WASMI HOLDING

Company Profile Presentation

∗ Established in 1975 by Wasmi Hamad Al Khaleeb∗ Company was named Wasmi Holding in 2012∗ Capable of meeting any requirement in the field of general

construction, civil construction, mechanical construction and rental equipment

∗ Safe Working Conditions∗ Quality Management System

Wasmi Holding

∗ Wasmiholding∗ Human Resources∗ Pipeline Construction∗ Road Construction ∗ Tower Construction∗ Machine Maintenance∗ Rental Equipment∗ Equipment Fleet∗ Quality Assurance & Control∗ Health, Safety & Environment∗ Current Projects∗ Completed Projects∗ Pipeline Construction Gallery∗ Our Clients

Content

Team NumberEngineer 11

Supervisor 18Inspectors 15Surveyors 16

General foreman 40Steel fixer 18Carpenters 12Plumbers 18

Electricians 6Mason 21

Store keeper 11Structural steel erectors 12

Operator / Driver 24Helpers 20Labor 30

Welder 25Pipefitter 15Operator 130

Driver 128Side boom operator 12

Human Resource

Unique set of pipeline services provided by us include : Pipeline Construction Integrity Service Subcontractor Management Labour Resource Management

Oil Pipeline

The pipeline construction services provided by us include: Welding and weld repairs Cold Bending NDT Testing Painting, Blasting, Coating and holiday testing Tie-in welds Site preparation, including Excavation and Backfilling Padding, lowering, backfilling, compacting, forming, berm and

crude oil stabilization of the berm Fabrication and installation of signage Hydrotesting

Pipeline Construction

Pipeline Construction

We provide maintenance, rehabilitation and installation of piping and facilities services to the oil and gas transmission industry. We offer customers the following pipeline integrity services:

Investigative digs Hydrostatic retests Corrosion remediation Leak repair Replacement Pipeline replacement and construction, and Pipeline cleaning

Pipeline Integrity Service

Pipeline Integrity Service

Our services include all aspects of Road and Highway Construction for the public sector as well as large parking areas and airport runways for the private sector. A sampling of our wide range of services includes: Roads and Highways (new construction and rehabilitation) Bridges, Culverts, & Concrete Pavement Structures Entranceways & Parking Lots Curbs, Traffic Islands, Sidewalks, and Retaining Walls Underground Sewers Drainage System

Road Construction

Road Construction

Our work and experience expands from site-development and construction, to maintenance and inspection of pre-existing sites. The company provides turnkey construction services for the telecommunications and broadcast industries.

Tower Construction

Tower Construction

∗ Machine tool repair and maintenance Services include tool leveling and alignment, way and spindle taper grinding, calibration, and hydraulic and lubrication system upgrade with various specifications and capacities.

∗ We have the necessary tools, equipment and expertise to rebuild and aid in repair of all kinds of equipment as required by our customers.

Machine Maintenance

Machine Maintenance

∗ Wasmiholding has built up a wide ranging fleet of heavy construction equipment. Our product line includes everything from small hand held tools to large earthmovers.

∗ While having a wide variety of tools and equipment is important, making sure they are all operating correctly is most important. We understand that our fleet is the cornerstone of our business and we stand behind the quality equipment we rent.

Transport & Rental Equipment Division

Vehicle Type NumberSedan Car 35

Pickup 18Bus (15 Seats) 17Bus (25 Seats) 10

Excavator 35Loader 16

Roller Compactor 12Plate Compactor 4

Dozer 51Crane 4

Dump Truck 45Water Tanker 24

Grader 12Flat Bed 20

Low Bed Hydraulic 12Trailer 25

Electric Generator 16Truck 19

Boom Truck 5T & 10T 21Side Boom 12

Equipment Fleet

Transport & Rental Equipment Division

It is the policy of Wasmiholding to comply fully with all applicable laws and regulations concerning construction activities on campus. We have Safety Plans that are adequate to protect the safety of people and property within the construction site and the surrounding area.

Health Safety and Environment

Organogram

Manager Operations

Services Department

Construction Department

Safety Manager

Quality Control Manager

Project Manager

Maintenance Dept.

President

General Manager

Construction Officer

Project Engineer 2

Project Engineer 1 Safety Supervisor

Safety Engineer

Quality Control Supervisor

Quality Control Engineer

Project Control And Support

Planning Dept.

Procurement Dept.

Estimation Dept.

Equipment Rental Division

Coordinator

Logistics And Transport

Officer

Workshop Incharge

Mechanic/ Layman

Clients

On-Going Projects

•Kentz/Saudi Aramco

•Project: Remaining Works For GOSP-3 Pipeline

•Shaybah Interconnecting Pipelines

Project 1

•Saudi Aramco

•Project: Remeining Works For Pipelines Between NGL, GOSP-1 And GOSP-4 Including Valve Hydro Testing.

•Shaybah Interconnecting Pipelines

Project 2

•Saudi Aramco

•Project: Remaining Works For GOSP-2 Pipelines

•Shaybah Interconnecting Pipelines

Project 3

WesternGeco

Project: Pipeline construction project

Start Date: June 1st , 2007

Saudi Aramco

Project: Design and construction of

communication link , tower and associated facilities at

Al- Uqair beachStart Date: Dec 1st, 2013

Completion Date: May 28th , 2014

ARGAS

Project : Equipment rental & services

Start Date: Sept 1st , 2010

ARGAS

Project : Drilling ProjectStart Date: May 28th , 2011

Sinopec

Project: Equipment maintenance

Start Date: Aug 19th , 2009

Makamin Petroleum

Project: Construction of PDHMS and E&I for 8 HWYH

and HRDH wells, SSV/SSV surface panels installation

for 13 UTMN wellsStart Date: Dec 13th , 2011

Completion Date: June 30th , 2014

Makamin Petroleum

Project: Installation of four water injection centrifugal

pumps in ABQ areaStart Date: Sept 20th , 2011

Completion Date: Sept 10th , 2014

Completed Projects