1 2 3 4 5 6 7 8 9
On-going
1 Raising of Mangla Dam 62553.000 0.000 59896.310 2656.690 18000.000 0.000 18000.000
2 Mirani Dam 5861.000 0.000 4931.540 929.460 300.000 0.000 300.000
3 Resettlement Action Plan - Mirani Dam 1243.940 0.000 662.690 581.250 50.000 0.000 50.000
4 Sabakzai Dam 1576.550 0.000 1455.970 120.580 120.000 0.000 120.000
5 Kurram Tangi Dam 17205.266 5368.222 874.710 16330.556 500.000 0.000 500.000
6 Satpara Multipurpose Dam 2090.431 195.786 2442.040 0.000 100.000 0.000 100.000
7 Gomal Zam Dam 12829.000 4964.000 3678.610 9150.390 2000.000 0.000 2000.000
8 Greater Thal Canal (Phase - I) 30467.000 0.000 8091.530 22375.470 1500.000 0.000 1500.000
9 Kachhi Canal (Phase - I) 31204.000 0.000 19517.820 11686.180 8500.000 0.000 8500.000
10 Rainee Canal (Phase - I) 18861.580 0.000 5871.730 12989.850 3000.000 0.000 3000.000
11 Lower Indus Right Bank Irrigation &
Drainage, Sindh
14707.000 0.000 11072.110 3634.890 2500.000 0.000 2500.000
12 Balochistan Effluent Disposal into RBOD.
(RBOD-III)
4485.000 0.000 2505.287 1979.713 1200.000 0.000 1200.000
13 International Water logging and Salinity
Research Institute, Lahore
20.720 0.000 16.470 4.250 4.250 0.000 4.250
14 Mona Reclamation & Expansion,
Sargodha
31.920 0.000 26.816 5.104 5.000 0.000 5.000
15 Lower Indus W. Management &
Reclamation Research, Hyderabad
34.374 0.000 31.046 3.328 3.000 0.000 3.000
16 Feasibility Studies of Dams (Naulong,
Hingol), Balochistan
161.680 0.000 142.000 19.680 20.000 0.000 20.000
17 Land and Water Monitoring / Evaluation
of Indus Plains (SMO)
117.720 0.000 60.000 57.720 58.000 0.000 58.000
18 Construction of IRSA Office building,
Islamabad
38.250 0.000 27.000 11.250 11.250 0.000 11.250
19 Revamping/Rehabilitation of Irrigation &
Drainage System of Sindh
12963.000 542.000 7350.000 5613.000 2000.000 0.000 2000.000
20 Extension of Right Bank Outfall Drain
from Sehwan to Sea, (RBOD-II), Dadu &
Thatta District of Sindh
29014.000 0.000 12910.990 16103.010 4000.000 0.000 4000.000
21 Lining of Distributaries & Minors in Sindh 12445.000 0.000 274.550 12170.450 500.000 0.000 500.000
22 Construction of Fall Structure on Nara
Canal, Resection of Rato Canal RD 0-72,
Strengthening of Jamro Canal, Sindh
1086.150 0.000 50.430 1035.720 50.000 0.000 50.000
23 Earthwork and Stone Pitching along
Chotiari Reservoir, Sindh
305.472 0.000 86.540 218.932 50.000 0.000 50.000
24 Rehabilitation of LBOD, KPOD and Allied
Outfall Drain, Sindh
483.000 0.000 174.570 308.430 100.000 0.000 100.000
25 Installation of 100 Tubewells of Saline
water around Chotiari, Sindh
192.350 0.000 127.493 64.857 50.000 0.000 50.000
26 Makhi Farash Link canal Project (Chotiari
Phase-II), Sindh
1729.912 0.000 52.580 1677.332 100.000 0.000 100.000
Rupee
WATER & POWER DIVISION (WATER SECTOR)
Foreign
Loan
Total
Throw-
forward as
on 01-7-08
(Million Rupees)
Estimated Cost Expenditure
upto June
2008
Sl.
No
Name, Location & Status of the
Scheme
Allocation for 2008-09
Total Foreign
Loan
1 2 3 4 5 6 7 8 9
27 Irrigation System Rehabilitation, Punjab 19519.000 0.000 6729.000 12790.000 1000.000 0.000 1000.000
28 Lining of Irrigation Channels in Punjab 30996.000 0.000 2270.000 28726.000 1000.000 0.000 1000.000
29 Punjab Barrages Rehabilitation
Modernization Project Phase-I
1647.877 0.000 1384.770 263.107 100.000 0.000 100.000
30 Extending Bhakkar Flood Protection
Bund from RD 42-72 Basti Mian Khan to
Basti Bukhara in District Bhakkar
496.000 0.000 50.000 446.000 100.000 0.000 100.000
31 Extension of Pat Feeder Canal for
utilization of Indus Water in Balochistan
3887.000 0.000 1800.000 2087.000 500.000 0.000 500.000
32 Khirther Canal (Balochistan Portion) 1000.000 0.000 966.700 33.300 33.300 0.000 33.300
33 Const. of Delay Action Dams Ground
Water recharge of Pishin Quetta
Mastung & Mangocher Valleys
1099.833 0.000 636.562 463.271 200.000 0.000 200.000
34 Restoration of Bolan Dam District
Kachhi, Balochistan
593.430 0.000 170.000 423.430 100.000 0.000 100.000
35 Toiwar/Batozai Storage Dam, District
Qilla Saifullah
2351.980 0.000 50.000 2301.980 50.000 0.000 50.000
36 Remedial Measures for Dhana Sadori
Flood Irrigation Scheme on Poralai River,
Lasbela, Balochistan
160.000 0.000 60.000 100.000 50.000 0.000 50.000
37 Construction of 10 Delay Action Dams,
Balochistan
2154.000 0.000 0.000 2154.000 10.000 0.000 10.000
38 Lining of Irrigation Channels in NWFP 2535.300 0.000 1917.250 618.050 750.000 0.000 750.000
39 Rehabilitation of irrigation Infrastructure
in NWFP
8484.910 0.000 1283.620 7201.290 750.000 0.000 750.000
40 Construction of 20 small Dams in NWFP 3600.000 0.000 870.380 2729.620 500.000 0.000 500.000
41 Bazai Irrigation Scheme, NWFP 1599.844 0.000 40.000 1559.844 50.000 0.000 50.000
42 Feasibility study of small Dams in NWFP 97.000 0.000 39.250 57.750 29.750 0.000 29.750
43 Construction of Trichen to Atta Irrigation
Scheme, Chitral
429.070 0.000 170.000 259.070 100.000 0.000 100.000
44 Flood Sector Programme (Accommodate
Projects of all Pakistan including Special
Areas)
3000.000 0.000 950.000 2050.000 1000.000 0.000 1000.000
45 Naigaj Dam, Dadu Sindh 115.02 0.000 84.770 30.250 30.000 0.000 30.000
46 Master Planning Study for Integrated
Development of Chitral, Swat and Kabul
River, NWFP
39.80 0.000 24.000 15.803 6.000 0.000 6.000
47 Strengthening of Hydrological Network in
Balochistan & NWFP
39.94 0.000 24.196 15.746 16.000 0.000 16.000
48 Rehabilitation of Sidhnai Mailsi Link
Canal, Punjab
373.000 0.000 210.000 163.000 100.000 0.000 100.000
49 Sukkur Barrage Rehabilitation and
Improvement Project
2478.000 0.000 0.000 2478.000 10.000 0.000 10.000
50 Construction of Aujo Escapa RD No. 135
Lower Nara Canal, Sindh
72.000 0.000 0.000 72.000 10.000 0.000 10.000
51 Construction of Snam/Pali & Kundal
Dam, NWFP
441.020 0.000 85.000 356.020 100.000 0.000 100.000
WATER & POWER DIVISION (WATER SECTOR)
Sl.
No TotalForeign
Loan
Throw-
forward as
on 01-7-08
PSDP for 2008-09
Total Foreign
Loan
Estimated Cost
(Million Rupees)
Rupee
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
52 Feasibility Study of Increasing Capacity
of Baran Dam by Raising Dam Height &
Construction of Tochi Baran Link, NWFP
25.000 0.000 4.000 21.000 5.000 0.000 5.000
53 Akhori Dam Project, PC-II, District Attock 817.157 0.000 200.000 617.157 50.000 0.000 50.000
54 Establishment of Microseismic Network
in Northern Areas of Pakistan
89.420 0.000 73.000 16.420 16.000 0.000 16.000
55 Construction of Small Storage Dams,
Delay Action Dams, Retention Weirs &
ISSO Barriers in Sindh.
12211.000 0.000 7.500 12203.500 100.000 0.000 100.000
56 Remodeling of Warsak Canal System,
Peshawar & Nowshera District, NWFP.
3000.000 0.000 0.000 3000.000 10.000 0.000 10.000
57 Construction of Diversion Weir for Kabul
River Canal District Peshawar.
500.000 0.000 45.000 455.000 10.000 0.000 10.000
58 National Center for Small Dam and Rain
Water Harvesting (Feasibility Study)
39.700 0.000 0.000 39.700 10.000 0.000 10.000
59 CRBC Additional Works by WAPDA
Stage - III
865.834 0.000 0.000 865.834 90.000 150.000 240.000
60 CRBC Additional Remedial Works in
NWFP Stage - III
321.000 0.000 26.000 295.000 5.000 100.000 105.000
61 CRBC Additional Remedial Works in
Punjab Stage - III
400.000 0.000 10.000 390.000 10.000 0.000 10.000
62 Feasibility Study of Pehur Canal
Extension, NWFP
20.000 0.000 5.270 14.730 5.000 0.000 5.000
63 Chashma Right Bank Canal (Lift cum
Gravity Project, D I Khan), NWFP
23389.000 0.000 0.000 23389.000 50.000 0.000 50.000
64 Rehabilitation of Nari Headworks 100.920 0.000 0.000 100.920 10.000 0.000 10.000
65 Construction of Slopping Studies/ Lunda
Bund against Erosion Action of Chenab
River to Protect Tombs of Aheer Shah
Walli Ullah Bhorrary Shah and Abadies
etc
100.000 0.000 0.000 100.000 12.430 0.000 12.430
66 Mangla Water Shed Management
Project, AJK
319.400 0.000 31.000 288.400 70.000 0.000 70.000
Total (on-going) 391115.775 11070.008 162548.100 228919.284 51769.980 250.000 52019.980
New Schemes
67 Dams (Small & Large) 15000.000 0.000 0.000 15000.000 10000.000 0.000 10000.000
68 Re-construction of Shadi Kour Dam,
District Gwadar
300.000 0.000 0.000 300.000 10.000 0.000 10.000
69 Suklagi Storage Dam, District Bolan,
Balochistan
7000.000 0.000 0.000 7000.000 5.000 0.000 5.000
70 Construction of Porali Dam, District
Lasbela, Balochistan
5000.000 0.000 0.000 5000.000 5.000 0.000 5.000
71 Engineering Design and Feasibility Study
for Munda Dam
652.000 0.000 0.000 652.000 80.000 0.000 80.000
72 Construction of Spurs No. 34 & 35 along
Right bank of Indus River in District D. I.
Khan, NWFP
242.000 0.000 0.000 242.000 75.000 0.000 75.000
73 Construction of Marginal Bund (Spur)
along Right Bank of Indus River for
Locality of Kacha Jhok, Ladhoo etc, D.I
Khan, NWFP (D/S Dera Darya Khan RD
0-23000.)
231.000 0.000 0.000 231.000 25.000 0.000 25.000
74 Indus 21 Water Sector Capacity Building
and Advisory Services Project (WCAP)
2500.000 0.000 0.000 2500.000 200.000 0.000 200.000
(Million Rupees)
WATER & POWER DIVISION (WATER SECTOR)
PSDP for 2008-09Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Total Foreign
Loan
Rupee Foreign
Loan
Total
Estimated Cost Throw-
forward as
on 01-7-08
Total (New) 30925.000 0.000 0.000 30925.000 10400.000 0.000 10400.000
Total (Water) 422040.775 11070.008 162548.100 259844.284 62169.980 250.000 62419.980
1 2 3 4 5 6 7 8 9
On-going
1 Bhasha Diamer Dam Project Near Chilas
District Diamer/Kohistan (NWFP/ N.
Areas)
1677.420 98.230 1214.800 462.620 417.000 0.000 417.000
2 Golan Gol Hydro Power Project, Chitral,
NWFP
7035.130 2638.120 273.300 6761.830 700.000 0.000 700.000
3 Khan-Khawar Hydro Power Project,
Shangla, Besham, NWFP (Abu Dhabi
Fund)
5362.705 2644.098 3603.900 1758.805 395.000 780.000 1175.000
4 Allai Khawar Hydro Power Project,
Batagram, Besham, NWFP (Abu Dhabi
Fund)
8577.824 3453.540 4693.300 3884.524 1685.000 850.000 2535.000
5 Dubir Khawar Hydro Power Project,
Kohistan, NWFP (Abu Dhabi Fund)
9754.260 4147.510 5653.800 4100.460 1930.000 1570.000 3500.000
6 Jinnah Hydro Power Project, Mianwali,
Punjab
13546.800 6608.221 5689.200 7857.600 240.000 1700.000 1940.000
7 Neelum Jhelum Hydropower Project, AJK 84502.260 46667.700 6150.000 78352.260 7500.000 0.000 7500.000
8 Bunji Hydro Power Project 832.716 232.733 476.900 355.816 325.000 0.000 325.000
9 Phander Hydro Power Project, Northern
Areas
120.376 0.000 2.000 118.376 80.000 0.000 80.000
10 Dasu Hydro Power Project, Kohistan
NWFP
796.876 100.000 484.700 312.176 132.000 0.000 132.000
11 Lawi Hydro Power Project Chitral, NWFP 90.585 0.000 50.800 39.785 50.000 0.000 50.000
12 Keyal Khawar Hydro Power Project,
NWFP
7066.961 3032.080 15.000 7051.961 10.000 0.000 10.000
13 Chor Nallah HPP Kohistan, NWFP 196.684 113.888 21.000 175.684 10.000 0.000 10.000
14 Spat Gah Hydro Power Project Kohistan,
NWFP
177.771 94.976 20.100 157.671 10.000 0.000 10.000
*15 Kohala Hydro Power Project 545.732 209.199 299.800 245.932 175.000 0.000 175.000
*16 Basho Hydro Power Project 91.243 0.000 3.000 88.243 40.000 0.000 40.000
17 800 MW Guddu Steam Power Project 44750.460 35435.000 200.000 44550.460 5000.000 0.000 5000.000
18 330 MW Combined Cycle Dadu Power
Project
29038.000 18215.570 7500.000 21538.000 4000.000 0.000 4000.000
19 500 MW Combined Cycle Power Plant at
Chicho Ki Malian
18050.000 11921.250 2500.000 15550.000 2500.000 2500.000 5000.000
20 425 MW Combined Cycle Nandipur
Power Plant
22335.000 14198.000 4200.000 18135.000 5000.000 0.000 5000.000
21 Transmission Arrangements for Power
Dispersal of Ghazi Barotha ,( ADB,
Kuwait, Germany, IDB, Japan)
14127.000 6990.000 7614.400 6512.600 400.010 599.990 1000.000
22 Muzaffargarh-Gatti 500 KV T/Line 6771.000 4975.000 4634.000 2137.000 1000.000 0.000 1000.000
23 Upgradation of NPCC (Load Dispatch
System) H-8, Islamabad ( JBIC)
2895.000 1880.000 74.700 2820.300 500.000 200.000 700.000
Foreign
Loan
Total
Throw-
forward as
on 01-7-08
PSDP for 2008-09
Rupee
(Million Rupees)
Estimated CostSl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
WATER & POWER DIVISION (POWER SECTOR)
Total Foreign
Loan
1 2 3 4 5 6 7 8 9
24 NTDC-KESC 500/220 KV inter
Connection facility, Karachi
3089.860 1749.500 2675.200 414.660 64.000 336.000 400.000
25 New 500/220 KV Sub Station, Sahiwal
along with 220 KV System Expansion
2909.000 1748.000 1806.900 1102.100 200.000 0.000 200.000
26 New 220 KV G/S at Khuzdar/220 KV
Dadu Khuzdar D/C Transmission Line
2901.000 1253.000 416.100 2484.900 600.000 400.000 1000.000
27 220 KV G/S at Ghazi Road Lahore with
220 KV D/C T/L 132 KV Expansion
System (Korea)
2591.000 1267.000 350.600 2240.400 600.000 400.000 1000.000
28 Extension of 8 New 220 G/S of NTDC
System (Local Bank)
2340.000 1297.000 1663.900 676.100 10.000 0.000 10.000
29 500 KV Transmission System for
Dispersal of Power from Thar Coal
Project (China)
5512.000 2599.000 10.000 5502.000 10.000 0.000 10.000
30 220 KV G/S at Kassowal with 132 KV
Expansion System. (World Bank)
2067.350 811.460 308.000 1759.350 400.000 400.000 800.000
31 Provision of Secured Metering System at
Delivery Point of Discos. (Local Bank)
1009.000 513.000 845.000 164.000 200.000 0.000 200.000
32 Power System Transmission
Enhancement Project-II (ADB)
48.240 36.180 32.360 15.880 10.000 0.000 10.000
33 Power System Transmission
Enhancement (19 sub Projects of 500 &
220 KV Sub Stations and T/Lines)
12617.000 8114.000 3045.000 9572.000 1500.000 1500.000 3000.000
34 Second Rural Electrification Project,
Balochistan Kuwait Funded
1685.115 1034.000 475.000 1210.115 450.000 750.000 1200.000
35
LESCO 5908.369 1251.290 2350.000 3558.369 1099.000 401.000 1500.000
GEPCO 5173.331 1200.285 1957.205 3216.126 1500.000 0.000 1500.000
MEPCO 9257.132 3402.927 4183.000 5074.132 1133.000 367.000 1500.000
FESCO 6167.848 1693.440 1965.295 4202.553 1100.000 0.000 1100.000
IESCO 5726.937 1355.000 2523.123 3203.814 582.000 318.000 900.000
PESCO 7123.263 2004.106 2365.000 4758.263 900.000 0.000 900.000
HESCO 7359.685 2240.583 1688.000 5671.685 640.000 260.000 900.000
QESCO 6579.860 3296.320 1429.000 5150.860 800.000 0.000 800.000
36
LESCO 6259.380 0.000 1624.396 4634.984 500.000 0.000 500.000
GEPCO 3869.240 0.000 1299.471 2569.769 500.000 0.000 500.000
MEPCO 8426.250 0.000 1825.171 6601.079 300.000 0.000 300.000
FESCO 4485.130 0.000 1732.753 2752.377 350.000 0.000 350.000
IESCO 3440.550 0.000 1545.479 1895.071 300.000 0.000 300.000
PESCO 5234.260 0.000 1579.090 3655.170 260.000 0.000 260.000
HESCO 3704.700 0.000 1395.960 2308.740 250.000 0.000 250.000
QESCO 1476.820 0.000 1334.989 141.831 160.000 0.000 160.000
Rupee Foreign
Loan
WATER & POWER DIVISION (POWER SECTOR)
Total Foreign
Loan
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
PSDP for 2008-09Sl.
No
Name, Location & Status of the
Scheme
Distribution and System Augmentation Programme
6th Secondary Transmission and Grids
(Million Rupees)
Total
1 2 3 4 5 6 7 8 9
37
LESCO 4093.000 0.000 2373.000 1720.000 500.000 0.000 500.000
GEPCO 2560.300 0.000 1672.474 887.826 400.000 0.000 400.000
MEPCO 2177.720 0.000 3173.375 0.000 400.000 0.000 400.000
FESCO 1859.110 0.000 2756.471 0.000 360.000 0.000 360.000
IESCO 1471.450 0.000 1962.222 0.000 300.000 0.000 300.000
PESCO 1998.000 0.000 1483.710 514.290 300.000 0.000 300.000
HESCO 1540.260 0.000 1513.220 27.040 300.000 0.000 300.000
QESCO 823.070 0.000 1524.263 0.000 200.000 0.000 200.000
*38 Rehabilitation of Jaban Hydro Electric
Power Station
1037.552 573.714 48.000 989.552 275.000 0.000 275.000
*39 Construction of Thakot Bridge 402.600 0.000 302.600 100.000 100.000 0.000 100.000
40 Power Distribution Enhancement Project
(ADB)
121.500 57.770 75.914 45.586 45.000 0.000 45.000
41 Institutional Capacity Building of Discos
(ADB)
162.020 121.500 92.020 70.000 70.000 0.000 70.000
42 Inter Connection of 9 IPPS with the
National Grid
1108.000 126.000 92.000 1016.000 591.000 0.000 591.000
43 National Power System Expansion Plan 490.480 318.940 0.000 490.480 195.000 0.000 195.000
*44 Construction of 132 KV Grid Station at
Sui and 132 KV Kashmore-Sui T/L (50
km) (Bugti Package)
297.200 0.000 0.000 297.200 10.000 0.000 10.000
*45 Construction of 132 KV Grid Station at
Dera Bugti and 132 KV Sui-Dera Bugti
T/L (55km) (Bugti Package)
303.650 0.000 0.000 303.650 10.000 0.000 10.000
46 220 KV T/L From Chashma to Ludewala
for Interconnection of Chashnupp-II
2057.000 1012.000 0.000 2057.000 300.000 0.000 300.000
47 Feasibility Study for Dispersal of Power
from Imported Coal at Karachi
177.000 0.000 0.000 177.000 30.000 0.000 30.000
48 Feasibility Study for Dispersal of Power
from imported 1000 MW Power from Iran
75.000 0.000 0.000 75.000 25.000 0.000 25.000
49 Feasibility Study for Dispersal of Power
from Large Hydro Projects (Basha HPP).
281.000 73.000 0.000 281.000 50.000 0.000 50.000
50 4 Projects (I) 500 KV RY Khan G/S & T/L
(II) 220 KV Chistian G/S & 220 Vehari -
Chistian T/L (III) 220 KV Gujrat G/S &
220 KV T/L (IV) 220 KV Shalimar G/S &
200 KV T/Line
13152.000 7787.000 0.000 13152.000 400.000 0.000 400.000
51 220 KV Rohri Sub Station & Associated
T/L for Dispersal of Power from IPPS
Fauji Fundation & Engro Near Dharki
(Tranch-II) ADB
4847.000 2412.000 0.000 4847.000 1000.000 0.000 1000.000
52 Power Transmission Enhancement
Project (Tranch-II) (10 Sub Projects) of
500 KV & 220 KV Sub Station & T/Line
(ADB Financing)
20193.000 10918.000 0.000 20193.000 800.000 0.000 800.000
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost
Total Foreign
Loan
Allocation for 2008-09
Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Rupee Foreign
Loan
WATER & POWER DIVISION (POWER SECTOR)
(Million Rupees)
Distribution Rehabilitation Renovation & Augmentation
53 Installation of Capacitors at 132 KV Grid
Stations QESCO
150.390 0.000 0.000 150.390 150.390 0.000 150.390
1 2 3 4 5 6 7 8 9
54 Power Distribution Enhancement Project
(Phase-I) (STG-ELR-DOP-Rehabilitation
Capactor Installation for Eight DISCOs
20437.180 3565.910 0.000 20437.180 804.000 0.000 804.000
*55 Bhasha - Diameer 578000.000 0.000 0.000 578000.000 200.000 0.000 200.000
Total (on-going) 1065119.605 227487.040 114869.961 953334.625 54332.400 13331.990 67664.390
Total (WAPDA) 1065119.605 227487.040 114869.961 953334.625 54332.400 13331.990 67664.390
*56 Solar Thermal Power Plants
Technologies (Demonstration Units)
39.080 0.000 36.730 2.350 2.350 0.000 2.350
*57 Solar Water Pumping & Desalination Unit 31.810 0.000 25.260 6.550 2.860 0.000 2.860
*58 Pilot Project of Production Plant of
Biodiesel
20.190 0.000 17.900 2.290 2.290 0.000 2.290
*59 Pilot Project for Development &
Installation of 2 Micro Hydro Kaplan
Turbines (Revised)
19.486 0.000 11.660 7.826 7.800 0.000 7.800
Total (AEDB) 110.566 0.000 91.550 19.016 15.300 0.000 15.300
Total (Power) 1065230.171 227487.040 114961.511 953353.641 54347.700 13331.990 67679.690
* Rupee Provision of these Projects will be met through Budget
Total
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
WATER & POWER DIVISION (POWER SECTOR)
(Million Rupees)
Alternative Energy Development Board (AEDB)
1 2 3 4 5 6 7 8 9
On-going
1 Chashma Nuclear Power Project C-II 51046.000 33422.000 31124.200 19921.800 4330.760 2989.000 7319.760
2 Gilgit Institute of Radiotherapy & Nuclear
Medicine
549.180 207.201 66.260 482.920 5.000 0.000 5.000
3 Gujranwala Institute of Radiotherapy &
Nuclear Medicine.
316.170 96.600 168.990 147.180 147.180 0.000 147.180
4 Installation of Cyclotron and Three
Position Emission Tomography/
Computerized Tomography (PET/CT)
Scanner at PAEC Nuclear Medicine
Oncology & Radiotherapy Institutes.
407.751 367.500 407.000 0.751 0.180 0.000 0.180
5 Swat Institute of Nuclear Medicine and
Radiotherapy.
671.260 208.010 285.000 386.260 386.260 0.000 386.260
6 Bannu Institute of Nuclear Medicine &
Radiotherapy
672.060 208.010 280.000 392.060 392.060 0.000 392.060
7 D.I.Khan Institute of Nuclear Medicine. 568.220 208.010 268.920 299.300 299.310 0.000 299.310
8 Nawabshah Institute of Nuclear Medicine
& Radiotherapy
726.050 219.510 180.000 546.050 273.840 0.000 273.840
9 Upgradation of Atomic Energy Medical
Centre, Karachi.
469.630 262.600 265.000 204.630 204.630 0.000 204.630
10 Upgradation of National Institute of Food
and Agriculture (NIFA), Peshawar
246.030 0.000 168.240 77.790 77.790 0.000 77.790
11 Establishment of National Institute of
Lasers and Optronics (NILOP)
701.763 0.000 266.390 435.373 225.000 0.000 225.000
12 Upgradation/Extension of PINSTECH
Labs (Phase-II)
1748.000 0.000 304.600 1443.400 285.000 0.000 285.000
13 Detailed Exploration of Uranium (Phase-
VII), DG Khan
856.560 0.000 545.035 311.525 311.525 0.000 311.525
14 Detailed Exploration of Uranium
Resources in Bannu Basin and Kohat
Plateau
498.960 0.000 212.960 286.000 157.991 0.000 157.991
15 Up-gradation of KINOPE Infrastructure,
Karachi
433.540 0.000 136.000 297.540 191.250 0.000 191.250
16 Upgradation of CHASCENT, Kundian 536.994 0.000 120.000 416.994 276.994 0.000 276.994
17 Engineering Design Organization,
Islamabad, Karachi, Chashma
424.300 107.900 196.000 228.300 228.300 0.000 228.300
18 Survey & Feasibility Studies of Six
Additional Nuclear Power Plants Sites in
Karachi
150.000 29.400 34.500 115.500 15.000 0.000 15.000
19 Fuel Fabrication Plant (FFP), Faisalabad 3266.000 0.000 25.400 3240.600 418.000 0.000 418.000
20 Chemical Processing Plant (CPP),
Faisalabad
22098.000 0.000 19.200 22078.800 2296.000 0.000 2296.000
21 Seamless Tube Plant (STP-1),
Faisalabad
2707.500 0.000 10.000 2697.500 351.000 0.000 351.000
22 Acquisition/Development of Land and
Construction of Office Building and
Accommodation of NP Supplier of K-2
Project
1972.010 752.500 0.000 1972.010 550.000 0.000 550.000
23 Nuclear Power Fuel Testing Project (NPF-
TP) , Faisalabad
1129.200 0.000 8.500 1120.700 145.000 0.000 145.000
Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme TotalRupee
Expenditure
upto June
2008
PAKISTAN ATOMIC ENERGY COMMISSION
Throw-
forward as
on 01-7-08
Foreign
Loan
Total
(Million Rupees)
Allocation for 2008-09Estimated Cost
24 MPS-3 Taunsa -2 Uranium Mining
Project
2386.551 0.000 684.131 1702.420 393.000 0.000 393.000
1 2 3 4 5 6 7 8 9
25 Funding for International Institute of
Applied System Analysis (IIASA) -
Pakistan Collaboration (Revised)
54.865 30.050 3.630 51.235 9.085 0.000 9.085
26 Development of Project Team for site
Development & Installation of 300 MW
and 1000 MW Nuclear Power Plants in
Karachi
363.500 27.500 0.000 363.500 114.400 0.000 114.400
27 Cloning of Cellulase Gens (s) for Ethanol
Production from Plant Biomass
20.000 0.000 8.486 11.514 8.150 0.000 8.150
28 Nuclear Desalination Demonstration
Project (NDDP)
271.000 0.000 271.000 0.000 20.228 0.000 20.228
29 Paediatric Hameatological Maligarcies
(PHM) Unit at Institute of Nuclear
Medicine and Oncology (INMOL)
Hospital, Lahore
34.000 0.000 25.000 9.000 9.000 0.000 9.000
Total (on-going) 95325.094 36146.791 36084.442 59240.652 12121.933 2989.000 15110.933
New Schems
30 Developing Man Power to meet the
Requirements of PAEC Nuclear Power
Programme with emphasis on Learning
Technical Chines and Industrial Traing at
China
491.420 0.000 0.000 491.420 15.000 0.000 15.000
31 Global Change Impact Studies Center
(GCISC) Phase-II
40.000 0.000 0.000 40.000 5.000 0.000 5.000
32 Chashma Nuclear Power Project (C3) 64687.000 40180.000 0.000 64687.000 100.000 0.000 100.000
33 Chashma Nuclear Power Project (C4) 64687.000 40180.000 0.000 64687.000 100.000 0.000 100.000
Total (New) 129905.420 80360.000 0.000 129905.420 220.000 0.000 220.000
Total (PAEC) 225230.514 116506.791 36084.442 189146.072 12341.933 2989.000 15330.933
Rupee Foreign
Loan
Total
Estimated Cost Expenditure
upto June
2008
PAKISTAN ATOMIC ENERGY COMMISSION
Throw-
forward as
on 01-7-08
Allocation for 2008-09Sl.
No
Name, Location & Status of the
Scheme Total Foreign
Loan
(Million Rupees)
1 2 3 4 5 6 7 8 9
On-going
1 Capacity Building of Pakistan Nuclear
Regulatory Authority (PNRA) to
implement National Nucleus Security
Action Plan
497.000 0.000 200.000 297.000 96.590 0.000 96.590
2 Institutional Strengthening and Capacity
Building of Pakistan Nuclear Regulatory
Authority (PNRA)
480.000 0.000 205.000 275.000 80.000 0.000 80.000
3 PNRA's School for Nuclear & Radiation
Safety
413.000 0.000 100.000 313.000 110.000 0.000 110.000
4 Establishment of National Dosimetry and
Protection Level Calibration Laboratory
(PNRA)
295.000 135.000 0.000 295.000 80.890 0.000 80.890
5 National Programme on Environmental
Radioactivity Surveillance (PNRA)
263.000 61.000 0.000 263.000 90.000 0.000 90.000
Total (On-going) 1948.000 196.000 505.000 1443.000 457.480 0.000 457.480
Total (PNRA) 1948.000 196.000 505.000 1443.000 457.480 0.000 457.480
Total Foreign
Loan
Rupee Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
PAKISTAN NUCLEAR REGULATORY AUTHORITY
(Million Rupees)
1 2 3 4 5 6 7 8 9
On-going
1 Feasibility Study for Development and
Exploration of Chichali Iron ore and
Commissioning of Steel Mill at Kalabagh
126.240 0.000 20.077 106.163 5.000 0.000 5.000
2 Geo-Hydrological Exploration for
Development of Underground Water in
Hamun-e-Mushkil, Chaghi Distt.
Balochistan
46.000 0.000 0.000 46.000 15.000 0.000 15.000
3 Establishment of Project Management
Unit (PMU) for PHRD Grant
50.900 45.000 39.300 11.600 2.000 3.000 5.000
4 Strengthening & Capacity Building of
Mineral Wing
95.000 0.000 10.880 84.120 10.000 0.000 10.000
5 Feasibility Study Gasification of Thar
Coal
126.649 0.000 22.236 104.413 35.000 0.000 35.000
6 Capacity Building for Hydrocarbon
Research and Development, Islamabad
140.000 0.000 106.760 33.240 26.320 0.000 26.320
7 Exploration for Coal in Kotli Area, Azad
Kashmir
20.025 0.000 16.003 4.022 4.022 0.000 4.022
8 Establishment of Project Monitoring and
Evaluation Cell
39.875 0.000 5.984 33.891 18.000 0.000 18.000
9 National Coal Policy 23.000 0.000 0.307 22.693 22.696 0.000 22.696
10 Exploration and Evaluation of Coal Fields
of Chamalang-Bala Dhaka, Bahlol and
Parts of Ghazi Coal Basin in Balochistan
30.000 0.000 11.186 18.814 10.895 0.000 10.895
11 Ground Follow-up Aeromagnetic
Anomalies in Chagai District,
Balochistan, Chagai Distt.
162.982 0.000 121.839 41.143 36.543 0.000 36.543
12 Upgradation/ Strengthening of
Geoscience Advance Research
Laboratories, GSP Islamabad
249.870 111.000 154.540 95.330 25.455 0.000 25.455
13 Accelerated Geological Mapping and
Geochemical Exploration of the Out-crop
Area of Pakistan
198.643 60.000 110.251 88.392 35.669 0.000 35.669
14 Construction of Petroleum House 452.440 0.000 98.885 353.555 25.000 0.000 25.000
15 Basic Training for Gemstone Cutting
Pakistan AJK & NA Gilgit
36.170 0.000 5.900 30.270 5.000 0.000 5.000
16 Training in Gemstone Mining, Processing
and Evaluation on Scientific Lines to
Private Sector in NA Gilgit
25.300 0.000 14.410 10.890 5.800 0.000 5.800
17 Oil & Gas Exploration Activities in
Balochistan
763.434 0.000 322.880 440.554 50.000 0.000 50.000
18 Capacity Expansion of HDIP CNG
Station at Islamabad
37.000 0.000 2.000 35.000 15.000 0.000 15.000
Total (On-going) 2623.528 216.000 1063.438 1560.090 347.400 3.000 350.400
New Schemes
*19 Thar Coal Infrastructure Development 1000.000 0.000 0.000 1000.000 500.000 0.000 500.000
Total (New) 1000.000 0.000 0.000 1000.000 500.000 0.000 500.000
Total (Petroleum & NR) 3623.528 216.000 1063.438 2560.090 847.400 3.000 850.400
* To be matched by Govt of Sindh
Rupee
(Million Rupees)
Foreign
Loan
Total
Sl.
No
Throw-
forward as
on 01-7-08
Name, Location & Status of the
Scheme
Allocation for 2008-09Expenditure
upto June
2008
Total Foreign
Loan
PETROLEUM AND NATURAL RESOURCES DIVISION
Estimated Cost
1 2 3 4 5 6 7 8 9
On-going
1 Road Safety Component under the
NWFP Road Development Sector Project
and Sub Region Connectivity Project
293.030 203.320 0.000 293.030 10.000 0.000 10.000
2 Establishment of National Highway and
Motorway Police Training Centre,
Sheikhupura
95.230 0.000 68.060 27.170 27.169 0.000 27.169
3 Acquisition of land for establishment of
Police Posts and Offices of National
Highways & Motorway Police along
National Highway N-5
404.000 0.000 310.332 93.668 53.000 0.000 53.000
4 Construction of NH&MP Complex at
Rahim Yar Khan
102.437 0.000 46.000 56.437 10.000 0.000 10.000
5 Feasibility Study for Ketti Bundar (New) 20.000 0.000 0.000 20.000 10.000 0.000 10.000
6 Feasibility Study for Karachi Mass Transit 100.000 0.000 0.000 100.000 10.000 0.000 10.000
7 Feasibility Study for Lahore Mass Transit 100.000 0.000 0.000 100.000 10.000 0.000 10.000
8 Feasibility Study for Inland Transport 50.000 0.000 0.000 50.000 1.000 0.000 1.000
NTRC
9 Operational Research Wing, Islamabad 50.000 1.000 42.070 7.930 2.000 0.000 2.000
10 Urban Transport Wing, Islamabad 33.300 5.000 34.010 0.000 0.500 0.000 0.500
11 Pakistan Transport Plan Study 38.700 24.000 7.600 31.100 1.500 0.000 1.500
12 National Transport Policy 21.550 17.120 3.080 18.470 0.500 0.000 0.500
13 Enhancement of Training Capability of
Construction Technology Training
Institute (CMTI), Islamabad (Phase -IV)
424.490 376.490 9.030 415.460 50.000 0.000 50.000
14 Construction of Machinery Training
Centre (CMTC), Hyderabad, Sindh
478.700 0.000 45.000 433.700 25.000 0.000 25.000
15 Construction of Machinery Training
Centre (CMTC), Quetta, Balochistan
478.700 0.000 45.000 433.700 25.000 0.000 25.000
16 Project Planning, Monitoring and
Evaluation Cell of Communication
Division
39.500 0.000 11.700 27.800 10.890 0.000 10.890
17 Construction of Machinery Training
Centre (CMTC), Swabi, NWFP
478.700 0.000 25.000 453.700 25.000 0.000 25.000
18 Construction of Machinery Training
Centre (CMTC), Bahawalpur, Punjab
478.700 0.000 25.000 453.700 25.000 0.000 25.000
19 Construction of Machinery Training
Centre (CMTC), Gari Duptha, AJK
478.700 0.000 25.000 453.700 25.000 0.000 25.000
Total (on-going) 4165.737 626.930 696.882 3469.565 321.559 0.000 321.559
NATIONAL HIGHWAYS AUTHORITY
On-going
20 Makran Coastal Road Balochistan 15010.000 0.000 12797.540 2212.460 1000.000 0.000 1000.000
21 Islamabad - Peshawar Motorway (M-I)
NWFP - Punjab
26862.300 0.000 38236.870 0.000 750.000 0.000 750.000
22 Karachi Northern Bypass 2928.000 0.000 4247.320 0.000 200.000 0.000 200.000
23 Lyari Expressway 5081.000 0.000 5371.460 0.000 557.000 0.000 557.000
Allocation for 2008-09
(Million Rupees)
Total Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme Total
COMMUNICATIONS DIVISION
Estimated Cost
Rupee
24 Islamabad - Muzafarabad Road 8242.000 0.000 6676.270 1565.730 700.000 0.000 700.000
1 2 3 4 5 6 7 8 9
25 Indus Highway Project Phase III, 319 Km
(N-55)
6556.000 0.000 2268.590 4287.410 100.000 0.000 100.000
26 Mansehra - Naran - Jalkhad Road 3821.000 0.000 4370.170 0.000 600.000 0.000 600.000
27 Jhalkhad - Chillas Road (66 km) 4017.000 0.000 1044.280 2972.720 600.000 0.000 600.000
28 Rahim Yar Khan - TMP - Bahawalpur
(166 Km)
7283.000 0.000 7256.550 26.450 26.000 0.000 26.000
29 Lowari Tunnel & Access Roads 7983.700 1602.200 2863.950 5119.750 1250.000 0.000 1250.000
30 Improvement of N - 65, Nutal - Sibi -
Dhadar Section (106 Km)
2266.000 0.000 2514.850 0.000 300.000 0.000 300.000
31 N-50, D.I Khan - Zam Tower - Mughalkot
Section (124 Km)
3650.000 0.000 2848.850 801.150 100.000 0.000 100.000
32 Improvement of N-70 Qila-Saifullah -
Loralai - Bewata Section (257 Km)
2841.250 0.000 1972.630 868.620 400.000 0.000 400.000
33 Gwadar - Turbat - Hoshab Section (200
Km) of Gwadar - Ratodero Road (650
Km) M-9
6000.000 0.000 8533.681 0.000 1000.000 0.000 1000.000
34 Khori - Quba Saeed Khan Section
(Khuzdar-Ratodero Road, 143 Km)
4000.000 0.000 2708.640 1291.360 900.000 0.000 900.000
35 Kalat-Quetta-Chaman Section of N-25
(247 Km)
6671.000 4574.000 4954.980 1716.020 150.000 900.000 1050.000
36 Realignment of N-65 near Jaccobabad &
Dera Allahyar Towns
477.540 0.000 473.340 4.200 50.000 0.000 50.000
37 Chenab Bridge at Shershah 1023.090 0.000 1075.110 0.000 150.000 0.000 150.000
38 Interchange on M-2 (Khanqah Dogran) 148.200 0.000 193.530 0.000 20.000 0.000 20.000
39 NWFP Road Development Sector & Sub-
regional Connectivity Project
5800.000 3514.000 1284.950 4515.050 920.000 900.000 1820.000
40 N-5 Highway Rehabilitation Project (857
Km)
15108.190 9328.900 9895.300 5212.890 1265.000 2359.000 3624.000
41 Feasibility Studies and Design 1500.000 0.000 508.660 991.340 100.000 0.000 100.000
42 5 Bridges on Gilgit - Skardu Road 372.070 0.000 145.480 226.590 100.000 0.000 100.000
43 Noshki - Dalbadin Section (165 Km) (N-
40)
1986.000 0.000 100.000 1886.000 400.000 0.000 400.000
44 Pakpattan Bridge 1108.220 0.000 150.420 957.800 200.000 0.000 200.000
45 National Highway Development Sector
Project (332 km)
31242.000 24994.000 3611.800 27630.200 3050.000 1200.000 4250.000
46 Widening & Improvement of Kararo-Wad
Section (96 Km) N-25
2328.470 2230.870 160.500 2167.970 110.000 0.000 110.000
47 Nowshera - Chakdara -Dir - Chitral
including Malakand Tunnel N-45 (309
km)
2399.270 0.000 1218.200 1181.070 400.000 0.000 400.000
48 Peshawar Northern Bypass (34 Km).
Including Land Acquisition
3078.100 0.000 51.110 3026.990 100.000 0.000 100.000
49 Widening & Improvement of N-85,
Hoshab - Nag - Basima - Surab Road
(459 Km)
22412.460 0.000 1806.370 20606.090 1468.000 0.000 1468.000
50 KKH Skardu Road S-I (167 Km) 15000.000 0.000 8.900 14991.100 50.000 0.000 50.000
51 Ghaggar Phatak Bridge to Kotri (N-5) 2850.000 0.000 0.000 2850.000 100.000 0.000 100.000
52 Bridge over River Indus at Larkana 4830.720 0.000 679.290 4151.430 1000.000 0.000 1000.000
(Million Rupees)
Foreign
Loan
Throw-
forward as
on 01-7-08
Estimated Cost
Total
Allocation for 2008-09
Foreign
Loan
Rupee Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
COMMUNICATIONS DIVISION
1 2 3 4 5 6 7 8 9
53 Construction of Additional Carriageway of
Indus Highway (N-55), Sehwan –
Khairpur Nathan Shah – Ratodero
Section (200 km approx)
12342.000 0.000 200.000 12142.000 0.000 1355.000 1355.000
54 Rehab. / Imp. / Widening of KKH (Raikot -
Khunjerab Section), GoP 15% of 335 km
30911.040 25268.050 55.400 30855.640 650.000 2280.000 2930.000
55 Rehab. of Thatta Badin Road 500.000 0.000 100.000 400.000 50.000 0.000 50.000
56 Peshawar - Torkhum (Section-I) 34 km
(ADB)
5640.000 4512.000 300.000 5340.000 10.000 0.000 10.000
57 Hassanabdal - Abbottabad - Mansehra
Expressway (97 km)
18000.000 14400.000 0.000 18000.000 300.000 0.000 300.000
58 Peshawar - Torkhum (Section-II) 17 km 5400.000 4320.000 0.000 5400.000 300.000 0.000 300.000
59 Basima - Khuzdar Road (110 Km) of N-
30
3300.000 0.000 0.000 3300.000 10.000 0.000 10.000
60 Chakdara - Kalam Road N-95 (135 Km) 5400.000 0.000 0.000 5400.000 5.000 0.000 5.000
61 Khanewal - Lodheran Expressway (100
Km) NTC
19960.300 15968.000 51.000 19909.300 100.000 0.000 100.000
62 Khawazakhela - Besham Road N-90 (64
Km)
2660.000 0.000 0.000 2660.000 10.000 0.000 10.000
63 Wazirabad - Pindi Bhattian Expressway
(100 km) NTC
20684.500 16548.000 100.000 20584.500 10.000 0.000 10.000
64 Karachi - Hyderabad Motorway M-9 (136
Km) Land Acquisition
2500.000 0.000 100.300 2399.700 5.000 0.000 5.000
65 Rawalpindi Bypass (28 Km) & Ternol
Interchange at N-5
1377.000 0.000 5.200 1371.800 20.000 0.000 20.000
66 Lakpass Tunnel 61.280 0.000 5.010 56.270 30.000 0.000 30.000
67 Faisalabad - Khanewal Expressway (184
Km) Land Acquisition
3957.000 0.000 434.010 3522.990 600.000 0.000 600.000
68 Overhead Bridge at Kotri 250.000 0.000 0.000 250.000 10.000 0.000 10.000
69 CRBC Crossing - Sara - e - Gambila N-
55 (70.271 Km)
1584.590 0.000 59.840 1524.750 400.000 0.000 400.000
70 Faisalabad - Khanewal Expressway, 184
km (Construction)
0.000 1078.438 921.562 2000.000
71 Construction of 4 Land Underpass at
Wah Gate No.1, Taxila Hassanabdal
Section
491.580 0.000 0.000 491.580 300.000 0.000 300.000
72 Bridge Over River Chenab at Chund 1085.000 0.000 0.000 1085.000 200.000 0.000 200.000
73 Widening & Improvement of KKH
(Manshera-Sazin Section) 258 km
11578.370 0.000 0.000 11578.370 100.000 0.000 100.000
74 East - West Road Improvement Project
(N-70) JBIC
9805.000 0.000 0.000 9805.000 100.000 150.000 250.000
Total (On-going) 382364.240 127260.020 131440.351 267337.290 22404.438 10065.562 32470.000
New Schemes
75 Construction of Road from Gharo to Ketti
Bunder (190 km)
3000.000 0.000 0.000 3000.000 500.000 0.000 500.000
76 Dualization of Sakrand - Nawab Shah
Road - 35 Km
1000.000 0.000 0.000 1000.000 400.000 0.000 400.000
77 Construction of Bridge over River Indus
at Sun - Sakrand and Sakrand Bypass
6000.000 0.000 0.000 6000.000 500.000 0.000 500.000
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Rupee
COMMUNICATIONS DIVISION
(Million Rupees)
Name, Location & Status of the
Scheme
Estimated Cost
Total
Expenditure
upto June
2008
Foreign
Loan
Sl.
No Total Foreign
Loan
1 2 3 4 5 6 7 8 9
78 Rehabilitation of Larkana-Naudero Lakhi
G.T. Road (61 Km)
1404.290 0.000 0.000 1404.290 500.000 0.000 500.000
79 Rehabilitation of Larkana Kamber Road
(21 Km)
492.830 0.000 0.000 492.830 200.000 0.000 200.000
80 Rehabilitation of Kamber Shahdadkot
Road (29 Km)
713.370 0.000 0.000 713.370 200.000 0.000 200.000
81 Rehabilitation of Ratodero Naudero Road
(16 Km)
457.330 0.000 0.000 457.330 100.000 0.000 100.000
82 Rehabilitation of Larkana Nasirabad
Road via Rasheed Wagan Road (34 Km
part of Indus Highway)
797.620 0.000 0.000 797.620 200.000 0.000 200.000
83 Dualization/ Rehabilitation of Larkana
Moenjo-Daro Road upto Airport (28 Km)
1755.550 0.000 0.000 1755.550 500.000 0.000 500.000
84 Multan southern Bypass (20 Km)
Including two interchanges)
2000.000 0.000 0.000 2000.000 800.000 0.000 800.000
85 Hiran Minar Interchage 184.000 0.000 0.000 184.000 10.000 0.000 10.000
86 Flyover on N-5 Khairpur 270.000 0.000 0.000 270.000 10.000 0.000 10.000
87 Highway Research & Training Centre 1400.000 0.000 0.000 1400.000 10.000 0.000 10.000
88 Awan Chowk Bypass Gujranwala to
Khanqah Dogran Interchange (widening
and Improvement 55 Km)
839.000 0.000 0.000 839.000 100.000 0.000 100.000
Total (New) 20313.990 0.000 0.000 20313.990 4030.000 0.000 4030.000
Total (NHA) 402678.230 127260.020 131440.351 287651.280 26434.438 10065.562 36500.000
Total (Communications) 406843.967 127886.950 132137.233 291120.845 26755.997 10065.562 36821.559
Rupee
Name, Location & Status of the
Scheme Foreign
Loan
TotalTotal
Estimated CostSl.
No
COMMUNICATIONS DIVISION
(Million Rupees)
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Foreign
Loan
Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
On-going
1 Gwadar Deep Sea Water Port (Phase-I)
including Deepening of Channel
16380.000 11880.000 17067.120 0.000 200.000 0.000 200.000
2 Gwadar Port Civic Centre, Gwadar 199.730 0.000 161.000 38.730 38.730 0.000 38.730
3 Eastbay Expressway to Link National
Road Network, Gwadar
3767.400 0.000 57.000 3710.400 100.000 0.000 100.000
Total (On-going) 20347.130 11880.000 17285.120 3749.130 338.730 0.000 338.730
New Schemes
4 Construction, Supply and Installation of
two Pontoons (low-level platforms) at
Gwadar Fish Harbour-cum-Mini Port
33.400 0.000 0.000 33.400 33.400 0.000 33.400
Total (New) 33.400 0.000 0.000 33.400 33.400 0.000 33.400
Total (Ports & Shipping) 20380.530 11880.000 17285.120 3782.530 372.130 0.000 372.130
TotalRupee Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Estimated CostSl.
No
Name, Location & Status of the
Scheme
(Million Rupees)
PORTS & SHIPPING DIVISION
1 2 3 4 5 6 7 8 9
On-going
1 Track Rehabilitation (Rehabilitation Plan) 9405.366 3328.236 6947.000 2458.366 1100.000 0.000 1100.000
2 Procurement of 69 Nos. D.E. Locos 11151.000 7454.000 7671.530 3479.470 5.000 0.000 5.000
3 Procurement of 1300 High Capacity
Wagons
5870.000 3607.000 5524.750 345.250 5.000 0.000 5.000
4 Doubling of Track on Lodharan -
Khanewal Section via loop Section.
3298.000 1146.000 2535.150 762.850 10.000 305.000 315.000
5 Doubling of Track Khanewal to Raiwind
Section
8326.180 3125.410 4467.890 3858.290 2000.000 0.000 2000.000
6 Procurement / Manufacture of 1000 High
Capacity Wagons.
5330.000 2967.000 685.510 4644.490 200.000 500.000 700.000
7 Conversion of Mirpur Khas - Khokhrapar
Meter Gauge Section into Broad Guage
1860.000 0.000 1172.740 687.260 200.000 0.000 200.000
8 Procurement / Manufacture of 75 Nos.
New D.E. Locos Risalpur
12700.000 8400.450 200.000 12500.000 100.000 500.000 600.000
9 Procurement / Manufacture of 150
Passenger Coaches
8226.000 5838.390 626.000 7600.000 180.000 1220.000 1400.000
10 Provision of Railway Track for Setting up
Dry Port at Prem Nagar including
Acquisition of Land for Dry Port at Prem
Nagar Near Raiwind
494.000 30.000 224.790 269.210 100.000 0.000 100.000
11 Special Repairs to 36 GMU-30 Locos 1610.000 1045.680 1411.240 198.760 198.000 0.000 198.000
12 Procurement of Plant & Machinery for
C&W Shop Mughalpura
199.000 107.000 145.350 53.650 55.000 0.000 55.000
13 Replacement of Old Signaling Gear from
Khanewal - Shahdara Section
10720.380 7988.970 751.000 9969.380 50.000 750.000 800.000
14 Rehabilitation, Upgradation and
Conversion of 400 Coaches
3434.000 1023.420 605.350 2828.650 600.000 0.000 600.000
15 Procurement of 300 High Capacity
Wagons
1883.220 1159.380 126.000 1757.220 100.000 500.000 600.000
16 Pilot Project for Manufacture of 5 (3000
HP) Locos
955.000 595.000 97.000 858.000 350.000 0.000 350.000
17 Feasibility Study for Rehabilitation and
Improvement of Track Quetta - Kohi -
Taftan Section
33.000 0.000 3.000 30.000 28.000 0.000 28.000
18 Procurement / Replacement of Plant and
Machinery for Railway Bridge Workshop
at Jhelum
211.000 145.000 1.000 210.000 2.000 0.000 2.000
19 Damages to Railways Assets during riots
in December 2007
7834.860 4914.100 1229.000 6605.860 2000.000 0.000 2000.000
20 Augmentation of Electrical Power Supply
System in Locos Shop and Steel
Moghalpura -Lahore
34.473 0.000 12.694 21.779 22.000 0.000 22.000
21 Strengthening /Rehabilitation of 159
weak Bridges
412.000 0.000 25.000 387.000 200.000 0.000 200.000
Total (Railways) 93987.479 52875.036 34461.994 59525.485 7505.000 3775.000 11280.000
Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
Total Foreign
Loan
Rupee
RAILWAYS DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
1 People's Works Programme - I 4420.000 0.000 4420.000
2 People's Works Programme - II 20000.000 0.000 20000.000
Total (Special Programmes) 24420.000 0.000 24420.000
Estimated Cost
SPECIAL PROGRAMMES
Rupee Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme Total Foreign
Loan
1 2 3 4 5 6 7 8 9
On-going
1 Public Sector Capacity Building Project
(PSCBP), Islamabad, World Bank Credit
3538.000 3190.000 1986.779 1551.221 80.000 973.000 1053.000
2 Financial Monitoring & Evaluation of
Drought Recovery Assistance Program
Project (DRAPP/DERA-II) Islamabad
427.585 0.000 115.157 312.428 77.040 0.000 77.040
3 Project for Improvement of Financial
Reporting & Auditing (PIFRA). (Phase-II),
Islamabad. (IDA/World Bank Credit)
5533.500 4998.000 1989.000 3544.500 180.000 1720.000 1900.000
4 Supporting Participatory Policy
Development and Building Institutions
and Markets for Development Services
and Credits for SMEs (ADB Loan)
1601.000 1029.000 592.000 1009.000 235.000 145.000 380.000
5 TA-I for Local Government Performance
Enhancement
1572.330 1334.000 552.850 1019.480 3.500 0.000 3.500
6 TA-2 Gender & Governance
Mainstreaming under Decentralization
Support Programme, (ADB Assisted)
858.120 660.000 37.700 820.420 6.500 0.000 6.500
7 TA Grant Microfinance for the Poorest
(TA 9105-PAK)
173.500 122.000 5.000 168.500 2.000 60.000 62.000
8 Improving Access to Financial Services
(Phase-I)
152.500 122.000 5.000 147.500 10.000 55.000 65.000
9 National Institute of Public Finance and
Accountancy
300.000 0.000 0.000 300.000 300.000 0.000 300.000
10 Establishment of Program coordination
Unit (PCU) for Public Private Partnership
9.200 6.100 1.700 7.500 1.400 6.100 7.500
11 Automation of CDNS 500.000 0.000 0.000 500.000 500.000 0.000 500.000
12 Infrastructure Project Finance Facility 1000.000 0.000 100.000 900.000 100.000 0.000 100.000
13 Competitiveness Support Fund 1000.000 0.000 0.000 1000.000 206.000 119.000 325.000
14 Greater Karachi Bulk Water Supply
Scheme (K-III)
8561.000 0.000 7267.516 1293.484 1231.000 0.000 1231.000
15 Greater Quetta Water Supply Project-
Main
7665.000 0.000 7405.081 259.919 250.000 0.000 250.000
16 Malakand Water Supply Scheme 465.000 0.000 410.000 55.000 55.000 0.000 55.000
17 Const. of Bridge over Malir River
Connecting Shah Faisal Colony and
Korangi Section 10 (Karachi Package)
1207.243 0.000 880.240 327.003 115.711 0.000 115.711
18 Rehabilitation and Improvement of
Existing Sewerage System for Korangi
Industrial Area (Karachi Package)
436.000 0.000 224.750 211.250 67.800 0.000 67.800
19 Rehabilitation and Improvement of
Existing Water Supply System for
Korangi Industrial Area (Karachi
Package)
350.414 0.000 148.217 202.197 36.499 0.000 36.499
20 Construction of Grade Separated
Interchange at Nagan Chowrangi,
Karachi (Karachi Package)
498.780 0.000 125.000 373.780 287.441 0.000 287.441
21 Construction of Grade Separated
Interchange at Gulshan Chowrangi,
Karachi (Karachi Package)
455.000 0.000 125.000 330.000 243.559 0.000 243.559
TotalTotal
Throw-
forward as
on 01-7-08
Expenditure
upto June
2008
Sl.
No
Allocation for 2008-09
Rupee Foreign
Loan
(Million Rupees)
Estimated Cost
FINANCE DIVISION
Name, Location & Status of the
Scheme Foreign
Loan
1 2 3 4 5 6 7 8 9
22 Construction of Soldier Bazar Drain from
Gurumandir Ghowarangi to Sultanabad.
(Karachi Package)
280.000 0.000 25.000 255.000 255.000 0.000 255.000
23 Expansion of Raw Water Filtration Plant
& Supply Network for Supplying Clean
Water to Hyderabad (Hyderabad
Package)
935.000 0.000 217.500 717.500 250.000 0.000 250.000
24 Construction of Sewerage Pumping
Stations at Tulsi Das APWA School and
Hali Road, Hyderabad (Hyderabad
Package)
444.500 0.000 350.000 94.500 130.000 0.000 130.000
25 Construction of Eastern and Expansion
of Southern Sewerage Treatment Plants
(Hyderabad Package)
915.300 0.000 250.000 665.300 207.650 0.000 207.650
26 Short Term Storm Water Drainage
System and Improvement/Extension of
Auto Bhan Drain (Hyderabad Packae)
245.600 0.000 0.000 245.600 245.000 0.000 245.000
27 Urban Water Supply Scheme, Sukkur 573.920 0.000 100.000 473.920 47.000 0.000 47.000
28 Urban Drainage Scheme, Sukkur. 474.227 0.000 190.563 283.664 47.000 0.000 47.000
29 Urban Water Supply Scheme,
Nawabshah
505.446 0.000 63.200 442.246 100.000 0.000 100.000
30 Urban Drainage Scheme, Nawabshah 345.614 0.000 32.200 313.414 80.000 0.000 80.000
31 Urban Water Supply Scheme Mirpur
Khas
399.406 0.000 193.313 206.093 25.000 0.000 25.000
32 Water Supply Scheme and Drainage Part-
IV Phase-II Faisalabad.
499.000 0.000 107.940 391.060 103.260 0.000 103.260
33 Urban Drainage Scheme (Phase-III)
Mirpur Khas
198.742 0.000 85.361 113.381 33.000 0.000 33.000
34 192 Tubewells Water Supply Scheme,
Peshawar
331.000 0.000 75.000 256.000 100.000 0.000 100.000
35 Dualization of Lahore - Kasur Road,
Section Kahna to Kasur
1014.000 0.000 719.980 294.020 294.000 0.000 294.000
36 Dualization of Kasur - Depalpur
Carriageway
1441.680 0.000 26.100 1415.580 500.000 0.000 500.000
37 Overhead Bridge at Changa Manga
Railway Crossing
144.970 0.000 145.000 0.000 48.720 0.000 48.720
38 Const. of Road from Tehsil Jatoi to
Karamdad Qureshi
501.240 0.000 296.000 205.240 205.240 0.000 205.240
39 Const. of Northern Bypass for Multan City 664.500 0.000 0.000 664.500 273.000 0.000 273.000
40 Const. of Bridge Over River Ravi at
Syedwala, Punjab
343.000 0.000 31.540 311.460 100.000 0.000 100.000
41 Widening / Improvement of Pattoki
Kanganpur Road
288.260 0.000 37.500 250.760 250.000 0.000 250.000
42 Construction of Offices/Officials
Accommodations for Officers, Ghotki
150.000 0.000 65.000 85.000 45.000 0.000 45.000
43 Victoria Bridge to Provide Crossing of
Vehicular traffic by road as well
700.000 0.000 50.000 650.000 20.000 0.000 20.000
44 Construction of Bridge Over River
Chenab to connect District Sialkot with
Jalalpur Jattan
565.970 0.000 163.750 402.220 100.000 0.000 100.000
45 Leh Nulla Expressway, Rawalpindi 8884.600 0.000 556.500 8328.100 106.000 0.000 106.000
Total Foreign
Loan
Rupee
FINANCE DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
TotalForeign
Loan
1 2 3 4 5 6 7 8 9
46 Construction of Fish Landing Jetty and
Allied Harbor Facilities at Surbandar -
East Bay - Gwadar
538.139 0.000 150.000 388.139 175.000 0.000 175.000
47 Construction of Fish Landing Jetty and
allied Harbor Facilities at Pakistan- West
Bay Gwadar at Pushukan
502.800 0.000 150.000 352.800 175.000 0.000 175.000
48 Drainage Scheme & Sewerage System,
Okara
50.018 0.000 0.000 50.018 36.330 0.000 36.330
49 Dualization of Kasur Ganda Singhwala
Road, Punjab
255.000 0.000 201.680 53.320 53.000 0.000 53.000
50 Const. of Underpass in Bahawalpur City
Near Railway Station to Link two Parts of
the City
17.020 0.000 8.510 8.510 14.016 0.000 14.016
51 Water Supply Scheme, Kot Adu 170.083 0.000 29.000 141.083 45.000 0.000 45.000
52 Water Supply Scheme, Ali Pur 34.159 0.000 20.000 14.159 14.159 0.000 14.159
53 Water Supply Scheme, Jatoi 73.897 0.000 24.000 49.897 45.000 0.000 45.000
54 Construction of Metalled Road Tarkoo
Adda Kharkan Road to Basti Yasmeen
NA-181
35.580 0.000 35.000 0.580 0.580 0.000 0.580
55 Construction of By Pass in Muzaffargarh 100.000 0.000 10.000 90.000 50.000 0.000 50.000
56 Sewerage / Drainage South Disposal
Okara
185.161 0.000 25.009 160.152 25.152 0.000 25.152
57 Clean Drinking Water Depalpur Okara 67.556 0.000 36.275 31.281 31.281 0.000 31.281
58 Chunian - Sulmanki Linked Haveli Lakha
Road
95.000 0.000 50.000 45.000 45.000 0.000 45.000
59 Construction of Ch. Zahoor Ellahi
Shaheed Bridge Over River Chenab at
Shahbaz Pur in District Gujrat
566.000 0.000 100.000 466.000 50.000 0.000 50.000
60 Development of Infrastructure in the
Industrial areas, to be matched by the
Government of Sindh
1000.000 0.000 20.000 980.000 100.000 0.000 100.000
61 Industrial Estate, Nowshera 62.533 0.000 10.000 52.533 10.000 0.000 10.000
62 Development of Summer Resort, Gorakh
Hill, Sindh
499.500 0.000 0.000 499.500 64.000 0.000 64.000
63 Construction of Metalled Road about 25
Km from Head Vahari to Banglow
Yasmeen
35.580 0.000 35.000 0.580 25.000 0.000 25.000
64 Const. of Sibi Rakhni Road via Maiwand
(Tall - Kohlu) Section km 24 - 164)
1484.104 0.000 710.000 774.104 400.000 0.000 400.000
65 Const. of Dual Carriageway from Gujrat
to Salam Interchange (Motorway)
through Mandi Bahauddin
1441.990 0.000 255.000 1186.990 250.000 0.000 250.000
66 Uplift of Ziarat City 300.000 0.000 25.000 275.000 50.000 0.000 50.000
67 Uplift of Loralai Town 200.000 0.000 25.000 175.000 25.000 0.000 25.000
68 Re - Development of Dargah Lal
Shahbaz Qalander (Phase - III)
142.225 0.000 132.000 10.225 10.225 0.000 10.225
FINANCE DIVISION
Allocation for 2008-09Sl.
No
Name, Location & Status of the
Scheme
(Million Rupees)
Total
Throw-
forward as
on 01-7-08
Estimated Cost Expenditure
upto June
2008
Foreign
Loan
Foreign
Loan
Total Rupee
1 2 3 4 5 6 7 8 9
69 Project Monitoring and Evaluation
(Project Implementation Unit, Finance
Division), Islamabad
34.920 0.000 0.000 34.920 11.630 0.000 11.630
70 Construction of Tehsil Office and
Residences at Sighari and Tilli Mat in
District Dera Bugti
100.000 0.000 10.000 90.000 40.000 0.000 40.000
71 Water Supply Scheme Sighari District
Dera Bugti
12.000 0.000 3.000 9.000 5.000 0.000 5.000
72 Water Supply Scheme Tilli Mat District
Dera Bugti
4.000 0.000 1.000 3.000 3.000 0.000 3.000
73 Construction of Black Topped Road from
Doli Check Post to Sighari Road 109
Bashha Pur Linking Kandh Kot and Jani
Bari Road 238 district Dera Bugti
301.390 0.000 12.500 288.890 25.000 0.000 25.000
74 Construction of Black Topped Road from
Tilli Mat to Doli Post (Eastern Bypass) 30
Km District Dera Bugti
215.610 0.000 12.500 203.110 25.000 0.000 25.000
75 Construction of Black Topped Road from
Till Mat to Jani Bari road 238 (Western
Bypass Km 0.0 to 55 District Dera Bugti
361.860 0.000 16.000 345.860 25.000 0.000 25.000
76 Integrated Solid Waste and Effluent
Management System in Urban Cities of
NWFP
600.000 0.000 0.000 600.000 50.000 0.000 50.000
77 Conversion of Main Road Leading from
BHP to G.T. Road into DCW
188.350 0.000 2.500 185.850 185.850 0.000 185.850
78 Gwadar Development Authority
(Business Plan)
25000.000 0.000 4000.000 21000.000 1000.000 0.000 1000.000
79 Metaling of Road Linking Chitral and
Gilgat (Improvement / Black Topping of
Bonni - Mastooj Shandoor Road, District
Chitral)
491.224 0.000 50.000 441.224 50.000 0.000 50.000
80 Kohlu Development Package (For
Project to be Formulated)
1714.000 0.000 400.000 1314.000 200.000 0.000 200.000
.
Total (On-going) 94029.846 11461.100 32311.411 61718.465 10867.543 3078.100 13945.643
New Schemes
81 Pro poor Income Support Programme 50000.000 0.000 0.000 50000.000 34000.000 0.000 34000.000
82 Construction of Various Roads in District
Tando Allahyar (Hyderabad Package)
426.000 0.000 0.000 426.000 150.000 0.000 150.000
83 Construction of Various Roads/C.C
Streets in District Matiari (Hyderabad
Package)
259.258 0.000 0.000 259.258 50.000 0.000 50.000
84 Construction of Various Roads/ C.C
Streets in District Tando Muhammad
Khan (Hyderabad Package)
308.002 0.000 0.000 308.002 75.000 0.000 75.000
85 Construction of 2 Lane Flyover Bridge
along Makki Shah Road and Station
Road, Hyderabad (Near Khawaja Gharib
Nawaz Bridge) (Hyderabad Package)
294.770 0.000 0.000 294.770 75.000 0.000 75.000
86 Purchase of Land for Federal Audit
Complex, Islamabad
7.000 0.000 0.000 7.000 7.000 0.000 7.000
FINANCE DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Total Foreign
Loan
Foreign
Loan
TotalRupee
Throw-
forward as
on 01-7-08
Allocation for 2008-09
1 2 3 4 5 6 7 8 9
87 Overhead Bridge on Railways Crossing
National Highway Khairpur
350.000 0.000 0.000 350.000 50.000 0.000 50.000
88 Urban Drainage Scheme Jaccobabad 637.650 0.000 0.000 637.650 80.000 0.000 80.000
89 Construction / Widening / Improvement
of Road from Piplywala Bypass to Tetley
Mali (Punjab)
100.000 0.000 0.000 100.000 5.000 0.000 5.000
90 Construction / Improvement of Road with
Railway Bridge from Chadiala Emanabad
via Morr Emanabad
100.000 0.000 0.000 100.000 5.000 0.000 5.000
91 Urban Sewerage / Drainage Scheme
Ferozwala
39.040 0.000 0.000 39.040 39.000 0.000 39.000
92 Urban Water Supply and Sewerage
Scheme Pakpattan & Arifwala
265.800 0.000 0.000 265.800 185.841 0.000 185.841
93 Establishment of Girls Degree College
Ghakhar
50.000 0.000 0.000 50.000 5.000 0.000 5.000
94 Establishment of Girls Degree College
Emanabad
100.000 0.000 0.000 100.000 5.000 0.000 5.000
95 Establishment of Benazir Medical
College, Gujranwala
200.000 0.000 0.000 200.000 5.000 0.000 5.000
96 Construction / Widening / Improvement
of Road from Gillwalla to Ghummanwala
via Botala
100.000 0.000 0.000 100.000 5.000 0.000 5.000
97 Construction of Stadium and Park in
Ladhewalla and Qilla Didar Singh
100.000 0.000 0.000 100.000 5.000 0.000 5.000
98 Establishment of Girls Degree College
Ladhewalla Waraich
100.000 0.000 0.000 100.000 5.000 0.000 5.000
99 Constrcution of Vocational College in
Qilla Didar Singh
100.000 0.000 0.000 100.000 5.000 0.000 5.000
100 Rehabilitation / Widening of Depalpur -
Lakha Road
100.000 0.000 0.000 100.000 50.000 0.000 50.000
101 Larkana Package 1000.000 0.000 1000.000
102 Multan Package 1000.000 0.000 1000.000
Total (New) 53637.520 0.000 0.000 53637.520 36806.841 0.000 36806.841
Total (Finance) 147667.366 11461.100 32311.411 115355.985 47674.384 3078.100 50752.484
Foreign
Loan
Total
FINANCE DIVISION
Rupee
Projects at Sr No. 26 to 63 and 88 to 100 are on cost sharing basis between the Federal Government & Provincial Governments
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
1 2 3 4 5 6 7 8 9
On-going
1 Establishment of Gwadar Institute of
Technology, Gwadar
198.216 32.000 96.500 101.716 48.000 32.000 80.000
2 German Debt Swap-II for Education in
NWFP
928.568 0.000 683.756 244.812 244.812 0.000 244.812
3 Punjab School Libraries Project
(German Debt Swap-I)
998.400 0.000 581.310 417.090 417.090 0.000 417.090
4 Capacity Building of Teachers Training
Institutions of MoE and Training of
Elementary Schools Teachers in ICT,
FATA, NA & AJK.
669.556 0.000 96.900 572.656 186.980 0.000 186.980
5 Capacity Building of Teachers Training
Institutions and Training of Elementary
school teachers in Punjab.
3137.752 0.000 904.000 2233.752 1.000 0.000 1.000
6 Capacity Building of Teachers Training
Institutions and Training of elementary
school teachers in Sindh
1261.773 0.000 452.000 809.773 481.601 0.000 481.601
7 Capacity Building of Teachers Training
Institutions and Training of Elementary
School Teachers in NWFP
1035.319 0.000 327.000 708.319 214.600 0.000 214.600
8 Capacity Building of Teachers Training
Institutions and Training of Elementary
Schools Teachers in Balochistan
588.407 0.000 197.000 391.407 1.000 0.000 1.000
9 Introduction of MA Education and M.Ed
classes at Federal College of Education,
Islamabad.
99.239 0.000 88.786 10.453 10.453 0.000 10.453
10 In-service Training programme for the
Teachers of ICT, FATA, NA & AJK at FG
College of Education, Islamabad
25.450 0.000 10.921 14.529 14.529 0.000 14.529
11 Facilitation, Monitoring & Coordination
and Mechanism for the Implementation
of ESR Action Plan
19.900 0.000 17.000 2.900 2.900 0.000 2.900
12 Training Programme in Information
Communication Technology for Science
Teachers in ICT, FATA & NA
17.175 0.000 13.050 4.125 4.125 0.000 4.125
13 Expansion of Science Block of NISTE 18.880 0.000 15.080 3.800 3.800 0.000 3.800
14 Promotion of Children Literature Phase-
IV
4.763 0.000 2.953 1.810 0.940 0.000 0.940
15 Award of 75 Scholarships to Bangladeshi
Students
77.000 0.000 31.008 45.992 12.160 0.000 12.160
16 Scholarships to Students from other
Countries Bilateral Programme (Phase-II)
103.000 0.000 7.700 95.300 20.000 0.000 20.000
17 Award of 100 Scholarships to Students
from Indian Occupied Kashmir in the
Field of Medicines, Engineering & IT
150.000 0.000 26.632 123.368 15.640 0.000 15.640
18 Grant for Sustainability of Community
Schools Established by National
Education Foundation (NEF)
121.691 0.000 76.503 45.188 45.188 0.000 45.188
19 Promotion of Science Education through
Public Private Partnership with INTEL
Corporation by Organizing Science
Olympiads
23.978 0.000 2.660 21.318 1.330 0.000 1.330
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee TotalForeign
Loan
(Million Rupees)
Estimated Cost
EDUCATION DIVISION
1 2 3 4 5 6 7 8 9
20 Establishment & Operation of Basic
Education Community Schools in the
Country
7000.000 0.000 1805.275 5194.725 1500.000 0.000 1500.000
21 Upgradation of National Library of
Pakistan, Islamabad
39.970 0.000 23.685 16.285 16.285 0.000 16.285
22 Madrasa Reforms (Teaching of formal
subjects in Madaris)
5759.395 0.000 375.801 5383.594 100.000 0.000 100.000
23 Provision of Quality Education Facilities
to 200 Tribal students from FATA in
settled Areas outside NWFP
102.193 0.000 23.790 78.403 27.086 0.000 27.086
24 Establishment of Boys Degree College
Puran, (Kot Habal) NWFP
40.000 0.000 6.400 33.600 1.000 0.000 1.000
25 Establishment of Boys Degree College
Tando Bhago, Badin (Sindh)
49.098 0.000 13.274 35.824 15.000 0.000 15.000
26 Provision of Quality Education
opportunities for students of Balochistan
& FATA & 3 PMUs
481.360 0.000 58.000 423.360 38.040 0.000 38.040
27 Strengthening of Monitoring and
Evaluation Cell, M/o Education.
33.793 0.000 20.521 13.272 8.964 0.000 8.964
28 Establishment of FG Degree College for
Women, Sector I-14, Islamabad
75.000 0.000 54.750 20.250 20.250 0.000 20.250
29 Establishment of FG Girls Model School
in I-14, Islamabad,
102.414 0.000 76.147 26.267 26.267 0.000 26.267
30 Establishment of FG Model School for
Girls at PM Staff Colony, Islamabad
32.412 0.000 4.000 28.412 10.000 0.000 10.000
31 Establishment of FG Model School for
Boys at PM Staff Colony, Islamabad
30.982 0.000 6.000 24.982 10.000 0.000 10.000
32 Establishment of Cadet College Okara 190.000 0.000 219.270 0.000 50.000 0.000 50.000
33 Establishment of Cadet College at Qilla
Saifullah, Zhob, Balochistan
180.697 0.000 154.963 25.734 25.734 0.000 25.734
34 Establishment of Cadet College Panjgur,
Balochistan.
186.250 0.000 123.326 62.924 62.924 0.000 62.924
35 Establishment of Cadet College Pasrur. 190.000 0.000 190.000 0.000 30.000 0.000 30.000
36 Establishment of Scout Cadet College,
Muzaffarabad, AJK
171.351 0.000 39.834 131.517 50.000 0.000 50.000
37 Estab. of Captain Karnal Sher Khan
Shaheed Cadet College, Swabi
597.340 0.000 368.983 228.357 50.000 0.000 50.000
38 Establishment of Cadet College at Choa
Saiden Shah, District Chakwal
190.000 0.000 140.000 50.000 50.000 0.000 50.000
39 Establishment of Cadet College
Jaffarabad, Balochistan
180.085 0.000 160.020 20.065 20.064 0.000 20.064
40 Establishment of Cadet College Mianwali 190.000 0.000 100.430 89.570 5.000 0.000 5.000
41 Establishment of Cadet College Ghotki,
Sindh
168.640 0.000 125.376 43.264 43.264 0.000 43.264
42 Establishment of Cadet College at
District Kohlu, Balochistan
218.754 0.000 65.000 153.754 80.000 0.000 80.000
43 Establishment of Cadet College at
Noshki, Balochistan
200.000 0.000 77.000 123.000 70.000 0.000 70.000
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
EDUCATION DIVISION
(Million Rupees)
Estimated Cost
1 2 3 4 5 6 7 8 9
44 Establishment of Cadet College at
Chelas, Northern Area
410.000 0.000 40.000 370.000 123.333 0.000 123.333
45 Adult Literacy Programme 2075.000 0.000 684.594 1390.406 50.000 0.000 50.000
46 Establishment of Polytechnic Institute for
boys at Khanozai, Distt. Pishin
208.502 0.000 74.900 133.602 40.000 0.000 40.000
47 Revamping of Science Education at
Secondary Level
2500.000 0.000 686.656 1813.344 100.000 0.000 100.000
48 Education For All (EFA) (Provision of
missing Facilities to Primary/ Elementary
Schools)
7663.200 0.000 2857.766 4805.434 1000.000 0.000 1000.000
49 Establishment of Polytechnic Institute for
Boys at Muslim Bagh, Distt. Qilla
Saifullah.
176.101 0.000 50.000 126.101 30.000 0.000 30.000
50 Establishment of Polytechnic Institute for
Girls at Turbat with the Additional
Classes in Evening for Boys
237.000 0.000 94.361 142.639 40.000 0.000 40.000
51 Establishment of Girls Degree College
Alpuri NWFP
55.000 0.000 20.000 35.000 1.000 0.000 1.000
52 Establishment of Polytechnic Institute for
Boys at Gilgit, N.A.
200.000 0.000 15.500 184.500 15.000 0.000 15.000
53 Construction / Renovation and Repair of
Building of Curriculum Wing and Hostel
30.466 0.000 28.401 2.065 2.065 0.000 2.065
54 Merit Scholarships for Minority Students
of Engg. Medical & Post-Graduate
Studies.
17.740 0.000 2.900 14.840 3.380 0.000 3.380
55 Readers Club Scheme by NBF (Phase-
V)
39.953 0.000 20.410 19.543 19.543 0.000 19.543
56 Authors Resource Centre at NBF Lahore
& Quetta
39.939 0.000 9.314 30.625 12.748 0.000 12.748
57 Introduction of M.Com classes at FG
College of Commerce H-8/4, Islamabad
29.980 0.000 17.000 12.980 12.980 0.000 12.980
58 Financial Management for Good
Governance (FMGG)
31.197 0.000 10.123 21.074 10.074 0.000 10.074
59 Construction of Auditorium at Pakistan
Academy of Letters, Islamabad
32.021 0.000 16.000 16.021 16.021 0.000 16.021
60 Provision of 119 Computer Labs in
Educational Institutes in Islamabad
199.191 0.000 92.000 107.191 53.597 0.000 53.597
61 Education & Leadership and Institutional
Management (ELIM)
34.300 0.000 12.000 22.300 11.000 0.000 11.000
62 Expension and Upgradation of FG
Fatima Jinnah Degree College for
Women, Model Town, Humak,
Islamabad
119.038 0.000 9.310 109.728 20.000 0.000 20.000
63 Establishment of FG Degree College for
Men Sihala, Islamabad
148.896 0.000 20.000 128.896 20.000 0.000 20.000
64 Establishment of FG Junior Model
School at Margala Twon and PWD
Colony, Islamabad
23.924 0.000 23.924 0.000 1.114 0.000 1.114
65 Rehabilitation of Damages caused by the
Earthquake on 8 October, 2005 to the
Educational Institutions under FDE,
Islamabad
35.475 0.000 27.225 8.250 8.250 0.000 8.250
EDUCATION DIVISION
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Foreign
Loan
(Million Rupees)
Estimated Cost
Rupee
66 Establishment of FG Degree College for
Women Bhara Kau, Prime Minister's
Directive
75.000 0.000 21.880 53.120 30.000 0.000 30.000
1 2 3 4 5 6 7 8 9
67 Strengthening of IMCB F-8/4 by Adding
10 Classrooms, one Staff Room, one Lab
and Library
33.104 0.000 30.000 3.104 3.104 0.000 3.104
68 Strengthening of FG College for Men, H-
9, Islamabad
25.769 0.000 16.300 9.469 9.469 0.000 9.469
69 Strengthening of IMCG, F-7/4, Islamabad 79.174 0.000 20.000 59.174 40.000 0.000 40.000
70 Strengthening of FG Postgraduate
College for Men, H-8, Islamabad
Providing Geography Department for
M.Sc. Classes and Renovation of old
campus
14.480 0.000 11.291 3.189 3.189 0.000 3.189
71 Cost of land for Establishment of Public
Library in F-10, Islamabad
2.300 0.000 0.000 2.300 2.300 0.000 2.300
72 Strengthening of Educational Facilities in
IMCG, F-6/2, Islamabad
22.545 0.000 18.408 4.137 4.137 0.000 4.137
73 Construction of Government Inter
College, Kohlu
100.000 0.000 76.978 23.022 23.022 0.000 23.022
74 National Educational Assessment
System (NEAS)
54.314 0.000 47.376 6.938 6.938 0.000 6.938
Total (On-going) 40602.410 32.000 12917.221 27714.459 5748.290 32.000 5780.290
New Schemes
75 Science Teachers Training Program at
NISTE during financial year 2008-09
24.020 0.000 0.000 24.020 24.020 0.000 24.020
76 Development of Camp site at National
Training Centre of Pakistan Girls Guides
Association
29.872 0.000 0.000 29.872 29.872 0.000 29.872
77 Promotion of Early Childhood Education
(ECE) in Pakistan
39.900 31.900 0.000 39.900 8.000 11.900 19.900
78 School Nutrition Programme 5148.000 0.000 0.000 5148.000 50.000 0.000 50.000
79 Establishment of Cadet College at
Multan
410.000 0.000 0.000 410.000 50.000 0.000 50.000
80 Establishment of Federal Government
College of Home Economics at
Islamabad
498.000 0.000 0.000 498.000 75.000 0.000 75.000
81 Establishment of Cadet College Swat 380.266 0.000 0.000 380.266 50.000 0.000 50.000
82 Establishment of Cadet College
Charsadda
389.551 0.000 0.000 389.551 50.000 0.000 50.000
83 Establishment of Cadet College Chitral 440.683 0.000 0.000 440.683 50.000 0.000 50.000
84 Establishment of Cadet College Lakki
Marwat
272.678 0.000 0.000 272.678 50.000 0.000 50.000
85 Enhancing participation in Education
through Targeted Conditional Cash
Transfer Program
39.900 0.000 0.000 39.900 15.570 0.000 15.570
86 Establishment of Cadet College, Pishin 200.000 0.000 0.000 200.000 5.000 0.000 5.000
87 Establishment of Cadet College, Ziarat 200.000 0.000 0.000 200.000 5.000 0.000 5.000
88 Establishment of Cadet College, Bolan 200.000 0.000 0.000 200.000 5.000 0.000 5.000
89 Establishment of Cadet College, Gwadar,
Balochistan
200.000 0.000 0.000 200.000 5.000 0.000 5.000
90 Establishment of Cadet College, Shadur,
Balochistan
200.000 0.000 0.000 200.000 5.000 0.000 5.000
Total (New) 8672.870 31.900 0.000 8672.870 477.462 11.900 489.362
Total (Education) 49275.280 63.900 12917.221 36387.329 6225.752 43.900 6269.652
EDUCATION DIVISION
TotalForeign
Loan
Throw-
forward as
on 01-7-08
(Million Rupees)
Allocation for 2008-09
Rupee
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Total Foreign
Loan
1 2 3 4 5 6 7 8 9
On-going
1 Strengthening of Main and Mirpur
Campuses of the AJK University,
Muzafarabad.
487.092 0.000 142.206 344.886 70.000 0.000 70.000
2 Strengthening of Existing Facilities at
Mirpur Campus, AJK University
Muzafarabad
299.943 0.000 30.000 269.943 70.000 0.000 70.000
3 Consultancy Services for Feasibility
Study for Up-gradation of the College of
Engg. & Tech. Mirpur, into Engg.
University.
16.284 0.000 10.000 6.284 6.284 0.000 6.284
4 Strengthening and Development of the
University of Balochistan, Quetta.
971.878 0.000 149.660 822.218 140.000 0.000 140.000
5 Strengthening and Development of the
University of Balochistan,
Quetta.(Revised)
277.402 0.000 241.438 35.964 35.964 0.000 35.964
6 Transport and Teaching Aid Facilities,
University of Balochistan, Quetta.
28.734 0.000 20.000 8.734 8.734 0.000 8.734
7 Development of Botanical Garden,
Department of Botany, University of
Balochistan Quetta
22.380 0.000 10.000 12.380 12.380 0.000 12.380
8 Development of Balochistan University of
Information Technology and
Management Sciences (BUITMS),
Quetta
468.313 0.000 283.465 184.848 90.000 0.000 90.000
9 Establishment of Central Engineering
Laboratory, Balochistan University of
Information Technology & Management
Sciences, Quetta
37.970 0.000 7.500 30.470 22.970 0.000 22.970
10 Faculty Development programme of
Balochistan University of Engineering
and Technology, Khuzdar
36.572 0.000 21.900 14.672 12.492 0.000 12.492
11 Strengthening of Balochistan University
of Engg. & Tech; Khuzdar
35.362 0.000 4.200 31.162 10.000 0.000 10.000
12 Immediate Requirement for Academic
Activities at Sardar Bahadur Khan
Women University, Quetta.
37.922 0.000 31.028 6.894 6.894 0.000 6.894
13 Establishment of Student Services
Centre at SBK Women University, Quetta
37.880 0.000 29.002 8.878 8.878 0.000 8.878
14 Establishment of Undergraduate Marine
Science Laboratory at Lasbela University
of Agriculture, Water and Marine
Sciences, Uthal
477.840 0.000 60.000 417.840 100.000 0.000 100.000
15 Strengthening and Up gradation of
Lasbela University of Agriculture, Water
and Marine Sciences, Uthal Balochistan
37.858 0.000 20.000 17.858 17.858 0.000 17.858
16 Strengthening and Development of
NWFP Agricultural University,
Peshawar. (Revised)
410.593 0.000 125.009 285.584 70.000 0.000 70.000
17 Strengthening of Water Resources
Management Deptt. NWFP Agriculture
University, Peshawar
36.387 0.000 13.210 23.177 23.177 0.000 23.177
18 Construction of Multi purpose sports
Gymnasium on the Campus of University
of Agriculture Peshawar
37.772 0.000 8.800 28.972 28.972 0.000 28.972
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Total
HIGHER EDUCATION COMMISSION
Allocation for 2008-09
Foreign
Loan
(Million Rupees)
Estimated Cost
Foreign
Loan
Rupee
1 2 3 4 5 6 7 8 9
19 Strengthening of Institute of
Biotechnology and Genetic Engineering
NWFP Agriculture University, Peshawar
429.229 0.000 2.940 426.289 40.000 0.000 40.000
20 Establishment of Student & Faculty
Service, Gomal University D.I. Khan
37.690 0.000 26.000 11.690 11.690 0.000 11.690
21 Improvement and Development of Gomal
University D.I. Khan
477.902 0.000 10.000 467.902 80.000 0.000 80.000
22 Development of Hazara University
Dodhial, Mansehra Phase-I (Revised)
384.079 0.000 150.758 233.321 80.000 0.000 80.000
23 Hazara University's Post-Quake
Development Plan.
340.337 0.000 38.220 302.117 70.000 0.000 70.000
24 Hostel Facilities for Girls Students (PM
Directive), Hazara University
34.940 0.000 30.000 4.940 4.940 0.000 4.940
25 Development of Infrastructure for
Improved Educational Facilities at Kohat
University of Science & Technology.
459.714 0.000 89.250 370.464 80.000 0.000 80.000
26 Hostel for Visiting & Foreign Faculty at
Kohat University of Science & Tech;
Kohat (Revised)
28.258 0.000 23.530 4.728 4.728 0.000 4.728
27 Strengthening of Kohat University of
Science & Tech; Kohat
473.527 0.000 2.000 471.527 80.000 0.000 80.000
28 Construction of Hostels for Boys and Girl
Students at Kohat University of Science
& Tech; Kohat
37.157 0.000 10.000 27.157 15.000 0.000 15.000
29 Strengthening and Enhancement of
Academic Provisions in the University of
Peshawar.
458.961 0.000 300.179 158.782 80.000 0.000 80.000
30 Strengthening & Enhancement of
Academic Provision in faculty of Life &
Environmental Sciences, University of
Peshawar.
464.695 0.000 120.000 344.695 80.000 0.000 80.000
31 Establishment of Centre for Photo-
Pharmaceutical and Nutraceuticals
Research, University of Peshawar.
39.114 0.000 28.590 10.524 10.524 0.000 10.524
32 Strengthening of Centre of Excellence in
Geology, University of Peshawar.
652.138 0.000 161.063 491.075 70.000 0.000 70.000
33 National Institute of Urban Infrastructure
Planning at the NWFP University of
Engg. & Tech., Peshawar (Revised)
190.601 0.000 126.839 63.762 48.762 0.000 48.762
34 Strengthening of Satellite Campuses of
NWFP University of Engineering &
Technology, Peshawar at Mardan,
Bannu and Abottabad.(Revised)
487.669 0.000 276.801 210.868 80.000 0.000 80.000
35 Strengthening and Up gradation of
Peshawar Campus of NWFP University
of Engineering & Technology, Peshawar.
479.000 0.000 436.789 42.211 42.211 0.000 42.211
36 Establishment of Institute of Earthquake
Engineering and Engineering Seismology
by Upgrading its existing earthquake
Engineering Centre at University of Engg.
& Tech., Peshawar.
487.219 0.000 360.000 127.219 42.219 0.000 42.219
Sl.
No
Expenditure
upto June
2008
HIGHER EDUCATION COMMISSION
(Million Rupees)
Name, Location & Status of the
Scheme
Throw-
forward as
on 01-7-08
Total Foreign
Loan
Allocation for 2008-09
Rupee Foreign
Loan
Total
Estimated Cost
37 Provision of Academic/Research
Facilities for Gemstones Development
Cell at Deptt. Of Mining Engineering
NWFP University of Engineering & Tech;
Peshawar
32.929 0.000 10.185 22.744 22.744 0.000 22.744
1 2 3 4 5 6 7 8 9
38 Establishment of New Campus of Jalozai
NWFP UET, Peshawar.
6565.272 0.000 30.000 6535.272 250.000 0.000 250.000
39 Development of Malakand University,
Chakdara.
494.373 0.000 194.502 299.871 80.000 0.000 80.000
40 Estab. of Botanical Garden and
Herbarium, University of Malakand
Campus - I
38.316 0.000 17.570 20.746 20.746 0.000 20.746
41 Construction of Hostel for 200 Students
at University of Malakand, Campus-II
Sheringal
34.206 0.000 3.000 31.206 24.206 0.000 24.206
42 Strengthening of Syed Iftikhar Hussain
Shah Central Library at University of
Malakand
36.659 0.000 2.500 34.159 10.000 0.000 10.000
43 Development of Institute of Management
Sciences (IMPS), Peshawar
466.553 0.000 10.000 456.553 70.000 0.000 70.000
44 Establishment of Frontier Women
University in NWFP at Peshawar. Phase-
1
456.153 0.000 75.518 380.635 70.000 0.000 70.000
45 Immediate needs of University of
Science & Technology, Bannu.
427.861 0.000 144.163 283.698 80.000 0.000 80.000
46 Infrastructure for Higher Educational
Facilities for University of Science &
Technology Bannu
29.625 0.000 10.000 19.625 19.625 0.000 19.625
47 Estab. of Faculty of Veterinary and
Animal Sciences, University of Arid
Agriculture, Rawalpindi.
468.620 0.000 105.000 363.620 80.000 0.000 80.000
48 Strengthening of Deptt. Of Entomology,
University of Arid Agriculture Rawalpindi
34.783 0.000 24.320 10.463 10.463 0.000 10.463
49 Strengthening of Sports Facilities at the
University of Arid Agriculture, Rawalpindi
38.885 0.000 20.000 18.885 18.885 0.000 18.885
50 Establishment of University Institute of
Biochemistry and Biotechnology,
University of Arid Agriculture Rawalpindi
358.619 0.000 20.000 338.619 50.000 0.000 50.000
51 Development of on Farm Research
Facilities at University of Arid Agriculture,
Rawalpindi.
343.224 0.000 50.000 293.224 50.000 0.000 50.000
52 Establishment of Bahauddin Zakariya
University College of Textile Engineering,
Multan.
248.965 0.000 105.000 143.965 60.000 0.000 60.000
53 Establishment of Sub-Campus of
Bahauddin Zakariya University Multan at
Sahiwal. (President's Directive)
478.873 0.000 28.500 450.373 60.000 0.000 60.000
54 Strengthening and up-gradation
Educational and Research Facilities,
University of Agriculture, Faisalabad.
473.839 0.000 100.915 372.924 70.000 0.000 70.000
55 Construction of New Building for Faculty
of Veterinary Sciences at PARS
(Financial Assistance under President
Directive) , Agriculture University
Faisalabad.
200.000 0.000 80.000 120.000 70.000 0.000 70.000
Total Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
Throw-
forward as
on 01-7-08
Estimated Cost Expenditure
upto June
2008
Allocation for 2008-09
Rupee Foreign
Loan
Total
HIGHER EDUCATION COMMISSION
(Million Rupees)
56 Strengthening of Institute of Food
Science and Technology into National
Institute of Food Science and
Technology, University of Agriculture,
Faisalabad.
169.856 0.000 36.000 133.856 60.000 0.000 60.000
1 2 3 4 5 6 7 8 9
57 Establishment of Sub-Campus of
University of Agriculture, Faisalabad at
Toba Tek Singh. (President's Directive)
38.170 0.000 11.013 27.157 21.344 0.000 21.344
58 Establishment of Sub Campus of
University of Agriculture, Faisalabad at
Depalpur. (P.M.Directive)
475.395 0.000 10.000 465.395 50.000 0.000 50.000
59 Extension of Existing Power Load
through Installation of three KV/400 V
Sub Station at Fatima Jinnah Women
University, Rawalpindi
37.080 0.000 24.250 12.830 12.830 0.000 12.830
60 Development of Fatima Jinnah Women
University, Rawalpindi Campus II
428.411 0.000 2.000 426.411 40.000 0.000 40.000
61 Advancement of Mathematical Science
Education and Research, GCU, Lahore.
38.100 0.000 32.355 5.745 5.745 0.000 5.745
62 Strengthening of Laser Lab Facilities,
GCU, Lahore
38.982 0.000 10.000 28.982 28.982 0.000 28.982
63 Strengthening of Libraries, Islamia
University, Bahawalpur
99.430 0.000 67.848 31.582 31.582 0.000 31.582
64 Up-graduation of Labs for Chemical
Sciences at Islamia University,
Bahawalpur
35.620 0.000 5.970 29.650 13.384 0.000 13.384
65 Establishment of Sub-Campus of Islamia
University Bahawalpur at Bahawalnagar.
(President's Directive)
408.639 0.000 10.000 398.639 50.000 0.000 50.000
66 Estab. of Agriculture College, Islamia
University, Bahawalpur.(President
Directive)
421.566 0.000 10.000 411.566 50.000 0.000 50.000
67 Establishment of Sub-Campus of Islamia
University Bahawalpur at Rahim Yar
Khan. (President's Directive)
416.694 0.000 10.000 406.694 40.000 0.000 40.000
68 Strengthening of Pharmacy Department
of Lahore College for Women University,
Lahore.
36.308 0.000 30.616 5.692 5.692 0.000 5.692
69 Strengthening of 4 year Degree
programme through Expansion of
Existing Facilities of Lahore College for
Women University, Lahore.
424.578 0.000 75.178 349.400 70.000 0.000 70.000
70 Strengthening, Up gradation and
Extension of Departments, University of
the Punjab, Lahore.
474.630 0.000 343.020 131.610 70.000 0.000 70.000
71 Establishment of newly Emerging
Disciplines at University of the Punjab,
Lahore.
466.880 0.000 304.392 162.488 50.000 0.000 50.000
72 Strengthening of Academic Research
and Clinical Services, Punjab University,
Lahore.
37.290 0.000 26.768 10.522 10.522 0.000 10.522
73 Expansion/Up gradation of Existing
Facilities at GIS Centre, University of the
Punjab, Lahore.
37.000 0.000 13.500 23.500 23.500 0.000 23.500
74 Financial Assistance for Punjab
University Lahore President Directive)
99.740 0.000 90.000 9.740 9.740 0.000 9.740
75 Study of Protein Biomarkers for Early
Diagnosis of Diseases, School of
Biological Sciences, University of Punjab
Lahore.
31.642 0.000 26.778 4.864 4.864 0.000 4.864
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
HIGHER EDUCATION COMMISSION
(Million Rupees)
Estimated CostSl.
No
1 2 3 4 5 6 7 8 9
76 Strengthening of Universities through
(R&D) by Foreign Faculty -
Establishment of Research Lab Polymer
and Material Synthesis, Characterization,
Rheology and Processing , Punjab
University, Lahore.
38.784 0.000 34.984 3.800 3.800 0.000 3.800
77 Strengthening of School of Biological
Sciences, University of the Punjab,
Lahore.
377.328 0.000 15.000 362.328 60.000 0.000 60.000
78 Cell for Structural Transformation of
leadership (CSTL), IBA, University of the
Punjab, Lahore.
30.000 0.000 10.000 20.000 20.000 0.000 20.000
79 Strengthening of Centre of Excellence in
Molecular Biology, University of Punjab,
Lahore.
471.134 0.000 359.660 111.474 81.474 0.000 81.474
80 Establishment of National Centre for
STEM Cell and Regenerative Medicine,
Centre of Excellence in Molecular
Biology, University of the Punjab, Lahore.
384.390 0.000 182.116 202.274 60.000 0.000 60.000
81 Development of Main Campus of
University of Engg. & Tech (UET) Lahore
(Phase-1).
493.000 0.000 360.550 132.450 80.000 0.000 80.000
82 Establishment of Kala Shah Kaku (KSK)
Campus of University of Engg. & Tech;
Lahore.
480.000 0.000 355.050 124.950 70.000 0.000 70.000
83 Establishment of Faisalabad Campus of
University of Engg. & Tech; (UET),
Lahore.
475.996 0.000 170.000 305.996 80.000 0.000 80.000
84 Strengthening of University of
Engineering & Technology, Lahore.
5929.000 0.000 368.000 5561.000 250.000 0.000 250.000
85 Strengthening of Research laboratory of
Hydraulics and water resources in Civil
Engg. Deptt. at University of Engg. &
Tech. Taxila.
38.500 0.000 34.470 4.030 4.030 0.000 4.030
86 Provision of Infrastructure and
Establishment of Telecommunication
Department at University of Engineering
& Technology, (UET) Taxila.
471.672 0.000 197.360 274.312 60.000 0.000 60.000
87 Up gradation of the Lab Equipment in
various laboratories of Electrical
Engineering Department University of
Engineering & Technology, Taxila
37.430 0.000 15.650 21.780 21.780 0.000 21.780
88 Establishment of Renewable Energy
Research and Development Centre,
University of Engg. & Tech; Taxila.
38.804 0.000 10.000 28.804 24.220 0.000 24.220
89 Extension in Academic block of Electrical
& Civil Engineering department to
enhance enrollment at UET Taxila
37.054 0.000 10.000 27.054 27.054 0.000 27.054
90 Estab.of Poultry & Dairy Animals Trg. &
Research Centres at New Campus at
Bhunnekey, University of Veterinary and
Animal Sciences, Lahore.
432.644 0.000 105.000 327.644 77.873 0.000 77.873
91 Dairy Training and Development Centre
at University of Veterinary and Animal
Sciences, Lahore.
109.815 0.000 36.438 73.377 40.000 0.000 40.000
Total Foreign
Loan
Rupee Foreign
Loan
Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
HIGHER EDUCATION COMMISSION
(Million Rupees)
Estimated CostSl.
No
Name, Location & Status of the
Scheme
Allocation for 2008-09
92 Student Service Centre University of
Education Lahore (Revised)
36.743 0.000 23.000 13.743 13.743 0.000 13.743
1 2 3 4 5 6 7 8 9
93 Development of University of Education,
Okara
433.279 0.000 31.000 402.279 53.130 0.000 53.130
94 Estab. of Medical College, Sargodha
University.(President Directive)
802.158 0.000 111.500 690.658 90.000 0.000 90.000
95 Establishment of Agriculture College at
Sargodha University,
Sargodha.(President Directive).
437.247 0.000 138.621 298.626 80.000 0.000 80.000
96 Hostel Facilities for Girls students at
Govt. College University (GCU),
Faisalabad.
38.233 0.000 35.000 3.233 3.233 0.000 3.233
97 Establishment of Residential Facilities for
Visiting and Foreign Faculty at GCU
Faisalabad.
28.619 0.000 10.000 18.619 18.619 0.000 18.619
98 Establishment of a University at
Faisalabad on Cost sharing basis with
Govt. of Punjab (GCU) President
Directive.
398.550 0.000 10.000 388.550 60.000 0.000 60.000
99 Hostel for Visiting Faculty, University of
Health Sciences, Lahore.
17.860 0.000 14.500 3.360 3.360 0.000 3.360
100 Strengthening of Basic Medical Science
Departments, University of Health
Sciences, Lahore.
295.917 0.000 70.000 225.917 70.000 0.000 70.000
101 Establishment of Centre for Research in
Endocrinology and Reproductive
Sciences, University of Health Sciences,
Lahore.
31.771 0.000 10.000 21.771 18.300 0.000 18.300
102 Establishment of National College of
Arts, Rawalpindi Campus. (President
Directive)
453.444 0.000 95.681 357.763 45.000 0.000 45.000
103 Strengthening of King Edward Medical
University, Lahore.
475.065 0.000 15.000 460.065 70.000 0.000 70.000
104 Establishment of Experimental Facilities
for Fabrication and Characterization of
Functional Nonoceramics at Centre of
Excellence in Solid State Physics,
University of the Punjab, Lahore.
38.533 0.000 10.000 28.533 20.000 0.000 20.000
105 Computerization & Networking of
Kinnaired College for Women, Lahore.
34.000 0.000 10.000 24.000 24.000 0.000 24.000
106 Establishment of Environmental
Sciences Laboratory in Kinnaired College
for Women Lahore
29.710 0.000 10.000 19.710 19.710 0.000 19.710
107 National Centre for Proteomics,
University of Karachi. Phase-I)
169.500 0.000 139.830 29.670 20.670 0.000 20.670
108 Capacity Enhancement of the Faculty of
Pharmacy, University of Karachi.
475.602 0.000 115.692 359.910 50.000 0.000 50.000
109 Strengthening of Departments of
Economics, Business Admn. Commerce
and Economics, Institute of Applied
Economics, University of Karachi.
471.221 0.000 10.000 461.221 40.000 0.000 40.000
110 Completion of ancillary facilities at Dr.
A.Q. Khan Institute of Biotechnology and
Genetic Engineering (KIBGE) University
of Karachi.
37.736 0.000 33.030 4.706 4.706 0.000 4.706
111 Provision of Sports Facilities, University
of Karachi, Karachi
37.500 0.000 1.075 36.425 27.500 0.000 27.500
Foreign
Loan
Total
Throw-
forward as
on 01-7-08
(Million Rupees)
Estimated Cost
Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Allocation for 2008-09
Total Rupee
HIGHER EDUCATION COMMISSION
1 2 3 4 5 6 7 8 9
112 Conversion of traditional knowledge and
Resources into Modern Sciences,
Industries and Environmental Protection
using Pakistan Indigenous (Plant)
Genetic Resources, University of Karachi
31.992 0.000 10.000 21.992 21.992 0.000 21.992
113 Strengthening of Teaching and Research
Facilities at Deptt. of Geology, University
of Karachi.
36.903 0.000 10.000 26.903 22.000 0.000 22.000
114 Strengthening of HEJ Research Institute
of Chemistry (Phase-II) University of
Karachi.
499.770 0.000 351.000 148.770 50.000 0.000 50.000
115 Establishment of Bio-equivalence Centre
at Dr. Punjwani Centre, University of
Karachi
249.130 0.000 36.800 212.330 40.000 0.000 40.000
116 Development of Infrastructure for Latif
Ebrahim Jamal National Science
Information Centre, International Centre
for Chemical and Biological Sciences,
University of Karachi (P.M. Directive)
30.000 0.000 8.000 22.000 22.000 0.000 22.000
117 Industrial Linkages - Technology Parks
and Technology Incubators, HEJ
Research Institute of Chemistry, Karachi
University, Karachi.
184.000 0.000 5.000 179.000 40.000 0.000 40.000
118 University Strengthening and
Rehabilitation Program of Liaquat
University of Medical and Health
Sciences (LUMHS), Jamshoro
459.960 0.000 147.000 312.960 70.000 0.000 70.000
119 Restoration of Rain Affected Academic
Block of Liaquat University of Medical
and Health Sciences (LUMHS),
Jamshoro
37.900 0.000 29.000 8.900 8.900 0.000 8.900
120 Immediate Restoration of Rain Affected
Old Campus Liaquat University of
Medical and Health Sciences, Jamshoro.
487.010 0.000 10.000 477.010 30.000 0.000 30.000
121 Strengthening & Development
Programme of Mehran University of
Engineering & Technology, Jamshoro.
471.278 0.000 291.035 180.243 80.000 0.000 80.000
122 Strengthening of Department of Bio-
medical Engineering, Environmental
Engineering & Management and
provision of Communal Facilities at
Mehran University of Eng. & Technology,
Jamshoro
469.080 0.000 107.000 362.080 80.000 0.000 80.000
123 Strengthening of Mechanical Engg.
Workshop at Mehran University of Engg.
& Technology (MUET), Jamshoro
29.609 0.000 17.540 12.069 12.069 0.000 12.069
124 Strengthening & Development of Mehran
University of Engineering & Technology
(MUET), Jamshoro (Part II)
1486.148 0.000 15.000 1471.148 70.000 0.000 70.000
125 Development Program and Academic
Facilities at LEJ Campus, NED
University of Engineering & Technology,
Karachi
475.178 0.000 445.178 30.000 30.000 0.000 30.000
126 Development of New Departments and
Student Facilities at NED University of
Engg. & Tech; Karachi.
486.000 0.000 324.822 161.178 161.178 0.000 161.178
Foreign
Loan
Name, Location & Status of the
Scheme
Sl.
No
(Million Rupees)
Estimated Cost
Rupee Foreign
Loan
Total
Throw-
forward as
on 01-7-08
Expenditure
upto June
2008
Total
Allocation for 2008-09
HIGHER EDUCATION COMMISSION
127 Estab. of Electron Microscopy
Laboratory, NED University of Engg. &
Technology, Karachi.
38.300 0.000 25.240 13.060 13.060 0.000 13.060
1 2 3 4 5 6 7 8 9
128 Strengthening of NED University of Engg.
& Tech; Karachi
2193.000 0.000 15.000 2178.000 250.000 0.000 250.000
129 Development of Sports Facilities at NED
University of Engg. & Tech; Karachi.
34.700 0.000 10.000 24.700 24.700 0.000 24.700
130 Faculty Development and other basic
requirements of QUEST, Nawabshah.
440.176 0.000 82.807 357.369 60.000 0.000 60.000
131 Extension of Educational and Allied
Facilities at Quaid-e-Awam University,
Nawabshah.
475.420 0.000 15.000 460.420 40.000 0.000 40.000
132 Construction of Hostel for 100
Teachers/Researchers at Shah Abdul
Latif University, Khairpur.
33.855 0.000 15.000 18.855 18.855 0.000 18.855
133 Strengthening of Infrastructure of Shah
Abdul Latif University, Khairpur
467.390 0.000 10.000 457.390 69.498 0.000 69.498
134 Estt. of Student Service Centre at Shah
Abdul Latif University Khairpur
37.994 0.000 10.000 27.994 27.994 0.000 27.994
135 Development scheme of University of
Sindh, Jamshoro (Faculty of Pharmacy,
Faculty of Natural Sciences, Faculty of
Social Sciences and Administration)
498.426 0.000 266.950 231.476 90.000 0.000 90.000
136 Strengthening and Up gradation of
Sindh Agriculture University, Tandojam.
461.440 0.000 76.031 385.409 80.000 0.000 80.000
137 Provision of Sports Allied Facilities at
Sindh Agriculture University, Tandojam.
37.124 0.000 10.000 27.124 27.124 0.000 27.124
138 Strengthening of Institute of Business
Administration ( IBA), Karachi .
308.947 0.000 41.000 267.947 40.000 0.000 40.000
139 Development of Dow University of Health
Sciences, Karachi.
486.403 0.000 270.554 215.849 80.000 0.000 80.000
140 Establishment of Medical Genetics and
Infectious Diseases, Dow University of
Health Sciences, Karachi. (Total cost
425.639)
340.511 0.000 105.000 235.511 90.000 0.000 90.000
141 Up gradation and modernization of
existing laboratories and libraries at
DOW University of Health Sciences,
Karachi
464.045 0.000 139.000 325.045 70.000 0.000 70.000
142 Establishment of Post Graduate Medical
Sciences Research Centre at Dow UHS,
Ojah Campus, Karachi.
479.740 0.000 15.000 464.740 60.000 0.000 60.000
143 Construction of Sports Complex at
DUHS, Karachi, Sindh
38.650 0.000 7.000 31.650 28.650 0.000 28.650
144 Strengthening of Existing Facilities at
Pakistan Study Centre, University of
Sindh, Jamshoro
35.017 0.000 21.792 13.225 13.225 0.000 13.225
145 Computerization & Networking of Sukkur
Institute of Business Admn. Sukkur,
Sindh
32.545 0.000 20.000 12.545 12.545 0.000 12.545
146 Development of Sukkur IBA Sukkur. 469.138 0.000 10.000 459.138 40.000 0.000 40.000
147 Strengthening of Area Study Centre, Far
East & South East Asia, University of
Sindh, Jamshoro.
28.069 0.000 5.000 23.069 15.000 0.000 15.000
148 Institute of Avionics and Aeronautical
Engg. at Air University, Islamabad.
(Revised)
288.195 0.000 231.955 56.240 56.240 0.000 56.240
HIGHER EDUCATION COMMISSION
(Million Rupees)
Total
Sl.
No Rupee Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Total Foreign
Loan
Estimated Cost
149 Establishment of Electrical Engg.
Department at Bahria University,
Islamabad and Karachi Campuses.
162.974 0.000 58.900 104.074 60.000 0.000 60.000
1 2 3 4 5 6 7 8 9
150 Multipurpose Hall and Fitness
Gymnasium at IIUI, Islamabad
37.504 0.000 25.450 12.054 12.054 0.000 12.054
151 Construction of Visiting Faculty Hostel,
International Islamic University,
Islamabad.
35.000 0.000 13.000 22.000 22.000 0.000 22.000
152 Development of infrastructure of
International Islamic University,
Islamabad (IIUI)
481.434 0.000 20.000 461.434 50.000 0.000 50.000
153 Strengthening of Allama Iqbal Open
University, Islamabad
389.655 0.000 46.140 343.515 60.000 0.000 60.000
154 Model Labs for Training Science
Teachers of Allama Iqbal Open
University, Islamabad
28.733 0.000 14.633 14.100 14.100 0.000 14.100
155 Provision of Essential Facilities at
COMSATS Institute of Information
Technology, Islamabad.
480.351 0.000 394.343 86.008 86.008 0.000 86.008
156 Infrastructure Development of COMSATS
Institute of Information Technology
Campuses at Abbotabad and Wah.
384.675 0.000 221.550 163.125 60.000 0.000 60.000
157 Designing and Fabrication of Micro and
Nanoelectronic Devices for Applications,
COMSATS IIT, Islamabad.
185.448 0.000 128.000 57.448 57.448 0.000 57.448
158 Engineering Faculty Development at
COMSATS Institute of Information
Technology, Islamabad.
229.800 0.000 192.643 37.157 37.157 0.000 37.157
159 Establishment of Physical Facilities at
COMSATS Institute of Information
Technology, Abbotabad
469.945 0.000 111.672 358.273 60.000 0.000 60.000
160 Establishment of Permanent Campus of
COMSATS Institute of Information
Technology at Sahiwal.
407.989 0.000 30.000 377.989 50.000 0.000 50.000
161 Infrastructure Development of Permanent
Campus of COMSATS Institute of
Information Technology Chak Shahzad,
Islamabad.
2862.656 0.000 339.853 2522.803 220.000 0.000 220.000
162 Establishment of Permanent Campus of
CIIT, Attock.
472.352 0.000 10.000 462.352 25.000 0.000 25.000
163 Provision of Sports Facilities at NUML 37.504 0.000 22.060 15.444 15.444 0.000 15.444
164 Estab. of Instt. of IT and Management
Sciences, NUST.
3722.089 0.000 1440.500 2281.589 300.000 0.000 300.000
165 Establishment of HQ, NUST and High
Tech. Postgraduate S&T Institutes at
Islamabad. .
2270.872 0.000 879.858 1391.014 250.000 0.000 250.000
166 Establishment of NUST Centre for
Advanced Mathematics and Physics
(CAMP) Phase-I at National University of
Science & Technology, Rawalpindi.
14.805 0.000 13.434 1.371 1.371 0.000 1.371
167 Establishment of Department of Robotics
and Artificial Intelligence at College of
EME, NUST
324.397 0.000 43.160 281.237 70.279 0.000 70.279
168 External /Peripheral Development of
Land in Sector H-12 at Islamabad for
National University of Sciences and
Technology (NUST) – Phase-IV
299.365 0.000 250.000 49.365 49.365 0.000 49.365
Total
Estimated Cost
Foreign
Loan
Total
HIGHER EDUCATION COMMISSION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Rupee Foreign
Loan
1 2 3 4 5 6 7 8 9
169 Establishment of Professional
Development Centre (Continuing
Engineering Education Centre) at NUST
22.002 0.000 10.000 12.002 12.002 0.000 12.002
170 PERN Network Performance Monitoring
and Event Diagnosis - A Research &
Development Project by NUST
36.853 0.000 10.000 26.853 9.675 0.000 9.675
171 Up-gradation of infrastructure, Pakistan
Instt. of Engg. and Applied
Sciences(PIEAS), Islamabad.
444.232 0.000 225.243 218.989 60.000 0.000 60.000
172 Development of Computational Engg.
Lab, at Pakistan Institute of Engg. &
Applied Sciences (PIEAS), Islamabad.
38.650 0.000 33.750 4.900 4.900 0.000 4.900
173 Up gradation & Strengthening of Quaid-e-
Azam University, Islamabad.
625.783 0.000 596.783 29.000 29.000 0.000 29.000
174 Master Trainers in Physics at Quaid-e-
Azam University .
25.700 0.000 15.250 10.450 2.000 0.000 2.000
175 National Centre for Bio-Informatics,
Quaid-e-Azam University, Islamabad.
Phase-I)
183.000 0.000 173.000 10.000 10.000 0.000 10.000
176 Establishment of A 5 MV Tandem
Accelerator at Deptt. of Physics, Quaid-e-
Azam University, Islamabad.(Revised)
256.000 0.000 241.000 15.000 15.000 0.000 15.000
177 Establishment of Experimental Physics
Laboratory at Quaid-e-Azam University,
Islamabad. (Revised)
225.000 0.000 209.000 16.000 16.000 0.000 16.000
178 Establishment of Institute of Vacuum
Science and Technology, Quaid-e-Azam
university, Islamabad.
195.000 0.000 190.000 5.000 5.000 0.000 5.000
179 Up gradation and Strengthening of
Quaid-e-Azam University, Islamabad.
Phase II
485.457 0.000 51.684 433.773 50.000 0.000 50.000
180 QAU Botanical Garden for Evaluation
and Conservation of Medicinal and
Aromatic Plants, Quaid-e-Azam
University
36.453 0.000 10.000 26.453 22.553 0.000 22.553
181 Production of Scientific Books in Urdu
for Higher Education in various
Disciplines, Federal Urdu University of
Arts, Science & Tech; Karachi.
36.034 0.000 19.280 16.754 2.000 0.000 2.000
182 Strengthening of Departments of
Computer Science, Physics, Business
Admn. and Law at Federal Urdu Univ. of
Arts, Science & Tech, Karachi.
426.022 0.000 75.000 351.022 20.000 0.000 20.000
183 Up gradation of Department of
Chemistry, Federal Urdu University of
Arts, Science & Technology, Karachi
37.313 0.000 10.000 27.313 23.313 0.000 23.313
184 Strengthening of Electronics and
Telecom Engg. Department of Federal
Urdu University of Arts, Science and
Technology, Islamabad.
27.624 0.000 12.000 15.624 15.624 0.000 15.624
185 Strengthening of Virtual University,
Lahore.
38.110 0.000 10.000 28.110 28.110 0.000 28.110
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Foreign
Loan
Rupee
Allocation for 2008-09Throw-
forward as
on 01-7-08
(Million Rupees)
Estimated Cost
Total Total
HIGHER EDUCATION COMMISSION
Foreign
Loan
186 Establishment of Higher Education,
Technology and Innovation Policy
Research Centre at COMSTECH
Secretariat, Islamabad
11.384 0.000 6.000 5.384 5.384 0.000 5.384
1 2 3 4 5 6 7 8 9
187 Strengthening of National Institute of
Historical and Cultural Research, QAU,
Islamabad.
21.993 0.000 16.424 5.569 5.569 0.000 5.569
188 Strengthening of Institute of Space
Technology, Islamabad
458.567 0.000 115.100 343.467 60.000 0.000 60.000
189 Construction of Hostel at Instt. Of Space
Technology, Islamabad
26.675 0.000 7.400 19.275 19.275 0.000 19.275
190 Capacity Building of PIDE, Islamabad 70.880 0.000 25.000 45.880 45.880 0.000 45.880
191 Development and Expansion of the
National Institute of Psychology, Centre
of Excellence, Quaid-e-Azam University,
Islamabad.
36.468 0.000 15.600 20.868 11.468 0.000 11.468
192 Establishment of National Law University
at Islamabad with Four Campuses at
Provinces.(Revised)
473.300 0.000 415.000 58.300 58.300 0.000 58.300
193 Establishment of Engineering University
in Collaboration with Sweden (University
of Engg. Science & Technology, KTH-
Sialkot, Pakistan (Part I) (HEC).
488.396 0.000 150.943 337.453 40.000 0.000 40.000
194 Establishment of Engineering University
in Collaboration with Austria, (HEC)
480.120 0.000 150.000 330.120 330.120 0.000 330.120
195 Establishment of University of
Engineering Science and Technology,
Pakistan UESTP- France at Karachi (part
I)
436.068 0.000 279.747 156.321 50.000 0.000 50.000
196 Establishment of Engineering University
in Collaboration with Italy.
42.370 0.000 20.000 22.370 22.370 0.000 22.370
197 Establishment of Engineering University
in Collaboration with China (HEC) Part I
64.220 0.000 20.000 44.220 44.220 0.000 44.220
198 Establishment of University Engineering,
Science and Technology Pakistan in
Collaboration with Austria, (Phase II)
37651.840 0.000 160.500 37491.340 300.000 0.000 300.000
199 Establishment of Universsity of
Engineering, Science and Technology
Pakistan in Collaboration with
Germany.(Part II)
39563.970 0.000 196.043 39367.927 300.000 0.000 300.000
200 Strengthening of the Federal
Coordination Unit for the Establishment
of Engineering Universities in Pakistan in
Collaboration with Foreign Universities.
85.485 0.000 13.780 71.705 41.500 0.000 41.500
201 Establishment of Universsity of
Engineering, Science and Technology
Pakistan in Collaboration with Italy.(Part
II)
34581.540 0.000 2.800 34578.740 200.000 0.000 200.000
202 Establishment of Universsity of
Engineering, Science and Technology
Pakistan in Collaboration with
China.(Part II)
38209.249 0.000 30.000 38179.249 300.000 0.000 300.000
203 Human Resource Development Initiative-
HRDI MS and MS Leading to PH.D
Programme of Faculty Development for
UESTP Phase I.
11806.139 0.000 20.652 11785.487 531.810 0.000 531.810
Name, Location & Status of the
Scheme
HIGHER EDUCATION COMMISSION
Expenditure
upto June
2008
(Million Rupees)
Rupee Foreign
Loan
Estimated CostSl.
No Total Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
204 Provision of Un-Interrupted Power
Supply to Karakuram International
University, Gilgit.
38.682 0.000 37.186 1.496 1.496 0.000 1.496
1 2 3 4 5 6 7 8 9
205 Capacity Building of Karakuram
International University, Gilgit.
36.320 0.000 27.000 9.320 9.320 0.000 9.320
206 Development of S&T Manpower through
Indigenous Ph.D. (300) Scholars.
603.900 0.000 450.330 153.570 0.500 0.000 0.500
207 PhD Fellowship for 5,000 Scholars.(HEC)
Revised.
6394.537 0.000 1900.000 4494.537 800.000 0.000 800.000
208 Development of High Level Scientific and
Technological Manpower through Split
PhD Programme.
334.250 0.000 291.050 43.200 43.200 0.000 43.200
209 Merit Scholarship for PhD Students in
Science & Technology.(200
Scholarships)
259.300 0.000 192.000 67.300 0.500 0.000 0.500
210 Scholarship for PhD Studies in Social
Sciences, Arts & Humanities for Univ.
Teachers.
194.513 0.000 61.730 132.783 15.000 0.000 15.000
211 Talent Farming Scheme –III. 30.440 0.000 28.195 2.245 2.245 0.000 2.245
212 Ph.D. Scholarship for Engineering
Sciences(40) China.
180.820 0.000 161.609 19.211 19.211 0.000 19.211
213 Foreign Faculty Hiring.(HEC) 3285.912 0.000 1532.000 1753.912 600.000 0.000 600.000
214 PhD Fellowship for Study of Sciences,
Technology and Engineering in Austria
(HEC).
187.300 0.000 183.690 3.610 3.610 0.000 3.610
215 PhD Scholarships for Basic Sciences in
China.
198.160 0.000 166.050 32.110 16.222 0.000 16.222
216 Ph.D. Scholarships for Engineering
Sciences -Germany.
199.500 0.000 136.000 63.500 28.400 0.000 28.400
217 Overseas Scholarship Scheme for
MS/M.Phil/Ph.D. .
4275.805 0.000 2279.037 1996.768 700.000 0.000 700.000
218 Presidential Young Innovators (PYI)
Program - HEC
37.800 0.000 27.472 10.328 6.574 0.000 6.574
219 Development / Strengthening of Selected
Departments of Social Sciences &
Humanities in General Universities in
Pakistan(HEC).
37.862 0.000 28.000 9.862 2.000 0.000 2.000
220 Monitoring and Development of
Programmes of HEC Islamabad.
(Revised)
25.243 0.000 22.173 3.070 3.070 0.000 3.070
221 Subsidy to Scholars Abroad under
Cultural Exchange Program.
132.750 0.000 120.838 11.912 11.912 0.000 11.912
222 PhD Scholarship for Natural and Basic
Sciences, France (HEC)
196.146 0.000 156.500 39.646 1.000 0.000 1.000
223 Financial Support for Meritorious Needy
Students for Study in Top Public/Private
Institutions at Graduate/ Post-Graduate
level(HEC).
122.420 0.000 59.548 62.872 27.762 0.000 27.762
224 Ph.D. Scholarships in Economics and
Finance abroad(HEC)
317.662 0.000 107.980 209.682 61.700 0.000 61.700
225 MS/M.Phil leading to Ph.D. Scholarships
in Engg. , Natural and Basic Sciences/
Humanities/Social Sciences for the
teachers of weaker Universities)(HEC)
612.979 0.000 165.340 447.639 85.000 0.000 85.000
Total
Name, Location & Status of the
Scheme
Throw-
forward as
on 01-7-08
HIGHER EDUCATION COMMISSION
(Million Rupees)
Foreign
Loan
Estimated CostSl.
No Rupee Foreign
Loan
Total
Expenditure
upto June
2008
Allocation for 2008-09
226 Sabbatical Funding Program for
University Faculty, HEC, Islamabad.
37.886 0.000 21.500 16.386 1.000 0.000 1.000
1 2 3 4 5 6 7 8 9
227 Training Program for Scientific/Technical
Staff & Researchers, HEC, Islamabad.
35.661 0.000 31.400 4.261 4.261 0.000 4.261
228 Award to Best University Teachers, HEC,
Islamabad.
29.500 0.000 19.700 9.800 9.800 0.000 9.800
229 Improvement of Infrastructure in
Universities/Institutions of Higher
Learning in Pakistan.
190.001 0.000 182.001 8.000 8.000 0.000 8.000
230 HRD Programs for Strengthening of
Universities/ Institutions of Higher
Learning.
198.640 0.000 55.663 142.977 17.000 0.000 17.000
231 Ph.D. Scholarship in Natural and Basic
Sciences -Austria, (HEC)
168.780 0.000 90.680 78.100 50.000 0.000 50.000
232 Establishment of Public Library in I-8/3,
Islamabad. HEC) (Revised)
59.860 0.000 26.200 33.660 10.000 0.000 10.000
233 Rehabilitation & Furnishing of existing
Buildings and Construction of Training
Centre at Khanspur (HEC)
38.929 0.000 28.070 10.859 2.000 0.000 2.000
234 US-Need Based Merit Scholarship for
Pakistani University Students enrolled in
Agriculture and Business Administration
study programs(USAID).
421.667 421.667 297.787 123.880 0.000 72.348 72.348
235 Japanese Need Based Merit Scholarship
for Pakistani University students, HEC.
(JICA)
596.600 0.000 224.180 372.420 135.000 0.000 135.000
236 Higher Education Links with British
Universities(HEC)
138.465 0.000 96.977 41.488 41.488 0.000 41.488
237 Post Doctoral Fellowship Programme.
Phase II (HEC)
1252.300 0.000 426.431 825.869 320.000 0.000 320.000
238 Expansion Program for Hiring of Eminent
Educationists and Researchers having
Ph.D. Degree (HEC).
185.000 0.000 131.275 53.725 53.725 0.000 53.725
239 Staff Development Programme in
Planning & Development for P&D
Officers of Planning & Development
Division, Finance Division and
HEC.(Revised)
28.729 0.000 14.783 13.946 5.000 0.000 5.000
240 Fulbright Scholarship Support Program
(HEC) (US Aid 4680m+GoP 2527.023m)
2527.023 0.000 1933.500 593.523 593.523 0.000 593.523
241 International Linkages of Pakistani
Universities with Foreign
Universities.(HEC)
308.772 0.000 200.000 108.772 40.000 0.000 40.000
242 MS Level Training in Korean
Universities/Industry (HEC)
439.500 0.000 188.500 251.000 170.000 0.000 170.000
243 PERN 2 Up gradation of Core Network &
Last Mile Connectivity. (HEC)
416.422 0.000 100.500 315.922 60.000 0.000 60.000
244 Establishment of HEC Human Resource
Development and Training Centre at
Lahore. (Under Revision)
39.870 0.000 36.870 3.000 3.000 0.000 3.000
245 Development Unit for Establishment of
Engineering Universities in Collaboration
with foreign universities (HEC). (Revised)
38.745 0.000 33.824 4.921 4.921 0.000 4.921
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
HIGHER EDUCATION COMMISSION
Foreign
Loan
Total
(Million Rupees)
Estimated CostSl.
No Total Foreign
Loan
Rupee
246 Overseas Scholarship Scheme for
MS/M.Phil leading to Ph.D. in Selected
Fields. (Phase-II), HEC.
14522.350 0.000 1614.000 12908.350 1900.000 0.000 1900.000
1 2 3 4 5 6 7 8 9
247 Development of On line Lectures and
Video Conferencing Facilities for
Universities and allied Govt. bodies.
141.915 0.000 50.500 91.415 41.915 0.000 41.915
248 Capacity Building of Executives of the
Universities (HEC)
38.426 0.000 12.000 26.426 15.000 0.000 15.000
249 Extension and improvement of Facilities
at HEC Regional Centre, Karachi.
38.660 0.000 6.000 32.660 27.257 0.000 27.257
250 1000 Cuban Scholarships for studies in
General Comprehensive Medicine
(Equivalent to MBBS), HEC.
792.567 0.000 178.000 614.567 11.000 0.000 11.000
251 Pak-US Joint Academic & Research
Program (Phase-II)
165.000 0.000 114.000 51.000 6.000 0.000 6.000
252 Provision of Higher Education
Opportunities for Students of Balochistan
& FATA (President Directive) HEC
981.486 0.000 2.300 979.186 45.997 0.000 45.997
253 Merit Scholarship Scheme for 25
Scholars(Overseas) HEC.(Ombudsman
decision)
32.488 0.000 8.000 24.488 8.014 0.000 8.014
254 National Academy of Higher Education -
Phase-II, HEC
37.766 0.000 10.000 27.766 12.000 0.000 12.000
255 ICT Infrastructure for Regional Centres
HEC (Karachi, Lahore, Peshawar)
36.287 0.000 5.000 31.287 16.626 0.000 16.626
256 Country Licenses of Advanced Design
Software for Teaching & Training in
Engineering Institutions. (Phase-II)
38.792 0.000 10.000 28.792 28.792 0.000 28.792
257 Pak-US Joint Academic & Research
Program (Phase-III)
129.203 0.000 55.000 74.203 30.000 0.000 30.000
258 Partial Support for Ph.D. Studies Abroad
Phase III
38.808 0.000 29.000 9.808 9.808 0.000 9.808
259 Short Term Foreign Faculty Hiring
Program- Phase III
163.104 0.000 18.000 145.104 18.000 0.000 18.000
260 HEC's Outstanding Research Award
Series.
24.436 0.000 13.000 11.436 7.614 0.000 7.614
Total On-going 275856.844 421.667 34129.693 241727.151 17393.525 72.348 17465.873
New Schemes
261 Infrastructure and Capacity
Enhancement, Balochistan University of
Information Technology & Management
Sciences, Quetta (Revised)
62.834 0.000 35.150 27.684 27.684 0.000 27.684
262 Construction of Student Hostel &
Residential Area at Balochistan
University of Information Technology &
Management Sciences, Quetta
144.737 0.000 38.940 105.797 30.000 0.000 30.000
263 Construction of Multipurpose Sports
Complex at Balochistan University of
Information Technology & Management
Sciences, Quetta
38.942 0.000 0.000 38.942 10.000 0.000 10.000
264 Construction of Boundary Wall around
the Kohat University of Science & Tech;
Kohat
37.660 0.000 0.000 37.660 10.000 0.000 10.000
265 Immediate needs by Provision of
Fabricated Infrastructure at Hazara
University, Manshra.(Revised)
55.765 0.000 38.004 17.761 17.761 0.000 17.761
266 Construction of Student Hostel at
University of Arid Agriculture, Rawalpindi.
(Revised)
36.436 0.000 25.440 10.996 10.996 0.000 10.996
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Estimated Cost
HIGHER EDUCATION COMMISSION
(Million Rupees)
Sl.
No
1 2 3 4 5 6 7 8 9
267 Hostel for Visiting Faculty at University of
Arid Agriculture, Rawalpindi.(Revised)
24.438 0.000 15.935 8.503 8.503 0.000 8.503
268 Establishment of College of Engineering
& Technology (Phase-I) Bahawalpur.
195.740 0.000 185.740 10.000 10.000 0.000 10.000
269 Strengthening Material Chemistry
Laboratory at Govt. College University,
Lahore.
37.329 0.000 34.479 2.850 2.850 0.000 2.850
270 Restoration of Main Block, Students
Facilities and Provision of Project
Directorate, National College of Arts
(NCA), Lahore.
33.135 0.000 0.000 33.135 15.000 0.000 15.000
271 Establishment of Research and Training
Facilities for Pets Breading at Ravi
Campus UVAS, Lahore.
29.971 0.000 0.000 29.971 10.000 0.000 10.000
272 Establishment of Research and Training
Facilities for Fishries and aquaculture,
UVAS, Lahore.
39.331 0.000 32.652 6.679 6.679 0.000 6.679
273 Strengthening of the Mass
Communication Department, Lahore
College of Women University, Lahore
(Revised)
37.968 0.000 34.230 3.738 3.738 0.000 3.738
274 Establishment of the Department of City
& Regional Planning at Mehran Univ. of
Engg. & Tech; Jamshoro (Revised)
38.669 0.000 29.316 9.353 9.535 0.000 9.535
275 Construction of Girls Hostel for 100 Girls
Students at Centre of Excellence in Arts
& Design, Mehran University of
Engineering & Technology, Jamshoro
38.600 0.000 0.000 38.600 10.000 0.000 10.000
276 Strengthening of laboratories of the
Centre of Excellence in Arts & Design,
MUET, Jamshoro by purchasing
equipment.
36.392 0.000 0.000 36.392 10.000 0.000 10.000
277 Supporting facilities for Karakuram
International University, Gilgit.
(President Directive)
49.700 0.000 0.000 49.700 30.000 30.000
278 Establishment of Karakuram
International University, Gilgit (Revised)
649.792 0.000 400.827 248.965 10.000 0.000 10.000
279 Construction of Engg. Block at
COMSATS Instt. of Information
Technology, Abbotabad.(Revised)
39.426 0.000 35.191 4.235 4.235 0.000 4.235
280 Post Earthquake Re-Construction /
Rehabilitation of Civil Structure at
COMSATS Institute of IT, Abbotabad
(Revised)
39.630 0.000 35.054 4.576 4.576 0.000 4.576
281 Establishment of NUST Centre for
Virology and Immunology(NCVI), NUST,
Islamabad.
38.530 0.000 0.000 38.530 20.000 0.000 20.000
282 Science, Technology, Engineering and
Mathematics Career Development
(STEM), PIEAS. (Revised)
35.388 0.000 30.443 4.945 4.945 0.000 4.945
283 Hostel for 200 Female Students at
Pakistan Institute of Engineering &
Applied Sciences (PIEAS), Islamabad
(Revised)
58.276 0.000 37.268 21.008 21.008 0.000 21.008
HIGHER EDUCATION COMMISSION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost
Foreign
Loan
TotalRupeeForeign
Loan
Expenditure
upto June
2008
Total
Throw-
forward as
on 01-7-08
Allocation for 2008-09
284 Support to Scientific Talent (HEC)
(Revised)
120.020 0.000 108.403 11.617 11.617 0.000 11.617
1 2 3 4 5 6 7 8 9
285 Feasibility Study to Identify Revenue
Generating Activities in Higher Education
Institutions (HEC)
38.700 0.000 0.000 38.700 10.000 0.000 10.000
286 Establishment of Monitoring Units (PMU)
in four Provinces and AJK (Phase-II)
38.861 0.000 0.000 38.861 15.000 0.000 15.000
287 Electronic Design Automation(EDA)
Tools to Facilitate VLSI Design in
Universities/DAI's (HEC)
37.635 0.000 0 37.635 10.000 0.000 10.000
288 Establishment of Central Library at
Lasbela University of Agriculture, Water
and Marine Sciences, Uthal
37.500 0.000 0.000 37.500 10.000 0.000 10.000
289 Establishment of School of Science and
Engineering, Lahore University of
Management Sciences (LUMS), Lahore.
1500.000 0.000 0.000 1500.000 50.000 0.000 50.000
290 Establishment of Shaheed Benazir
Bhutto Campus of Virtual University in Dir
Upper, NWFP
35.000 0.000 0.000 35.000 10.000 0.000 10.000
291 Establishment of University in Mardan 800.000 0.000 0.000 800.000 50.000 0.000 50.000
292 Establishment of Islamic University at
Imam Dheri, Swat
600.000 0.000 0.000 600.000 50.000 0.000 50.000
293 Foreign MS/M Phil leading to Ph.D
Programme for Faculty Strengthening of
Public Sector University/degree awarding
Institution
16480.920 0.000 0.000 16480.920 30.000 0.000 30.000
Total (New) 21487.325 0.000 1117.072 20370.253 534.127 0.000 534.127
Total (HEC) 297344.169 421.667 35246.765 262097.404 17927.652 72.348 18000.000
Sl.
No
(Million Rupees)
Total Total
HIGHER EDUCATION COMMISSION
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Foreign
Loan
Throw-
forward as
on 01-7-08
Rupee Foreign
Loan
Allocation for 2008-09
1 2 3 4 5 6 7 8 9
On-going
1 National Program for Family Planning &
Primary Health Care
21533.502 1509.210 19083.730 2449.772 5500.000 0.000 5500.000
2 Expanded Programme of Immunization
(EPI), Control of Diarrheal Disease
(CDD) N.I.H Islamabad
11470.030 4108.538 4025.477 7444.553 6000.000 0.000 6000.000
3 Enhanced HIV/AIDS Control Program
N.I.H Islamabad
1137.366 909.893 955.537 181.829 181.829 0.000 181.829
4 Improvement of Nutrition through PHC
Islamabad
795.530 0.000 631.750 163.780 50.000 0.000 50.000
5 Roll Back Malaria Islamabad 664.000 0.000 371.037 292.963 100.000 0.000 100.000
6 National TB Control Program 1184.412 0.000 335.430 848.982 200.000 0.000 200.000
7 Strengthening of EPI Services through
GAVI Grant Assistance
2440.832 2131.003 376.520 2064.312 183.000 0.000 183.000
8 Prime Minister's Program for Prevention
& Control of Hepatitis, NIH, Islamabad.
2593.830 2131.000 1463.222 1130.608 468.000 0.000 468.000
9 National Program for Prevention and
control of Blindness, NIH Islamabad
2774.958 0.000 906.000 1868.958 500.000 0.000 500.000
10 National Health Policy Unit, Ministry of
Health, Islamabad.
195.780 131.676 62.890 132.890 8.000 0.000 8.000
11 National Plan of Action for non
communicable diseases, Islamabad.
39.954 0.000 22.820 17.134 5.000 0.000 5.000
12 National Maternal, Neonatal and child
Health Programme, Islamabad.
19994.871 0.000 570.991 19423.880 664.000 1500.000 2164.000
13 National Program for Prevention and
Control of Avion Pandemic influenza, NIH
Islamabad
330.683 0.000 105.080 225.603 45.000 0.000 45.000
14 National Health Information Resource
Center (MoH), Islamabad
290.000 0.000 102.103 187.897 20.000 0.000 20.000
15 Tuberculosis Conditional Cash Transfer
Program, Islamabad.
31.156 0.000 10.000 21.156 10.000 0.000 10.000
16 Health Services Academy, Islamabad 219.805 0.000 219.805 0.000 3.800 0.000 3.800
17 Establishment of 400 beded women
Hospital and Chest Disease Center at
Rawalpindi.
1325.044 106.000 956.284 368.760 368.000 0.000 368.000
18 Strengthening of Project Management
Unit, Ministry of Health, Islamabad
36.874 16.200 18.031 18.843 10.000 0.000 10.000
19 Federal Drug Surveillance Laboratory,
Islamabad.
156.270 46.600 60.000 96.270 50.000 0.000 50.000
20 Improvement, up gradation, of existing
Building and Equipment for the
Manufacturing of Measles Vaccine from
Concentrate (secondary manufacture)
according to Current GMP and GLP at
N.I.H, Islamabad
86.300 0.000 39.786 46.514 32.347 0.000 32.347
21 Improvement, up gradation and Capacity
Enhancement of Existing HDC Building
for the Manufacture of Cell Culture, N.I.H,
Islamabad.
140.200 0.000 116.464 23.736 23.750 0.000 23.750
22 Establishment of a Current GMP
Compliant Processing Laboratory for
Capacity Enhancement BDP,N.I.H,
Islamabad
164.775 0.000 69.931 94.844 25.000 0.000 25.000
Total
HEALTH DIVISION
(Million Rupees)
Sl.
No
Estimated CostName, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
1 2 3 4 5 6 7 8 9
23 Rehabilitation of Residential Colony and
Water Supply / Treatment System at
N.I.H, Islamabad.
38.613 0.000 32.494 6.119 6.000 0.000 6.000
24 Rehabilitation of National Institute of
Health Campus Sewerage / Roads.
Islamabad
23.998 0.000 21.467 2.531 2.500 0.000 2.500
25 EPI/Polio Control Project with JICA
Collaboration. NIH Islamabad
103.215 87.013 23.661 79.554 1.659 13.191 14.850
26 Establishment of Cardiac Surgery
Facilities at PIMS
1260.000 0.000 387.362 872.638 500.000 0.000 500.000
27 In-Country Training Program, " Safe
Mother Hood" at MCH, Children Hospital,
PIMS Islamabad
24.210 16.198 15.930 8.280 2.000 4.000 6.000
28 Establishment of Bio-safety Level-3 (BSL-
3) Laboratory Public Health Laboratories
Division, NIH Islamabad
36.109 0.000 36.000 0.109 0.100 0.000 0.100
29 National ARI Control Program, Children
Hospital, PIMS, Islamabad
36.989 0.000 11.895 25.094 3.000 0.000 3.000
30 Institute of Dentistry at PIMS, Islamabad 331.000 0.000 50.000 281.000 1.000 0.000 1.000
31 Hospital Waste Management at PIMS,
Islamabad.
39.086 0.000 20.000 19.086 10.000 0.000 10.000
32 Upgradation/Renovation of Nursing
Hostels and Residences at PIMS
Islamabad
38.156 0.000 10.000 28.156 28.156 0.000 28.156
33 Maternal Care Services FGSH Islamabad 39.917 0.000 37.460 2.457 2.457 0.000 2.457
34 Upgradation of School of Nursing at
FGSH, Islamabad
39.927 0.000 1.000 38.927 5.000 0.000 5.000
*
35 Establishment of Institute of Neuro
Surgery at JPMC Karachi
329.220 0.000 321.343 7.877 75.000 0.000 75.000
36 Replacement and Purchase of
Equipment for Department of
Pharmacology and Therapeutics, BMSI,
JPMC, Karachi
16.050 0.000 1.000 15.050 15.050 0.000 15.050
37 Replacement and Purchase of
Equipment at NICVD Karachi
658.625 1509.210 488.625 170.000 170.000 0.000 170.000
38 Establishment of Gastroenterology Unit
at NICH, Karachi
35.160 0.000 25.000 10.160 10.000 0.000 10.000
*39 Establishment of a District Headquarter
Hospital in Mandi Baha-Ud-Din
494.500 0.000 20.000 474.500 100.000 0.000 100.000
40 Provision of MRI & CT Scanner for Civil
Hospital Karachi, Chandka Medical
College Larkana, Peoples Medical
College Nawabshah & Liaqat University
Hospital Hyderabad/ Jamshoro
564.000 0.000 207.000 357.000 150.000 0.000 150.000
41 Accident & Emergency Center and
Ancillary Services Complex at Civil
Hospital Karachi
1438.403 0.000 187.500 1250.903 50.000 0.000 50.000
42 Strengthening of Gambat Institute of
Medical Science, Taluka Hospital
Gambat, Distt Khairpur.
587.427 0.000 125.000 462.427 50.000 0.000 50.000
43 Khalifa Gul Nawaz Hospital Complex
Bannu Township, Bannu
972.080 0.000 321.264 650.816 50.000 0.000 50.000
Total
Estimated Cost
Total Foreign
Loan
Rupee Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09Sl.
No
Name, Location & Status of the
Scheme
(Million Rupees)
HEALTH DIVISION
44 Construction of Building for Gomal
Medical College D.I.Khan
962.477 0.000 50.000 912.477 50.000 0.000 50.000
1 2 3 4 5 6 7 8 9
*
45 Improvement and Standardization of
DHQ Hospital, Nowshera.
917.758 0.000 50.000 867.758 50.000 0.000 50.000
*
46 Establishment of Peshawar Institute of
Cardiology Peshawar (Phase II)
1454.972 0.000 12.500 1442.472 50.000 0.000 50.000
*47 Purchase and Installation of 1.5 Tesla
MRI Scaners in Lady Reading Hopsital,
Peshawar, Mufti Mehmood Memorial
Hospital D.I.Khan, Khalifa Gul Nawaz
Medical Complex, Bannu, Ayub Teaching
Hospital, Abbottabad and Saidu Group of
Hospitals, Swat
424.000 0.000 0.000 424.000 212.000 0.000 212.000
#
48 Up-gradation of Saidu Group of Hospitals
for Teaching prupose of Saidu Medical
College, Saidu Sharif, Sawat, NWFP.
1085.289 0.000 50.000 1035.289 50.000 0.000 50.000
49 Establishment of 50 Beded Hospital at
District Kohlu ( Kohlu Package)
180.141 0.000 100.000 80.141 80.141 0.000 80.141
50 Operationalization of Sheikh Khalifa Bin
Zayyed (SKBZ) Federal hospital Quetta
497.220 0.000 259.457 237.763 100.000 0.000 100.000
51 Determination of Prevalence of Hepatitis -
B and C in General Population, PMRC
18.240 0.000 10.000 8.240 8.224 0.000 8.224
52 National Breast Cancer Screening
Program, Islamabad
421.200 0.000 100.000 321.200 100.000 0.000 100.000
53 Provision of 64 Slice Helical CT Scan
Angiography Equipment at Karachi
Institute of Heart Diseases , Karachi
120.000 0.000 60.000 60.000 45.000 0.000 45.000
54 Up-gradation of Radiology Department at
PIMS Islamabad
39.800 0.000 38.800 1.000 1.000 0.000 1.000
55 Installation of Multi detector C.T. Scan in
Radiology Department PIMS Islamabad
55.250 0.000 55.250 0.000 55.250 0.000 55.250
56 Up gradation of school of Nursing,
National Institute of Child Health Karachi
14.566 0.000 5.000 9.566 9.566 0.000 9.566
57 Establishment of National Resource
Center for Raw Material Traditional
medicine NIH Islamabad
28.069 0.000 5.000 23.069 5.000 0.000 5.000
58 Establishment of Allergy Center with
Diagnostic, Curative and Research
Facilities NIH Islamabad
39.876 0.000 5.000 34.876 5.000 0.000 5.000
59 Provision of stereotactics Radiosurgery
System at JPMC Karachi
493.000 0.000 10.000 483.000 15.000 0.000 15.000
60 Strengthening of National Control
Authority for Biological and its
Independent Laboratory, Islamabad
231.051 73.160 50.000 181.051 75.000 0.000 75.000
61 Establishment of Reference Laboratory
for Strengthening of Food Quality Control
25.145 0.000 17.279 7.866 7.866 0.000 7.866
62 Construction of Female Doctors Hostel at
FGSH, Islamabad
39.199 0.000 1.000 38.199 10.000 0.000 10.000
63 Upgradation of Physiotheropy
Department in PIMS, Islamabad
28.000 0.000 10.000 18.000 5.000 0.000 5.000
Allocation for 2008-09Estimated Cost
Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
(Million Rupees)
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
TotalRupee Foreign
Loan
HEALTH DIVISION
64 Institutionalization of Health System
Research (HSR): Establishment of
Centers and field areas for HSR,
Islamabad
16.271 0.000 16.271 0.000 2.000 0.000 2.000
1 2 3 4 5 6 7 8 9
65 Construction of Female Doctors Hostel in
PIMS, Islamabad
39.356 0.000 1.000 38.356 5.000 0.000 5.000
66 Improvement of Perinatology and
Perinatal Care, PIMS, Islamabad
859.350 0.000 90.000 769.350 1.000 0.000 1.000
67 Enhancement of Health Care Facilities at
Department of ENT, JPMC Karachi
21.945 0.000 21.000 0.945 0.945 0.000 0.945
68 Establishment of Neuropsychiatry Unit at
NICH, Karachi
20.207 0.000 5.000 15.207 10.207 0.000 10.207
69 Establishment of Diagnostic Genetics
Laboratory NICH, Karachi
8.000 0.000 5.000 3.000 3.000 0.000 3.000
*
70 Cancer Hospital Lahore 46.340 0.000 0.000 46.340 46.340 0.000 46.340
*
71 Burn Centre Faisalabad 240.000 0.000 100.000 140.000 100.000 0.000 100.000
Total (On-going) 83039.579 12775.701 33974.446 49065.133 16782.187 1517.191 18299.378
New Schemes
72 Constrcution of two Trauma Centres at
Behra Services Area, Lahore Motorway
89.018 0.000 20.000 69.018 1.000 0.000 1.000
73 Up-gradation of Pathology Department at
NICH, Karachi
29.232 0.000 28.000 1.232 1.000 0.000 1.000
74 National Plan for Disease Surveillance 400.000 0.000 0.000 400.000 1.000 0.000 1.000
75 Health House 157.820 0.000 0.000 157.820 1.000 0.000 1.000
76 Establishment of Research and
Development (R&D) Laboratories for
Biological products, NIH, Islamabad
721.084 0.000 0.000 721.084 1.000 0.000 1.000
77 Constrcution of Five Dispansaries in
Various Sectors of Islamabad
393.777 0.000 0.000 393.777 1.000 0.000 1.000
*
78 Bannu Medical College, Bannu 500.000 0.000 0.000 500.000 50.000 0.000 50.000
*
79 NWFP Institute of Child Health &
Hospital
859.350 0.000 0.000 859.350 50.000 0.000 50.000
80 Establishment of Casuality Block of KTH
Peshawar
350.000 0.000 0.000 350.000 40.000 0.000 40.000
*
81 Upgradation and Staffing of DHQ
Hospital at Swabi
266.600 0.000 0.000 266.600 50.000 0.000 50.000
82 Prime Minister's Special Initiative for
Expansion and Up-gradation of BHUs
500.000 0.000 0.000 500.000 500.000 0.000 500.000
83 Improvement & Up-gradation of Facilities
at JPMC, Karachi
3200.000 0.000 0.000 3200.000 5.000 0.000 5.000
84 Improvement & Up-gradation of Facilities
at PIMS, Islamabad
2200.000 0.000 0.000 2200.000 5.000 0.000 5.000
85 Constrcution of Quarantine Hospital at
Peshawar
17.670 0.000 0.000 0.000 5.000 0.000 5.000
Total (New) 9684.551 0.000 48.000 9618.881 711.000 0.000 711.000
Total (Health) 92724.130 12775.701 34022.446 58684.014 17493.187 1517.191 19010.378
# Rs 651.18 million is Federal Share
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Estimated Cost Throw-
forward as
on 01-7-08
Expenditure
upto June
2008
(Million Rupees)
Sl.
No
HEALTH DIVISION
Name, Location & Status of the
Scheme
* On 50:50 cost sharing basis Federal share / Releases are subject to matching releases by the Provincial Government concerned
1 2 3 4 5 6 7 8 9
IT Projects
On-going
1 Federal Government Data Centre and
Intranet, Islamabad
493.802 0.000 269.373 224.429 80.428 0.000 80.428
2 E-Services at Chief/Deputy
Commissioner's Office, Islamabad
80.405 0.000 71.027 9.378 1.000 0.000 1.000
3 E-Services for Food and Agriculture
Sector
155.332 0.000 86.013 69.319 26.463 0.000 26.463
4 E-Services of Islamabad Police,
Islamabad
110.921 0.000 92.335 18.586 13.500 0.000 13.500
5 Provision of E-Services at CDA,
Islamabad
175.618 0.000 148.691 26.927 10.000 0.000 10.000
6 E-Enablement of Establishment Division,
Islamabad
37.214 0.000 22.454 14.760 4.500 0.000 4.500
7 E-Services for M/o Interior Islamabad 31.887 0.000 18.499 13.388 8.474 0.000 8.474
8 E-Services for M/o Health, Islamabad 23.360 0.000 20.579 2.781 1.480 0.000 1.480
9 E-Services for M/o Population Welfare
Throughout Pakiatan
26.153 0.000 23.597 2.556 2.556 0.000 2.556
10 HMIS at Territory Health Care Level
Shaikh Zayed Hospital, Lahore
36.167 0.000 27.862 8.305 8.305 0.000 8.305
11 Consultancy for Formulating Projects for
Online Services, Islamabad
39.745 0.000 20.386 19.359 10.000 0.000 10.000
12 Automation of Trading Corporation of
Pakistan, Karachi
37.224 0.000 21.773 15.451 9.885 0.000 9.885
13 Capacity Building of EGD Islamabad 39.510 0.000 9.058 30.452 10.000 0.000 10.000
14 Automation of District Courts & Case
Flow Management System, Sindh
(Phase-1)
39.953 0.000 38.976 0.977 2.713 0.000 2.713
15 Online Recruitment System for Federal
Public Service Commission Phase-II
Islamabad, Peshawer, Quetta, Lahore,
Karachi
39.971 0.000 5.004 34.967 10.000 0.000 10.000
16 E-Office Replication at Finance Division
(Pilot Phase), Islamabad
10.777 0.000 8.499 2.278 2.278 0.000 2.278
17 Land Revenue Records Management
System in Rural Areas of ICT
Islamabad
88.654 0.000 18.561 70.093 29.580 0.000 29.580
18 M/o Information Technology -Health NET
Telemedicine Project for Rural/Remote
Areas in Punjab (Holy Family Hospital
Rawalpindi)
39.949 0.000 19.512 20.437 3.000 0.000 3.000
19 M/o Infomration Technology -Health NET
Telemedicine Project for Rural/Remote
Areas in Punjab (Mayo Hospital Lahore)
37.474 0.000 18.419 19.055 2.500 0.000 2.500
20 M/o Information Technolgoy -Health NET
Telemedicine Project for Rural/Remote
Areas in Sindh (Jinnah Post-Graduate
Medical College, Karachi)
37.474 0.000 18.280 19.194 2.500 0.000 2.500
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
TELECOMMUNICATIONS DIVISION
(Million Rupees)
INFORMATION TECHNOLOGY &
21 Online Access to Statutory and Case
Laws (Supreme Court of Pakistan)
Islamabad
26.845 0.000 17.572 9.273 7.000 0.000 7.000
1 2 3 4 5 6 7 8 9
22 Online Access to Statutory and Case
Laws (Punjab) Lahore
39.961 0.000 26.871 13.090 13.090 0.000 13.090
23 Online Access to Statutory and Case
Laws (NWFP) Peshawar
34.359 0.000 17.663 16.696 13.000 0.000 13.000
24 Electronic Office at Ministry of IT 33.935 0.000 33.584 0.351 0.343 0.000 0.343
25 Capacity Building of Pakistani IT Industry 25.660 0.000 15.362 10.298 10.298 0.000 10.298
26 Standardization of Pakistani Software
Industry on CMMI
32.491 0.000 26.675 5.816 1.000 0.000 1.000
27 Strengthening of industry through
International Certifications of IT
Companies
33.040 0.000 19.582 13.458 10.000 0.000 10.000
28 Marketing Launch Phase II, Islamabad 39.530 9.930 30.010 9.520 9.520 0.000 9.520
29 Automation of Domestic Industry on
Open Source Systems
39.993 0.000 38.893 1.100 1.100 0.000 1.100
30 Open Source Resource Center 39.970 0.000 23.701 16.269 11.270 0.000 11.270
31 Strategic Studies & Promotions,
Islamabad
39.837 9.919 37.424 2.413 2.413 0.000 2.413
32 Feasibility Study and Consultancy for
Architectural and Structural Design of
Software Technology Park No. 1
31.264 0.000 18.105 13.159 7.656 0.000 7.656
33 Institutional Strengthening of PCB 38.970 0.000 35.148 3.822 3.882 0.000 3.882
34 IT Human Resourse Support to
Ministries/Departments
28.775 0.000 16.732 12.043 8.330 0.000 8.330
35 Introduction of Computer Education in 81
F.G/Model Colleges and Schools in ICT,
Islamabad (Phase-II)
154.578 0.000 122.592 31.986 31.986 0.000 31.986
36 Information Technology Training for the
Employees of Federal Government
Provinces and AJK (Phase-II)
37.338 0.000 25.308 12.030 12.030 0.000 12.030
37 National IT Development and Promotion
Unit M/o Information Technology
24.717 0.000 5.505 19.212 4.000 0.000 4.000
38 Strengthening of IT Deparment,
Balochistan, Quetta
22.130 0.000 5.753 16.377 2.507 0.000 2.507
39 Balochistan Government Portal, Quetta 9.469 0.000 1.707 7.762 5.395 0.000 5.395
40 Revamping of Existing Polytechnics of
Balochistan
10.899 0.000 8.173 2.726 2.726 0.000 2.726
41 Establishment of Data Center at
Balochistan Board of Intermediate and
Secondary Education
19.328 0.000 6.556 12.772 3.140 0.000 3.140
42 Establishment of Provincial Portal for
Govt of Sindh
30.900 0.000 8.000 22.900 0.500 0.000 0.500
43 Revamping of Existing Polytechnics of
AJK
18.529 0.000 12.474 6.055 1.321 0.000 1.321
44 Establishment of Capacity for the
Production of Graphics NCA Lahore
39.989 0.000 23.300 16.689 0.500 0.000 0.500
Estimated CostName, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
(Million Rupees)
Sl.
No
TELECOMMUNICATIONS DIVISION
INFORMATION TECHNOLOGY &
1 2 3 4 5 6 7 8 9
45 Industrial Information Network for SME's
Development in Pakistan SMEDA
39.600 0.000 18.165 21.435 0.500 0.000 0.500
46 Pakistan Health Information Online,
Health Information Resource Center in
PMRC Islamabad
9.467 0.000 4.600 4.867 4.867 0.000 4.867
47 Planning and Monitoring Cell 39.720 0.000 8.900 30.820 9.000 0.000 9.000
48 Internships Phase-III (ISB) 38.670 0.000 15.000 23.670 23.670 0.000 23.670
49 Replication of E-Office (Basic Common
Applications at all Divisions of Federal
Government)
163.649 0.000 36.452 127.197 35.000 0.000 35.000
50 Computerization of PM Secretariat
(Phase - II)
23.932 0.000 9.708 14.224 7.000 0.000 7.000
51 Research & Development Unit 18.143 0.000 3.910 14.233 5.000 0.000 5.000
52 Economic Development Mapping in 5
Districts
34.550 0.000 13.000 21.550 21.550 0.000 21.550
53 Purchase of Land in Karachi and Lahore
for Establishment of IT Parks.
1020.000 0.000 500.000 520.000 520.000 0.000 520.000
54 Purchase of Land at National Park Area,
Islamabad
410.964 0.000 363.739 47.225 1.000 0.000 1.000
55 Online Tracking System for Cargo
Handling Freight Wagons and
Locomotives
39.849 0.000 5.000 34.849 15.000 0.000 15.000
56 Online Access to Statutory and Case
Laws - Sindh
32.199 0.000 5.000 27.199 15.000 0.000 15.000
57 E-Enablement of FIA 39.645 0.000 0.300 39.345 12.000 0.000 12.000
58 Networking Digital Library and
Computerization of
Federal Government College for Women
F-7/2, Islamabad
14.892 0.000 5.000 9.892 9.892 0.000 9.892
59 Strategic Studies and Promotions Phase
II PSEB
39.987 9.913 0.700 39.287 11.000 0.000 11.000
60 Strengthening/Upgradation of Data
Network Node for Software Technology
Park at AIA Lahore
15.060 0.000 12.000 3.060 3.060 0.000 3.060
61 Strengthening/Upgradation of Data
Network Node for Software Technology
Park at Awami Markaz
10.000 0.000 8.000 2.000 2.000 0.000 2.000
62 Strengthening of PSEB 36.928 0.000 4.000 32.928 15.000 0.000 15.000
63 Pilot Project for End Users and System
Administrators Training on Open Source
Software
36.000 0.000 0.000 36.000 12.400 0.000 12.400
64 Construction of Office Accommodation of
PCB at H-9/1, Islamabad
39.850 0.000 10.765 29.085 25.000 0.000 25.000
65 IT Computer Science Teachers, Lab
Incharges and Computer Labs Project-
Matching Program with the Government
of Sindh (Phase-I)
347.650 0.000 171.325 176.325 2.500 0.000 2.500
Rupee Foreign
Loan
INFORMATION TECHNOLOGY &
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
TELECOMMUNICATIONS DIVISION
(Million Rupees)
Allocation for 2008-09
TotalTotal Foreign
Loan
Estimated CostSl.
No
Name, Location & Status of the
Scheme
1 2 3 4 5 6 7 8 9
New Schemes
66 IT Computer Science Teachers, Lab
Incharge and Computer Labs Project-
Matching Program with the Government
of Punjab (Phase-II)
6523.061 0.000 0.000 6523.061 1.085 0.000 1.085
67 IT Computer Science Teachers, Lab
Incharge and Computer Labs Project-
Matching Program with the Government
of N.W.F.P (Phase-II)
2164.790 0.000 0.000 2164.790 1.000 0.000 1.000
68 IT Computer Science Teachers, Lab
Incharges and Computer Labs Project-
Matching Program with the Government
of Balochistan (Phase-II)
1240.848 0.000 0.000 1240.848 1.000 0.000 1.000
69 IT Computer Science Teachers, Lab
Incharge and Computer Labs Project-
Matching Program with the Government
of AJK (Phase-II)
343.832 0.000 0.000 343.832 1.000 0.000 1.000
70 IT Computer Science Teachers, Lab
Incharge and Computer Labs Project-
Matching Program with FATA / FANA &
ICT (Phase-II)
1099.459 0.000 0.000 1099.459 1.000 0.000 1.000
71 IT Computer Science Teachers, Lab
Incharges and Computer Labs Project-
Matching Program with the Government
of Sindh (Phase-II)
2638.621 0.000 0.000 2638.621 1.000 0.000 1.000
72 Prime Minister's Special Initiative for
Video Conferencing Facility in the
Federal Secretariat and Provincial Head
Quarters
100.000 0.000 0.000 100.000 100.000 0.000 100.000
73 Prime Minister's Special Initiative for
Paperless Governance
500.000 0.000 0.000 500.000 100.000 0.000 100.000
Total (IT) 19495.463 29.762 2731.152 16764.311 1358.693 0.000 1358.693
Telecom
On-going
74 Rural Digital Communication Uplift
Project Phase - II for AJK
1486.000 0.000 1824.842 0.000 61.158 0.000 61.158
75 Expansion and Improvement of Telecom
Facilities in Northern Areas (Phase-II)
668.996 0.000 780.000 0.000 60.000 0.000 60.000
76 Interconnect Billing and Customer
Support System for SCO
580.000 0.000 515.000 65.000 145.000 0.000 145.000
77 International Coordination Unit (M/o IT) 11.113 0.000 12.308 0.000 4.959 0.000 4.959
78 Northern Areas Terrestrial MW Link 490.000 0.000 600.000 0.000 140.000 0.000 140.000
79 Establishment of Optical Fibre based
Transmission Link (2.5 GB/S Capacity)
for Establishing Coastal Comm. Link
between Ketti Bandar/Port Qasim to
Jiwani Gwadar, Pasni, Ormara along the
Coastal Highway
627.137 0.000 378.389 248.748 12.000 0.000 12.000
80 De-Regulation Facilitation Unit (DFU) by
MoIT
18.000 0.000 14.178 3.822 6.822 0.000 6.822
81 Establishment of Video Conferencing
Facility for GoP by NTC
39.437 0.000 40.192 0.000 15.000 0.000 15.000
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
INFORMATION TECHNOLOGY &
TELECOMMUNICATIONS DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
82 SCO's ISP Project in NA 35.342 0.000 20.000 15.342 15.342 0.000 15.342
83 Hosting of Government of Pakistan
Portal
20.650 0.000 13.620 7.030 7.030 0.000 7.030
84 National ICT Scholarship Programme 2414.840 0.000 517.957 1896.883 150.000 0.000 150.000
Total (Telecom) 6391.515 0.000 4716.486 2236.825 617.311 0.000 617.311
Total (IT & Telecom) 25886.978 29.762 7447.638 19001.136 1976.004 0.000 1976.004
TotalTotal Foreign
Loan
Rupee Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09
INFORMATION TECHNOLOGY &
TELECOMMUNICATIONS DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
On-going
1 Setting up a Joint Revolving Fund for
S&T Co-operation between Pakistan and
China (Pak-China Joint Research Fund),
IL Wing, M/o S&T
30.000 0.000 28.887 1.113 1.113 0.000 1.113
2 Pak-USA Joint Research Fund (PUJRF)
for S&T Cooperation
34.500 0.000 34.167 0.333 0.333 0.000 0.333
3 Teachers and Researchers Overseas
Scholarship Scheme (TROSS), M/o S&T
826.700 0.000 613.815 212.885 2.000 0.000 2.000
4 Strengthening of P&D Wing - NCST
Projects Monitoring Cell in M/o S&T
39.900 0.000 31.900 8.000 8.000 0.000 8.000
5 Engagement of Consultants and Experts/
Members of Peer Review Committee to
implement NCST Recommendations,
Technology Wing, M/o S&T
37.375 0.000 21.331 16.044 8.923 0.000 8.923
6 STED Project # 236: Establishment of
Specific Pathogen Free (SPF)
Technology for Laying Flocks to produce
SPF Eggs for Vaccine Production, Sindh
Poultry Vaccine Centre, Karachi.(M/o
S&T loan Rs 32.73 million & Rs 3.63
million by SPVC)
36.367 0.000 24.013 12.354 1.000 0.000 1.000
7 Chloroplast Based Overexpression of
Pharmaceuticals to Develop Cost
Effective Therapeutics, NIBGE.
35.500 0.000 24.250 11.250 11.250 0.000 11.250
8 Use of RNA Interference Technology for
Resistance against Economically
Important Gemini-Viruses, NIBGE.
27.000 0.000 25.150 1.850 1.850 0.000 1.850
9 Establishment of Complete Facility for
Design, Fabrication, Testing & Packaging
of Micro Electro- Mechanical Systems
(MEMS)
35.500 0.000 24.500 11.000 11.000 0.000 11.000
10 Extensive Wind Energy Potential Survey
of Northern Areas of the Country, Pak
Met Deptt Islamabad
39.100 0.000 30.485 8.615 8.615 0.000 8.615
11 Establishment of Facilities for Coal
Cleaning Gasification and Combustion at
NFC IET, Multan
79.480 0.000 60.000 19.480 10.480 0.000 10.480
12 Industrial Incubators cum Service
Centres at Gujranwala & Faisalabad
(Punjab Small Industries Estate-II), PSIC
18.660 0.000 17.060 1.600 1.600 0.000 1.600
13 Development of Indigenous Secure
Digital Voice, Data and Fax Encryptor,
Ministry of Defence, Islamabad
38.000 0.000 2.000 36.000 1.000 0.000 1.000
14 Export Quality Cut Flower Production and
Essential Oil Extraction (Phase-II),
University of Agriculture, Faisalabad
20.893 0.000 19.966 0.927 0.927 0.000 0.927
15 Development of Nanobiotechnological
Research at NIBGE
155.000 0.000 133.500 21.500 15.000 0.000 15.000
16 Research and Fabrication of Quantum
Devices (Laser Diode) a current
application of Nanotechnology,
PINSTECH
195.867 0.000 110.241 85.626 25.000 0.000 25.000
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
Total Foreign
Loan
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Foreign
Loan
(Million Rupees)
TotalRupee
17 Faculty Development at University of
Illinois at Urbana Champaign, USA
484.389 0.000 21.175 463.214 115.000 0.000 115.000
1 2 3 4 5 6 7 8 9
18 PCSIR Industrial Linkage Programme
(Food, Textile, Material Sciences,
Pharmaceuticals & Chemicals)
1297.420 0.000 1171.313 126.107 100.107 0.000 100.107
19 Establishment of Cast Metals and
Foundry Technology Centre
304.700 0.000 198.000 106.700 106.700 0.000 106.700
20 Establishment of Technical Training
Centre for Precision Mechanics &
Instrument Technology at PCSIR
Campus, Peshawar
186.250 0.000 114.862 71.388 60.388 0.000 60.388
21 Access to Scientific Instrumentation
among R&D Organizations/ Universities.
PCSIR
9.999 0.000 9.165 0.834 0.833 0.000 0.833
22 Development and Operation of
Proficiency Testing Programme in
Pakistan, PCSIR
36.140 0.000 2.000 34.140 5.000 0.000 5.000
23 Establishment of Health Safety and
Security Division in PCSIR Laboratories
Complex, Karachi
9.100 0.000 5.411 3.689 3.689 0.000 3.689
24 Establishment of Facilities for Testing &
UN Certification of Packaging Materials
used to Transport Dangerous Goods,
PCSIR, Karachi
6.045 0.000 4.683 1.362 1.362 0.000 1.362
25 Development of Electro Medical
Equipment, their Commercialization &
Creating Facilities for the Performance
Test
37.600 0.000 17.250 20.350 20.350 0.000 20.350
26 Establishment of Technical Training
Centre for Precision Mechanics &
Instrument Technology, Gwadar,
Balochistan
189.360 0.000 75.000 114.360 25.000 0.000 25.000
27 Sustainable Technologies for Efficient
Water Management in Irrigated Areas of
Southern Indus Plain, PCRWR
38.570 0.000 30.970 7.600 7.600 0.000 7.600
28 Water Quality Monitoring in Rural Areas
of Pakistan
38.710 0.000 35.710 3.000 3.000 0.000 3.000
29 Improved Water Conservation Practics
for NWFP and Northern Areas of
Pakistan
39.900 0.000 30.100 9.800 9.800 0.000 9.800
30 Mitigation of Desertification for Poverty
Alleviation by Integrated Management of
Land and Water Resources in Cholistan,
PCRWR
34.400 0.000 31.500 2.900 2.900 0.000 2.900
31 Result Oriented Short Term Research
Studies to Improve Water Resources of
Northern Area
28.010 0.000 22.595 5.415 5.415 0.000 5.415
32 Enhancement and Management of
Groundwater Resources in Balochistan
38.680 0.000 23.000 15.680 15.680 0.000 15.680
33 Participatory National Integrated Water
Management Programme
177.205 0.000 114.200 63.005 10.000 0.000 10.000
34 Mass Awareness for Water Conservation
& Development (Rs 92.2 Million UNDP
Grant)
154.450 92.200 55.000 99.450 32.000 27.000 59.000
35 Strengthening of WRRC Peshawar for
Undertaking Research in Water
Resources Management, PCRWR.
37.640 0.000 35.640 2.000 2.000 0.000 2.000
36 Combating Drought and Desertification in
the Thar Desert by Management of
Water Resources
35.530 0.000 25.930 9.600 5.000 0.000 5.000
Estimated Cost
Foreign
Loan
Sl.
No Foreign
Loan
Total
Throw-
forward as
on 01-7-08
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
(Million Rupees)
Allocation for 2008-09
Total Rupee
1 2 3 4 5 6 7 8 9
37 Rainwater Harvesting and Desertification
Control in the Kharan-Chagai Desert of
Balochistan, PCRWR
37.371 0.000 17.680 19.691 5.000 0.000 5.000
38 Provision of Safe Drinking Water 1413.350 0.000 786.600 626.750 150.000 0.000 150.000
39 Technology Foresight Exercise in
Pakistan, Technology Wing, M/o S&T
39.744 0.000 17.979 21.765 10.000 0.000 10.000
40 Internship/Apprenticeship Programme in
Pakistan Council for Science &
Technology, PCST
4.376 0.000 1.031 3.345 1.031 0.000 1.031
41 Completion of Block II and Strengthening
of Research and Display Activities of
PMNH, Islamabad
39.980 0.000 36.308 3.672 3.672 0.000 3.672
42 Participation of Scientists and
Technologists in International
Conferences, Seminars and Workshops.
36.080 0.000 13.000 23.080 10.000 0.000 10.000
43 Automation of PSF Research Support
Programme and other
19.081 0.000 15.000 4.081 4.081 0.000 4.081
44 Electrification of Mosques & Schools in
Remote Rural Areas through Solar
Energy
28.580 0.000 25.580 3.000 3.000 0.000 3.000
45 Upgradation of Facilities to Produce
Silicon Solar Modules upto 80 KW,
PCRET
262.040 0.000 166.826 95.214 95.214 0.000 95.214
46 Provision of Electricity to Earth quake
Effected Areas through installation 100
Micro Hydel Plants, PCRET.
132.256 0.000 78.027 54.229 54.229 0.000 54.229
47 Development and Promotion of Biogas
Technology for Meeting Domestic Fuel
Needs of Rural Areas & Production of Bio-
Fertilizer.
89.210 0.000 60.000 29.210 29.210 0.000 29.210
48 Establishment of National Quality Policy
and Plan Implementation Cell
(NQP&PIC), PNAC
24.270 0.000 8.500 15.770 8.130 0.000 8.130
49 Awareness Raising & Training on
Conformity Assessment, Quality &
Productivity, PNAC
22.086 0.000 8.133 13.953 11.338 0.000 11.338
50 DNA Data Bank for Crime Investigation,
CAMB Lahore
37.900 0.000 37.540 0.360 0.360 0.000 0.360
51 DNA Typing for the Selection of
Genetically Superior Cattle and Buffalo,
CAMB Lahore
30.006 0.000 19.700 10.306 5.631 0.000 5.631
52 Molecular Basis of Recessive Hereditary
Hearing Impartment in Balochistan &
NWFP
32.000 0.000 19.600 12.400 8.520 0.000 8.520
53 Disease Resistance through SIRNA
Gene Silencing Technique in Local
Sugar Cane
36.450 0.000 19.800 16.650 9.730 0.000 9.730
54 Construction of Offices / Laboratories of
Pakistan Standards & Quality Control
Authority, Karachi (Revised)
163.170 0.000 120.388 42.782 27.540 0.000 27.540
55 Construction of PSQCA Office and
Laboratories at Peshawar (N.W.F.P.)
31.060 0.000 15.190 15.870 12.770 0.000 12.770
56 Accreditation and Strengthening of Labs
Facilities at TSC/PSQCA, Lahore
35.000 0.000 20.000 15.000 15.000 0.000 15.000
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
57 Extension of PSQCA Services-
Establishment of System Certification
Centre at Standards Development
Centre (SDC), Lahore
7.000 0.000 5.610 1.390 1.390 0.000 1.390
58 Research and Dissemination of
Ferrocement Technology, CWHR
7.000 0.000 5.865 1.135 1.135 0.000 1.135
59 Balancing, Modernization &
Rehabilitation of National Institute of
Electronics, Islamabad
490.000 0.000 50.000 440.000 100.000 0.000 100.000
60 Production of Bioenergy from Plant
Biomass
260.329 0.000 50.000 210.329 80.329 0.000 80.329
61 Fund for Pakistan Side's Obligations
under Bilateral Agreements/MOU for
Scientific & Technological Cooperation
with Friendly Countries. IL Wing, M/o
S&T
33.260 0.000 5.000 28.260 5.000 0.000 5.000
62 HMIS Software, Networking and Video
Conferencing of NIHD Rawalpindi.
33.520 0.000 15.000 18.520 18.520 0.000 18.520
63 Establishment of Radiation Physics
Laboratory in the Department of Physics
at CIIT, Islamabad
38.750 0.000 29.650 9.100 9.100 0.000 9.100
64 Development and Application of Plant
Tissue Culture Technology for the
Production of Stress Tolerant Crop,
PCSIR Labs Karachi
28.171 0.000 4.650 23.521 15.500 0.000 15.500
65 Balancing, Modernization &
Refurbishment (BMR) of PCSIR
Laboratories, Lahore
431.280 0.000 80.000 351.280 45.000 0.000 45.000
66 Renovation & Upgradation of Existing
Infrastructure of PCSIR, Labs, Peshawar
332.654 0.000 80.000 252.654 20.000 0.000 20.000
67 Upgradation/ BMR of NPSL, Islamabad 467.750 0.000 85.000 382.750 18.549 0.000 18.549
68 Upgradation and Modernization of
Herbal, Mineral & Food Pilot Plants at
PCSIR Laboratories Complex, Peshawar
156.830 0.000 20.000 136.830 50.000 0.000 50.000
69 Upgradation and Modernization of Pilot
Plants at PCSIR Laboratories, Lahore
149.785 0.000 80.000 69.785 69.785 0.000 69.785
70 Upgradation and Modernization of
Workshop of PCSIR Laboratories
Complex, Karachi
140.311 0.000 80.000 60.311 20.311 0.000 20.311
71 Upgradation and Modernization of
Workshop Facilities at PCSIR
Laboratories, Peshawar
148.000 0.000 60.000 88.000 19.190 0.000 19.190
72 Upgradation and Modernization of
Workshop at PCSIR Laboratories,
Lahore
147.600 0.000 60.000 87.600 19.600 0.000 19.600
73 Integrated Circuit Design Centre 24.400 0.000 17.000 7.400 7.400 0.000 7.400
74 Development of Comprehensive
Database on S&T Organizations,
Manpower & Performance Evaluation of
R&D Organizations, PCST
23.081 0.000 6.250 16.831 8.819 0.000 8.819
75 Upgradation and Modernization of Pilot
Plants at PCSIR Laboratories, Complex
Karachi
334.400 0.000 75.000 259.400 20.000 0.000 20.000
Name, Location & Status of the
Scheme
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
Total Foreign
Loan
Rupee Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
Estimated CostSl.
No
(Million Rupees)
1 2 3 4 5 6 7 8 9
76 Preparation of Conjugate Vaccine for
Salmonella Typhi and Salmonella
Paratyphi A at NIBGE in collaboration
with Agha Khan University, Karachi &
Amson Farmco Biologico, Rawalpindi
34.000 0.000 0.000 34.000 5.000 0.000 5.000
77 Establishment of Stem Cell Research
Laboratory for Kidney and Realted
Diseases
37.240 0.000 10.000 27.240 15.000 0.000 15.000
78 Upgradation of Existing Facilities at CIIT,
Lahore
35.240 0.000 30.000 5.240 5.240 0.000 5.240
79 PC-II on Market Survey and Quality
Analysis of Electric Fans & Cables in
Pakistan
7.900 0.000 5.000 2.900 2.900 0.000 2.900
80 Strengthening of HRD in M/o S&T & its
Organizations (Development of 400
PhDs), PCSIR
2898.980 0.000 5.000 2893.980 50.000 0.000 50.000
81 Centre for Quality Testing & Certification
of Electronics Products
33.900 0.000 15.000 18.900 12.880 0.000 12.880
82 Strengthening of Pakistan Technology
Board
39.737 0.000 10.000 29.737 10.000 0.000 10.000
83 Acquisition of Oceanographics Research
Vessel for Coastal Surveys (up 200
meter Water Depth), NIO
504.600 0.000 100.000 404.600 404.600 0.000 404.600
84 Purchase of Lab Equipment/ Provision of
Furniture and Fixture for PSQCA Labs
Complex, Karachi
414.094 0.000 40.000 374.094 70.000 0.000 70.000
85 Establishment of 11 Quality Control
Centers in Industrial Towns of the
country, PSQCA
12.000 0.000 0.000 12.000 10.000 0.000 10.000
86 Establishment of Super Computing
Research and Education Center, NUST
33.390 0.000 0.000 33.390 15.000 0.000 15.000
87 National Labs for Home Appliances
Industry at Economic Zone, PSQCAQ,
Lahore
35.700 0.000 15.000 20.700 10.000 0.000 10.000
88 Establishment of Technology Monitoring
and Training Division, PCRET
16.000 0.000 0.000 16.000 5.000 0.000 5.000
89 Establishment of Textile Testing
Laboratory at Textile, Faisalabad
236.764 0.000 10.000 226.764 40.000 0.000 40.000
90 Biotechnological Production of proteases
for Detergent & Leather Industries PCSIR
9.752 0.000 9.047 0.705 0.706 0.000 0.706
91 Control of Post Harvest Losses of Fruits
in Northern Ares and Swat Division,
PCSIR, Peshawar
35.000 0.000 24.850 10.150 10.150 0.000 10.150
92 Establishment of Nano-Science and
Nano-Technology Laboratory at PCSIR
35.000 0.000 33.783 1.217 1.217 0.000 1.217
93 Research & Development of Fish Skin
into Value Added Leather PCSIR
23.491 0.000 0.000 23.491 12.000 0.000 12.000
94 Strengthening & BMR of the R&D
Capabilities of Fuel Research Centre at
PCSIR, Karachi
37.871 0.000 33.062 4.809 4.809 0.000 4.809
95 Integrated Land & Water Management
Studies for Agriculture Development in
Pothwar Region
33.900 0.000 23.290 10.610 10.610 0.000 10.610
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Foreign
Loan
Total
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee
(Million Rupees)
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
Estimated Cost
1 2 3 4 5 6 7 8 9
96 Establishment of Patent Advisory Cell at
PCSIR Laboratories Complex, Karachi to
facilities Pakistani Scientists in acquiring
National/ Foreign Patents, PCSIR Labs
Karachi
24.065 0.000 15.574 8.491 8.491 0.000 8.491
97 Rain Water Harvesting and Rangland
Management for Desertification Control,
PCSWR
37.371 0.000 17.680 19.691 15.000 0.000 15.000
98 Construction of Office Building for MoST
& its Organizations
620.494 0.000 86.708 533.786 40.000 0.000 40.000
99 Strengthening of MoST 39.340 0.000 10.000 29.340 8.000 0.000 8.000
100 Biodesulfurization of Indigenous Fossil
Fuels. NIBGE
28.800 0.000 19.090 9.710 9.710 0.000 9.710
101 Strengthening of Polytechnic -
Introduction of New Technology/ Trades
in selected Institutions (Punjab), STE
Wing, M/o Education/ Punjab Govt.
72.570 0.000 67.570 5.000 5.000 0.000 5.000
102 Indigenous Developemnt of Cardiac
stent, NESCOM.
39.218 0.000 36.260 2.958 2.965 0.000 2.965
103 Upgradation & Extension of PCRET
Facilities at Islamabad Centre.
418.736 0.000 50.000 368.736 60.000 0.000 60.000
104 Upgradation and Modernization of
Building of PCSIR Laboratories Complex
(Karachi)
434.802 0.000 48.000 386.802 20.000 0.000 20.000
105 Construction of PSQCA Office and
Laboratories at Quetta.
36.780 0.000 1.000 35.780 8.000 0.000 8.000
106 Establishment of Non Destructive Testing
Facilities at CWHR for Research
Assessment & Evaluation of Concrete
Structures.
13.225 0.000 11.500 1.725 1.726 0.000 1.726
107 Centre for Software Development and
Training in Advanced Databases (CSDT-
AD) (Phase-I).
14.200 0.000 9.200 5.000 5.000 0.000 5.000
108 Establishment of Research,
Development and Support Facility in the
Field of Image Processing, NUST
17.855 0.000 15.081 2.774 2.774 0.000 2.774
109 Embedded Control System Development
(ECSD), NIE
34.780 0.000 12.080 22.700 10.780 0.000 10.780
Total (On-going) 16948.866 92.200 6284.451 10664.415 2526.557 27.000 2553.557
New Schemes
*
110 Development and Installation of MHP
Plant at Canal Fall for Demonstration and
Commercial Application
17.042 0.000 0.000 17.042 8.000 0.000 8.000
111 Production of Allergy Vaccines-PMRC
(STED MoST Loan 9.98M and Pvt Sector
Contribution 2.495M).
12.475 0.000 0.000 12.475 5.000 0.000 5.000
112 Bioavailability & Bioequivalence Studies
of Pharmaceutical Products-PCSIR.
25.480 0.000 0.000 25.480 10.000 0.000 10.000
113 Survey, Analysis and Preventive
Measures on the use of Counterfeit
Medicines in Pakistan.PCSIR
26.810 0.000 0.000 26.810 5.000 0.000 5.000
Rupee Foreign
Loan
TotalTotal Foreign
Loan
Allocation for 2008-09
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
1 2 3 4 5 6 7 8 9
114 Up gradation Renovation /
Reconstruction and Modernization of
Animal House (For Rearing/Breeding &
Supply of Research Experimental
Animals) for R&D Activities & Drugs
Development/Evaluation.PCSIR
38.730 0.000 0.000 38.730 5.000 0.000 5.000
115 Strenthening of MoST Organizations
(PTB)
37.708 0.000 0.000 37.708 15.000 0.000 15.000
116 Automation of Pakistan Technology
Board
26.000 0.000 0.000 26.000 5.000 0.000 5.000
117 Strengthening & Enhancement of
Reprographic Services of PASTIC
39.035 0.000 0.000 39.035 5.000 0.000 5.000
118 Development and Commercialization of
Bio Technology Product
20.000 0.000 0.000 20.000 8.000 0.000 8.000
119 Establishment of Product Conformity
Centre, PSQCA, Karachi.
27.190 0.000 0.000 27.190 10.000 0.000 10.000
120 Establishment of 11 Quality Control
Centers in Industrial Towns of the
Country, purchase of land at Faisalabad,
PSQCA.
36.960 0.000 0.000 36.960 34.860 0.000 34.860
121 Establishment of 11 Quality Control
Centers in Industrial Towns of the
Country, purchase of land at Lahore,
PSQCA.
38.720 0.000 0.000 38.720 38.618 0.000 38.618
122 Upgradation of Printed Circuit Board
Facility of NIE (addition of multilayer
fabrication capacity), Islamabad.
35.500 0.000 0.000 35.500 10.000 0.000 10.000
123 Upgradation of Training Centre and
Renovation of Building (block-I) of NIE,
Islamabad
36.270 0.000 0.000 36.270 7.000 0.000 7.000
124 Development of a Point-of-Use Arsenic
Removal Two Stage Filter Using
Titanium Oxide Particles NUST.
13.164 0.000 0.000 13.164 8.000 0.000 8.000
125 Design and development of water
purification technology using
Nanotechnology at NUST.
7.294 0.000 0.000 7.294 3.000 0.000 3.000
126 Water Quality Monitoring in Rural Areas
of Pakistan. Installation of Low Cost
Water Conditioning & Filtration Units
(Phase-II).
39.655 0.000 0.000 39.655 5.000 0.000 5.000
127 Business Process Reengineering of S&T
Organization (Phase wise).
37.000 0.000 0.000 37.000 8.000 0.000 8.000
128 Pak-US Agreement for S&T (Phase-II) 120.000 0.000 0.000 120.000 10.000 0.000 10.000
129 Display Center of MoST & its
organizations
38.000 0.000 0.000 38.000 19.000 0.000 19.000
130 Indigenous Production of High Purity
Silicon, PCRET
30.000 0.000 0.000 30.000 5.000 0.000 5.000
131 Biotechnology Product Manufacturing for
Veterinary use Vaccine-PTB
36.000 0.000 0.000 36.000 10.000 0.000 10.000
Estimated Cost
Total Foreign
Loan
Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Rupee Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
(Million Rupees)
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
1 2 3 4 5 6 7 8 9
132 Conversion of Conventional Machines
into CNC Machines
30.000 0.000 0.000 30.000 10.000 0.000 10.000
133 Exploration of Technology Transfer/ Joint
Venturtes at International level at
selected fields-PTB
35.000 0.000 0.000 35.000 8.000 0.000 8.000
134 Establishment of Science & Technology
Exhibition at National Monument
Museum Islamabad
10.000 0.000 0.000 10.000 10.000 0.000 10.000
135 Design & Development of Earthquake
Resistant Low Cost Houses.
10.000 0.000 0.000 10.000 5.000 0.000 5.000
136 Development of Organic Semiconductors
and Solar Cells, PCRET.
37.953 0.000 0.000 37.953 8.000 0.000 8.000
137 Upgradation of Existing Technical
Training center of PCSIR, Karachi.
25.000 0.000 0.000 25.000 5.750 0.000 5.750
138 Strengthening and Upgradation of
CWHR
37.000 0.000 0.000 37.000 10.000 0.000 10.000
139 PC-II on Establishment of COMSATS
Institute of Information Technology
Campuses at Larkana, Vehari, Karachi &
Quetta.
18.122 0.000 0.000 18.122 18.122 0.000 18.122
140 Establishment of COMSATS Institute of
Information Technology Campus at
Vehari
480.000 0.000 0.000 480.000 25.000 0.000 25.000
141 Establishment of COMSATS Institute of
Information Technology Campus at
Larkana
475.000 0.000 0.000 475.000 25.000 0.000 25.000
142 Establishment of COMSATS Institute of
Information Technology Campus at
Karachi
490.000 0.000 0.000 490.000 25.000 0.000 25.000
143 Establishment of COMSATS Institute of
Information Technology Campus at
Quetta
460.000 0.000 0.000 460.000 25.000 0.000 25.000
144 Construction of Academic/Training Block
for Mechanical Department-NUST
50.000 0.000 0.000 50.000 25.000 0.000 25.000
145 Construction of Sports Complex-NUST 39.000 0.000 0.000 39.000 25.000 0.000 25.000
146 Prime Minister's Gold Medal including
funding for PhD abroad for overall Best
Student of the Year-NUST
15.000 0.000 0.000 15.000 2.500 0.000 2.500
Total (New) 2951.108 0.000 0.000 2951.108 461.850 0.000 461.850
Total (Science & Technology) 19899.974 92.200 6284.451 13615.523 2988.407 27.000 3015.407
* On Public Private Partnership Basis 80:20 ratio
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Throw-
forward as
on 01-7-08
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
On-going
1 Population Welfare Program Federal
Activity (2003-08)
3822.000 0.000 2684.691 1137.309 597.000 0.000 597.000
2 Population Welfare Program Punjab
(2003-08)
6062.963 0.000 5601.804 461.159 1560.000 0.000 1560.000
3 Population Welfare Program Sindh (2003-
08)
3464.890 0.000 3200.587 264.303 796.000 0.000 796.000
4 Population Welfare Program NWFP
(2003-08)
2223.370 0.000 1681.224 542.146 468.000 0.000 468.000
5 Population Welfare Program Balochistan
(2003-08)
1276.650 0.000 1182.031 94.619 270.000 0.000 270.000
6 Population Welfare Program FATA (2003-
08)
250.316 0.000 97.910 152.406 50.000 0.000 50.000
7 Population Welfare Program NA (2003-
08)
161.359 0.000 124.255 37.104 65.000 0.000 65.000
8 Population Welfare Program AJK (2003-
08)
303.018 0.000 254.925 48.093 75.000 0.000 75.000
9 Population Welfare Services in
Islamabad District(2003-08)
135.192 0.000 141.153 0.000 39.900 0.000 39.900
10 NATPOW 50.000 0.000 4.878 45.122 5.000 0.000 5.000
11 National Institute of Population
Studies(NIPS).
170.000 0.000 139.304 30.696 35.943 0.000 35.943
12 Construction of Buildings for Population
Welfare Training Institute (PWTI) Lahore
(ADB Funding)
72.100 72.100 12.500 59.600 5.000 0.000 5.000
13 Establishment of Additional RHS 'A'
Centres-Punjab (2005-2008)
923.500 0.000 39.721 883.779 100.000 0.000 100.000
14 Establishment of Additional RHS 'A'
Centres-Sindh (2005-2008)
313.000 0.000 157.787 155.213 47.000 0.000 47.000
15 Establishment of Additional RHS 'A'
Centres-NWFP (2005-2008)
88.190 0.000 17.269 70.921 20.000 0.000 20.000
16 Establishment of Additional RHS 'A'
Centres-AJK(2005-2008)
79.900 0.000 55.486 24.414 5.000 0.000 5.000
17 Establishment of Regional Training
Institute at Muzaffarabad, AJK
68.980 0.000 15.163 53.817 6.000 0.000 6.000
18 Construction of Office/ Hostle/
Residential Buildings for Population
Welfare Training Institute (PWTI) Karachi
(ADB Funding)
73.910 73.910 14.070 59.840 17.000 0.000 17.000
19 PC-I for Acquisition of Land and
Construction of RTI, Faisalabad
88.366 10.000 10.000 78.366 15.000 0.000 15.000
20 Acquisition of Land and Construction if
RTIs in the Country
370.000 0.000 0.000 370.000 5.000 0.000 5.000
Total (On-going) 19997.704 156.010 15434.758 4568.907 4181.843 0.000 4181.843
New Schemes
21 Public Private Sector Organization
(PPSO)
17.000 0.000 0.000 3.000 3.000 0.000 3.000
22 RHS Project Federal Activity 24.000 0.000 0.000 24.000 24.000 0.000 24.000
Rupee Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
POPULATION WELFARE DIVISION
Allocation for 2008-09
Total Foreign
Loan
Estimated Cost
(Million Rupees)
Throw-
forward as
on 01-7-08
23 Additional FWCs in all Provinces and
AJK
9.000 0.000 0.000 9.000 9.000 0.000 9.000
1 2 3 4 5 6 7 8 9
24 Establishment of RTIs at Nawabshah
and Khuzdar
10.000 0.000 0.000 10.000 10.000 0.000 10.000
25 Development of On-line MIS for M/o.
Population Welfare
1.000 0.000 0.000 1.000 1.000 0.000 1.000
26 Construction of Car Parking, Furniture,
furnishing of Auditorium, Genertor and
allied works in Population House
61.332 0.000 0.000 61.332 61.332 0.000 61.332
27 Construction of Men Advisory Centre
(MAC) in National Institute of Health
6.000 0.000 0.000 6.000 6.000 0.000 6.000
28 Establishment of two MSUs and six
FWCs in Balochistan
10.060 0.000 0.000 10.060 10.060 0.000 10.060
29 Special Repair of Building at Regional
Training Institute, Lahore
8.765 0.000 0.000 8.765 8.765 0.000 8.765
Total (New) 147.157 0.000 0.000 133.157 133.157 0.000 133.157
Total (Population Welfare) 20144.861 156.010 15434.758 4702.064 4315.000 0.000 4315.000
Name, Location & Status of the
Scheme
Estimated Cost Allocation for 2008-09Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
(Million Rupees)
POPULATION WELFARE DIVISION
Total Foreign
Loan
Sl.
No Foreign
Loan
Rupee Total
1 2 3 4 5 6 7 8 9
On-going
1 Gender Reform Action Plan (GRAP)
2005-08
418.563 0.000 325.080 93.483 70.000 0.000 70.000
2 Family Protection and Rehabilitation
Centre for Women Islamabad (2004-09)
23.262 0.000 14.928 8.334 4.400 0.000 4.400
3 Establishment of Crisis Centres (Lahore,
Karachi, Peshawar, Mianwali, Quetta,
Kohat, Vehari, Sahiwal and Rawalpindi).
98.365 0.000 56.861 41.504 17.200 0.000 17.200
4 Establishment of Crisis Centres Sialkot,
Faisalabad, Multan, Bhawalpur, Mirwala,
Hyderabad, Nawab Shah, Sibi,
Abbotabad & Mirpur (AJK)
84.340 0.000 34.250 50.090 12.000 0.000 12.000
5 Establishment of Crisis Centre, at
Jacobabad, Khushab, D.G. Khan,
Khuzdar and Swat (Mangora) (2006-08)
37.524 0.000 17.202 20.322 4.500 0.000 4.500
6 CEDAW follow up and Implementation
(2004-08)
34.760 0.000 15.120 19.640 9.770 0.000 9.770
7 Establishment of Women Welfare Centre
in Orakzai Agency, FATA (2004-09)
11.375 0.000 7.462 3.913 2.518 0.000 2.518
8 Jafakash Aurat Economic Empowerment
of Rural Women in Tharparkar
35.000 0.000 4.000 31.000 4.750 0.000 4.750
9 Provision of Transport for Girls/Women
Colleges in less Developed
Districts/Rural areas of the Provinces of
Punjab
38.500 0.000 19.250 19.250 19.250 0.000 19.250
10 Purchase of two buses for students of
Fatima Jinnah Medical College Lahore
7.500 0.000 3.750 3.750 3.750 0.000 3.750
11 Construction of 10 Bashalani in Kalash
Valley by Works and Services Deptt.
Chitral
19.619 0.000 5.183 14.436 14.436 0.000 14.436
12 Poverty Allevation and Training of
Women by Behbood Association of
Pakistan Rawalpindi
2.588 0.000 0.843 1.745 0.872 0.000 0.872
Total (On-going) 811.396 0.000 503.929 307.467 163.446 0.000 163.446
New Schemes
13 Up-gradation of APWA College for
Science & Technology / Vocational &
Technical Training
2.307 0.000 0.000 2.307 2.307 0.000 2.307
14 Employment of Young Women and Men
through Building Leadership in Gender
and Human Rights by Mehergarh,
Islamabad
3.220 0.000 0.000 3.220 3.220 0.000 3.220
15 Purchase of one Bus for Public School /
College Skardu (Girls Wing)
3.850 0.000 0.000 3.850 3.850 0.000 3.850
16 Provision of a Bus for Girl Students of
Khyber Medical College, Peshawar
4.000 0.000 0.000 4.000 4.000 0.000 4.000
Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Rupee
Name, Location & Status of the
Scheme
Allocation for 2008-09
Foreign
Loan
Sl.
No
Estimated Cost
Total
WOMEN DEVELOPMENT DIVISION
Foreign
Loan
(Million Rupees)
17 Capacity Building of Women through
Women Skill Development Centers at
Karachi, Sindh
3.220 0.000 0.000 3.220 3.220 0.000 3.220
1 2 3 4 5 6 7 8 9
18 Awareness Raising Campaign on Legal
rights of Women in District Larkana by
Bright Educational Society Larkana
3.520 0.000 0.000 3.520 3.520 0.000 3.520
19 Establishment of thirty (30) Women
Centers at Attock, Chakwal, Gujrat,
Jhang, Rahim Yar Khan, Bhawalnagar,
Layyah, Larkana, Mirpur Khas, Sukkur,
Shadad Kot, Dadu, Sanghar, Badin,
Chitral, Batkhela, Bannu, D.I. Khan,
Haripur, Charsada, Mardan, Zob, Turbat
Gwadar, Panjgur, Chaman, Dal Badin,
Lasbela, Gilgit & Skardu
398.880 0.000 0.000 398.880 65.000 0.000 65.000
20 IT Training for Elected Lady
Representatives Phase II (Five Year
Plan)
105.280 0.000 0.000 105.280 10.000 0.000 10.000
21 Awareness through Media for Women's
Development (Five Year Plan)
511.000 0.000 0.000 511.000 75.000 0.000 75.000
22 Establishment of Computer Literacy
Centers Jaffarabad, Balochistan
1.067 0.000 0.000 1.067 1.067 0.000 1.067
Total (New) 1036.344 0.000 0.000 1036.344 171.184 0.000 171.184
Total (Women Development) 1847.740 0.000 503.929 1343.811 334.630 0.000 334.630
Foreign
Loan
Rupee Foreign
Loan
Total
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
WOMEN DEVELOPMENT DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
On-going
1 Vocational Training Centre for the
Disabled, Peshawar & Quetta
37.612 0.000 25.774 11.838 4.000 0.000 4.000
2 Construction of Special Education Centre
at Kohat
39.280 0.000 33.686 5.594 9.594 0.000 9.594
3 Rehabilitation Centre at Hunza, NAs 28.929 0.000 27.119 1.810 1.810 0.000 1.810
4 Upgradation of National Spl. Edu.
Centres HIC Islamabad & SE Centre for
HIC Lhr. From Secondary to Higher Sec.
Level
33.193 0.000 23.696 9.497 5.000 0.000 5.000
5 Computerization of 7 Special Education
Centres
9.417 0.000 6.625 2.792 1.200 0.000 1.200
6 Establishment of Special Edu. Centres
for Physically Handicapped Children
Karachi
13.395 0.000 8.320 5.075 3.000 0.000 3.000
7 Establishment of Special Edu. Centres
for Mentally Retarded Children Peshawar
9.831 0.000 6.729 3.102 2.500 0.000 2.500
8 Establishment of Special Edu. Centres
for Hearing Impaired Children
Muzaffarabad
12.101 0.000 7.018 5.083 2.500 0.000 2.500
9 Establishment of Special Education
Center for Mentally Retarted Children,
Faisalabad
10.202 0.000 6.133 4.069 2.000 0.000 2.000
10 Establishment of Special Education
Center for Mentally Retarted Children
Nawabshah
10.434 0.000 6.986 3.448 2.000 0.000 2.000
11 Establishment of Special Education
Center for Mentally Retarted Children
Khuzdar
9.274 0.000 5.236 4.038 2.000 0.000 2.000
12 Establishment of Special Education
Center for Mentally Retarted Children
Mardan
10.289 0.000 5.583 4.706 3.000 0.000 3.000
13 Upgradation of 4 Special Education
Centres for Physically Handicapped
Children from Primary to Middle Level
Rawalpindi, Dadu, Quetta & Abbottabad
35.082 0.000 19.660 15.422 6.000 0.000 6.000
14 Upgradation of 4 Spl. Edu. Centres for
Visulally Handicapped Children from
Primary to Middle Level Sialkot, Gujrat,
Larkana and Mirpurkhas
38.823 0.000 20.434 18.389 5.000 0.000 5.000
15 Upgradation of 4 Spl. Edu. Centres for
Hearing Impaired Children from Primary
to Middle Level Sargodha, Jhang,
Sukkur & Swat
38.754 0.000 23.478 15.276 5.000 0.000 5.000
16 Construction of Special Education Centre
Mirpurkhas
35.800 0.000 20.000 15.800 15.800 0.000 15.800
17 External Development & Landscaping of
Housing Colony for Teachers of DGSE, I-
9/4, Islamabad
37.500 0.000 21.109 16.391 16.391 0.000 16.391
18 Construction of Special Education Centre
Jhang
37.168 0.000 20.000 17.168 17.168 0.000 17.168
19 Construction of Housing Colony for
Teach. /Staff of DGSE, (Phase-II),
Islamabad
39.850 0.000 17.098 22.752 11.000 0.000 11.000
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme Total
Expenditure
upto June
2008
Foreign
Loan
Rupee
Throw-
forward as
on 01-7-08
Foreign
Loan
Total
Estimated Cost Allocation for 2008-09
SOCIAL WELFARE & SPECIAL EDUCATION DIVISION
1 2 3 4 5 6 7 8 9
20 Establishment of Special Edu. Centre for
Hearing Impaired Child. and Visually
Handicapped Child. Primary Level,
Mardan
20.312 0.000 10.282 10.030 10.030 0.000 10.030
21 Establishment of Special Edu. Centre for
Hearing Impaired Child. and Visually
Handicapped Child. Primary Level,
Faisalabad
20.312 0.000 10.883 9.429 9.429 0.000 9.429
22 Establishment of Special Edu. Centre for
Hearing Impaired Child. and Mentally
Retarded Children Primary Level,
Khuzdar
18.595 0.000 8.350 10.245 10.245 0.000 10.245
23 Establishment of Special Edu. Centre for
Visually Handicapped Child. and Mentally
Retarded Children Primary Level,
Nawabshah
18.595 0.000 9.400 9.195 9.195 0.000 9.195
24 Establishment of Special Edu. Centre for
Visually Handicapped Child. and Mentally
Retarded Children Primary Level,
Muzaffarabad
18.595 0.000 10.614 7.981 7.981 0.000 7.981
25 Establishment of Special Edu. Centre for
Visually Handicapped Children Primary
Level, Peshawar
11.350 0.000 6.282 5.068 5.068 0.000 5.068
26 Establishment of Special Edu. Centre for
Hearing Impaired Child. Primary Level
Karachi
8.962 0.000 4.690 4.272 4.272 0.000 4.272
27 Upgradation of Spl. Edu. Centres HIC
Islamabad from Primary to Secondary
Level
12.436 0.000 6.302 6.134 6.134 0.000 6.134
28 Upgradation of Spl. Edu. Centre for
Hearing Impaired Children from Primary
to Secondary Level, Lahore
12.436 0.000 5.735 6.701 6.701 0.000 6.701
29 Upgradation of Spl. Edu. Centre for
Hearing Impaired Child. Peshawar From
Primary to Secondary Level
8.404 0.000 5.120 3.284 3.284 0.000 3.284
30 Upgradation of National Special Edu.
Centre for Physically Handicapped
Children, from Primary to Secondary
Level, Islamabad
9.545 0.000 4.698 4.847 4.847 0.000 4.847
31 Upgradation of Institute of Physically
Handicapped Children from Primary to
Secondary Level, Lahore
9.545 0.000 4.751 4.794 4.794 0.000 4.794
32 Upgradation of Institute of Physically
Handicapped Children from Primary to
Second. Level, Peshawar
9.545 0.000 5.095 4.450 4.450 0.000 4.450
33 Upgradation of National Special Edu.
Centre for Visually Handicapped
Children, from Primary to Secondary
Level, Islamabad
10.011 0.000 4.930 5.081 5.081 0.000 5.081
34 Upgradation of Special Education
Centre for Visually Handicapped
Children, from Primary to Secondary
Level, Lahore
10.011 0.000 4.439 5.572 5.572 0.000 5.572
35 Upgradation of Special Education Centre
for Visually Handicapped Children, from
Primary to Secondary Level, Karachi
10.011 0.000 4.515 5.496 5.496 0.000 5.496
36 Upgradation of Special Education Centre
for Visually Handicapped Children, from
Primary to Middle Level, Okara
8.233 0.000 4.546 3.687 3.687 0.000 3.687
Foreign
Loan
Rupee
SOCIAL WELFARE & SPECIAL EDUCATION DIVISION
Sl.
No
Name, Location & Status of the
Scheme
Allocation for 2008-09
Foreign
Loan
Total
Estimated Cost
(Million Rupees)
Throw-
forward as
on 01-7-08
Total
Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
37 Upgradation of Special Education Centre
for Hearing Impaired Child.from Primary
to Middle Level, Rahim Yar Khan
7.872 0.000 4.189 3.683 3.683 0.000 3.683
38 Upgradation of Special Education Centre
for Hearing Impaired Child. from Primary
to Middle Level, Sheikhupura
7.872 0.000 3.952 3.920 3.920 0.000 3.920
39 Upgradation of Special Education
Centre for Visually Handicapped
Children, from Primary to Middle Level,
Jhelum
8.233 0.000 4.313 3.920 3.920 0.000 3.920
40 Upgradation of Special Education Centre
for Physically Handicapped Children from
Primary to Middle Level, D.G. Khan
8.233 0.000 4.050 4.183 4.183 0.000 4.183
41 Upgradation of Special Education Centre
for Visually Handicapped Children, from
Primary to Middle Level, Kohat
8.233 0.000 4.036 4.197 4.197 0.000 4.197
42 Upgradation of Special Education Centre
for Visually Handicapped Children, from
Primary to Middle Level, Charsadda
8.233 0.000 3.923 4.310 4.310 0.000 4.310
43 Establishment of Vocational Trg.Centre
for the Disabled Mardan
10.017 0.000 4.219 5.798 5.798 0.000 5.798
44 Establishment of Vocational Trg.Centre
for the Disabled Nawabshah
10.017 0.000 4.299 5.718 5.718 0.000 5.718
45 Establishment of Vocational Trg. Centre
for the Disabled Khuzdar
10.017 0.000 3.999 6.018 6.018 0.000 6.018
46 Establishment of Vocational Trg. Centre
for the Disabled Faisalabad
10.017 0.000 4.599 5.418 5.418 0.000 5.418
47 Provision of Hostel Facilities at National
Special Educaiton Centre for VHC
Islamabad
12.975 0.000 4.365 8.610 8.610 0.000 8.610
48 Provision of Hostel Facilities at National
Special Edu. Centre for VHC, Peshawar
12.975 0.000 4.559 8.416 8.416 0.000 8.416
49 Community Development Project Village
Noon, Islamabad
7.736 0.000 6.955 0.781 0.781 0.000 0.781
50 Community Development Project Ghizer
(FANA) NA
7.963 0.000 7.715 0.248 0.248 0.000 0.248
51 Community Development Project
Ghanche (FANA)
7.963 0.000 6.086 1.877 1.877 0.000 1.877
52 Community Development Project Khyber
Agency (FATA)
9.771 0.000 4.691 5.080 2.000 0.000 2.000
53 Community Development Project Kurram
Agency (FATA)
9.771 0.000 5.242 4.529 2.000 0.000 2.000
54 Community Development Project North
Wazirstan Agency (FATA)
9.771 0.000 4.775 4.996 2.000 0.000 2.000
55 Community Development Project
Mohmand Agency (FATA)
6.120 0.000 3.451 2.669 1.624 0.000 1.624
56 Community Development Project Bajaur
Agency (FATA)
6.120 0.000 3.480 2.640 1.623 0.000 1.623
57 Community Development Project South
Wazirstan Agency (FATA)
6.120 0.000 3.429 2.691 1.623 0.000 1.623
Total
(Million Rupees)
SOCIAL WELFARE & SPECIAL EDUCATION DIVISION
Estimated Cost Allocation for 2008-09
Rupee Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme Total Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
1 2 3 4 5 6 7 8 9
58 Community Dev. Projects at Aurakzai
Agency & Austore, NA's
13.108 0.000 6.681 6.427 3.600 0.000 3.600
59 Establishment of (Six) Community
Development Projects at Turbat, Faisal
Town Quetta, Panjgur, Dasht Pingov,
Mach, Gwadar Balochistan
39.324 0.000 12.076 27.248 12.000 0.000 12.000
60 Social Services (Medical) Projects in
FATA, FANA & Karachi (Rs.2.737 million
each) (4=FANA,7=FATA,1=Karachi)
32.844 0.000 12.608 20.236 16.800 0.000 16.800
61 04 Integrated Social Development
Projects Lahore, Karachi, Peshawar and
Quetta
24.648 0.000 8.002 16.646 8.000 0.000 8.000
62 Child Domestic Labour Project Basic
Enabling Education Programme (Non-
formal) Centres
34.639 0.000 10.410 24.229 10.000 0.000 10.000
63 District Based NGOs Management
System
32.015 0.000 16.768 15.247 5.000 0.000 5.000
64 National Child Protection Centre
Islamabad
15.993 0.000 8.400 7.593 7.593 0.000 7.593
65 Implementation of National Plan of Action
for the Children
13.000 0.000 5.850 7.150 4.000 0.000 4.000
66 Fiscal Incentives, Technical Assistance &
other Measures for Growth of NGOs in
Rural, Farflung and Under-developed
Areas
38.000 0.000 30.322 7.678 7.678 0.000 7.678
67 Grant for Self-Help Projects (Phase-II) 36.000 0.000 30.000 6.000 6.000 0.000 6.000
68 Monitoring, Evaluation & Advocacy of
NGOs
10.492 0.000 5.000 5.492 3.000 0.000 3.000
69 Child Protection Centre Turbat
Balochistan
7.000 0.000 3.000 4.000 2.000 0.000 2.000
70 Establishment of 2 Model Centres for
Inclusive Education of HIC at Kech
(Turbat) and Mirpur Khas
29.300 0.000 0.927 28.373 10.000 0.000 10.000
71 Non-Profit Organization, Certification
Programme by PCP
25.780 0.000 9.398 16.382 14.650 0.000 14.650
Total (On-going) 1242.004 0.000 671.085 570.919 409.517 0.000 409.517
New Schemes
72 Nutrition Supplement Programme for
Girls
875.631 0.000 0.000 875.631 100.000 0.000 100.000
Total (new) 875.631 0.000 0.000 875.631 100.000 0.000 100.000
Total (Social Welfare & Spl. Edu) 2117.635 0.000 671.085 1446.550 509.517 0.000 509.517
Name, Location & Status of the
Scheme
Sl.
No
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
SOCIAL WELFARE & SPECIAL EDUCATION DIVISION
(Million Rupees)
Estimated Cost
1 2 3 4 5 6 7 8 9
On-going
1 Establishment of Workers Education
Centre at Gujranwala and Sialkot
22.740 0.000 19.740 3.000 3.000 0.000 3.000
2 Establishment of Policy Planning Cell,
Islamabad
39.136 0.000 25.690 13.446 13.440 0.000 13.440
3 Visits of Expatriate Pakistani Consultant
for Short Duration Assignment in
Pakistan
39.300 0.000 14.150 25.150 3.000 0.000 3.000
4 Labour Market Information System and
Analysis, Islamabad
64.730 36.000 23.960 40.770 8.000 0.000 8.000
5 Training of Trainers for Skill
Development, Islamabad
62.707 0.000 37.740 24.967 10.000 0.000 10.000
6 Vocational Training Centre, Kashmore,
Sindh
36.020 0.000 18.000 18.020 18.020 0.000 18.020
7 Computerization of Data of Outgoing
Migrants and Returning Migrants
Rawalpindi, Lahore, Multan, Karachi,
Quetta, Peshawar, Malakand
39.500 0.000 25.520 13.980 13.980 0.000 13.980
8 Construction of Technical Training
Institute for Trade at Mandra
70.000 0.000 25.500 44.500 32.010 0.000 32.010
9 Green Man Certificate Course on
Gardening
15.060 0.000 3.450 11.610 4.980 0.000 4.980
10 Trade Testing and Certification 18.090 0.000 6.300 11.790 7.400 0.000 7.400
11 Construction of Hostel Building for 100
persons in NTB complex , Islamabad
161.330 0.000 15.000 146.330 10.000 0.000 10.000
Total (Labour & Manpower) 568.613 36.000 215.050 353.563 123.830 0.000 123.830
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Total
LABOUR & MANPOWER DIVISION
Estimated Cost
Total Foreign
Loan
Rupee Foreign
Loan
(Million Rupees)
Allocation for 2008-09
1 2 3 4 5 6 7 8 9
On-going
1 Capacity Building of the Officers of
Overseas Pakistanis Division, Islamabad
25.500 0.000 8.860 16.640 3.000 0.000 3.000
Total (Overseas Pakistanis) 25.500 0.000 8.860 16.640 3.000 0.000 3.000
Allocation for 2008-09
Total Foreign
Loan
(Million Rupees)
OVERSEAS PAKISTANIS DIVISION
Estimated CostName, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Sl.
No Rupee Foreign
Loan
Total
1 2 3 4 5 6 7 8 9
On-going
1 Northern Areas (Block Allocation) 0.000 0.000 0.000 0.000 5450.000 0.000 5450.000
2 Azad Jammu & Kashmir (Block
Allocation)
0.000 0.000 0.000 0.000 8550.000 800.000 9350.000
3 Implementation of Management Plan
Khunjrab
47.750 0.000 42.270 5.480 5.380 0.000 5.380
4 Construction of Rathua Haryam Bridge
across Reservoir Channel on Mirpur -
Islamgarh Road
1394.650 0.000 629.830 764.820 300.000 0.000 300.000
5 Provision of Water Supply and Sewerage
of Mirpur City and Hamlets
3083.961 0.000 700.780 2383.181 700.000 0.000 700.000
6 Improvement and Upgradation of
Existing Single Lane Metalled Road to
Double Lane Metalled Road
425.830 0.000 100.020 325.810 150.000 0.000 150.000
7 Establsihment of Project Monitoring and
Evalaution Cell
29.200 0.000 17.000 12.200 6.000 0.000 6.000
8 Up-gradation of District Hospital at Chilas 119.997 0.000 50.000 69.997 25.000 0.000 25.000
Total (On-going) 5101.388 0.000 1539.900 3561.488 15186.380 800.000 15986.380
New Schemes
9 4.8 Battar Hydel Power Project (AJK) 760.403 0.000 0.000 760.403 150.000 0.000 150.000
10 1.7 MW Dhannan Hydro Power Project
(AJK)
297.254 0.000 0.000 297.254 297.254 0.000 297.254
11 43.5 MW Jagran Hydro Power Project
(AJK)
5356.310 0.000 0.000 5356.310 100.000 0.000 100.000
12 14.4 Jhing Hydro Power Project (AJK) 1750.689 0.000 0.000 1750.689 150.000 0.000 150.000
13 Special Development Packages for 13
Constituencies along LOC in AJK-
Payara Kashmir Programme (PKP) (AJK)
11000.000 0.000 0.000 11000.000 500.000 0.000 500.000
14 Green & Skilled Kashmir (AJK) 8800.000 0.000 0.000 8800.000 300.000 0.000 300.000
15 16 MW Hydro Power Project, Nultar - III 1279.399 0.000 0.000 1279.399 72.217 0.000 72.217
16 14 MW Hydro Power Project Nultar - IV 1412.790 0.000 0.000 1412.790 59.252 0.000 59.252
Total (New) 30656.845 0.000 0.000 30656.845 1628.723 0.000 1628.723
Total (KA & NA) 35758.233 0.000 1539.900 34218.333 16815.103 800.000 17615.103
Name, Location & Status of the
Scheme
KA & NA DIVISION
Estimated Cost
Total
Sl.
No
(Million Rupees)
Total Foreign
Loan
Rupee Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
1 2 3 4 5 6 7 8 9
On-going
1 Federally Administered Tribal Areas
(FATA) including all Special Programmes
and FATA Rural Development Project
0.000 0.000 0.000 0.000 8462.000 0.000 8462.000
2 Water Supply Scheme from Shalman to
Landi Kotal
289.600 0.000 0.000 289.600 200.000 0.000 200.000
Total (SAFRON) 289.600 0.000 0.000 289.600 8662.000 0.000 8662.000
(Million Rupees)
STATES & FRONTIER REGIONS DIVISION
RupeeTotal Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Foreign
Loan
Total
Expenditure
upto June
2008
Estimated Cost
1 2 3 4 5 6 7 8 9
On-going
1 National Awareness Campaign on
Energy Efficiency and Environment
Protection
38.970 0.000 35.328 3.642 10.000 0.000 10.000
2 Preparation of National Land Use Plan
Country wide
39.211 0.000 30.563 8.648 8.648 0.000 8.648
3 Protected Area Management Project 648.600 609.800 23.599 625.001 1.000 9.000 10.000
4 Forestry Sector Research and
Development Project
193.500 0.000 135.800 57.700 22.744 0.000 22.744
5 Establishment of Environmental
Monitoring System in Pakistan (Japan &
GoP).
1098.242 973.000 783.034 315.208 97.000 50.000 147.000
6 Mass Awareness and Education 39.400 0.000 19.868 19.532 10.000 0.000 10.000
7 Environmental Rehabilitation & Poverty
Reduction through Participatory
Watershed management in Tarbela
Reservoir Catchment Area
532.457 0.000 317.199 215.258 113.209 0.000 113.209
8 Establishment of Project Planning and
Monitoring Cell in the M/o Environment
Islamabad
36.158 0.000 10.099 26.059 12.526 0.000 12.526
9 National Biosafety Centre 39.500 0.000 12.691 26.809 9.000 0.000 9.000
10 Establishment of Pak-EPA Marine Water
Pollution Monitoring Centre at National
Institute of Oceanography
37.930 0.000 33.550 4.380 6.444 0.000 6.444
11 Establishment of a Model Park for
Improvement of Urban Environment and
Recreational Facility in Attock City
34.170 0.000 18.476 15.694 13.502 0.000 13.502
12 Strengthening of Forest Products
Research at Pakistan Forest Institute,
Peshawar
39.250 0.000 31.178 8.072 3.828 0.000 3.828
13 Activity Based Capacity Development
project (ABCD)
133.427 0.000 57.153 76.274 44.325 0.000 44.325
14 Establishment National MEA Secretariat
and Preparing National Action Plans for
MEAS
39.661 0.000 11.038 28.623 10.724 0.000 10.724
15 Environmental Education in Schools
through Roaming Teachers
16.629 0.000 8.039 8.590 4.233 0.000 4.233
16 Planting of Blank Areas of Khanewal
Irrigated Plantation
45.000 0.000 10.784 34.216 21.626 0.000 21.626
17 Implementation of management plan for
Ayubia National Park, District Abbottabad
72.710 0.000 48.747 23.963 21.579 0.000 21.579
18 National Conservation Strategy Resource
Centre
18.286 0.000 13.353 4.933 3.511 0.000 3.511
19 Environmental Rehabilitation through
Improvement/ Promotion of Indigenous
Tree Species in south AJK
39.000 0.000 21.256 17.744 8.882 0.000 8.882
20 AJK Poverty Reduction Project Through
Participatory Watershed Development
474.900 0.000 236.852 238.048 117.063 0.000 117.063
21 Renovation and Improvement Special
Repaire of PFI at Peshawar
39.697 0.000 8.618 31.079 6.194 0.000 6.194
Throw-
forward as
on 01-7-08
Allocation for 2008-09Estimated Cost
Total Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
(Million Rupees)
ENVIRONMENT DIVISION
Foreign
Loan
TotalRupee
22 Rehabilitation of Denuded Forest Area
Through Sowing and Planning and
Development of Farm/Social Forestry
with Community Participation in Northern
Areas
125.000 0.000 41.608 83.392 23.695 0.000 23.695
1 2 3 4 5 6 7 8 9
23 Upgrading and Reconstruction of PFI
Field Station Shinkiari for Forestry
Research, Education and Training
141.671 3.900 68.219 73.452 14.105 0.000 14.105
24 Establishment of CDM Cell 38.935 0.000 15.139 23.796 10.853 0.000 10.853
25 Establishment of Chach Recreational
Park for Improvement of Local
Environment at Manser Camp District
Attock
18.668 0.000 10.028 8.640 2.998 0.000 2.998
26 Programme for Mountain Area
Conservation (NAs, Chitral, AJK)
496.560 0.000 27.460 469.100 103.026 0.000 103.026
27 Damage Control through Environmental
Improvement of Polluted River Ravi Near
Lahore
335.700 0.000 0.000 335.700 10.000 0.000 10.000
28 Environmental Improvement of Swat
River
208.355 0.000 0.000 208.355 10.000 0.000 10.000
29 Development of Forestry Sector
Resources for Carbon Sequestration in
Punjab (5 years)
3678.660 0.000 0.000 3678.660 255.128 0.000 255.128
30 Development of Forestry Sector
Resources for Carbon Sequestration in
AJK (5 years)
1663.043 0.000 0.000 1663.043 103.364 0.000 103.364
31 Development of Forestry Sector
Resources for Carbon Sequestration in
Sindh (3 years)
1483.000 0.000 0.000 1483.000 150.000 0.000 150.000
32 Development of Forestry Sector
Resources for Carbon Sequestration in
Balochistan (5 years)
1664.657 0.000 0.000 1664.657 175.000 0.000 175.000
33 Development of Forestry Sector
Resources for Carbon Sequestration in
NWFP (6 years)
3003.766 0.000 0.000 3003.766 191.000 0.000 191.000
34 Multi Sectoral Mega Project for
Conservation of Juniper Forests (5 years)
493.166 0.000 0.000 493.166 97.000 0.000 97.000
35 Extension in ENERCON Building (2
years)
147.510 0.000 1.000 146.510 100.000 0.000 100.000
36 Sustainable Land Management to
Combat Desertification in Pakistan
(Phase-1) (2 years)
238.800 0.000 0.631 238.169 22.636 0.000 22.636
37 Conversion of Polythene Bags, Wastes
Tyres, Waste Rubbers/Plastics to Light
Fuel Oil (Diesel) through Microwave
Technology
454.530 0.000 0.000 454.530 10.000 0.000 10.000
38 Pilot Projet for Sewerage, Drainage &
Sanitation Mangement Using E/M
Technology for Environmental
Improvement (Urban) -
39.610 0.000 0.000 39.610 10.000 0.000 10.000
39 Pilot Projet for Sewerage, Drainage &
Sanitation Mangement Using E/M
Technology for Environmental
Improvement (Rural)
14.218 0.000 0.000 14.218 5.000 0.000 5.000
40 Establishment of Pakistan Botanic
Gardens Network Secretariat in
Government College University, Lahore
(2 years)
36.836 0.000 10.170 26.666 26.666 0.000 26.666
41 Rachna Doab Afforestation (Phase-II) 212.182 0.000 36.432 175.750 52.042 0.000 52.042
Name, Location & Status of the
Scheme
Estimated Cost
ENVIRONMENT DIVISION
Total
Expenditure
upto June
2008
Sl.
No Foreign
Loan
Allocation for 2008-09
Total Foreign
Loan
Rupee
Throw-
forward as
on 01-7-08
(Million Rupees)
1 2 3 4 5 6 7 8 9
42 Provision of Drainage/Sewerage
Management for environmental
Improvement at Mohallah Kot Fateh
Khan & Awaisia Attock City
21.185 0.000 3.000 18.185 18.185 0.000 18.185
43 Provision of Drainage/Sewerage
Management for environmental
Improvement at Cantt. Housing City
Attock
33.709 0.000 5.000 28.709 28.709 0.000 28.709
44 Construction of CC Drains type I, II, III,
and CC Block in Taluka Jacobabad, thul
and Gari Khairo, District Jacobabad at
Various Places for Environmental
Improvement Protection
37.989 0.000 3.000 34.989 34.989 0.000 34.989
45 Construction of Open Channel and Drain
for Drainage for improvement of Local
Environment at Kot Bhai Khan Tehsil
Shahpur District Sargodha
13.645 0.000 3.000 10.645 10.645 0.000 10.645
46 Improvement of Environment of
Jacobabad City (Quaid-e-Azam Road)
35.286 0.000 5.000 30.286 30.286 0.000 30.286
47 Renovation, Repair & Refurbishing of the
Office Building of Ministry of
Environment, Islamabad
22.600 0.000 5.000 17.600 17.600 0.000 17.600
48 Integration of Environment in Teaching
Training Programme of Allama Iqbal
Open University
38.911 0.000 0.000 38.911 10.000 0.000 10.000
49 Conversation of Municipal Solid Waste in
to Energy and Fertilizer, Faisalabad
5215.713 0.000 0.000 5215.713 10.000 0.000 10.000
50 Coastal Areas / Dry Land Biodiversity
and Survey management
39.540 0.000 33.585 5.955 5.955 0.000 5.955
51 Conservation and Rehabilitation of Indus
Delta Mangroves for Sustainable
Management
39.400 0.000 33.280 6.120 6.120 0.000 6.120
Total (On-going) 23649.543 1586.700 2168.777 21480.766 2091.040 59.000 2150.040
New Schemes
52 Development of Forest Resources for
Carbon Sequestration in FATA
1439.875 0.000 0.000 1439.875 39.884 0.000 39.884
53 Feasibility Study (PC-II) regarding
Conversion of Polythene Bags Waste
Tyres, Waste Rubbers/ Plastics to Light
Fuel Oil (Diesel) through Microwave
Technology
2.000 0.000 0.000 2.000 2.000 0.000 2.000
54 Environment Improvement of other
Water Bodies through-out province
(River, Chitral, River Panjkora, River,
Kunhar & River Kabul)
205.000 0.000 0.000 205.000 20.000 0.000 20.000
55 Community Based Natural Resource
Mgt. project for Dir-Kohistan
10.150 0.000 0.000 10.150 10.150 0.000 10.150
56 Media Advertising Campaign on Energy
Conservation & Institutional
Strengthening / Capacity Building of
ENERCON.
200.000 0.000 0.000 200.000 1.000 0.000 1.000
57 Integrated National Resource
Development Project in Upper Dir NWFP
750.000 0.000 0.000 750.000 29.870 0.000 29.870
Total (New) 2607.025 0.000 0.000 2607.025 102.904 0.000 102.904
Estimated Cost
ENVIRONMENT DIVISION
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Foreign
Loan
(Million Rupees)
TotalRupee
Sl.
No
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Total (Environment) 26256.568 1586.700 2168.777 24087.791 2193.944 59.000 2252.944
1 2 3 4 5 6 7 8 9
On-going
1 Establishment of Monitoring and
Evaluation Cell
61.170 0.000 18.480 42.690 15.920 0.000 15.920
2 Human and Physical Resources
Development Project of AHK NCRD &
MA
36.215 0.000 28.000 8.215 8.215 0.000 8.215
Total (On-going) 97.385 0.000 46.480 50.905 24.135 0.000 24.135
New Schemes
3 Feasibility Studies 100.000 0.000 0.000 100.000 20.000 0.000 20.000
4 Construction of Rural Access Roads in
the Country
600.000 0.000 0.000 600.000 50.000 0.000 50.000
5 Institutional Strengthening, Capacity
Development and Data Base Preparation
91.785 0.000 0.000 91.785 10.000 0.000 10.000
6 Gender Justice through Maslehat
Anjuman Project
100.000 0.000 0.000 100.000 4.000 0.000 4.000
Total (New) 891.785 0.000 0.000 891.785 84.000 0.000 84.000
Total (Local Govt. & RD) 989.170 0.000 46.480 942.690 108.135 0.000 108.135
Expenditure
upto June
2008
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme Total Foreign
Loan
Estimated Cost Throw-
forward as
on 01-7-08
Allocation for 2008-09
Rupee Foreign
Loan
Total
LOCAL GOVERNMENT & RURAL DEVELOPMENT DIVISION
1 2 3 4 5 6 7 8 9
On-going
1 Development and Restoration of
Archaeological Sites from Taxila to Swat
(Taxila Section).
200.000 0.000 70.500 129.500 30.000 0.000 30.000
2 Master Plan for Preservation and
Restoration of Rohtas Fort.
163.000 0.000 33.860 129.140 32.517 0.000 32.517
3 Shahdara Complex of Monuments
(Master Plan for Preservation and
Restoration of Jahangir's Tomb)
100.902 0.000 64.667 36.235 20.000 0.000 20.000
4 Development and Restoration of
Archaeological Sites from Taxila to Swat
(Peshawar Section).
100.000 0.000 48.500 51.500 15.000 0.000 15.000
5 Master Plan for Rehabilitation and
Cultural Tourism at Moenjodaro.
35.000 0.000 15.000 20.000 10.000 0.000 10.000
6 Construction of Museum / Library at Sibbi
(Balochistan)
44.296 0.000 0.000 44.296 10.000 0.000 10.000
7 Preservation and Restoration of Mir
Chakar's Fort at Sibbi (Balochistan)
3.290 0.000 1.000 2.290 2.290 0.000 2.290
8 Master Plan for Preservation
Conservation and Presentation of Mehr
Garh Sites (Balochistan)
8.019 0.000 5.000 3.019 3.019 0.000 3.019
9 Strengthening of Planning, Monitoring
and Evaluation Cell (PME)
20.000 0.000 6.000 14.000 6.000 0.000 6.000
10 Re-organization of Termite Affected
Quran Gallery of National Museum
Karachi
15.000 0.000 12.000 3.000 3.000 0.000 3.000
11 Construction of Aiwan-e-Quaid
Islamabad
173.262 0.000 40.000 133.262 3.000 0.000 3.000
12 Pak China Friendship Centre Islamabad. 3128.901 2120.000 95.000 3033.901 60.000 0.000 60.000
13 Construction and Development of Hiran
Minar and Tank at Sheikuhpura
116.509 0.000 8.000 108.509 35.760 0.000 35.760
14 Preservation and Restoration of
Monument of Jandiala Sher Khan at
Sheikhupura
39.995 0.000 10.000 29.995 29.995 0.000 29.995
15 Creative Works of National Monument
Museum, Islamabad
119.567 0.000 109.567 10.000 10.000 0.000 10.000
16 Construction of Aiwan-e-Quaid
Islamabad
173.262 0.000 45.000 128.262 97.000 0.000 97.000
Total (On-going) 4441.003 2120.000 564.094 3876.909 367.581 0.000 367.581
New Schemes
17 Hardware Purchase for Films and
Television Studio, National Academy of
Performing Arts
39.633 0.000 0.000 39.633 39.633 0.000 39.633
18 Establishment of National Cultural
Center, Islamabad
775.000 0.000 0.000 775.000 2.000 0.000 2.000
19 Construction of National Museum of
Pakistan, Islamabd
350.000 0.000 0.000 350.000 2.000 0.000 2.000
20 Rock Encryption 20.000 0.000 0.000 20.000 2.000 0.000 2.000
Total (new) 1184.633 0.000 0.000 1184.633 45.633 0.000 45.633
Sl.
No
(Million Rupees)
Name, Location & Status of the
Scheme
Estimated Cost
Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Rupee Foreign
Loan
Total
Expenditure
upto June
2008
Total
CULTURE DIVISION
Total (Culture) 5625.636 2120.000 564.094 5061.542 413.214 0.000 413.214
1 2 3 4 5 6 7 8 9
On-going
1 Construction of Boxing Gymnasium at
Islamabad
62.019 0.000 32.922 29.097 12.124 0.000 12.124
2 Construction of Boxing Gymnasium at
Lahore
39.595 0.000 26.095 13.500 5.000 0.000 5.000
3 Construction of Boxing Gymnasium at
Quetta
70.949 0.000 27.451 43.498 5.000 0.000 5.000
4 Construction of Boxing Gymnasium at
Peshawar
71.179 0.000 23.690 47.489 5.000 0.000 5.000
5 Construction of Boxing Gymnasium at
NSTCC Karachi
76.747 0.000 43.703 33.044 5.000 0.000 5.000
6 Construction of Sports Stadium at
Nowshera
16.996 0.000 0.000 16.996 2.000 0.000 2.000
7 Improvement of Malam Jabba Ski Slope
at Malam Jabba, District Swat
39.489 0.000 7.905 31.584 5.000 0.000 5.000
8 Establishment of Sports Medicine Centre
at Pakistan Sports Board, Islamabad
39.543 0.000 19.500 20.043 14.543 0.000 14.543
9 Laying of Hockey Turf at Swat 35.043 0.000 18.721 16.322 5.000 0.000 5.000
10 Laying of Synthetic Hockey Turf at Sibi 35.101 0.000 18.769 16.332 10.000 0.000 10.000
11 Laying of Synthetic Hockey Turf at Gilgit 35.807 0.000 14.475 21.332 5.500 0.000 5.500
12 Construction of Sports Stadium at Taxila 32.018 0.000 0.000 32.018 2.000 0.000 2.000
13 Construction of Sports Stadium at Patuki
District Kasur
14.500 0.000 10.500 4.000 4.000 0.000 4.000
14 Construction of Gymnasium Hall at
Sialkot
21.053 0.000 11.053 10.000 10.000 0.000 10.000
15 Construction of Gymnasium Hall at
Bahawalnagar
12.270 0.000 0.000 12.270 10.000 0.000 10.000
16 Construction of Boundary Wall at
Pakistan Sports Complex, Islamabad
12.535 0.000 7.172 5.363 5.363 0.000 5.363
17 Construction of Staff Residential Flats at
PSB Coaching Centre, Karachi
13.034 0.000 10.521 2.513 2.153 0.000 2.153
18 Construction of Sports Stadium at
Nankana Sahib
20.237 0.000 18.237 2.000 5.000 0.000 5.000
19 Construction of Staff Residential flats at
PSB Complex, Islamabad.
12.676 0.000 10.535 2.141 0.141 0.000 0.141
20 Construction of Sports Hostel at PSB
Coaching Centre, Lahore
34.772 0.000 0.000 34.772 10.000 0.000 10.000
21 Provision of External Services Network at
Pakistan Sports Complex, Islamabad
13.011 0.000 5.700 7.311 6.011 0.000 6.011
22 Provision of Facilities at Qazi Mohib
Hockey Stadium at Bannu
12.621 0.000 8.000 4.621 2.621 0.000 2.621
23 Construction of Malakhra Stadium at
Sehwan Sharif, Dadu
22.000 0.000 7.755 14.245 5.000 0.000 5.000
24 Laying of Synthetic Hockey Turf at
Sukkur
35.079 0.000 20.000 15.079 15.079 0.000 15.079
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Foreign
Loan
SPORTS DIVISION
Throw-
forward as
on 01-7-08
Total
Allocation for 2008-09
RupeeForeign
Loan
(Million Rupees)
Estimated Cost
25 Construction of Sports Stadium at Bori,
District Loralai
38.558 0.000 5.000 33.558 5.000 0.000 5.000
1 2 3 4 5 6 7 8 9
26 Construction of Physical Fitness and
Injury Rehabilitation Centre, Site
Development & Staff Residences at
Sports Complex at, Sialkot
39.985 0.000 5.000 34.985 5.000 0.000 5.000
27 Renovation of Squash Courts at Karachi 9.600 0.000 5.000 4.600 4.600 0.000 4.600
28 Renovation of Squash Courts at
Rawalpindi
9.538 0.000 5.000 4.538 4.538 0.000 4.538
29 Construction of Sports Stadium at Zhob 39.918 0.000 5.000 34.918 5.000 0.000 5.000
30 Renovation/upgradation of Football
Ground, Qila Saifullah
26.194 0.000 5.000 21.194 5.000 0.000 5.000
31 Upgradation of Existing Jamal Abdul
Nasir Shaheed Stadium at Chaman
36.144 0.000 5.000 31.144 5.000 0.000 5.000
32 Upgradation of Existing Taj Lala Football
Stadium at Pishin
25.819 0.000 4.000 21.819 5.000 0.000 5.000
33 Construction of Sports Stadium at
Mianwali
39.746 0.000 12.000 27.746 9.746 0.000 9.746
Total (On-going) 1043.776 0.000 393.704 650.072 200.419 0.000 200.419
New Schemes
34 Construction of Sports Stadium at
Narowal
600.000 0.000 0.000 600.000 150.000 0.000 150.000
Total (New) 600.000 0.000 0.000 600.000 150.000 0.000 150.000
Total (Sports) 1643.776 0.000 393.704 1250.072 350.419 0.000 350.419
Estimated Cost
Total Rupee
Allocation for 2008-09
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
SPORTS DIVISION
Foreign
Loan
Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Foreign
Loan
1 2 3 4 5 6 7 8 9
On-going
1 Mobile Youth Computer Literacy
awareness Programme
8.725 0.000 1.331 7.394 3.500 0.000 3.500
2 Development of Youth Center at Malir,
Karachi
18.000 0.000 5.000 13.000 5.000 0.000 5.000
3 Construction of Youth Development
Center at Sukkur
18.000 0.000 5.000 13.000 5.000 0.000 5.000
4 Construction of Youth Development
Centre at Gwadar
39.930 0.000 5.000 34.930 5.000 0.000 5.000
5 Construction of Youth Development
Centre at Gilgit
38.000 0.000 5.000 33.000 5.000 0.000 5.000
6 Establishment of Planning and
Monitoring Cell
5.220 0.000 1.143 4.077 1.738 0.000 1.738
7 Construction of Youth Development
Centre at Quetta
33.182 0.000 24.500 8.682 8.682 0.000 8.682
Total (Youth Affairs) 161.057 0.000 46.974 114.083 33.920 0.000 33.920
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Allocation for 2008-09Throw-
forward as
on 01-7-08
Sl.
No Rupee Foreign
Loan
YOUTH AFFAIRS DIVISION
(Million Rupees)
Total Foreign
Loan
Total
1 2 3 4 5 6 7 8 9
On-going
1 Updation of Tourism Research
Publications
5.203 0.000 4.386 0.817 0.817 0.000 0.817
2 Development of Website for Tourism
Industry
5.000 0.000 2.702 2.298 2.298 0.000 2.298
3 Bus Terminal at Nankana Sahib 38.950 0.000 18.950 20.000 8.750 0.000 8.750
4 Aiwan-e-Sayyahat 470.735 0.000 90.000 380.735 7.000 0.000 7.000
Total (Tourism) 519.888 0.000 116.038 403.850 18.865 0.000 18.865
(Million Rupees)
Sl.
No
Estimated Cost
TOURISM DIVISION
Total Foreign
Loan
Rupee
Expenditure
upto June
2008
Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
Name, Location & Status of the
Scheme
1 2 3 4 5 6 7 8 9
On-going
1 Pakistan Social & Living Standard
Measurement Survey, Islamabad
304.129 0.000 166.535 137.594 60.879 0.000 60.879
2 Rebasing of National Accounts from
1999-2000 to 2005-06
283.104 0.000 77.070 206.034 70.000 0.000 70.000
3 Construction of Office Building for
Statistics Division and its attached
Departments at Islamabad
196.335 0.000 181.574 14.761 44.211 0.000 44.211
Total (Statistics) 783.568 0.000 425.179 358.389 175.090 0.000 175.090
STATISTICS DIVISION
Total
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee
(Million Rupees)
Sl.
No Foreign
Loan
Name, Location & Status of the
Scheme
1 2 3 4 5 6 7 8 9
On-going
1 Hiring Services of Pakistan Engineering
Council for Seeking Professional /
Technical advice on Special
Development Project, Islamabad
20.000 0.000 0.114 19.886 5.000 0.000 5.000
2 Institutional Strengthening and Capacity
Building of Energy Wing of Planning
Commission
24.205 0.000 23.598 0.607 1.000 0.000 1.000
3 Establishment of Federal Unit for
Drought Emergency Relief Assistance
(DERA) Programme, Islamabad
202.270 0.000 123.070 79.200 51.520 0.000 51.520
4 Macro Modeling Project (Phase-II),
Islamabad
14.905 4.040 10.093 4.812 2.320 0.000 2.320
5 Electronic Government Project Phase-II 36.466 0.000 29.790 6.676 10.255 0.000 10.255
6 Economic Research Programme, P&D
Division, Islamabad
18.000 0.000 10.401 7.599 4.000 0.000 4.000
7 Inspector General Development Projects,
Quetta.
45.492 0.000 36.720 8.772 8.772 0.000 8.772
8 Establishment of a Nucleus for
Preparation of Vision 2030 for Pakistan
and MTDFs in Planning Commission,
Islamabad
48.464 0.000 18.000 30.464 10.000 0.000 10.000
9 Upgradation of PPMI Phase-II
(Construction of PPMI Complex,
Islamabad
492.366 0.000 208.269 284.097 187.000 0.000 187.000
10 ADB TA for Results Based Monitoring
(RBM) of projects. (ADB grant)
42.000 30.000 0.000 42.000 20.000 1.000 21.000
11 Institutional Strengthening and Efficiency
Enhancement of Planning Commission
59.000 0.000 32.032 26.968 18.280 0.000 18.280
12 Monitoring of PSDP Financed Projects 360.000 0.000 50.234 309.766 57.249 0.000 57.249
13 Upgradation of Jawaid Azfar Computer
Centre
76.983 0.000 22.800 54.183 20.752 0.000 20.752
14 Promoting Professional Excellence in
Planning Commission (Phase-I)
127.146 0.000 25.953 101.193 55.500 0.000 55.500
15 National Trade Corridor Management
Unit: Trade and Transport Facilitation
Project - 2
1140.000 980.000 20.240 1119.760 45.000 200.000 245.000
16 Establishment of Environment Section in
Planning Commission, Islamabad
39.317 0.000 18.668 20.649 13.000 0.000 13.000
17 Drought Recovery Assistance
Programme (DRAP)/DERA-II
30000.000 0.000 4213.767 25786.233 1500.000 0.000 1500.000
18 Restructuring of PIDE to make it a World
Class Institution
210.000 0.000 0.000 210.000 117.000 0.000 117.000
19 Strategic Planning, Inter Sectoral
Linkage and Policy Development on
Social Sectors Wing of Planning
Commission
38.749 0.000 3.500 35.249 15.000 0.000 15.000
20 Strengthening of Agriculture Sector
Comprising of Food, Nutrition, Crops,
Livestock, Forestry and Irrigation at
Planning Commission
34.961 0.000 15.020 19.941 9.970 0.000 9.970
(Million Rupees)
Sl.
No
Estimated Cost
PLANNING & DEVELOPMENT DIVISION
Rupee Foreign
Loan
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Total
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
1 2 3 4 5 6 7 8 9
21 Support to Centre for Poverty Reduction
and Social Policy Development
183.580 91.790 18.700 164.880 19.000 0.000 19.000
22 Institutional Co-operation Programme
(Norwegian Grant)
95.000 95.000 75.058 19.942 0.000 30.000 30.000
23 Un-funded Important Projects 6410.000 0.000 6410.000
24 Feasibility Studies 427.000 0.000 427.000
25 Public Private Partnership Based
Environment Friendly Public Transport
System, Karachi
5000.000 0.000 12.000 4988.000 500.000 0.000 500.000
26 TA for Infrastructure Institutional Capacity
Building and Project preparatory Facility
(ADB)
2118.540 1500.000 725.521 1393.019 233.260 757.081 990.341
27 Pakistan Urban Forum 11.650 0.000 8.340 3.310 3.000 0.000 3.000
Total (On-going) 40439.094 2700.830 5701.888 34737.206 9743.878 988.081 10731.959
New Schemes
28 Sustainable Development Programme
for Energy Efficiency Conservation &
Renewable
53.701 37.210 0.000 53.701 4.000 6.000 10.000
29 Development of National Integrated
Energy Modeling System for Pakistan
161.574 124.000 0.000 161.574 4.000 6.000 10.000
30 National Trade Corridor Business
Strategy
233.000 186.000 0.000 233.000 47.000 186.000 233.000
31 Placement Bureaus across the Country 50.000 0.000 0.000 50.000 10.000 0.000 10.000
32 Integerated Water Resources
Development in Sukkur Kanal Command
Area
450.000 186.000 0.000 450.000 120.000 0.000 120.000
Total (New) 948.275 533.210 0.000 948.275 185.000 198.000 383.000
Total (Planning & Development) 41387.369 3234.040 5701.888 35685.481 9928.878 1186.081 11114.959
PLANNING & DEVELOPMENT DIVISION
Sl.
No
Name, Location & Status of the
Scheme Foreign
Loan
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost
(Million Rupees)
Allocation for 2008-09
Rupee Foreign
Loan
TotalTotal
1 2 3 4 5 6 7 8 9
On-going
1 Const. of Zonal Office Buildging for FIA
at Gulistan-e-Johar Karachi.
37.890 0.000 31.890 6.000 6.000 0.000 6.000
2 Const. of 6 Nos. Cat-I House for FIA
Officer of BPS 20 & above at Islamabad
50.454 0.000 50.454 0.000 7.568 0.000 7.568
3 Const. of 11 Cat. V & 10 Cat VI Flats for
FIA staff in G-8/1 Islamabad.
15.319 0.000 11.192 4.127 4.127 0.000 4.127
4 Const. of 2 Cat.III & 12 Cat IV Flats for
FIA staff in G-8/2 Islamabad.
17.812 0.000 13.533 4.279 4.279 0.000 4.279
5 Const. of FIA Police Station Bldg. of Cat
II Faisalabad.
13.209 0.000 12.000 1.209 1.209 0.000 1.209
6 Const. of FIA Police Station Bldg. of Cat
II Multan.
34.975 0.000 15.000 19.975 10.000 0.000 10.000
7 Const. of Police Station in FIA Building at
Hamid Nizami Road Lahore.
21.307 0.000 18.500 2.807 2.807 0.000 2.807
8 Const. of FIA Buliding at Khunjrab Pass
(Sust) Phase-II
19.291 0.000 13.370 5.921 5.921 0.000 5.921
9 Const. of FIA Cat-III Police Station
Building at D.I.Khan.
16.156 0.000 6.361 9.795 5.000 0.000 5.000
10 Construction of 5 Cat-IV and 8-Cat-V
type Flats for the staff of F.I.A. at
Hyderabad.
11.900 0.000 5.500 6.400 6.400 0.000 6.400
11 Const. of building for RPO at Abbottabad 25.102 0.000 16.924 8.178 7.478 0.000 7.478
12 Const. of building for RPO at Multan 31.459 0.000 22.187 9.272 9.238 0.000 9.238
13 Const. of building for RPO at Bhawalpur 22.459 0.000 15.868 6.591 6.272 0.000 6.272
14 Const. of building for RPO at Sukkur 31.787 0.000 25.387 6.400 6.110 0.000 6.110
15 Const. of building for RPO at D. I. Khan 23.322 0.000 14.227 9.095 8.135 0.000 8.135
16 Const. of building for RPO at
Muzaffarabad
23.511 0.000 10.374 13.137 13.137 0.000 13.137
17 Const. of building for RPO at Mirpur 22.930 0.000 16.974 5.956 5.956 0.000 5.956
18 Const. of building for RPO at Sialkot 35.128 0.000 9.145 25.983 15.000 0.000 15.000
19 Construction of Accommodation for 8
Wing Pakistan Rangers (Punjab) at Moza
Mundake Berian District Sialkot
81.480 0.000 76.480 5.000 5.000 0.000 5.000
20 Construction of 100x BOPs for Pakistan
Rangers (Punjab)
230.500 0.000 208.500 22.000 22.000 0.000 22.000
21 Construction of Frontier Constabulary HQ
and Lines at Sector H-11/1, Islamabad.
145.000 0.000 128.000 17.000 17.000 0.000 17.000
22 Const. of FC District HQ at Malakand (
Phase IV )
18.800 0.000 16.298 2.502 2.500 0.000 2.500
23 External Water Supply to FC Head
Quarter at Jutial Gilgit.
10.400 0.000 6.142 4.258 4.260 0.000 4.260
24 Raising of Balochistan Constabulary,
Balochistan
4138.000 50.000 2313.947 1824.053 1500.000 0.000 1500.000
25 Conversion of B area into A Area in 25
Revenue Districts of Balochistan
5515.407 0.000 2619.400 2896.007 1000.000 0.000 1000.000
Rupee TotalForeign
Loan
INTERIOR DIVISION
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
Estimated Cost
(Million Rupees)
Foreign
Loan
1 2 3 4 5 6 7 8 9
26 Const. of Surgical Medical Block JCO
Ward & other Allied Facilities alongwith
Renovation. of Family Wing at FC
Hospital, Quetta
384.144 0.000 46.165 337.979 10.000 0.000 10.000
27 Construction of Single Man Barrack
office at HQ Coast Guards Karachi
31.273 0.000 24.286 6.987 6.987 0.000 6.987
28 Construction of SM Barracks or Married
Accommodation for HQ NA Scouts and
113 Wing at Gilgit
57.051 0.000 39.031 18.020 5.000 0.000 5.000
29 Construction of Single and Married
Accommodation for Officers JCOs and
others for HQ NA Scouts and 113 Wing
at Gilgit
67.224 0.000 30.197 37.027 5.000 0.000 5.000
30 Construction of Residential and Non-
Residential Building for 112 Wing NA
Scouts at Skardu.
142.294 0.000 20.000 122.294 20.000 0.000 20.000
31 Project Monitoring & Evaluation Cell
Islamabad.
37.539 0.000 28.001 9.538 14.000 0.000 14.000
32 Construction of Judicial & Administration
Complex in G-10/1, Islamabad.
419.207 0.000 344.940 74.267 20.000 0.000 20.000
33 Construction of 05 Nos. Police Barrack
for 100 men each near K Block,
Islamabad
119.508 0.000 83.802 35.706 20.000 0.000 20.000
34 Construction of 04 Nos. Police Barrack
100 men each in Sector F-7, F-8, G-9
and G-10, Islamabad
90.590 0.000 66.433 24.157 24.147 0.000 24.147
35 Construction of Admin Block, Quarter
Guard, 03 Barracks, Magazine and
Horse Stable in Diplomatic Enclave
Islamabad.
201.407 0.000 60.000 141.407 30.000 0.000 30.000
36 Water Supply Scheme Shahpur 13.000 0.000 12.000 1.000 1.000 0.000 1.000
37 Construction of Residential
Accommodation for Officer of ICT.
36.978 0.000 20.000 16.978 16.978 0.000 16.978
38 Construction of Residential
Accommodation for Judicial
Officers/Officials of Session Courts at
Islamabad (Phase -- II).
37.197 0.000 17.644 19.553 5.000 0.000 5.000
39 Water Supply Scheme Trammri. 12.588 0.000 7.904 4.684 4.684 0.000 4.684
40 Water Supply Scheme Pindori &
Adjoining Dhokes.
18.000 0.000 13.471 4.529 4.529 0.000 4.529
41 Water Supply Scheme (WSS) Nilore. 9.823 0.000 4.648 5.175 5.175 0.000 5.175
42 Construction of MT Shed and 02 Barrack
for 100 men for MT staff in Police Lines,
Sector H-11, Islamabad.
62.152 0.000 51.684 10.468 10.468 0.000 10.468
43 Improvement/ Dev. Of Civil Defence
Department in ICT
10.069 0.000 8.507 1.562 1.569 0.000 1.569
44 Women Credit Programme 5.000 0.000 2.800 2.200 1.500 0.000 1.500
45 Training for Women in Glass Painting &
Flowers making
1.600 0.000 1.032 0.568 0.570 0.000 0.570
46 Establishment of Computer literacy
Centre in 9 Union Council (AP)
3.500 0.000 1.370 2.130 1.000 0.000 1.000
47 Establishment of Forest Nurseries and
Block Afforestation in ICT
7.030 0.000 5.686 1.344 1.344 0.000 1.344
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
INTERIOR DIVISION
(Million Rupees)
Estimated Cost
48 Establishment of National Forensic
Science Agency (HQs), and Islamabad
Laboratory
1292.450 52.000 543.934 748.516 500.000 0.000 500.000
1 2 3 4 5 6 7 8 9
49 Automated Finger-Print Identification
System
1107.014 537.014 1297.014 0.000 10.000 0.000 10.000
50 Personal Identification, Secure
Comparision & Evaluation System
(PISCES)
501.021 317.059 498.105 2.916 40.000 0.000 40.000
51 National Response Centre for Cyber
Crime (NR3C)
181.429 0.000 100.000 81.429 81.429 0.000 81.429
52 Machine Readable Passports/Visas/ ABC
Project
2830.930 1348.180 2612.560 218.370 312.000 0.000 312.000
53 Machine Readable Passports/Machine
Readable Visa Project (Phase-II)
3562.540 2679.570 651.756 2910.784 863.613 0.000 863.613
54 Islamabad Development Package 4300.000 0.000 1042.310 3257.690 500.000 0.000 500.000
55 Construction of Auditorium at National
Police Academy H-11, Islamabad
38.700 0.000 28.700 10.000 3.000 0.000 3.000
56 Construction of 40 X Other Ranks
Family Qtrs at Dera Bugti
33.812 0.000 15.000 18.812 5.000 0.000 5.000
57 Construction of MT Shed, Boundary Wall
& Road at Dera Bugti
21.215 0.000 10.000 11.215 5.000 0.000 5.000
58 Construction of 6x MOQs, 2x 64 Men
Barracks & Office Block at Dera Bugti
24.215 0.000 10.000 14.215 5.000 0.000 5.000
59 Construction of 2x128 Men Barracks,
1x150 Men Dinning Hall/Cook House and
JCOs Mess at Ghazaband Scouts Beleli.
33.205 0.000 15.000 18.205 5.000 0.000 5.000
60 Construction of 6 x JCOs Quarters and
24x Others Ranks Qtrs at Kohlu, Fazal
Chal & Barkhan
26.747 0.000 10.000 16.747 5.000 0.000 5.000
61 Construction/Improvement of Roads at
Talhar, ICT, Islamabad
38.710 0.000 5.000 33.710 33.710 0.000 33.710
62 Street Pavement in Villages
Shahdra/Mohar Noor (Remaining Area),
ICT, Islamabad
38.870 0.000 5.000 33.870 33.870 0.000 33.870
63 Street Pavement in Village Nilore/Area
RD Markaz Tarlai
35.500 0.000 27.910 7.590 7.590 0.000 7.590
64 Construction of Tubewell and Allied
works at NPA Building, Sector H-11,
Islamabad.
27.149 0.000 15.000 12.149 5.000 0.000 5.000
65 Construction of 20 x posts for TS 39.860 0.000 10.000 29.860 5.000 0.000 5.000
66 Construction of 20 x Posts for South
Wazirstan Scouts
39.860 0.000 10.000 29.860 5.000 0.000 5.000
67 Const of 1x Additional Wing
Accommodation for Swat Scouts at
Warsak
247.464 0.000 50.000 197.464 5.000 0.000 5.000
68 Const: of 3 X Married Officer Quarters for
Pakistan Coast Guards each at Battalion
Headquarter Gwadar, Pasni and Uthal.
39.196 0.000 15.000 24.196 5.000 0.000 5.000
69 WSS Mohra Nagial & Chak Sihala 20.262 0.000 10.000 10.262 10.262 0.000 10.262
70 Street pavement in 3 villages of UC
Tarlai
39.840 0.000 34.000 5.840 5.840 0.000 5.840
71 Const. Improvement of Road at Kot
Hathial (South)
30.240 0.000 30.240 0.000 32.630 0.000 32.630
Rupee Foreign
Loan
Allocation for 2008-09
Total
INTERIOR DIVISION
Estimated CostSl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Total Foreign
Loan
Throw-
forward as
on 01-7-08
(Million Rupees)
72 Improvement of 10 KM Rural Road in UC
Koral
30.240 0.000 10.000 20.240 20.240 0.000 20.240
1 2 3 4 5 6 7 8 9
73 Street pavement in 5 villages Dhokes of
UC Kirpa
30.240 0.000 10.000 20.240 24.240 0.000 24.240
74 Street pavement in villages Pagh panwal,
Boora Bangial, Pind Dlan, Bukkar &
Lohibher
34.990 0.000 10.000 24.990 24.990 0.000 24.990
75 Street pavement in Villages Tumair,
Jandala & Sihall
39.840 0.000 32.900 6.940 6.940 0.000 6.940
76 Improvement of link Rawat-Sheikhpur,
Rajwal Ara Humak Road
34.290 0.000 10.000 24.290 24.290 0.000 24.290
77 Const. Improvement of Road at Gokina 35.000 0.000 10.000 25.000 25.000 0.000 25.000
78 Street pavement at Pind Begwal 35.000 0.000 31.000 4.000 4.000 0.000 4.000
79 Provision of Sweat Water to 59 numbers
Border Out Posts of Pakistan Rangers
(Sindh)
92.600 0.000 40.000 52.600 52.600 0.000 52.600
80 Construction of Judicial Lockup for 500
Deportees/victims for FIA Gwadar
12.941 0.000 5.000 7.941 7.941 0.000 7.941
81 Construction of FC District HQ at
Malakand (Phase-III)
19.160 0.000 16.251 2.909 2.750 0.000 2.750
82 Construction of Officers Colony for HQ
NWFP at Hayatabad, Peshawar
28.261 0.000 22.530 5.731 5.731 0.000 5.731
83 Construction of Ammunition Magazine for
Pakistan Coast Guards at Pasni
6.045 0.000 3.537 2.508 2.508 0.000 2.508
84 External Water Supply Net Work for
Pakistan Coast Guards at Gwadar &
Pasni
7.259 0.000 4.461 2.798 2.800 0.000 2.800
85 Construction of Boundary Wall for
Battalion Hqrs at winder (Front Side
Block Masonry & Three Side Borbed wire
fencing)
1.813 0.000 1.220 0.593 0.593 0.000 0.593
86 Construction of Office and Residential
Accommodation for Pakistan Coast
Guards at Battalion Head Quarters Pasni
33.250 0.000 0.000 33.250 9.000 0.000 9.000
87 Construction of BHU with Staff
Accommodation at Tarnol
22.940 0.000 10.233 12.707 12.707 0.000 12.707
88 Upgradation of Automated Finger
Identication System (AFIS)
212.140 0.000 165.000 47.140 47.140 0.000 47.140
89 Installation of 25 Filtration Plant for FC
Balochistan
39.530 0.000 20.000 19.530 5.000 0.000 5.000
90 Const. Of Building of National Institute of
Fire Technology, Islamabad.
270.393 0.000 79.472 190.921 17.000 0.000 17.000
91 Establishment & Construction of Federal
Civil Defence Training School,
Faisalabad
39.816 0.000 19.829 19.987 9.426 0.000 9.426
92 Const. Of Zonal Office for FIA at
Peshawar
39.405 0.000 39.198 0.207 0.207 0.000 0.207
93 Construction of Accommodation 9-Wing
at Moza Kailon District Kasur (Phase-II)
85.327 0.000 55.000 30.327 15.000 0.000 15.000
94 Construction of Accommodation for HQ 2
Wing Chenab Rangers at Village Ratta
Ariaan tehsil & District Sialkot
113.463 0.000 20.000 93.463 15.000 0.000 15.000
Total
Estimated CostName, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Sl.
No
INTERIOR DIVISION
(Million Rupees)
95 Construction of Accommodation for
Abdullah Shah Ghazi Rangers at Karachi
616.050 0.000 100.000 516.050 15.000 0.000 15.000
1 2 3 4 5 6 7 8 9
96 Construction of Accommodation for
Bhittai Rangers at Karachi
616.058 0.000 42.312 573.746 15.000 0.000 15.000
97 Infrastructure (Civil works) for Married
Accommodation of 30 Inspectors and
Married Accommodation for 104 Other
Ranks of Bhittai Rangers Karachi.
32.500 0.000 5.000 27.500 15.000 0.000 15.000
98 Construction of 2 D/S
Barracks, 15 Family Quarters,
Recreation Hall, Canteen, Gymnasim
Skill Man Shops at FC Line Shabqadar
61.331 0.000 30.000 31.331 14.836 0.000 14.836
99 Const. of FC District HQ at Malakand (
Phase V )
33.390 0.000 16.964 16.426 16.426 0.000 16.426
100 Const: of Other Ranks
Accommodation for Pakistan Coast
Guards at Company Headquarter,
Ormara.
16.225 0.000 8.000 8.225 8.225 0.000 8.225
101 Const of Wing Office, Quarter Guard,
JCOs Mess, Officers Mess and Accn etc
for HQ NA Scouts and 113 Wing at Gilgit
73.572 0.000 28.300 45.272 10.490 0.000 10.490
102 Const of Residential Buildings for Force
HQ NA Scouts and 113 Wing at Gilgit
109.819 0.000 20.000 89.819 11.000 0.000 11.000
103 Const of Non Residential Buildings and
other Facilities for Force HQ NA Scouts
and 113 Wing at Gilgit.
166.220 0.000 20.915 145.305 10.000 0.000 10.000
104 Const of Play Ground, Mosque, MT
Workshop etc and other Facilities for HQ
NA Scouts and 112 Wing at Skardu
74.098 0.000 30.400 43.698 10.040 0.000 10.040
105 Const of Residential and Non Residential
Buildings for 112 Wing NA Scouts,
Skardu
142.294 0.000 20.000 122.294 10.000 0.000 10.000
106 Const of Accn for HQ NA Scouts and 114
Wing at Chilas.
288.944 0.000 101.393 187.551 12.000 0.000 12.000
107 Construction of Revenue Service Center
Golra
18.797 0.000 10.000 8.797 8.797 0.000 8.797
108 Construction of 20 Patwarkhanas of ICT 38.043 0.000 16.568 21.475 10.000 0.000 10.000
109 Construction of Houses Cat-II for 15
Superintendent of Police, Islamabad
79.244 0.000 20.000 59.244 10.000 0.000 10.000
110 Construction of Wireless Complex and
Residential Accommodation for
Telecommunication Staff in Sector H-11,
Islamabad
58.515 0.000 20.000 38.515 5.000 0.000 5.000
111 Construction of Horse stable and 01
Barrack for 100 Men for Horse Stable
Staff in Sector H-11, Islamabad
30.991 0.000 15.000 15.991 15.991 0.000 15.991
112 Construction of Police Station Tarnol,
Islamabad
63.270 0.000 17.000 46.270 10.000 0.000 10.000
113 Water Supply Scheme, Kot Hathial 23.240 0.000 10.000 13.240 13.240 0.000 13.240
114 Promotion of Livestock among Women
of ICT
2.500 0.000 1.000 1.500 0.500 0.000 0.500
INTERIOR DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost
Total
Expenditure
upto June
2008
Allocation for 2008-09
TotalForeign
Loan
Throw-
forward as
on 01-7-08
Foreign
Loan
Rupee
1 2 3 4 5 6 7 8 9
115 Development of Rural Poultry in ICT 5.139 0.000 2.933 2.206 2.200 0.000 2.200
116 Strengthening of Mobile Veterinary
Services in ICT
7.034 0.000 4.378 2.656 2.650 0.000 2.650
117 Improvement of Milk & Meat Production
by Strengthening Artificial Insemination
Services in Islamabad
12.524 0.000 9.880 2.644 2.640 0.000 2.640
118 Up gradation & Expansion of Veterinary
Healthcare Services in ICT
18.264 0.000 14.776 3.488 3.488 0.000 3.488
119 Development of Adaptive Research
Farms in ICT
17.450 0.000 16.262 1.188 1.188 0.000 1.188
120 Development of Olive Vegetable Nursery
in ICT
22.057 0.000 7.481 14.576 3.931 0.000 3.931
121 Fisheries Development & Improvement
of Rawal Dam, its Tributaries & Rivers of
ICT
6.800 0.000 5.924 0.876 0.876 0.000 0.876
122 Strengthening Facilities at Fish Seed
Hatchery project Rawal Dam with
Establishment of Diagnostic Labaratory
5.571 0.000 4.403 1.168 0.624 0.000 0.624
123 Raising of Sindh Constabulary 1000.000 0.000 0.000 1000.000 1000.000 0.000 1000.000
Total (Interior) 31814.884 4983.823 14828.303 17176.581 6942.537 0.000 6942.537
Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Rupee Foreign
Loan
Total
Allocation for 2008-09
Total
INTERIOR DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
On-going
1 Award of Merit Scholarship to Students of
FGEIs in Cantts.
15.480 0.000 12.060 3.420 3.240 0.000 3.240
2 Establishment of Degree College
Nowshera
39.684 0.000 19.684 20.000 20.000 0.000 20.000
3 Const. of Residential Accommodation for
Operational Staff at PMD Centre Lahore
26.940 0.000 23.940 3.000 3.000 0.000 3.000
4 Construction of New Residential
Accommodation at Met Colony,
University Road, Karachi
57.360 0.000 29.220 28.140 20.000 0.000 20.000
5 Reconst. of Met Observatory Building &
Const. of Boundary Wall around Met
Land at Chillas
3.950 0.000 3.070 0.880 0.880 0.000 0.880
6 Const. of HQ MSA Building Plot 34-A
Dockyard Road, Karachi
150.668 0.000 101.370 49.298 38.910 0.000 38.910
7 Construction of Barrack Accommodation
at Quetta Airport
18.722 0.000 16.950 1.772 4.500 0.000 4.500
8 Construction of New Gwadar
International Airport
6400.000 1050.000 50.000 6350.000 225.000 525.000 750.000
9 Reconstruction of Office Building for
CWO at Ghari Duppatta
13.270 0.000 9.410 3.860 3.860 0.000 3.860
10 Reconstruction of Office Building at PBO
Muzaffarabad
12.730 0.000 4.430 8.300 8.300 0.000 8.300
11 Reconstruction of Met Observatory at
Balakot
13.270 0.000 1.320 11.950 2.000 0.000 2.000
12 Construction of Barrack Accommodation
at Turbat Airport
5.895 0.000 5.895 0.000 1.000 0.000 1.000
13 Construction of Barrack Accommodation
at Gwadar Airport
5.895 0.000 5.900 0.000 1.124 0.000 1.124
14 Metrological Training Facilities for
Neighbouring Developing Countries
8.871 0.000 6.000 2.871 2.870 0.000 2.870
15 Capacity Building of Pakistan
Meteorological Department
107.315 0.000 0.000 107.315 27.600 0.000 27.600
16 Establishment of Aeronautical Met. Office
at Sialkot int'l Airport Ltd. (SIAL)
9.441 0.000 6.940 2.501 2.510 0.000 2.510
17 Const. of Hostel Buildg. at RMC
Peshawar
11.500 0.000 7.320 4.180 4.180 0.000 4.180
18 Renovation of Met. Centre / Replacing of
Roof Slab Main Met Office Buldg. 46 Jail
Road Lahore
30.620 0.000 7.260 23.360 10.000 0.000 10.000
19 Establishment of Specialized Medium
Range Forecasting Centre (SMRFC) in
the Islamic Republic of Pakistan
431.742 402.909 11.990 419.752 16.843 402.909 419.752
20 Establishment of Monitoring and
Evaluation Cell M/o Defence
36.860 0.000 0.000 36.860 10.000 0.000 10.000
21 Establishment of Tropical Cyclone
Warning Centre at Karachi
124.763 0.000 0.000 124.763 109.690 0.000 109.690
22 Construction of Office Building Survey of
Pakistan, Peshawar
83.730 0.000 0.000 83.730 23.000 0.000 23.000
Sl.
No
Name, Location & Status of the
Scheme Foreign
Loan
Rupee Foreign
Loan
Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
Total
DEFENCE DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
23 Construction of New Residential Quarters
Pilot Baloon Observatory (PBO), Zhob
4.374 0.000 2.000 2.374 2.370 0.000 2.370
24 Construction of IMG Hostel at
Meteorological Complex University Road,
Karachi
32.080 0.000 13.700 18.380 14.060 0.000 14.060
25 Construction of Residential
Accommodation at Met. Complex in
Sector H-8/2, Islamabad
80.900 0.000 2.890 78.010 20.000 0.000 20.000
26 Construction of Residential
Accommodatin at ASF Karachi
81.360 0.000 25.000 56.360 15.000 0.000 15.000
27 Upgradation & Strengthening of Seismic
Network of PMD (Basic Component of
Sonami Early Warning System)
193.574 0.000 185.089 8.485 8.664 0.000 8.664
28 Up-gradation of Paediatric, Cardiac,
Surgical Facility in NIHD
321.730 0.000 125.400 196.330 182.310 0.000 182.310
29 Construction of First Floor of FFD,
Lahore
13.790 0.000 0.000 13.790 3.000 0.000 3.000
30 Water Connection to ASF Camp, Karachi 11.600 0.000 0.000 11.600 6.000 0.000 6.000
31 Water Distribution Network for
Rawalpindi Cantonment from Khanpur
Dam Source (Phase-III)
699.500 0.000 0.000 699.500 100.000 0.000 100.000
.32 Construction of Dinning Hall with Kitchen
at Survey of Pakistan
0.410 0.000 0.000 0.410 1.200 0.000 1.200
Total (Others) 9048.024 1452.909 676.838 8371.191 891.111 927.909 1819.020
SUPPARCO
33 Development of Flexible Bearing
SUPARCO Plant, Karachi
128.000 0.000 65.000 63.000 25.000 0.000 25.000
34 Development of Composite Pressure
Vessel Sindh (Karachi)
131.000 0.000 65.000 66.000 26.000 0.000 26.000
35 Development of Large Dia Rocket Motor
Casing Using Maraging Steel Sindh
(Karachi)
286.000 0.000 159.000 127.000 50.000 0.000 50.000
36 Development of Satellite Environmental
Validation and Testing (EVT) Facility
Punjab (Lahore)
215.053 0.000 114.701 100.352 100.352 0.000 100.352
37 Up-gradation of Quality Assurance and
Quality Control Labs Sindh (Karachi)
195.000 0.000 125.000 70.000 30.000 0.000 30.000
38 Human Resource Development (Phase-
II) for National Satellite Development
Programme (NSDP)
357.009 0.000 172.379 184.630 50.000 0.000 50.000
39 Know-How Development & Capacity
Building in Satellite Engineering and
Technology
411.657 0.000 260.089 151.568 84.700 0.000 84.700
40 Up-gradation of Propellant Testing
Facility
182.000 0.000 102.000 80.000 47.000 0.000 47.000
41 Pakistan Communication Satellite
System (Paksat-IR)
18810.910 0.000 3883.700 14927.210 1764.500 0.000 1764.500
Total Foreign
Loan
Allocation for 2008-09
(Million Rupees)
Estimated Cost Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
DEFENCE DIVISION
Rupee
1 2 3 4 5 6 7 8 9
42 Design & Development of Compact
Antenna Test Range (CATR)
499.860 0.000 397.060 102.800 150.000 0.000 150.000
43 Development of a Satellite Assembly
Integration & Test (SAINT) Facility
323.612 0.000 171.280 152.332 100.000 0.000 100.000
44 Establishment of a SAINT Support
Workshop
96.588 0.000 16.840 79.748 50.000 0.000 50.000
45 Altitude & Orbital Control System (AOCS)
Centre
376.637 0.000 59.500 317.137 100.000 0.000 100.000
46 Remote Sensing Data Transmission
(RSDT) Facility
251.289 0.000 103.710 147.579 76.900 0.000 76.900
47 Satellite Bus Development Facility
(Phase-I)
439.817 0.000 37.390 402.427 70.000 0.000 70.000
48 Development of Satellite Dynamic
System Test Facility
201.336 0.000 26.160 175.176 50.000 0.000 50.000
49 Pak Sat Project (Phase-I Extension) 722.728 0.000 245.790 476.938 249.676 0.000 249.676
50 Upgradation of Precision Machine Shop 178.000 0.000 31.500 146.500 46.000 0.000 46.000
51 COSPAS - SARSAT Station Upgradation 98.955 0.000 75.360 23.595 23.595 0.000 23.595
52 Design Development & Testing of
Special Metallic Joint
159.000 0.000 97.000 62.000 20.000 0.000 20.000
53 Fog Aerosole Characterization, Source
Appointment and Impact Study Lahore
50.000 0.000 9.500 40.500 2.500 0.000 2.500
New Schemes
54 Development of CFIs to Fly On-board
Communication Satellite Pak-Sat-1R
487.413 0.000 0.000 487.413 1.000 0.000 1.000
55 Development of Engineering
Qualification Model (EQM) of a Small
Communication Satellite (SCS)
496.702 0.000 0.000 496.702 1.000 0.000 1.000
56 Development of Logistic Support
Facilities for NSDP
495.330 0.000 0.000 495.330 1.000 0.000 1.000
57 Development of various Labortaries for
National Satellite Development Program
(NSDP)
476.922 0.000 0.000 476.922 1.000 0.000 1.000
Total (SUPPARCO) 26070.818 0.000 6217.959 19852.859 3120.223 0.000 3120.223
Total (Defence) 35118.842 1452.909 6894.797 28224.050 4011.334 927.909 4939.243
RupeeTotal Foreign
Loan
Expenditure
upto June
2008
Name, Location & Status of the
Scheme
Estimated Cost
DEFENCE DIVISION
(Million Rupees)
Sl.
No
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Foreign
Loan
Total
1 2 3 4 5 6 7 8 9
On-going
1 Establishment of Information and
Communication Technology (ICT) R&D
Laboratory, Islamabad
35.604 0.000 23.608 11.996 11.996 0.000 11.996
2 Centre of Excellence for Urdu Informatics
Development of Standards
37.121 0.000 27.513 9.608 8.833 0.000 8.833
3 Production of Scientific, Technical &
Model general reading material in
National Language Authority, Islamabad
23.018 0.000 10.580 12.438 4.432 0.000 4.432
4 Construction of 2nd floor within the
current Shaikh Zayed Hospital Building,
Lahore.
841.939 0.000 304.017 537.922 329.351 0.000 329.351
5 Liver Transplant Centre Project at Shaikh
Zayed Postgraduate Medical Institute,
Lahore
170.250 0.000 51.000 119.250 72.250 0.000 72.250
6 Up-gradation of Equipment and
Improvement of Infrastructure in the
Microfilming Unit of NDC, Islamabad
35.477 0.000 1.516 33.961 2.509 0.000 2.509
CDA
7 Construction of Residential and Non
Residential Accommodation for Police at
Aiwan-e-Sadar, Islamabad.
157.864 0.000 51.258 106.606 30.000 0.000 30.000
8 Construction of Official Residence of
Honourable Speaker National Assembly
in Sector F-5/2, Islamabad.
77.420 0.000 29.641 47.779 47.779 0.000 47.779
9 Improvement of HVAC System and
Furnishing at Aiwan-e-Sadar, Phase-II.
Senate Hall at Parliament House
Building, Islamabad.
36.569 0.000 16.996 19.573 19.537 0.000 19.537
10 Addition of 3rd & 4th Lane Kashmir
Highway from Peshawar more to Gholra
more.
2191.827 0.000 50.000 2141.827 50.000 0.000 50.000
11 AC Facilities by Providing Additional
Installation of Split/package type units,
Providing/Installation Fire Alarm system,
P/L of CCTV System & Procurement of
Spares for Lifts at Parliament House,
Islamabad
59.890 0.000 18.554 41.336 10.857 0.000 10.857
12 Rehabilitation/Replacement of 32 Nos
Lifts at Pak Secretariat Building,
Islamabad
173.969 0.000 26.150 147.819 147.969 0.000 147.969
13 Construction of 3rd Avenue between
Sector G-3 & G-4 from Murree Road to
Quaid-e-Azam University, Islamabad
33.633 0.000 30.026 3.607 1.500 0.000 1.500
14 Construction of Offices for Chairman
Standing Committees
1468.774 0.000 25.000 1443.774 50.000 0.000 50.000
Total (On-going) 5343.355 0.000 665.859 4677.496 787.013 0.000 787.013
New Schemes
15 Purchase of Land for Construction of
Pakistan Institute of Parliamentary
Services (PIPS) in Sector F-5 Islamabad
34.472 0.000 0.000 34.472 34.472 0.000 34.472
16 Prime Minister's Special Initiative for
Hunarmand Pakistan Programme
2000.000 0.000 0.000 2000.000 2000.000 0.000 2000.000
17 Institute of National Disaster
Management
158.000 0.000 100.000 58.000 58.000 0.000 58.000
Total Foreign
Loan
Rupee Total
Allocation for 2008-09Name, Location & Status of the
Scheme
Estimated CostSl.
No
CABINET DIVISION
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
(Million Rupees)
Foreign
Loan
Total (New) 2192.472 0.000 100.000 2092.472 2092.472 0.000 2092.472
Total (Cabinet) 7535.827 0.000 765.859 6769.968 2879.485 0.000 2879.485
1 2 3 4 5 6 7 8 9
On-going
1 Adoption of Social Accountability (SA
8000) Islamabad
124.875 0.000 30.377 94.498 45.000 0.000 45.000
2 Creation of Domestic Commerce Wing in
Ministry of Commerce Islamabad.
36.366 0.000 4.000 32.366 10.000 0.000 10.000
3 Creation of Planning & Monitoring Wing
in Ministry of Commerce Islamabad
38.796 0.000 9.000 29.796 10.000 0.000 10.000
4 Construction of Building for Pakistan
School of Fashion Design at Johar Town,
Lahore
859.170 0.000 505.590 353.580 190.000 0.000 190.000
5 Trade & Transport Facilitation Project 360.000 0.000 24.800 335.200 20.000 60.000 80.000
6 Capacity Building of National Tariff
Commission for implementation of Trade
Defence Laws. Islamabad JICA-
Japan/EU/China/
39.500 23.880 0.000 39.500 3.000 0.000 3.000
7 Restructuring Foreign Trade Institute of
Pakistan , Islamabad
130.000 0.000 30.000 100.000 50.000 0.000 50.000
Total (On-going) 1588.707 23.880 603.767 984.940 328.000 60.000 388.000
New Schemes *
8 Furnishing & Purchase of Equipment for
School of Fashion Design
200.000 0.000 0.000 200.000 75.000 0.000 75.000
Total (New) 200.000 0.000 0.000 200.000 75.000 0.000 75.000
Total (Commerce) 1788.707 23.880 603.767 1184.940 403.000 60.000 463.000
COMMERCE DIVISION
* 50% of the cost should be borne from EDF
Foreign
Loan
Total
Name, Location & Status of the
Scheme
Sl.
No
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee
(Million Rupees)
Estimated Cost
1 2 3 4 5 6 7 8 9
On-going
1 Construction of Office Building for M/ o
Local Govt. and Rural Dev.G-5,
Islamabad
215.228 0.000 185.452 29.776 29.776 0.000 29.776
2 Restoration of Fire affected Shaheed-e-
Millat,Secretariat, Islamabad.
196.881 0.000 175.944 20.937 20.937 0.000 20.937
3 Improvement and Uplift of External Area
and Car Parking in Shaheed - e Millat
Secretariat Building at F-6 Islamabad
17.052 0.000 10.821 6.231 6.231 0.000 6.231
4 Acquisition of Land and Construction of
Residential Accommodation for NAB,
Peshawar.
231.873 0.000 262.500 0.000 10.000 0.000 10.000
5 Construction of Office cum Residential
Accommodation for I.B at Chitral.
15.300 0.000 10.800 4.500 4.500 0.000 4.500
6 Construction of Accommodation for I.B at
Parachinar.
3.052 0.000 2.829 0.223 0.233 0.000 0.233
7 Construction of Specialized Commando
Training Center for Anti Dacoit at
Sakrand Road Nawabshah
199.900 0.000 204.280 0.000 25.000 0.000 25.000
8 Construction of Office building 3rd floor
for AGPR Karachi
20.702 0.000 21.594 0.000 2.000 0.000 2.000
9 Construction of FPSC building at Mustafa
Town Lahore
37.512 0.000 40.761 0.000 4.343 0.000 4.343
10 Const. of National Accountability Bureau
Punjab Complex Lahore
487.252 0.000 231.430 255.822 70.000 0.000 70.000
11 Purchase of State Bank Colony and New
Construction of Office Building for NAB
(B) at Quetta
323.400 0.000 273.000 50.400 5.000 0.000 5.000
12 Construction of Office cum Residential
Accommodation for I.B Sibbi.
16.078 0.000 12.451 3.627 3.627 0.000 3.627
13 Const.of Resdl. Accommodation for
F.G.Es at Islamabad (P.M.Estate).
366.329 0.000 356.279 10.050 10.000 0.000 10.000
14 Construction of 30-Nos Minister's
Residences at Islamabad (Phase-II,14-
Nos Residences).
205.230 0.000 187.678 17.552 2.000 0.000 2.000
15 Provision of Pak.Secretariat Blocks,T.U
& V Islamabad
1176.322 0.000 504.000 672.322 500.000 0.000 500.000
16 Replacement of Kitchen cabinet of
21,72 and 108-Family suits at Gulshan-e-
Jinnah,F-5,Islamabad.
17.255 0.000 13.753 3.502 3.502 0.000 3.502
17 Acq.of land & construction of 48-Family
suits at Islamabad.
170.696 0.000 101.932 68.764 68.764 0.000 68.764
18 Construction of 2-Nos Pre-Stressed
Bridges in Distt Abbottabad.
57.810 0.000 42.456 15.354 5.000 0.000 5.000
19 Internal water supply at Manzoor Colony
and Strengthening Water Supply at
Mehmoodabad Karachi.
138.500 0.000 131.523 6.977 3.000 0.000 3.000
20 Musa Khail Tunsa Road (35km) stretch
Roads to be constructed and Linked with
Zhob
497.620 0.000 80.000 417.620 50.000 0.000 50.000
21 Construction of office Building for
National Accountability Bureau
Headquarter at G-5/1 Islamabad.
540.650 0.000 101.000 439.650 50.000 0.000 50.000
Throw-
forward as
on 01-7-08
Allocation for 2008-09
TotalForeign
Loan
Total Foreign
Loan
Rupee
Expenditure
upto June
2008
Estimated CostSl.
No
Name, Location & Status of the
Scheme
(Million Rupees)
HOUSING & WORKS DIVISION
1 2 3 4 5 6 7 8 9
22 Acquisition of land for Pak PWD,
Complex at Multan.
38.822 0.000 15.818 23.004 23.004 0.000 23.004
23 Construction of Garages and Servant
Quarters at 72-Family Suites Sector F-
5/1, Islamabad.
11.309 0.000 3.309 8.000 8.000 0.000 8.000
24 Widening and Reconditioning of Badin-
Tando Bago-Judho Road (Via Pangrio)
from 12 feet to 24 feet)
189.300 0.000 61.340 127.960 40.000 0.000 40.000
25 Construction of VIP Block No. 5(32 Suits)
at Federal Lodge No.1 (Qaser-e-Naz)
Karachi
145.000 0.000 20.000 125.000 20.000 0.000 20.000
26 Construction of Allied and Renovation
works at Constantia Lodge at Kashmir
Point Murree
18.694 0.000 8.398 10.296 10.000 0.000 10.000
27 Special Repair of Wafaqi Colony at
Dhana Singh Wala Lahore
39.950 0.000 22.959 16.991 10.649 0.000 10.649
28 Construction of Federal Government
Office/Residential at Carlton hotel Cantt.
Karachi
38.800 0.000 13.000 25.800 10.000 0.000 10.000
29 Construction of Working Women hostel
at Garden road Karachi
34.500 0.000 11.000 23.500 10.000 0.000 10.000
30 Up gradation and Renovation of Qasre-e-
Naz Karachi
39.408 0.000 8.214 31.194 10.000 0.000 10.000
31 Rehabilitation works at A.G Office Lahore 39.472 0.000 23.800 15.672 21.230 0.000 21.230
32 Reception Hall, Canteen and updating
Electrical Infrastructure at A.G Office,
Lahore
29.980 0.000 18.894 11.086 11.086 0.000 11.086
33 Construction of FPSC Branch at Quetta 36.230 0.000 15.000 21.230 21.230 0.000 21.230
34 Construction of office/Residential
Accommodation for I.B at Lakki Marwat
10.872 0.000 5.000 5.872 6.872 0.000 6.872
35 Construction of Office and Residential
Accommodation for I.B at Zhob
33.987 0.000 16.718 17.269 17.269 0.000 17.269
36 Extension of I.B Academy H-11/1,
Islamabad
196.600 0.000 25.000 171.600 50.000 0.000 50.000
37 Provision and Installation of HVAC
equipment at Shaheed-e-Millat Sectt.
Building Islamabad
30.604 0.000 0.611 29.993 29.993 0.000 29.993
38 Computerization working of Pak. PWD 292.000 0.000 0.000 292.000 5.000 0.000 5.000
39 Construction of Curtis Ground in District
Haripur
25.640 0.000 8.740 16.900 0.640 0.000 0.640
40 Construction of 12 Nos Apartment in
Minister's Enclave, Islamabad
164.511 0.000 10.000 154.511 50.000 0.000 50.000
41 Renovation of Govt. owned House, Cat-I
& II, Family Suites & Minister's
Residencies, Islamabad
15.848 0.000 10.000 5.848 5.848 0.000 5.848
42 Renovation/ Rehabilitation of 240 Cat 'F'
Type Flats at FC Area Karachi (Phase-I)
38.179 0.000 10.000 28.179 14.000 0.000 14.000
43 National Housing Policy Implementation
Project
38.627 0.000 5.000 33.627 10.000 0.000 10.000
TotalTotal
(Million Rupees)
Sl.
No
Estimated Cost Expenditure
upto June
2008
HOUSING & WORKS DIVISION
Foreign
Loan
Rupee Foreign
Loan
Allocation for 2008-09Name, Location & Status of the
Scheme
Throw-
forward as
on 01-7-08
1 2 3 4 5 6 7 8 9
44 Construction of Mosque at Federal
Lodge-I, Islamabad
7.562 0.000 2.502 5.060 5.060 0.000 5.060
Total (On-going) 6450.537 0.000 3265.786 3223.899 1263.794 0.000 1263.794
New Schemes
45 Provision of Smoke /Heat Detectors for
Fire Alarm system of Prime Minister
Secretariat, Islamabad
1.610 0.000 0.000 1.610 1.610 0.000 1.610
46 Construction of Wall, Car Shed ,Gate
and Accommodation of Land,
Landscaping for I.B, F/5 Islamabad
39.644 0.000 0.000 39.644 15.000 0.000 15.000
47 Provision of Car shed in Garages
Complex at Prime Minister House
Islamabad
0.695 0.000 0.000 0.695 0.695 0.000 0.695
48 Construction of Security Beats (6-Nos)
and Jeepable Track along C.C Wall at
Prime Minister House, Islamabad
0.928 0.000 0.000 0.928 0.928 0.000 0.928
49 Renovation, Rehabilitaion of 264 Cat. "G"
Type Flats at FC Area Karachi (Ph-II)
39.512 0.000 0.000 39.512 20.000 0.000 20.000
50 Renovation, Rehabilitaion 20 Cat. "C" &
32 Cat "D" Type Flats at Govt. officers
Colony at Garden Rd Karachi(Ph-II)
39.203 0.000 0.000 39.203 20.000 0.000 20.000
51 Cont. of Additional Accommodation at
FPSC Building, Mustafa Town, Lahore
9.748 0.000 0.000 9.748 9.745 0.000 9.745
52 Cont. of Cat-III, Dispensary /Enquiry and
Overhead Tank for I.B. Departmnet at 94
Upper Mall, Lahore
32.600 0.000 0.000 32.600 10.000 0.000 10.000
53 Const. of Cat-II Houses for I.B
Department at 111,College Rd. Lahore
8.750 0.000 0.000 8.750 8.750 0.000 8.750
54 Rehabilitaion of Old I.B. Office at 94-
Upper Mall Lahore
9.637 0.000 0.000 9.637 9.637 0.000 9.637
55 Undertaking Survey and Feasibility Study
of Pak. PWD Complex at 11-Egerton Rd.
Lahore
0.500 0.000 0.000 0.500 0.500 0.000 0.500
56 Construction of Audit Complex Peshawar 39.995 0.000 0.000 39.995 15.000 0.000 15.000
57 Provision of Reception ,Waiting Office
Guard Room and Compound Wall
Fatima Jinnah Hostel G 5/2, Islamabad
2.230 0.000 0.000 2.230 2.230 0.000 2.230
58 Construction of 24-Family Suites in
Federal Lodge No.1 at G 5/1, Islamabad
37.672 0.000 0.000 37.672 15.000 0.000 15.000
59 Const. of Federal Lodge -II, Shami Road
Peshawar
39.512 0.000 0.000 39.512 15.000 0.000 15.000
60 Construction of 22 Cat-IV for Flat Low
paid FG Employee Hassan Gari
Peshawar
39.812 0.000 0.000 39.812 15.000 0.000 15.000
Total Foreign
Loan
Rupee Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
(Million Rupees)
Estimated CostSl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
HOUSING & WORKS DIVISION
1 2 3 4 5 6 7 8 9
61 Additional /Alteration in NAB Office
Building at Hyatabad ,Peshawar
7.963 0.000 0.000 7.963 6.073 0.000 6.073
62 Construction of Mosque at Prime
Minister's Secretariat, Islamabad
6.810 0.000 0.000 6.810 6.810 0.000 6.810
63 Renovation/Improvement of CGE & Pak.
PWD. Colony at Wahdat Road, Lahore
(Turbine Pumping Set)
9.873 0.000 0.000 9.873 9.873 0.000 9.873
64 Capacity Building & Strengthening of
National Housing Authority & Technical
Wing of Ministry of Housing & Works
166.400 0.000 0.000 166.400 66.400 0.000 66.400
65 Acquisition of land for execution of Pilot
Project of 1000 apartments for low paid
Federal Govt. Employees
(BS . 1-16)
258.089 0.000 0.000 258.089 258.089 0.000 258.089
66 Prime Minister's Special Initiative for
Housing for the Government Servants
(Revolving Fund)
1000.000 0.000 0.000 1000.000 1000.000 0.000 1000.000
67 Prime Minister's Special Initiative for
Housing for the Poor (Revolving Fund)
1000.000 0.000 0.000 1000.000 1000.000 0.000 1000.000
68 Real Estate Investment Trust 300.000 0.000 0.000 300.000 300.000 0.000 300.000
Total (New) 3091.183 0.000 0.000 3091.183 2806.340 0.000 2806.340
Total (Housing & Works) 9541.720 0.000 3265.786 6315.082 4070.134 0.000 4070.134
Expenditure
upto June
2008
Total Foreign
Loan
Rupee Foreign
Loan
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total
HOUSING & WORKS DIVISION
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost
1 2 3 4 5 6 7 8 9
On-going
1 Construction of High Security Block
Ministry of Foreign Affairs, Islamabad
605.000 0.000 165.191 439.809 218.948 0.000 218.948
2 Furnishing of High Security Block and
Conference Hall
195.000 0.000 6.627 188.373 188.373 0.000 188.373
Total (On-going) 800.000 0.000 171.818 628.182 407.321 0.000 407.321
Total (Foreign Affairs) 800.000 0.000 171.818 628.182 407.321 0.000 407.321
MINISTRY OF FOREIGN AFFAIRS
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated Cost Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
1 2 3 4 5 6 7 8 9
On-going
1 Community Participation in Drug
Demand Reduction.
32.430 0.000 14.000 18.430 18.430 0.000 18.430
2 Creating Mass Awareness against Drug
Abuse
39.000 0.000 13.000 26.000 26.000 0.000 26.000
3 Khyber Area Development Project Phase-
II, FATA
558.310 529.140 306.570 251.740 15.890 134.110 150.000
4 Re-organisation of Special Development
Unit (UNDCP)
23.340 11.850 9.450 13.890 0.000 2.400 2.400
5 Kohistan Area Development Project 933.350 600.000 71.740 861.610 5.500 126.290 131.790
6 Kala Dhaka Area Development Project 667.910 420.050 137.390 530.520 6.000 81.620 87.620
7 Construction of Anti Narcotics Force
Police Station at Kohat Tunnel, NWFP.
29.092 0.000 4.000 25.092 15.092 0.000 15.092
8 Treatment Programme for Injecting Drug
Units Rawalpindi
19.700 0.000 8.000 11.700 11.700 0.000 11.700
9 Bajaur Area Development Project Phase -
III (Grant)
60.000 60.000 20.000 40.000 0.000 40.000 40.000
10 Mohmand Area Development Project
Phase - III (Grant)
70.900 60.000 20.000 50.900 5.650 45.250 50.900
11 Construction of Anti Narcotics Force HQ
Building at Islamabad
305.523 0.000 0.000 305.523 11.000 0.000 11.000
12 Construction of Anti Narcotics Force
Academy at Islamabad
188.891 0.000 0.000 188.891 10.000 0.000 10.000
13 Planning and Monitoring Cell in Ministry
of Narcotics Control, Islamabad
24.880 0.000 5.000 19.880 12.330 0.000 12.330
14 Model Addiction Treatment &
Rehabilitation Centre, Islamabad
39.020 0.000 5.000 34.020 21.180 0.000 21.180
15 Model Addiction Treatment &
Rehabilitation Centre, Quetta
39.020 0.000 5.000 34.020 21.180 0.000 21.180
16 Linkage of Nara Amazi and Bait Gali
District Haripur with Kala Dhaka Area of
Disrict Mansehra
193.400 0.000 35.000 158.400 158.400 0.000 158.400
Total (Narcotics Control) 3224.766 1681.040 654.150 2570.616 338.352 429.670 768.022
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Total Foreign
Loan
(Million Rupees)
Foreign
Loan
Total
Sl.
No
Estimated Cost Allocation for 2008-09Throw-
forward as
on 01-7-08
NARCOTICS CONTROL DIVISION
Rupee
1 2 3 4 5 6 7 8 9
On-going
1 Balancing & Modernization of Equipment
Phase-V.
112.353 0.000 80.000 32.353 32.353 0.000 32.353
2 2x100 KW SW Transmitter & H.F Aerial
system Landhi, Karachi
433.459 0.000 266.760 166.699 166.699 0.000 166.699
3 Expansion of Educational TV Channel
PTV 2nd Channel (Phase-II)
722.330 698.695 17.350 704.980 3.000 0.000 3.000
4 TV Centre, Multan Punjab 280.173 0.000 251.000 29.173 29.173 0.000 29.173
5 Rebroadcast Station, Kohat 20.310 0.000 15.000 5.310 5.310 0.000 5.310
6 Rebroadcast Station, Badin 26.800 0.000 20.000 6.800 6.800 0.000 6.800
7 Rebroadcast Station, Kharan,
Balochistan
23.070 0.000 15.000 8.070 8.070 0.000 8.070
8 Rebroadcast Station, Bar Khan,
Balochistan
26.365 0.000 10.000 16.365 16.365 0.000 16.365
9 Rebroadcast Station, Mian Channu,
Punjab
81.822 0.000 30.000 51.822 30.000 0.000 30.000
10 Rebroadcast Station, Jura, AJK 20.115 0.000 11.000 9.115 9.115 0.000 9.115
11 Rebroadcast Station, Athmaqam 20.115 0.000 11.000 9.115 9.115 0.000 9.115
12 Rebroadcast Station, Karan, AJ&K 20.115 0.000 11.000 9.115 9.115 0.000 9.115
13 Rebroadcast Station, Dhudhnial, AJ&K 20.115 0.000 11.000 9.115 9.115 0.000 9.115
14 Rebroadcast Station, Shadra, AJ&K 20.115 0.000 11.000 9.115 9.115 0.000 9.115
15 Rebroadcast Station, Koi (AJ&K) 20.115 0.000 11.000 9.115 9.115 0.000 9.115
16 Establishment of PBA and IT Block at
Lehtrar Road, Receiving Centre,
Islamabad
62.938 0.000 62.938 0.000 2.000 0.000 2.000
17 Electronic News Gathering Service (APP) 246.000 0.000 120.000 126.000 123.419 0.000 123.419
18 100 KW/MW Transmitter at Chaman 124.549 0.000 30.000 94.549 56.312 0.000 56.312
19 100 KW/MW Transmitter at Gwadar 139.842 0.000 30.000 109.842 66.312 0.000 66.312
20 Establishment of Uplinking Station at
PBC Islamabad, Lahore, Karachi,
Peshawar and Quetta
49.981 0.000 30.000 19.981 2.000 0.000 2.000
21 Establishment of Planning and
Monitoring Cell, Information and
Broadcasting Division
28.951 0.000 9.000 19.951 8.967 0.000 8.967
22 Establishment of 47 FM Radio Stations 475.534 0.000 50.000 425.534 187.234 0.000 187.234
23 TV Booster at Shangla, Swat 52.854 0.000 40.000 12.854 12.854 0.000 12.854
24 Islamabad Media University PC-II 30.676 0.000 11.676 19.000 19.000 0.000 19.000
Total (On-going) 3058.697 698.695 1154.724 1903.973 830.558 0.000 830.558
New Schemes
25 National Press Club PC-II Islamabad 35.000 0.000 0.000 35.000 35.000 0.000 35.000
26 Replacement of 3 Transmitters of 100
KW at Muzaffarabad, Hyderabad and
Multan
155.144 0.000 0.000 155.144 50.000 0.000 50.000
27 100 KW MWB T/R Para Chanar FATA 122.849 0.000 0.000 122.849 122.849 0.000 122.849
Total (New) 312.993 0.000 0.000 312.993 207.849 0.000 207.849
Total (Information & Broadcasting) 3371.690 698.695 1154.724 2216.966 1038.407 0.000 1038.407
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Foreign
Loan
TotalRupee
Estimated CostSl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
INFORMATION & BROADCASTING DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
On-going
1 Construction of NIPA Complex at
Sumungly Road, Quetta.
350.082 0.000 226.000 124.082 100.000 0.000 100.000
2 Construction of 50 Rooms Hostel at
CSA, Walton, Lahore.
39.510 0.000 39.510 0.000 11.562 0.000 11.562
3 Ladies Industrial Home-cum-Work Order
Centres at Lahore, Karachi and
Peshawar
21.736 0.000 9.000 12.736 6.000 0.000 6.000
4 Job Content Analysis (JCA) Project 26.000 0.000 0.130 25.870 13.000 0.000 13.000
5 Construction of New Hostel Building at
NIM, Karachi
35.813 0.000 20.000 15.813 15.813 0.000 15.813
6 Improvement / Up-Gradation of Holiday
Home No.1, Muree
5.562 0.000 3.562 2.000 2.000 0.000 2.000
Total (On-going) 478.703 0.000 298.202 180.501 148.375 0.000 148.375
New Schemes
7 Construction of Mosque, Receiption
office and six No. Toilets in STI
Premises at Islamabad
4.077 0.000 0.000 4.077 4.077 0.000 4.077
8 Improvement & up-gradation of
vocational Training Centres and Ladies
industrial Homes
38.996 0.000 0.000 38.996 19.460 0.000 19.460
9 Replacement of Sewerage Line at Pak.
Academy for Rural Development (PARD)
Peshawar (NWFP)
4.721 0.000 0.000 4.721 4.721 0.000 4.721
10 Construction of NSPP Headquarters at
Islamabad
800.000 0.000 0.000 800.000 100.000 0.000 100.000
11 Construction of 50 Rooms Hostel at CSA
Walton Lahore
39.510 0.000 0.000 39.510 16.180 0.000 16.180
Total (New ) 887.304 0.000 0.000 887.304 144.438 0.000 144.438
Total (Establishment) 1366.007 0.000 298.202 1067.805 292.813 0.000 292.813
Allocation for 2008-09Estimated CostSl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Total Foreign
Loan
Rupee Total
Throw-
forward as
on 01-7-08
Foreign
Loan
(Million Rupees)
ESTABLISHMENT DIVISION
1 2 3 4 5 6 7 8 9
On-going
1 Project for Technical Assistance to
Access to Justice Program (Revised),
Islamabad. (ADB)
1692.516 1280.754 495.309 1197.207 150.000 350.000 500.000
2 Federal Programme under Access to
Justice Program,Islamabad, (ADB).
6420.000 6420.000 848.647 5571.353 1000.000 0.000 1000.000
3 Provincial Programme under Access to
Justice Programme,Islamabad.(ADB)
11880.000 11880.000 9179.411 2700.589 880.000 0.000 880.000
Total (On-going) 19992.516 19580.754 10523.367 9469.149 2030.000 350.000 2380.000
New Schemes
4 Construction of New Building of Federal
Shariat Court Bench Registry Khyber
Road, Peshawar
63.462 0.000 0.000 63.462 1.000 0.000 1.000
Total (New) 63.462 0.000 0.000 63.462 1.000 0.000 1.000
Total (Law, Justice & HR) 20055.978 19580.754 10523.367 9532.611 2031.000 350.000 2381.000
Rupee
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Allocation for 2008-09
(Million Rupees)
Total
Throw-
forward as
on 01-7-08
Foreign
Loan
Total Foreign
Loan
LAW, JUSTICE & HUMAN RIGHTS DIVISION
Estimated Cost
1 2 3 4 5 6 7 8 9
On-going
1 Establishment of Taxpayers Facilities
Centres (TFCs) and Const. of Transit
Accommodation With RTOs and LTU, at
Islamabad
314.500 0.000 114.245 200.255 125.000 0.000 125.000
2 Const. of Boundary wall of Custom
Station Jiwani, Custom Post. Omara and
Barracks for Class IV Staff at Turbat
Jiwani and Omara.
22.318 0.000 15.141 7.177 7.177 0.000 7.177
3 Const. of Inter Agency Complex, Khuda
Abad at Khunjrab Pass.
15.097 0.000 14.789 0.308 4.685 0.000 4.685
4 Tax Administration Reform Project
(TARP), Islamabad. World Bank/ IDA
loan.
9500.617 7193.041 1703.930 7796.687 220.000 1625.000 1845.000
5 Construction of 3rd
, 4th
and 5th
floor of
office building of Collectorate of
Customs, CE & ST for DOT, Customs,
CE & ST at G-9/1, Islamabad
35.538 0.000 32.000 3.538 3.538 0.000 3.538
6 Provision of Residential Facilities for the
Officers/Staff of the Collectorate of
Customs at Jamrud Road, Peshawar
21.103 0.000 15.500 5.603 6.103 0.000 6.103
7 Construction of Additional Office Block at
Income Tax Department, Faisalabad
39.991 0.000 29.015 10.976 16.050 0.000 16.050
8 Construction of Residentioal
Accommodation for Income Tax Quetta
21.984 0.000 17.053 4.931 4.931 0.000 4.931
9 Construction of 2nd, Office Block in CBR
House in G-5/1, Islamabad
236.034 0.000 135.000 101.034 100.000 0.000 100.000
10 Project Monitoring & Evaluation Cell 39.499 0.000 6.000 33.499 16.000 0.000 16.000
11 Construction of Multi Storied Office
Building for Custom House, Multan
33.212 0.000 17.300 15.912 15.912 0.000 15.912
12 Construction of Additional Office Block at
Income Tax Department, Multan
31.788 0.000 16.000 15.788 15.788 0.000 15.788
13 Construction of Annexe Building and
Store Rooms at Regional Taxpayers
Offie, Lahore
39.000 0.000 8.000 31.000 9.518 0.000 9.518
14 Renovation of Customs Old Building,
Wahga, Lahore
14.513 0.000 1.634 12.879 12.879 0.000 12.879
15 Renovation/Rehabilitation of Office/
Residential Buildings of DOT, Income
Tax, Sutluj Block, Allama Iqbal Town,
Lahore
14.400 0.000 7.000 7.400 7.400 0.000 7.400
16 Construction of Boundary Wall for Office
and Residential Accommodation for
Regional Sommissionerate of Income
Tax at Public School Road, Mouza Near
Kot, Multan
2.650 0.000 0.000 2.650 2.650 0.000 2.650
17 Construction of Additional Office Block
Building for Income Tax Department
Faisalabad
39.991 0.000 23.098 16.893 16.893 0.000 16.893
18 Construction of 50 Nos Cat - V Flats for
Customs Sepays at Kharadar, Karachi
33.654 0.000 13.000 20.654 20.654 0.000 20.654
19 Construction of Income Tax Office
Building 3rd & 4th Floor phase-II at F/L-
17 & 18 Block-15 at Gulstan-e-johar,
Karachi
32.260 0.000 16.000 16.260 16.260 0.000 16.260
TotalRupee
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Estimated Cost
Foreign
Loan
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
REVENUE DIVISION
(Million Rupees)
1 2 3 4 5 6 7 8 9
20 Construction of Remaining Portion of
Boundary Wall and Retaining Wall for
Hostel of MBA Tax Management
Programme Officers/ Officials Residential
Accommodation at Gulistan-e-johar,
Karachi
9.739 0.000 5.000 4.739 4.739 0.000 4.739
21 Operation of Integrated Cargo/ Container
Control (IC3) Site in Pakistan at Port
Muhammad Bin Qasim, Karachi
230.980 0.000 201.000 29.980 29.980 0.000 29.980
22 Establishment of Customs Station
Qamar-ud-din Karez & Friendship Gate
at Afghanistan Border
21.266 0.000 6.266 15.000 15.000 0.000 15.000
23 Establishment of Customs Station at
Badini at Afghanistan Border
34.239 0.000 15.000 19.239 19.239 0.000 19.239
24 External Essential Services at Integrated
Cargo/ Container Control (IC3) Project,
Port Muhammad Bin Qasim, KarachI
40.790 0.000 35.470 5.320 5.320 0.000 5.320
25 Construction of 2nd, 3rd, 4th & 5th floor
of office Building of Regional Income Tax
for DOTS & ROTS at G-9/1 Islamabad
37.671 0.000 15.000 22.671 13.295 0.000 13.295
26 Construction of Hostel Building at
Directorate General Training & Research
(Custom, CE&ST) Regional Office at
DOT Complex Allama Iqbal Twon Lahore
12.774 0.000 6.000 6.774 6.774 0.000 6.774
27 Renovation of Old Hostel Building at
Directorate General IT (Training &
Research), Allama Iqbal Twon, Lahore
14.400 0.000 7.000 7.400 7.400 0.000 7.400
28 Construction of 1st floor over existing
Office Building and Renovation of its
ground floor, Boat House, Slipway and
Docking of Customs Patrol
Boats/Launches for Antismuggling
Organization near Passenger Pier
Keamari Karachi
16.078 0.000 5.000 11.078 11.078 0.000 11.078
29 Renovation of Old Custom House
Building Karachi
34.567 0.000 7.654 26.913 4.509 0.000 4.509
30 Providing and Installation of 2 No Lifts in
the Collectorate of ST&FE at NIPA
Chorangi Karachi
12.944 0.000 6.000 6.944 6.944 0.000 6.944
Total (Revenue) 10953.597 7193.041 2494.095 8459.502 745.716 1625.000 2370.716
Allocation for 2008-09
Rupee Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost
REVENUE DIVISION
(Million Rupees)
Throw-
forward as
on 01-7-08
Foreign
Loan
Expenditure
upto June
2008
Total
1 2 3 4 5 6 7 8 9
On-going
1 Installation of Ship Lift & Transfer System
and Associated Machinery and
Equipment to Provide Docking and
Repair Facilities to Surface Ships,
Submarines and Commercial Vessels of
upto 4,000 Tonnage
3000.000 0.000 310.000 2690.000 1300.000 0.000 1300.000
2 Civil Works for Up-gradation of Karachi
Shipyard & Engineering Works Ltd (KS &
EW)
494.000 0.000 121.000 373.000 100.000 0.000 100.000
Total (On-going) 3494.000 0.000 431.000 3063.000 1400.000 0.000 1400.000
New Schemes
3 Establishment of Project Management
Cell for Development of Ship Building
Industries in Pak.
394.000 0.000 69.000 325.000 50.000 0.000 50.000
Total (New) 394.000 0.000 69.000 325.000 50.000 0.000 50.000
Total (Defence Production) 3888.000 0.000 500.000 3388.000 1450.000 0.000 1450.000
Estimated CostSl.
No
Name, Location & Status of the
Scheme
Allocation for 2008-09
Total Total
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
(Million Rupees)
DEFENCE PRODUCTION DIVISION
Foreign
Loan
Rupee Foreign
Loan
1 2 3 4 5 6 7 8 9
On-going
1 Support to Good Governance Islamabad.
(Phase-III) UNDP funded as grant
235.330 209.630 89.000 146.330 76.714 0.000 76.714
Total (NRB) 235.330 209.630 89.000 146.330 76.714 0.000 76.714
(Million Rupees)
Allocation for 2008-09
Foreign
Loan
Total
Sl.
No
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Total Foreign
Loan
Estimated Cost
Rupee
NATIONAL RECONSTRUCTION BUREAU
1 2 3 4 5 6 7 8 9
1 Institutional Strengthening and Efficiency
Enhancement of Economic Affairs
Division
39.985 0.000 3.030 36.955 12.000 0.000 12.000
Total Economic Affairs Division 39.985 0.000 3.030 36.955 12.000 0.000 12.000
Total
Estimated Cost Expenditure
upto June
2008
Name, Location & Status of the
Scheme Total Rupee
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Foreign
Loan
Foreign
Loan
ECONOMIC AFFAIRS DIVISION
(Million Rupees)
Sl.
No
1 2 3 4 5 6 7 8 9
On-going
1 National Program for Improvement of
Watercourses in Pakistan
50655.027 0.000 30264.620 20390.407 9500.000 0.000 9500.000
2 Chaghi Water & Agricultural
Development Programme.
567.170 0.000 124.830 442.340 50.000 100.000 150.000
3 National Research Project on Water
Management of Spate Irrigation System
in Pakistan
95.961 0.000 46.070 49.891 10.000 0.000 10.000
4 Land and Water Resources
Development Project for Poverty
Reduction in Pakistan
3400.000 0.000 900.000 2500.000 1350.000 0.000 1350.000
5 Establishment of Federal Programme
Management Unit (PMU) National
Programme for Improvement of Water
courses in Pakistan,
199.517 0.000 19.410 180.107 10.000 0.000 10.000
6 Water Conservation & Productivity
Enhancement through High Efficiency
Irrigation System.
18000.000 0.000 1250.000 16750.000 1000.000 0.000 1000.000
7 Strengthening of Livestock Services for
Livestock Diseases Control in Pakistan,
Eradication of Rinderpest. All provinces
1714.800 1587.270 884.830 829.970 20.000 100.000 120.000
8 Agriculture Sector Development Loan
(Ph - I) ADB Asisted. All Pakistan
10266.000 10266.000 5498.193 4767.807 260.000 0.000 260.000
9 Agribusiness Development and
Diversification Project, ADB Assisted All
Provinces and AJK.
3274.000 1860.000 1081.635 2192.365 250.000 500.000 750.000
10 Restructuring and Strengthening of
National Agricultural Research System,
Balochistan, Phase-I (Revised)
723.867 0.000 263.057 460.810 175.110 0.000 175.110
11 Livestock Production and Development
of Meat Production. All Pakistan
1520.847 0.000 354.792 1166.055 316.776 0.000 316.776
12 Prime Minister's Special Initiative for
Livestock (All Pakistan)
1696.400 0.000 798.159 898.241 300.000 0.000 300.000
13 Milk Collection/Processing and Diary
Production & Development Programme
(All Pakistan)
1588.350 0.000 349.795 1238.555 350.000 0.000 350.000
14 National Integrated Pest Management
Project
197.433 0.000 99.909 97.524 37.033 0.000 37.033
15 Adaptation of Integrated Pest
Management Approach for Cotton Crop
in Sindh
75.541 0.000 48.974 26.567 5.000 0.000 5.000
16 Managing Burewala Strain of Cotton
Virus. All Pakistan
149.085 0.000 144.138 4.947 4.947 0.000 4.947
17 Programme Implementation Unit for
ASPL-II Loan, Islamabad
36.050 0.000 20.610 15.440 8.000 0.000 8.000
18 Special Programme for Strengthening
SPS Facilities and Quality Inspection
Services in Compliance with WTO ,
Establishment of an Integrated National
Animal and Plant Health Inspection
Services (NAPHIS)
358.060 0.000 124.872 233.188 100.000 0.000 100.000
19 Rapid Conversion of Wild Olive into Oil
Bearing Species, NWFP, Punjab and
Balochistan
186.379 0.000 133.712 52.667 52.667 0.000 52.667
Total Foreign
Loan
Rupee Foreign
Loan
Total
Estimated CostName, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
(Million Rupees)
Sl.
No
FOOD, AGRICULTURE & LIVESTOCK DIVISION
1 2 3 4 5 6 7 8 9
20 Introduction of Sugarbeet and
Enhancement of Sugarcane Productivity
in Punjab, Sindh, NWFP and Balochistan
35.000 0.000 26.969 8.031 6.500 0.000 6.500
21 Production of Medicinal Herbs in
Collaboration with Private Sector All
Provinces/AJK
98.222 0.000 33.710 64.512 17.541 0.000 17.541
22 National Agricultural Land Use Plan
(Phase-I)
185.753 0.000 134.561 51.192 20.000 0.000 20.000
23 Establishment of Post-Entry Quarantine
Sections (Construction and Execution of
Port Qasim Station), Karachi
13.611 0.000 8.577 5.034 5.034 0.000 5.034
24 Pesticide Quality Control and Research
Laboratory in Balochistan
19.262 0.000 15.875 3.387 3.387 0.000 3.387
25 Establishment of Seed Testing
Laboratories and Rehabilitation of
Existing Laboratories
81.284 0.000 62.268 19.016 19.016 0.000 19.016
26 Oilpalm Development Project
Sindh/Balochistan
113.080 0.000 75.523 37.557 37.557 0.000 37.557
27 National Project to Stimulate the
Adaptation of Permanent Raised Beds
for Maize, Wheat and Cotton-Wheat
Farming System in Pakistan (All
Provinces)
474.000 0.000 56.584 417.416 58.352 0.000 58.352
28 Establishment of Facilitation Unit for
Participatory Vegetable Seed & Nursery
Production Programme (All Pakisan)
497.500 0.000 96.775 400.725 122.655 0.000 122.655
29 National Programme for Control and
Prevention of Avian Influenza (All
Pakistan)
1180.142 0.000 327.700 852.442 371.254 0.000 371.254
30 Upgradation of Central Cotton Research
Institute, Multan as an International
Institute
363.080 0.000 123.600 239.480 92.900 0.000 92.900
31 Up-gradation and Establishment of
Animal Quarantine Stations in Pakistan
336.085 0.000 108.551 227.534 105.170 0.000 105.170
32 Establishment of Animal Quarantine
Station, Gwadar
38.287 0.000 15.656 22.631 16.685 0.000 16.685
33 Accreditation of Quarantine Facilities and
Training of Staff of Central Plant
Quarantine Laboratory, Karachi
22.520 0.000 10.293 12.227 12.227 0.000 12.227
34 Construction of Sukkur Outpost for the
Desert Locust Survey and Control Works
10.450 0.000 6.000 4.450 4.500 0.000 4.500
35 Stock Assessment Survey Programme in
EEZ of Pakistan through chartering of
Fisheries Research Vessel and Capacity
Building of MFD, Karachi
495.619 0.000 229.240 266.379 100.000 0.000 100.000
36 Operationalization/Commissioning of
Plant Quarantine Laboratory, Karachi
17.700 0.000 8.004 9.696 9.696 0.000 9.696
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Sl.
No
(Million Rupees)
FOOD, AGRICULTURE & LIVESTOCK DIVISION
Estimated Cost
Total
1 2 3 4 5 6 7 8 9
37 Etiology and Management of Sudden
Death Phenomenon in Mango, Punjab
and Sindh
25.470 0.000 16.730 8.740 8.740 0.000 8.740
38 Research for Agriculture Development
Programme (PARC and its institutions)
2963.000 0.000 766.708 2196.292 600.000 0.000 600.000
39 Improvement of Agricultural and
Livestock Markets and Marketing System
2000.000 0.000 9.500 1990.500 13.400 0.000 13.400
40 Aquaculture and Shrimp Farming 1997.303 0.000 100.000 1897.303 600.000 0.000 600.000
41 Commercialization of Tea Production
through Public-Private Partnership
NWFP and AJK
490.274 0.000 50.000 440.274 145.452 0.000 145.452
42 Special Programme for Food Security
and Productivity Enhancement of Small
Farmers in 1012 Villages. Crop
Maximazation Project-II (All Pakistan)
8013.522 0.000 470.000 7543.522 1600.000 0.000 1600.000
43 National Commercial Seed Production
Programme (PC -II)
6.400 0.000 4.000 2.400 2.400 0.000 2.400
44 Research and Development Cotton
Programme (PC - II)
6.400 0.000 3.000 3.400 3.400 0.000 3.400
45 Crop Scouting and Price Monitoring of
Essential Items of Daily Use by Common
Men
34.733 0.000 10.000 24.733 24.733 0.000 24.733
46 Fisheries Training Centre Gwadar 361.154 0.000 50.000 311.154 100.000 0.000 100.000
47 National Institute in Soil and Geomatics 39.660 0.000 15.000 24.660 10.920 0.000 10.920
48 Improving Reproductive Efficiency of
Cattle and Buffaloes in small holders
Production System
495.150 0.000 140.010 355.140 155.640 0.000 155.640
49 National Bio-Saline Agriculture
Programme
826.000 0.000 0.000 826.000 50.000 0.000 50.000
50 National Institute of Genomics &
Advanced Bio-technology (NIGAB)
482.701 0.000 40.000 442.701 100.000 0.000 100.000
51 Commercialization and Promotion of
Olive and Olive Products through Public -
Private Partnership for Economic
Development and Poverty Alleviation (PC-
II)
9.160 0.000 3.200 5.960 5.960 0.000 5.960
52 Promotion of Cotton Cultivation in
Balochistan Phase - II
160.470 0.000 0.000 160.470 30.000 0.000 30.000
53 Development of Olive Production and
Processing in Balochistan
190.000 0.000 0.000 190.000 20.000 0.000 20.000
54 Growing of Olive Palm in Coastal Belt of
Balochistan
326.371 0.000 0.000 326.371 20.000 0.000 20.000
55 Improvement of water Management
Practices in Northern Area
37.783 0.000 20.026 17.757 15.000 0.000 15.000
56 Exploration and Management of Water
Resources Development for Peri Urban
around ICT
27.260 0.000 4.000 23.260 5.000 0.000 5.000
Total (On-going) 117178.893 13713.270 45449.666 71729.227 18312.652 700.000 19012.652
New Schemes
Sl.
No
Name, Location & Status of the
Scheme Total
Estimated Cost
Foreign
Loan
Total
Allocation for 2008-09
FOOD, AGRICULTURE & LIVESTOCK DIVISION
Expenditure
upto June
2008
(Million Rupees)
Rupee
Throw-
forward as
on 01-7-08
Foreign
Loan
57 Biological Control of Major Cotton Pests
in Pakistan with Emphasis on Mealy Bug
363.722 0.000 0.000 363.722 150.224 0.000 150.224
1 2 3 4 5 6 7 8 9
58 National Pesticides Residues Monitoring
System
50.000 0.000 0.000 50.000 20.000 0.000 20.000
59 Construction of Office Building Central
Cotton Committee at Karachi
250.000 0.000 0.000 250.000 50.000 0.000 50.000
60 Prime Minister's Special Initiative for
White Revolution
500.000 0.000 0.000 500.000 500.000 0.000 500.000
61 Wheat Maximization Programme 1500.000 0.000 0.000 1500.000 500.000 0.000 500.000
62 Agriculture Sector Development Loan
(Phase-II)
5000.000 0.000 0.000 5000.000 200.000 0.000 200.000
63 Monitoring of Corps through Satellite
Technology (Phase-II)
183.000 0.000 0.000 183.000 18.000 0.000 18.000
64 Reconstruction of Test House in
DALPMG at Karachi
90.000 0.000 0.000 90.000 40.000 0.000 40.000
65 National oil Seed Development &
Commercial Production Programme
500.000 0.000 0.000 500.000 10.000 0.000 10.000
66 Development of Research Facility Olive
Model Form, Sungh Bhatti
15.000 0.000 0.000 15.000 15.000 0.000 15.000
Total (New) 8451.722 0.000 0.000 8451.722 1503.224 0.000 1503.224
Total (Food, Agriculture & Livestock) 125630.615 13713.270 45449.666 80180.949 19815.876 700.000 20515.876
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
Foreign
Loan
(Million Rupees)
FOOD, AGRICULTURE & LIVESTOCK DIVISION
Throw-
forward as
on 01-7-08
Total
Allocation for 2008-09
Total Rupee Foreign
Loan
1 2 3 4 5 6 7 8 9
On-going
1 Clean Drinking Water for All 15843.356 0.000 10605.502 5237.854 2000.000 0.000 2000.000
2 Clean Drinking Water Initiatives 955.100 0.000 565.322 389.778 219.780 0.000 219.780
3 Agro-Food Processing Facilities Multan 135.190 0.000 123.090 12.100 11.910 0.000 11.910
4 Gujranwala Business Centre, Gujranwala 98.780 0.000 78.000 20.780 15.640 0.000 15.640
5 Sports Industries Development Centre
Sialkot
272.620 0.000 249.900 22.720 22.720 0.000 22.720
6 Women Business Incubation Centre
Lahore
31.220 0.000 18.930 12.290 6.350 0.000 6.350
7 Institutional Development in MOIP&SI
with respect to WTO
39.840 0.000 16.806 23.034 10.000 0.000 10.000
8 Five (5) advanced CAD/CAM Training
Centres in 8 cities All over Pakistan
321.100 0.000 278.160 42.940 42.940 0.000 42.940
9 Gujranwala Tools, Dies and Moulds
Centre
878.040 0.000 367.690 510.350 510.350 0.000 510.350
10 2MGD Water Desalination Project
Gwadar Balochistan
378.860 0.000 244.930 133.930 133.930 0.000 133.930
11 Ceramic Complex, Gujranwala 314.470 0.000 220.000 94.470 55.960 0.000 55.960
12 Glass Products Design and
Manufacturing Centre Hyderabad, Sindh
37.080 0.000 23.540 13.540 13.540 0.000 13.540
13 Strengthening of Planning, Monitoring
and Evaluation Cell in M/o IP&SI
Islamabad
25.690 0.000 5.740 19.950 7.380 0.000 7.380
14 Foundry Service Centre Lahore 150.040 0.000 20.000 130.040 20.000 0.000 20.000
15 Product Development Centre for
Composite Based Sports Goods Sialkot
380.000 0.000 20.000 360.000 20.000 0.000 20.000
16 Development Projects of Pakistan Gem
& Jewllery Development Co.
1400.000 0.000 250.000 1150.000 400.000 0.000 400.000
17 Development of Marble and Granite
Sector
1980.000 0.000 500.000 1480.000 400.000 0.000 400.000
18 Expansion of Network of USC 1778.844 0.000 600.000 1178.844 600.000 0.000 600.000
19 Revival of Cuttlary Institute of Pakistan
Wazirabad
39.840 0.000 7.000 32.840 13.000 0.000 13.000
Total (On-going) 25060.070 0.000 14194.610 10865.460 4503.500 0.000 4503.500
New Schemes
20 Sialkot Business & Commerce Centre
(CBCC)
161.670 0.000 0.000 161.670 161.000 0.000 161.000
*21 China-Pak: Economic Zone Hattar,
NWFP
750.000 0.000 0.000 750.000 75.000 0.000 75.000
*22 Establishment of Industrial Estate
Khushhal Ghar, NWFP
150.000 0.000 0.000 150.000 10.000 0.000 10.000
23 Area Development and EPZ in
Balochistan
5000.000 0.000 0.000 5000.000 5000.000 0.000 5000.000
*24 Improvement, Re-habilitation and
Moderanization of Industrial Estates,
NWFP
500.000 0.000 0.000 500.000 75.000 0.000 75.000
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
Total
Estimated Cost
(Million Rupees)
INDUSTRIES, PRODUCTION & SPECIAL INITIATIVES DIVISION
Sl.
No
1 2 3 4 5 6 7 8 9
25 Chromite Benefication Plant Muslim
Bagh
8.380 0.000 0.000 8.380 8.380 0.000 8.380
26 Women Business Development Center,
Peshawar, NWFP
28.410 0.000 0.000 28.410 18.000 0.000 18.000
27 Revival of Hyderabad Leather Foot Wear
Center, Hyderabad
35.010 0.000 0.000 35.010 11.620 0.000 11.620
28 SME Sub Contracting Exchange in
Gujranwala
26.090 0.000 0.000 26.090 16.000 0.000 16.000
29 Washing and Impressing unit, Mutta
Mughal Kheal, Charsadda
5.380 0.000 0.000 5.380 2.380 0.000 2.380
30 Women Business Development Center,
Karachi
34.030 0.000 0.000 34.030 17.680 0.000 17.680
31 Policy and Project Implementation,
Monitoring and Evaluation Unit (PPIMEU)
25.820 0.000 0.000 25.820 19.000 0.000 19.000
32 Energy Efficiency for Textile Center in
Pakistan
39.680 0.000 0.000 39.680 20.010 0.000 20.010
33 Prime Minister's Special Initiative for
Village Product Specialization
500.000 0.000 0.000 500.000 500.000 0.000 500.000
34 Construction of Boundry Wall Site Office
for Gwadar EPZ
11.250 0.000 0.000 11.250 11.251 0.000 11.251
35 Cold Chains 100.000 0.000 0.000 100.000 10.000 0.000 10.000
Total (New) 7375.720 0.000 0.000 7375.720 5955.321 0.000 5955.321
Total (Industries, Production & Spl. Init) 32435.790 0.000 14194.610 18241.180 10458.821 0.000 10458.821
* Federal Share
Foreign
Loan
Rupee
INDUSTRIES, PRODUCTION & SPECIAL INITIATIVES DIVISION
Throw-
forward as
on 01-7-08
Allocation for 2008-09
Total Foreign
Loan
Total
(Million Rupees)
Sl.
No
Name, Location & Status of the
Scheme
Estimated Cost Expenditure
upto June
2008
1 2 3 4 5 6 7 8 9
On-going
1 Lahore Garment City Project, Punjab 497.640 0.000 350.000 147.640 147.640 0.000 147.640
2 Faisalabad Garment City Project, Punjab 498.820 0.000 131.138 367.682 367.682 0.000 367.682
3 Providing & Laying Dedicated 48 inch
Diameter mild Steel Water main for
Textile City Karachi
636.585 0.000 100.000 536.585 218.000 0.000 218.000
4 Export Development Plan
Implementation Unit
39.967 0.000 17.860 22.107 18.200 0.000 18.200
5 Up-gradation of EDF Funded Textile
Institutes
37.816 0.000 20.960 16.856 16.856 0.000 16.856
6 Holding of Conferences & Seminars 3.600 0.000 2.400 1.200 1.200 0.000 1.200
Total (Textile Industry) 1714.428 0.000 622.358 1092.070 769.578 0.000 769.578
Name, Location & Status of the
Scheme
Expenditure
upto June
2008
Throw-
forward as
on 01-7-08
Estimated CostSl.
No Total
Allocation for 2008-09
Total Foreign
Loan
Rupee Foreign
Loan
(Million Rupees)
TEXTILE INDUSTRY DIVISION