB INVERT

MATCH NEW KERB TO EXISTING LEVELS

AND RESHAPE SURROUNDING AREA TO

DIRECT SURFACE WATER TO KERB INVERT

E

X

T

E

N

T

O

F

W

O

R

K

S

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CONSTRUCT NEW GRATED SIDE ENTRY PIT TO NEW LEVELS IN

ACCORDANCE WITH THE SHIRE OF YARRA RANGES STANDARD

DRAWING SD P3, AND CONNECT NEW 300Ø PIPE

CH

1380.000

CH

1390.000

C

H

1400.000

C

H

1402.362

C

H

1402.362

C

H

1410.000

C

H

1420.000

C

H

1430.000

C

H

1440.000

C

H

1450.000

C

H

1452.207

C

H

1452.207

CH

1460.000

CH

1470.000

CH

1471.117

CH

1471.117

CH

1471.117

CH

1501.691

CH

1501.691

CH

1501.691

C

H

1

5

1

0

.0

0

0

C

H

1

5

1

9

.

7

4

8

C

H

1

5

1

9

.

7

4

8

C

H

1

5

3

0

.

0

0

0

T#37

T#38

T#39

T#40

T#41

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1380.000 - CH 1530.000

CO

NT

IN

UE

D O

N S

HE

ET

1

3

CO

NT

IN

UE

D O

N S

HE

ET

1

1

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

12

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 13: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX WEX W

EX WEX W

EX WEX W

C

O

N

C

R

E

T

E

V

E

H

I

C

L

E

X

-

O

V

E

R

B

IT

U

M

E

N

V

E

H

IC

L

E

X

-O

V

E

R

UNSEALED

VEHICLE X-OVER

UNSEALED PATH

UNSEALED PATH

UN

SE

ALE

D P

AT

H

UN

SE

ALE

D P

AT

H

UNSEALED PATH

C

H

1

5

3

6

.

4

5

5

C

H

1

5

3

6

.

4

5

5

C

H

1

5

4

0

.

0

0

0

C

H

1

5

5

0

.0

0

0

C

H

1

5

6

0

.0

0

0

C

H

1570.000

C

H

1572.756

C

H

1572.756

C

H

1580.000

C

H

1589.498

C

H

1589.498

CH

1600.000

CH

1610.000

CH

1620.000

CH

1628.618

CH

1628.618

CH

1630.000

CH

1640.000

CH

1650.000

CH

1654.818

CH

1654.818

CH

1660.000

CH

1670.000

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

EXISTING LIGHT POLE OFFSET 675mm

FROM NEW BACK OF KERB

2.75 m

2.75 m

C

H

1

5

3

6

.

4

5

5

C

H

1

5

3

6

.

4

5

5

C

H

1

5

4

0

.

0

0

0

C

H

1

5

5

0

.0

0

0

C

H

1

5

6

0

.0

0

0

C

H

1570.000

C

H

1572.756

C

H

1572.756

C

H

1580.000

C

H

1589.498

C

H

1589.498

CH

1600.000

CH

1610.000

CH

1620.000

CH

1628.618

CH

1628.618

CH

1630.000

CH

1640.000

CH

1650.000

CH

1654.818

CH

1654.818

CH

1660.000

CH

1670.000

REMOVE TREE FROM

ROAD CLEARANCE

ENVELOPE (TREE #78)

T#43

T#44

T#45

T#46

T#47

T#48

REMOVE TREES

#42 AND #43)

T#78

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1537.502 - CH 1670.000

CO

NT

IN

UE

D O

N S

HE

ET

1

4

CO

NT

IN

UE

D O

N S

HE

ET

1

2

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

13

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 14: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

EX

G

E

X

G

EX

G

E

X

G

EX G

EX G

EX G

EX WEX W

EX WEX W

EX WEX W

EX WEX W

EX WEX W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

/

/

o

p

e

n

d

r

a

i

n

c

o

v

e

r

e

d

i

n

s

h

r

u

b

p

i

p

e

l

o

c

a

t

i

o

n

u

n

k

n

o

w

n

f

i

l

l

UNSEALED

VEHICLE X-OVER

CO

NC

RE

TE

VE

HIC

LE

X-O

VE

R

CONCRETE

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

U

N

S

E

A

L

E

D

P

A

T

H

U

N

S

E

A

L

E

D

P

A

T

H

UNSEALED PATH

U

N

S

E

A

LE

D

P

A

TH

UNSEALED PATH

CH

1680.000

CH

1690.000

CH

1697.947

CH

1697.947

CH

1697.947

CH

1700.000

CH

1710.000

CH

1718.946

CH

1718.946

CH

1724.000

CH

1730.000

CH

1740.000

CH

1750.000

CH

1760.000

CH

1770.000

CH

1780.000

CH

1790.000

CH

1792.508

CH

1792.508

CH

1793.759

CH

1793.759

CH

1793.759

CH

1818.834

CH

1818.834

CH

1818.834

CH

1820.000

15.00m

EXISTING CONCRETE CROSSOVER TO BE

SAWCUT, REMOVED AND REINSTATED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE

SAWCUT, REMOVED AND REINSTATED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 3m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT

AND RECONSTRUCTED OR ASPHALT OVERLAYED

OVER A MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROFILE EXISTING ASPHALT BY A MINIMUM

OF 30mm AND MATCH NEW ASPHALT

LEVELS TO EXISTING LEVELS

MATCH NEW KERB TO EXISTING LEVELS

AND RESHAPE SURROUNDING AREA TO

DIRECT SURFACE WATER TO KERB INVERT

MATCH NEW KERB TO EXISTING LEVELS

AND RESHAPE SURROUNDING AREA TO

DIRECT SURFACE WATER TO KERB INVERT

EX

TE

NT

OF

W

OR

KS

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

28

CH

1680.000

CH

1690.000

CH

1697.947

CH

1697.947

CH

1697.947

CH

1700.000

CH

1710.000

CH

1718.946

CH

1718.946

CH

1724.000

CH

1730.000

CH

1740.000

CH

1750.000

CH

1760.000

CH

1770.000

CH

1780.000

CH

1790.000

CH

1792.508

CH

1792.508

CH

1793.759

CH

1793.759

CH

1793.759

CH

1818.834

CH

1818.834

CH

1818.834

CH

1820.000

T#49

T#50

T#51

T#52

T#53

T#54

T#56

T#57

T#58

T#55

T#60

T#61

T#59

REMOVE TREES

#49 AND #50)

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1680.000 - CH 1819.881

CO

NT

IN

UE

D O

N S

HE

ET

1

5

CO

NT

IN

UE

D O

N S

HE

ET

1

3

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

14

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 15: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX G

EX GEX G

EX GEX G

EX GEX G

EX G

EX G

EX G

EX

T

EX

T

EX

TEX W EX W EX W EX W EX W EX W EX W

EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

B

R

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

UNSEALED

VEHICLE X-OVER

UNSEALED PATH

UNSEALED PATH

UN

SE

ALE

D P

ATH

CH

1820.000

CH

1830.000

CH

1840.000

CH

1850.000

CH

1851.576

CH

1851.576

CH

1851.576

CH

1860.000

CH

1870.000

CH

1880.000

CH

1884.072

CH

1884.072

CH

1890.000

CH

1899.157

CH

1899.157

CH

1910.000

CH

1920.000

CH

1930.000

CH

1940.000

CH

1944.485

CH

1944.485

CH

1950.000

CH

1956.229

CH

1956.229

CH

1960.000

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

1820.000

CH

1830.000

CH

1840.000

CH

1850.000

CH

1851.576

CH

1851.576

CH

1851.576

CH

1860.000

CH

1870.000

CH

1880.000

CH

1884.072

CH

1884.072

CH

1890.000

CH

1899.157

CH

1899.157

CH

1910.000

CH

1920.000

CH

1930.000

CH

1940.000

CH

1944.485

CH

1944.485

CH

1950.000

CH

1956.229

CH

1956.229

CH

1960.000

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1830.000 - CH 1960.000

CO

NT

IN

UE

D O

N S

HE

ET

1

6

CO

NT

IN

UE

D O

N S

HE

ET

1

4

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

15

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 16: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX GEX G

EX GEX G

EX G

EX G

EX GEX G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX

G

EX G EX G EX G EX G EX G EX G EX G

EX G EX G EX G EX G EX G EX G EX G EX G

EX T EX TEX T

EX TEX T

EX TEX T

EX TEX T

EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX

W

EX

W

EX

W

EX

W

EX

W

E

X

W

E

X

W

E

X

W

E

X

W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX T

EX T

EX T

EX T

EX T

EX T

EX T EX T EX T EX T EX T

D

E

N

C

E

S

H

R

U

B

UNSEALED

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

BITUMEN

VEHICLE X-OVER

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

U

N

S

E

A

L

E

D

V

E

H

IC

L

E

X

-O

V

E

R

UNSEALED

VEHICLE X-OVER

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

H

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

HUNSEALED PATH

U

N

S

E

A

LE

D

P

A

TH

D

E

N

S

E

S

H

R

U

B

DENSE BLACK

BERRIES

OBSTRUCTING

SURVEY

CH

1970.000

CH

1978.831

CH

1978.831

CH

1978.831

CH

1983.000

CH

1988.284

CH

1988.284

CH

1988.284

CH

1990.000

CH

1992.122

CH

1992.122

CH

2000.000

CH

2010.000

CH

2012.180

CH

2012.180

CH

2020.000

CH

2030.000

CH

2040.874

CH

2040.874

CH

2050.000

CH

2060.000

CH

2067.759

CH

2070.000

CH

2080.000

CH

2083.623

CH

2085.858

CH

2085.858

CH

2090.000

CH

2100.000

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

OVERLAY EXISTING SIDE ROAD A MINIMUM

2m FROM NEW EDGELINE OR AS DIRECTED

BY COUNCIL. PROFILE EXISTING ASPHALT

BY A MINIMUM OF 30mm AND MATCH NEW

ASPHALT LEVELS TO EXISTING LEVELS

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 3m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 3m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

1970.000

CH

1978.831

CH

1978.831

CH

1978.831

CH

1983.000

CH

1988.284

CH

1988.284

CH

1988.284

CH

1990.000

CH

1992.122

CH

1992.122

CH

2000.000

CH

2010.000

CH

2012.180

CH

2012.180

CH

2020.000

CH

2030.000

CH

2040.874

CH

2040.874

CH

2050.000

CH

2060.000

CH

2067.759

CH

2070.000

CH

2080.000

CH

2083.623

CH

2085.858

CH

2085.858

CH

2090.000

CH

2100.000

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 1970.000 - CH 2100.000

CO

NT

IN

UE

D O

N S

HE

ET

1

7

CO

NT

IN

UE

D O

N S

HE

ET

1

5

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

16

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 17: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX

W

EX

W

EX

W

EX

W

EX

W

EX

W

EX W EX WEX W

EX WEX W EX W

EX WEX W EX W

EX WEX W

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

UNSEALED

VEHICLE X-OVER

UN

SE

ALE

D

VE

HIC

LE X

-OV

ER

BITUMEN

VEHICLE X-OVER

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

DEN

SE BU

SH A

ND

BLACKBERRIES

OBSTR

UC

TING

SURVEY

D

E

N

S

E

B

U

S

H

O

B

S

T

R

U

C

T

IN

G

S

U

R

V

E

Y

DENSE BUSH AND

BLACKBERRIES

OBSTRUCTING SURVEY

BITUMEN

VEHICLE X-OVER

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED PATH

U

N

S

E

A

L

E

D

P

A

T

H

CH

2110.000

CH

2110.083

CH

2110.083

CH

2120.000

CH

2130.000

CH

2140.000

CH

2150.000

CH

2154.048

CH

2158.291

CH

2158.291

CH

2164.000

CH

2170.000

C

H

2176.000

C

H

2180.936

C

H

2180.936

C

H

2189.465

C

H

2189.465

CH

2195.000

CH

2201.362

CH

2201.362

CH

2210.000

CH

2216.422

CH

2220.000

CH

2230.000

CH

2235.000

CH

2236.021

CH

2236.818

CH

2236.818

CH

2240.000

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

2110.000

CH

2110.083

CH

2110.083

CH

2120.000

CH

2130.000

CH

2140.000

CH

2150.000

CH

2154.048

CH

2158.291

CH

2158.291

CH

2164.000

CH

2170.000

C

H

2176.000

C

H

2180.936

C

H

2180.936

C

H

2189.465

C

H

2189.465

CH

2195.000

CH

2201.362

CH

2201.362

CH

2210.000

CH

2216.422

CH

2220.000

CH

2230.000

CH

2235.000

CH

2236.021

CH

2236.818

CH

2236.818

CH

2240.000

REMOVE TREE FROM

ROAD CLEARANCE

ENVELOPE (TREE #79)

T#64

T#63

T#79

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

LAYOUT PLAN CH 2111.130 - CH 2240.000

CO

NT

IN

UE

D O

N S

HE

ET

1

8

CO

NT

IN

UE

D O

N S

HE

ET

1

6

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

17

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

-

Page 18: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G

EX

G

EX

G

EX

G

EX

GE

X

G

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E

E

X

E

E

X

E

E

X

E

E

X

E

E

X

E

E

X

E

EX

E

EX

E

EX

E

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX W EX W EX W

EX WEX W

EX W EX WEX W

EX WEX W EX W

EX WEX W

EX W EX WEX W

EX WEX W EX W

EX WEX W EX W

EX WEX W

EX W EX W

EX

W

EX W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX SEX S EX S

EX SEX S EX S

EX SEX S EX S

EX SEX S EX S

E

X

S

E

X

S

E

X

S

E

X

S

E

X

S

E

X

S

B

R

g

r

/

b

i

t

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

VEHICLE X-OVER

D

E

N

S

E

B

U

S

H

O

B

S

T

R

U

C

T

I

N

G

S

U

R

V

E

Y

D

E

N

S

E

B

U

S

H

A

N

D

B

L

A

C

K

B

E

R

R

I

E

S

O

B

S

T

R

U

C

T

I

N

G

S

U

R

V

E

Y

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

VEHICLE X-OVER

D

E

N

S

E

B

U

S

H

O

B

S

T

R

U

C

T

I

N

G

S

U

R

V

E

Y

B

IT

U

M

E

N

A

N

D

U

N

S

E

A

LE

D

V

E

H

IC

LE

X

-O

V

E

R

U

N

S

E

A

L

E

D

P

A

T

H

U

N

S

E

A

L

E

D

P

A

T

H

UNSEALED PATH

UNSEALED PATH

CH

2250.000

C

H

2

2

5

5

.0

0

0

C

H

2

2

6

0

.5

7

7

C

H

2

2

6

0

.5

7

7

C

H

2

2

6

0

.5

7

7

C

H

2

2

6

2

.9

3

9

C

H

2

2

6

2

.9

3

9

C

H

2

2

7

0

.0

0

0

C

H

2

2

7

4

.3

5

1

C

H

2

2

7

4

.3

5

1

C

H

2

2

8

0

.0

0

0

CH

2290.000

CH

2300.000

CH

2305.000

CH

2310.115

CH

2310.115

CH

2320.000

CH

2329.534

CH

2329.534

CH

2332.579

CH

2332.579

CH

2332.579

CH

2340.000

C

H

2350.000

C

H

2

3

5

8

.2

5

0

C

H

2

3

5

8

.2

5

0

C

H

2

3

6

0

.0

0

0

C

H

2

3

6

5

.0

0

0

C

H

2

3

7

1

.0

3

9

C

H

2

3

7

1

.0

3

9

CH

2380.000

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

CONSTRUCT NEW GRATED SIDE ENTRY PIT TO NEW LEVELS IN

ACCORDANCE WITH THE SHIRE OF YARRA RANGES STANDARD

DRAWING SD P3, AND CONNECT EXISTING 300Ø PIPE

OVERLAY EXISTING SIDE ROAD A MINIMUM

2m FROM NEW EDGELINE OR AS DIRECTED

BY COUNCIL. PROFILE EXISTING ASPHALT

BY A MINIMUM OF 30mm AND MATCH NEW

ASPHALT LEVELS TO EXISTING LEVELS

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 2m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 2m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2

.7

5

m

2

.7

5

m

CH

2250.000

C

H

2

2

5

5

.0

0

0

C

H

2

2

6

0

.5

7

7

C

H

2

2

6

0

.5

7

7

C

H

2

2

6

0

.5

7

7

C

H

2

2

6

2

.9

3

9

C

H

2

2

6

2

.9

3

9

C

H

2

2

7

0

.0

0

0

C

H

2

2

7

4

.3

5

1

C

H

2

2

7

4

.3

5

1

C

H

2

2

8

0

.0

0

0

CH

2290.000

CH

2300.000

CH

2305.000

CH

2310.115

CH

2310.115

CH

2320.000

CH

2329.534

CH

2329.534

CH

2332.579

CH

2332.579

CH

2332.579

CH

2340.000

C

H

2350.000

C

H

2

3

5

8

.2

5

0

C

H

2

3

5

8

.2

5

0

C

H

2

3

6

0

.0

0

0

C

H

2

3

6

5

.0

0

0

C

H

2

3

7

1

.0

3

9

C

H

2

3

7

1

.0

3

9

CH

2380.000

T#65

T#66

T#67T#68

T#69

T#70

COUNCIL APPOINTED

ARBORIST SUPERVISION

REQUIRED DURING

EXCAVATION WITHIN TREE

PROTECTION ZONES OF

TREES #69 AND #70

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

-

LAYOUT PLAN CH 2250.000 - CH 2380.000

CO

NT

IN

UE

D O

N S

HE

ET

1

9

CO

NT

IN

UE

D O

N S

HE

ET

1

7

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

18

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

Page 19: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G EX G

EX

G

EX

G

EX

G

EX

G

EX

G

EX G EX GEX G

EX G

EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E EX E

EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T EX T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

E

X

W

E

X

W

E

X

W

E

X

W

EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W EX W

EX S EX SEX S

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

B

I

T

U

M

E

N

V

E

H

I

C

L

E

X

-

O

V

E

R

BITUMEN AND

UNSEALED VEHICLE

X-OVER

B

IT

U

M

E

N

V

E

H

IC

LE

X

-O

V

E

R

CH

2390.000

CH

2396.000

CH

2401.641

CH

2401.641

CH

2401.641

CH

2403.564

CH

2403.564

CH

2410.000

CH

2416.000

CH

2420.547

CH

2420.547

CH

2426.764

CH

2426.764

CH

2426.764

CH

2430.000

CH

2436.000

CH

2441.195

CH

2441.195

CH

2450.000

CH

2460.000

CH

2466.000

CH

2471.276

CH

2471.276

CH

2480.000

CH

2487.457

CH

2487.457

CH

2493.000

CH

2500.000

CH

2510.000

CH

2520.000

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

REMOVE & DISPOSE OF

EXISTING DRIVEWAY CULVERT

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 10m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 10m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

RECONSTRUCTED OR ASPHALT OVERLAYED OVER A

MINIMUM OF 1m AS DIRECTED BY COUNCIL

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CH

2390.000

CH

2396.000

CH

2401.641

CH

2401.641

CH

2401.641

CH

2403.564

CH

2403.564

CH

2410.000

CH

2416.000

CH

2420.547

CH

2420.547

CH

2426.764

CH

2426.764

CH

2426.764

CH

2430.000

CH

2436.000

CH

2441.195

CH

2441.195

CH

2450.000

CH

2460.000

CH

2466.000

CH

2471.276

CH

2471.276

CH

2480.000

CH

2487.457

CH

2487.457

CH

2493.000

CH

2500.000

CH

2510.000

CH

2520.000

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

-

LAYOUT PLAN CH 2390.000 - CH 2520.000

CO

NT

IN

UE

D O

N S

HE

ET

2

0

CO

NT

IN

UE

D O

N S

HE

ET

1

8

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

19

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN

Page 20: WARNING BEWARE OF UNDERGROUND SERVICES ROAD … · 2019. 10. 31. · direction of pipe flow direction of channel flow legend tree at risk (arborist supervision required) warning beware

EX G EX G EX G EX G

EX G EX GEX G

EX G EX GEX G

EX G EX GEX G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

E

X

G

EX

E

EX

E

EX

E

EX

E

EX

E

E

X

T

EX

T

EX

T

EX

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

E

X

T

EX

T

EX

T

EX

T

EX

T

E

X

T

E

X

T

E

X

T

EX T EX T EX T EX T EX T

EX W EX W EX W EX W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

EX W EX W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

E

X

W

EX W EX W EX W EX W

/

/

/

/

/

/

//

/

/

/

/

////

/

/

/

/

/

/

/

/

/

G

A

T

E

E

N

D

U

N

S

E

A

L

E

D

V

E

H

I

C

L

E

X

-

O

V

E

R

UNSEALED

VEHICLE X-OVER

D

E

N

S

E

B

U

S

H

O

B

S

T

R

U

C

T

I

N

G

S

U

R

V

E

Y

D

E

N

S

E

B

U

S

H

O

B

S

T

R

U

C

T

I

N

G

S

U

R

V

E

Y

G

R

O

U

P

O

F

L

A

R

G

E

A

N

D

S

M

A

L

L

T

R

E

E

S

C

O

N

C

R

E

T

E

F

O

O

T

P

A

T

H

CONCRETE

FOOTPATH

B

IT

U

M

E

N

R

O

A

D

C

H

2575.486

CH

2529.679

CH

2529.679

CH

2534.000

CH

2540.000

CH

2550.000

CH

2556.000

CH

2561.401

CH

2561.401

CH

2564.007

CH

2564.007

EX

TE

NT

O

F W

OR

KS

REMOVE & DISPOSE OF

EXISTING 300Ømm PIPE

CONSTRUCT NEW GRATED SIDE ENTRY PIT TO NEW LEVELS

IN ACCORDANCE WITH THE SHIRE OF YARRA RANGES

STANDARD DRAWING SD P3, AND CONNECT NEW 300Ø PIPE

CONSTRUCT NEW GRATED SIDE ENTRY PIT WITH V NOTCH TO NEW LEVELS IN GENERAL

ACCORDANCE WITH THE SHIRE OF YARRA RANGES STANDARD DRAWING SD P3 & SD P5, AND

CONNECT NEW 300Ø PIPE. RESHAPE EXISTING TABLE DRAIN TO ALIGN WITH V NOTCH OF PIT

PROVIDE GIVE WAY STATCON LINE IN ACCORDANCE WITH

VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(300mm WIDE, 600mm DASH WITH 600mm GAP)

39

MATCH NEW KERB TO EXISTING LEVELS

AND RESHAPE SURROUNDING AREA TO

DIRECT SURFACE WATER TO KERB INVERT

PROFILE EXISTING ASPHALT BY A MINIMUM

OF 30mm AND MATCH NEW ASPHALT

LEVELS TO EXISTING LEVELS

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 1m FROM NEW BACK OF KERB

RECONSTRUCT GRAVEL CROSSOVER WITH

20mm CLASS 2 CRUSHED ROCK A MINIMUM

OF 8m FROM NEW BACK OF KERB

PROVIDE SINGLE SOLID CENTRELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

PROVIDE SINGLE SOLID EDGELINE IN ACCORDANCE

WITH VICROADS TRAFFIC ENGINEERING MANUAL VOL 2.

(100mm WIDE, UNBROKEN LINE)

2.75 m

2.75 m

CONSTRUCT NEW GRATED SIDE ENTRY PIT TO NEW LEVELS

IN ACCORDANCE WITH THE SHIRE OF YARRA RANGES

STANDARD DRAWING SD P3, AND CONNECT NEW 300Ø PIPE

C

H

2575.486

CH

2529.679

CH

2529.679

CH

2534.000

CH

2540.000

CH

2550.000

CH

2556.000

CH

2561.401

CH

2561.401

CH

2564.007

CH

2564.007

REMOVE TREE FROM

ROAD CLEARANCE

ENVELOPE (TREE #74)

T#74

T#73

T#71

T#72

PROPOSED FULL DEPTH PAVEMENT

30mm ASPHALT OVERLAY WITH REGULATION AS

REQUIRED

GRAVEL CROSSOVER TO BE 'TOPPED UP'

WITH 20mm CLASS 2 CRUSHED ROCK AS

DIRECTED BY COUNCIL

EXISTING CONCRETE CROSSOVER TO BE SAWCUT,

REMOVED AND REINSTATED AS DIRECTED BY COUNCIL

EXISTING BITUMEN CROSSOVER TO BE SAWCUT AND

ASPHALT OVERLAYED OR RECONSTRUCTED AS

DIRECTED BY COUNCIL

EXISTING ROAD PAVEMENT

EXISTING CONTOUR MINOR

4

6

EXISTING CONTOUR MAJOR

PAVEMENT LINE MARKING REINSTATEMENT

FINISHED SURFACE MINOR

4

6FINISHED SURFACE CONTOUR MAJOR

PROPOSED ROLLOVER CONCRETE KERB &

CHANNEL IN ACCORDANCE WITH THE SHIRE OF

YARRA RANGES STANDARD DRAWING SD B1

TREE TO BE REMOVED

FILL BATTER EXTENT

CUT BATTER EXTENT

NEW DRAINAGE PIT WITH PIT NUMBER AND PIPE

EXISTING DRAINAGE PIPE

2

EXISTING WATER

EXISTING GAS

EXISTING SEWER

EXISTING TELECOMMUNICATIONS

EXISTING UNDERGROUND ELECTRICITY

EX W

EX G

EX S

EX T

EX E

DIRECTION OF PIPE FLOW

DIRECTION OF CHANNEL FLOW

LEGEND

TREE AT RISK (ARBORIST SUPERVISION REQUIRED)

WARNINGBEWARE OF UNDERGROUND SERVICES

THE LOCATION OF EXISTING UNDERGROUND SERVICES ARE APPROXIMATEONLY AND THEIR EXACT POSITION SHOULD BE PROVEN ON SITE. NO

GUARANTEE IS GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

-

LAYOUT PLAN CH 2526.666 - CH 2576.538

CO

NT

IN

UE

D O

N S

HE

ET

1

9

VER DESCRIPTION DATE00 FUNCTIONAL DESIGN - ISSUED FOR REVIEW 20-04-2018

VERSION

04

DWG No.

PC1720-DD-04

SHEET No.

OF 58

PROJECT No.

PC1720

ROAD WIDENING WORKS

DETAILED DESIGN

SHEFFIELD ROAD, MONTROSE

CLIENT

CLIENT PROJECT MANAGER / CONTACTCommittment | Communication | Collaboration

PHILLIP HOANG | YARRA RANGES SHIRE COUNCIL

PROCIVIL CONSULTING PTY LTDABN 51 759 386 092

SUITE 9, 12 MAROONDAH HWY, RINGWOOD VIC 3134

PO BOX 164, RINGWOOD VIC 3134

P: (03) 8644 6834

E: [email protected]

www.procivil.com.au

CIVIL ENGINEERING DESIGN

DW

REGISTERED & CHARTERED PROFESSIONAL ENGINEER'S REVIEWCHRIS PROCTOR

CONSULTANT ENGINEERSHIRE OF YARRA RANGES

LOCAL GOVERNMENT AREAORIENTATION

HEIGHT DATUM

AHD

COORDINATE DATUMMGA 94 ZONE 55

OR AS SHOWN

SURVEY DATE

09-02-2018

AERIAL IMAGE DATE23-11-2017

ORIGINAL SCALE & SHEET SIZE

AS SHOWN @ A1

01 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 31-07-2018

02 REVISED FUNCTIONAL DESIGN - ISSUED FOR REVIEW 17-05-2019

03 DETAILED DESIGN - ISSUED FOR REVIEW 15-10-2019

04 DETAILED DESIGN - ISSUED FOR REVIEW 16-10-2019

20

04 1:200 @ A14 821:400 @ A3

GENERAL LAYOUT PLAN