    Water Supply - Key Issues

    Issues pertaining to Quantity of waterOverall availability and equitable distribution

    Issues pertaining to Quality of WaterContamination due to aging network

    Issues pertaining to Cost of Operations and tariffstructure

    Issues pertaining to hours of supplyIntermittent supply vs. 24X7 supply

    Issues pertaining to unaccounted for waterPhysical as well as revenue losses

    Issues pertaining to Customers relationship

    management

  • 8/12/2019 Water Supply Initiatives

    3/32

    Customer CareChallenges of Rising Expectations & Numbers

  • 8/12/2019 Water Supply Initiatives

    4/32

    4

    Water Supp ly: 3350 Mld

    Major Water Treatmen t Plants:

    Bhandup: Rated capacity 1910 Mld, working at 2100MldPanjarapur: Rated capacity 1365 Mld, working at 1365Mld

    Vehar + Tulsi : Rated capacity 90 Mld

    Major Pumping stat ions:PisePanjarapurBhandupRaoli

    Master Balancing Reservoirs : 2

    YewaiBhandup

    Service Reservoirs : 26

    Length of water mains : 4000 Kms

    No. of Distr ibut ion Zones : 109

    No. of Leak-detect ion Zones : 615

    No. of dai ly operated valves : 800

    MumbaiWater Supply At A Glance

  • 8/12/2019 Water Supply Initiatives

    5/32

    5

    Exist ing Water Supp ly Sources

    Sr.

    No.

    Name of the Source Year of

    Completion

    Qty of Water

    Supply (MLD)

    Total Qty of Water

    Supply(MLD)(Cumulative)

    1 Vihar Lake 1860 110 110

    2 Tulsi Lake 1879 18 128

    3 Tansa Lake 1892 to 1925 485 613

    4 Lower & Upper Vaitarna 1957 1142 1755

    Bhatsa

    I Mumbai 1981 455 2210

    II Mumbai 1989 455 2665

    III Mumbai 1996 455 3120

    6

    III A MUMBAI 2007 350 3470 *

    Inclusive of 120MLD En-Route Supply

  • 8/12/2019 Water Supply Initiatives

    6/32

    6

    Sources o f Water Supp ly For Mumbai

    Basin w ise water

    sources

    Vaitarna

    Upper Vaitarna

    Lower Vaitarna

    Middle Vaitarna

    Pinjal

    Gargai

    Bhatsa

    Ulhas

    Kalu

    Shai

    MIDDLE

    VAITARNA

    GARGAI

    UPPERVAITARNA

    LOWER

    VAITARNA

    PINJAL

    KALU

    SHAI

    BHATSA

    TANSA

  • 8/12/2019 Water Supply Initiatives

    7/32

    Mumbai Water Supply- Broad Features

    Mumbais Current Population : 13 million

    Mumbais water supply : 3350 MLD

    Non-revenue water : 20-25%

    Domestic per capita water availability : 180 lpcd

    (excluding 20% leakage & Ind./Com. Demand)

    Avg. Hours of Supply : 2 to 4 hours

    The per capita water availability in some cities having 24X7 water supply:- London : 150 lpcd

    Singapore : 160 lpcd

    Kuala Lumpur : 120 lpcd

    Paris : 150 lpcd

    Phnom-Penh : 45 lpcd

    Thus Mumbai has enough water to switch over from the present intermittent patternto Continuous pattern of water supply provided:

    1. Non revenue water is reduced significantly

    2. Customer Demand is managed (including wastage)

    3. Supply is augmented as per rising demand (new sources for future demand are created)

  • 8/12/2019 Water Supply Initiatives

    8/32

    24X7 Water Supply- Myths & Realities

    24X7 water supply is an achievable objective with proper technical &

    Managerial reforms.

    Myth:

    The continuous water supply:

    Needs more water

    Expensive Is it necessary?

    Is it achievable?

    Truth:

    The intermittent water supply Consumes more water.

    Requires huge capital investment & coping costs

    Associated with the water pollution & leakage management problems

    The system is never designed for intermittent supply

    Reduces the asset life

  • 8/12/2019 Water Supply Initiatives

    9/32

    Intermittent System Consumes More Water

    1. Consumer taps are usually kept open.

    2. There is a tendency to store more water what is

    required.

    3. The STALE water is thrown to store FRESHwater.

    4. High peak needs strong network and more capital

    investment.5. Low pressures increases the coping cost of the

    consumer

    6. Leak detection & management is difficult.

  • 8/12/2019 Water Supply Initiatives

    10/32

    Benefits of 24 x 7 Water Supply

    1. Improved public health through reduction of waterpollution.

    2. Better system: Demand management by efficientmetering and rationalization of tariff

    3. Better leak detection & control measures.

    4. Higher consumer satisfaction: willingness to pay moreand on time.

    5. Investments in the network can be optimised.

    6. Consumer can utilize his time more productively.

    7. Reduction in the coping cost on the consumers.

    8. The unregulated ground water exploitation and itsnegative environmental impact prevented.

    9. Overall economic boost: Improved infrastructure attractsIndustry / Commerce.

  • 8/12/2019 Water Supply Initiatives

    11/3211

    Major Water Secto r Init iat ives

    Source Augmentat ion

    Demand-side Management

    Supp ly-side Management

    Transition from Intermittent to 24X7 Water Supply

  • 8/12/2019 Water Supply Initiatives

    12/3212

    Source Augmentat ion- Long Term Plan

    In the year 1993, the Govt. of Maharashtra appo inted an expert comm ittee under the chairm anship ofDr M A Chitale (Ex-Secretary, Irrigation Dept)for advice on the long term planning fo r augmentation

    of water supp ly to Mumbai. The committee recommended development of fol low ing sou rces in

    phases

    The GoM has accepted the Dr. Chi tale Comm it tee recommend at ions and has

    approved al lotment of these so urces. The MCGM has therefore taken u p th e

    Middle Vaitarna Projectas an imm ediate addi t ional source of water

    supp ly.Simul taneously feasib i l i ty of Gargai and Pinjal Projectsis current ly being

    studied and the report o f the Consul tants, M/s Mot Mcd onald & Co. in th is regard

    is current ly und er scrut iny.

    Sr. Source Basin Yield

    No. [MLD]

    1 Middle Vaitarna Vaitarna 455

    2 Gargai Vaitarna 455

    3 Pinjal Vaitarna 865

    4 Kalu Ulhas 590

  • 8/12/2019 Water Supply Initiatives

    13/32

    Demand Supply Scenario

    2001

    2011

    2021

    121.94 lakhs

    152.99 lakhs

    163.8 lakhs

    Source: Dr. Chi tale Committee Report

    44502980

    5300

    3800

    50105120

    Demand in Mld

    Supply in Mld

    Present Supply 3350 Mld

  • 8/12/2019 Water Supply Initiatives

    14/3214

    Source Augm entat ion

    III A Mumbai Water Supply Project

    Project based on Bhatsa Dam

    Original cost: Rs. 667 cr;

    Revised estimate: Rs.739 cr

    Earlier scheduled for completion in 2009,

    this project is fully commissioned in May

    2007, giving 355 mld of additional water to

    Mumbai

    Present allocation of

    355 mld water for the

    project has been

    renewed for 5 more yrs

    after 2007. Additional allocation of

    300 mld okayed for

    Mumbai from Bhatsa

    Dam for five years till

    Middle Vaitarna Project

    is completed.

  • 8/12/2019 Water Supply Initiatives

    15/3215

    Project is based on a new dam to be constructed

    between Upper Vaitarna dam and Modak Sagar

    Environmental Clearance along with permission for

    diversion of 634 ha of forest land received from the

    Ministry of Environment & Forest, Govt. of India

    Detailed estimates of all the components of the scheme

    prepared through Consultants.Tenders invited for most of the components of the

    Project Agency fixed for the Tunnel & Pipeline

    components

    The work on the Project expected to start in Oct 2007.

    Rehabilitation Plan for the 43 Project Affected Persons

    has been submitted to the District Rehabilitation Officer

    Thane for implementation after securing approval of theState Rehabilitation Authority

    ApprovedProject Cost:Rs.1,329.50 crore

    Proposal for

    financing under

    JNNURM cleared

    in February 07 by

    the Government

    of India.1stinstallment of grant

    released.

    Middle Vaitarna WaterSupply Project

  • 8/12/2019 Water Supply Initiatives

    16/3216

    Middle Vaitarna Project Financing

    MCGM share,

    (50%)

    Rs.664.75

    Crores,

    Share of State

    Gov.(15%)

    Rs.199.43

    Crores,

    Share of GoI

    under

    JNNURM(35%)

    Rs.465.32

    Crores

  • 8/12/2019 Water Supply Initiatives

    17/3218

    Demand/Supply Side Ini t iat ives

    Apart from sou rce augmentat ion, the

    Corporation is also taking a number ofmeasures on both, the Demand sideas well

    as the Supply sideto ensure greater

    efficiency and consumer satisfaction.

  • 8/12/2019 Water Supply Initiatives

    18/3219

    Demand Side ini t iat ives

    Universal meteringis being introduced to enable the citizens pay as per theirconsumption

    Expressions of Interest have been called for short-listing one or more agencies forsupply, installation, operation/maintenance & reading of water meters throughoutMumbai. The agency will be appointed by the end of November 2007.

    Telescopic Ratesto encourage conservation of water are proposed to be introduced

    after installation of meters on the connections to domestic consumers of plannedbuildings

    Proposed Tariff Structure is as under : Upto 150 lpcd One time 150 to 200 lpcd Two times 200 to 250 lpcd Three times 250 lpcd & above Four timesProposal is under consideration at the level of the Group Leaders and the Standing

    Committee.

    Prepaid water meters- water connections with prepaid meters are proposed to begiven to the inhabitants of unauthorised slums & structures so as to avoid stealing of

    water & tampering of the watermains and thereby cut down the wasteful use of water.

    S l Sid i i t i t i

  • 8/12/2019 Water Supply Initiatives

    19/3220

    Supp ly Side ini t iat ives

    Comp rehensive Water Supply Distr ibut ion Imp rovement Programmeis

    being taken up under the guidance of a reputed Consultant, broadly along the

    following lines -

    Water Distr ibution Management & NRW Reduction:1. Digital mapping of the utility on GIS compatible base maps.

    2. Hydraulic modeling of the entire network.

    3. Hydraulic model of DMA, each comprising about 1000

    connections.

    4. 100% Consumer metering, Bulk metering and District

    Metering set-up.

    5. Water balance and estimation of NRW/UFW

    6. Leakage detection, Repairs / Rehabilitation / Replacement

    plan7. Water balance. If NRW within limits, implement 24X7 supply

    8. Introduce pressure regulating devices for equitable

    distribution

    9. Introduce / upgrade Distribution management tool SCADA

  • 8/12/2019 Water Supply Initiatives

    20/32

    IMPROVEMENT IN PRIMARY NETWORK

    A massive programme for replacement of Tansa Water

    main is proposed to be undertaken from Gundavali to

    Tansa due to ageing of old pipes.

    Replacing Tansa and Vaitarna Mains between Gundavali

    and Bhandup Complex by 5500 mm dia. Tunnel for a

    length of 15 Kms.

    DPRs of these projects are under preparation and would

    be submitted to GoI for availing financial assistance

    under the JNNURM.

  • 8/12/2019 Water Supply Initiatives

    21/32

    Improvement in Secondary Network

    A major programme has been taken up for replacement ofTrunk mains / Inlets / Outlets by Tunnels due to aging of pipe

    lines, and to avoid leakages -

    (i) Replacing Tansa and Vaitarna Mains between Maroshi andRuparel by 3000mm dia. Tunel for a length of 12 Kms.

    (ii) Replacing of Outlets of Malbar Hill Reservoir between Malabar

    Hill and Cross Maidan by 2200mm dia. Tunnel for a length of 3.6

    Kms.

    (iii) Replacing of Outlets of Veravali Hill Reservoir between

    Veravali Hill and Yari Road by 2200mm dia. Tunnel for a length of

    6.1 Kms.

  • 8/12/2019 Water Supply Initiatives

    22/32

    TUNNEL FROM MAROSHI TO RUPAREL COLLEGE

  • 8/12/2019 Water Supply Initiatives

    23/32

    TUNNEL - SHAFT EXCAVATION

    (Photographs from earl ier works)

  • 8/12/2019 Water Supply Initiatives

    24/32

    TBM CUTTER HEAD-FRONT VIEW

  • 8/12/2019 Water Supply Initiatives

    25/32

    STEEL LINER PLATES BEING FIXED

    Steel Liners

  • 8/12/2019 Water Supply Initiatives

    26/32

    LOOSE ROCK FALL ON TBM FRONT PORTION.

  • 8/12/2019 Water Supply Initiatives

    27/32

    REINFORCEMENT BEING PLACED FOR TUNNEL

    LINING

  • 8/12/2019 Water Supply Initiatives

    28/32

    RCC LINED TUNNEL WITH WATER FOR CURING

    2200mm

  • 8/12/2019 Water Supply Initiatives

    29/32

    30

    Replacement and

    Rehabi l i tation o f oldpipel ines

    A major programmecosting Rs. 356 Crore, tobe implemented over twoyears, has been drawn up

    forreplacement/rehabilitationof old pipelines to reduceleakages and possibility ofcontamination. DPR of Rs.253.47 Crore is preparedand submitted to the GOIfor availing financial

    assistance under theJNNURM.

    Year

    Pipel ines

    2006-07

    length

    2007-08

    length

    Total

    length

    Replacement 221 Km 103 Km 324 Km

    Rehabi l i tat ion 196 Km 94 Km 290 Km

    Total 417 Km 197 Km 614 Km

    Expendi ture

    (Rs. Cro res)

    150 206 356

    Improvement in Secondary Network

  • 8/12/2019 Water Supply Initiatives

    30/32

    Improvement in Tertiary Network

    In order to reduce leakages and consequentcontamination, the tertiary network is being replaced

    / rehabilitated wherever necessary, under Expert

    guidance. Zonal contractors are being appointed for

    carrying out the work as suggested by the Consultantfor which a proposal to appoint contractors in six

    zones of Mumbai has been submitted to the Standing

    Committee.

    Tender process for appointing a reputed Consultant

    for Comprehensive Water Supply Distr ibuti on

    Improvement Programmeis currently going on.

    Supp ly Side Management:

  • 8/12/2019 Water Supply Initiatives

    31/32

    32

    Energy Audit

    A reputed agency has been appointed forcarrying out energy audit of the completesystem and major pumping stations in watersupply sector in order to identify areaswhere energy can be saved.

    The Audit Report is submitted in the monthof February 07 and the recommendationsare being implemented

    Supp ly Side Management:

    Reduct ion of Operat ional Costs