32
Water System Water System Design - Design - The Role of O&M The Role of O&M Staff Staff Cheryl Capron Cheryl Capron Seattle Public Utilities Seattle Public Utilities

Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Embed Size (px)

Citation preview

Page 1: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Water System Water System Design -Design -

The Role of O&M The Role of O&M StaffStaffCheryl CapronCheryl Capron

Seattle Public UtilitiesSeattle Public Utilities

Page 2: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Why Include Operators Why Include Operators and Maintenance Staff?and Maintenance Staff?

Incorporating their knowledge Incorporating their knowledge makes a project more successful. makes a project more successful.

Better integration of project with existing Better integration of project with existing systemsystem

Reduces the amount of work re-done by O&M Reduces the amount of work re-done by O&M staff once project is closedstaff once project is closed

Potential reduction in CIP & O&M costsPotential reduction in CIP & O&M costs

Page 3: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

What Kind of O&M Staff?What Kind of O&M Staff? System KnowledgeSystem Knowledge Detail-Oriented Detail-Oriented

Ones who notice subtle Ones who notice subtle changes or changes or discrepancies in datadiscrepancies in data

InquisitiveInquisitive Ones who ask whyOnes who ask why

Analytical & PersistentAnalytical & Persistent Ones who figure out Ones who figure out

whywhy Bill Bill NyeNye

Page 4: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

What Should What Should They Know They Know

About?About?

Page 5: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Infrastructure Infrastructure TroubleTrouble SpotsSpots

That’s pretty soggy ground for a flex That’s pretty soggy ground for a flex coupling…coupling…

We need another isolation valve; that one’s We need another isolation valve; that one’s awfully close to the excavation zone.awfully close to the excavation zone.

That 80-year-old valve hung up last week at That 80-year-old valve hung up last week at 30% open...30% open...

Page 6: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities
Page 7: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Infrastructure Infrastructure TroubleTrouble SpotsSpots

It’s 80 psi down there and most of It’s 80 psi down there and most of those gate valves leak – we should those gate valves leak – we should replace them when we reline…..replace them when we reline…..

Page 8: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities
Page 9: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

O&M Practices & HistoryO&M Practices & History

Why this way?Why this way? Staffing levels Staffing levels How long it takesHow long it takes ConstraintsConstraints

• Why it’s done• How it’s done

Page 10: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities
Page 11: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Instrumentation & Instrumentation & Control NeedsControl Needs

Identify desired level of I&C and Identify desired level of I&C and automationautomation

Identify what’s appropriate for the Identify what’s appropriate for the operator’s level of accountabilityoperator’s level of accountability

Ed Harris as Gene Ed Harris as Gene Kranz in Kranz in Apollo 13Apollo 13

Page 12: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

System Water QualitySystem Water Quality

Knows normal and seasonal Knows normal and seasonal variationsvariations

Good, bad

or normal?

Page 13: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

System Water QualitySystem Water Quality

Can identify probable impacts of Can identify probable impacts of events or changes in operationevents or changes in operation

Four impacts that can result from high velocities are...

Page 14: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Their PerspectiveTheir Perspective

Page 15: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

How Will It Work?How Will It Work?

Will the design Will the design allow the project to allow the project to function as function as required?required?

How will the How will the project change the project change the way my system way my system operates? Is that operates? Is that acceptable?acceptable?

Page 16: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

To bring it on To bring it on lineline

To operate itTo operate it To maintain itTo maintain it

What Will It Take to What Will It Take to Make It Work?Make It Work?

Page 17: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

What Happens With Pieces Out What Happens With Pieces Out For O&M?For O&M?

• An automated pump station starts when pressure drops below 90 psi. The gauge needs to be replaced. It is isolated, causing the input to the PLC to drop out. Does the PLC

1) interpret the missing point as a valid reading <90 psi & start a pump?

2) flag the data as invalid and hold last valid status?

3) have a manual over-ride or bypass mode?

Page 18: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Worst-Case ScenarioWorst-Case Scenario

What could go What could go wrong? wrong?

How hard would it How hard would it be to rectify? be to rectify?

How long will it How long will it take?take?

Is it even a big deal?Is it even a big deal?

Page 19: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

What Can O&M What Can O&M StaffStaff

Do For You? Do For You?

Page 20: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Pre-DesignPre-Design

Functional Requirements AnalysisFunctional Requirements Analysis For the projectFor the project For system during constructionFor system during construction For start-up & commissioningFor start-up & commissioning For O&M For O&M

Page 21: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Pre-DesignPre-Design

Draft shutdown & start-up plansDraft shutdown & start-up plans

Draft a pressure zone or system Draft a pressure zone or system operating plan for the construction operating plan for the construction periodperiod Identify bypass needs & constraints Identify bypass needs & constraints

imposed by the loss of the facilityimposed by the loss of the facility Identify major system maintenance that Identify major system maintenance that

should be done prior to NTPshould be done prior to NTP

Page 22: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Ethyl Tank

SinclairReservoir

Hess PS2 pumps @ 5500 gpm each

Richfield PS2 pumps @ 6000

gpm each

WeSaySo Water CompanyIntermediate Service Area Schematic

(Not To Scale) Base

Jura

ssic

Blv

d

Permian St.

Tria

ssic

Blv

d

Mesozoic St.

Pal

eozo

ic B

lvd

Cre

tace

ous

Way

1.0 MGAltitude Valve

10 MG

Zone Base MapZone Base Map BoundariesBoundaries StorageStorage SupplySupply Major FeedersMajor Feeders Shut Down Shut Down

ValvesValves PrimaryPrimary BackupBackup

Page 23: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Ethyl Tank

SinclairReservoir

Hess PS2 pumps @ 5500 gpm each

Richfield PS2 pumps @ 6000

gpm each

WeSaySo Water CompanyIntermediate Service Area Schematic

(Not To Scale) Inlet 2

Zone Map for Zone Map for Backup Inlet Backup Inlet ShutdownShutdown

South end isolated, South end isolated, needs new relief needs new relief pointpoint

South end PS has South end PS has reduced service reduced service area, throttling area, throttling capability on capability on discharge neededdischarge needed

Page 24: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

4" Blowoff

Pipe Size & Length Volume in Gallons

30" - 817 ft(Inlet valve to blowoff)

30" - 6131 ft(Blowoff to Mesozoic St. valve)

Emergency Pump Connection

30

"

WeSaySo Water CompanyIntermediate Service Area Schematic

(Not To Scale) Inlet Dewatering

Cu

rb 6

47

8'

Curb 7386'

Curb 8374'

Curb 9370'

Curb 10351'

Curb 11316'

Inlet Invert479'

Note: No service or hydrant taps on feeder lines.

30,000

225,000

De-Watering De-Watering Identify blowoff Identify blowoff

pointspoints Calculate volumesCalculate volumes If the whole thing If the whole thing

sits for a month, can sits for a month, can I disinfect & flush I disinfect & flush the required the required volume?volume?

Requires either a short-Requires either a short-term shutdown or a new term shutdown or a new isolation valve before isolation valve before the reservoir is the reservoir is demolished.demolished.

Page 25: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Why Do This During Pre-Why Do This During Pre-Design?Design?

The answers to these questions will The answers to these questions will identify whether there are elements identify whether there are elements that need to be incorporated into the that need to be incorporated into the design.design. Is a new isolation valve required?Is a new isolation valve required? Are air valves, blow-offs and sample Are air valves, blow-offs and sample

points where they are needed?points where they are needed? Is a specific construction sequence Is a specific construction sequence

required?required?

Page 26: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Challenges of Replacement Challenges of Replacement ProjectsProjects

Capacity reduction may require bypassCapacity reduction may require bypass Connecting new to old may be difficultConnecting new to old may be difficult Old valves leak or break easilyOld valves leak or break easily Disturbing old pipe or bedding may Disturbing old pipe or bedding may

cause leakscause leaks Long, large dead ends for extended Long, large dead ends for extended

periodsperiods Flushing, disinfection, no sample pointsFlushing, disinfection, no sample points

Page 27: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Sequencing Multiple Sequencing Multiple ShutdownsShutdowns

Maintaining service & fire flowsMaintaining service & fire flows How many blocks to the nearest How many blocks to the nearest

hydrant?hydrant? How many streets in a row on How many streets in a row on

temporary?temporary? Diurnal & seasonal demandDiurnal & seasonal demand What happens to your shutdown if What happens to your shutdown if

you have to back up another valve?you have to back up another valve?

Page 28: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Pre-DesignPre-Design

Draft O&M review checklistsDraft O&M review checklists Do this early and give them to the Do this early and give them to the

designers so they know what you’ll be designers so they know what you’ll be looking for.looking for.

Page 29: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Design ReviewDesign Review

Include O&M staff at all stages of Include O&M staff at all stages of review.review. As design becomes more refined, their As design becomes more refined, their

review becomes more specific & focused on review becomes more specific & focused on how they will operate & maintain project.how they will operate & maintain project.

If items are deleted, include O&M staff in If items are deleted, include O&M staff in the decision-making process.the decision-making process.

Reduction in CIP $ frequently means increase in Reduction in CIP $ frequently means increase in O&M. Make sure your staff can handle what O&M. Make sure your staff can handle what you’re committing them to.you’re committing them to.

Page 30: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Start-up & Start-up & CommissioningCommissioning

Acceptance Testing Acceptance Testing ((NotNot the the manufacturer’s & contractor’s equipment testing manufacturer’s & contractor’s equipment testing & commissioning)& commissioning) Does the project work with your whole Does the project work with your whole

system like it’s supposed to?system like it’s supposed to?

DocumentationDocumentation Test results/findingsTest results/findings Operating proceduresOperating procedures

Page 31: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Post-ImplementationPost-Implementation

Go back & talk to the O&M staffGo back & talk to the O&M staff What’s working well?What’s working well? What’s been changed? Why?What’s been changed? Why? What would they do differently next What would they do differently next

time?time?

Page 32: Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Questions?Questions?

[email protected]@seattle.gov