Watershed Management Program
Topographic InformationWatershed Evaluation
Watershed Management PlanImplementation of Best Management Practices
Maintenance of Watershed Parameters and Models
Project Development
• Project issues and approach outline• Project timeline, and staff allocation and cost
spreadsheet• Project communication and quality assurance
plan
Digital Topographic Information
– Horizontal and vertical datum establishment;– Collection of existing topographic information and
generation of topographic feature classes necessary for building a DTM of the watershed;
– Datum conversion;– Identification of topographic voids;– Acquisition of topographic information using aerial
methods or other approved methods;– Triangulated Irregular Network (TIN) and Digital
Elevation Model (DEM) for Watershed Evaluation processing;
– Project management and quality control; and– Final approved deliverables for Digital Topographic
Information.
Watershed Evaluation– Generic watershed feature assembly, evaluation, and processing from
existing data sources;– Field data acquisition approach to refine DTM and hydraulic features
(locations, methods, and accuracy);– Public Notification – Field reconnaissance and acquisition of additional spatial (xyz)
information and attributes for DTM and hydraulic feature refinement;– TIN and DEM refinement based on added information from desktop
evaluation and field reconnaissance;– Generic hydrologic features;– Generic hydraulic features;– Surface water resource assessment analysis approach;– Project management and quality control; and– Final approved deliverables for the Watershed Evaluation.
Watershed Management Plan – Refined generic and semi-generic geodatabase, and parameterization for specific use
geodatabase or database;
– Watershed computer simulation model development and verification;
– Floodplain analysis and delineation;
– Public notification, public meeting and 90 day review and comment period;
– Revised floodplain analysis and delineation based on public comment and review;
– Level of service determination;
– Digital Flood Insurance Rate Maps (DFIRM) generation;
– Surface water resource assessment;
– Best Management Practices (BMP) alternative analysis;
– Project management and quality control;
– Final approved deliverables for Watershed Management Plan; and
– Conceptual Environmental Resource Permit application(s) for Selected BMP(s). (optional)
Issues
• Rainfall excess method for Floodplains– SCS/NRCS not reasonable for floodplains in watersheds
with deep type A soils– Dynamics of saturation excess and level of detail– S or total retention storage, including initial soil storage.– Storage threshold for Initial abstraction in the hydrology
and storage threshold for dynamic storage (explicit in the model)
• One day ERP, Five day for floodplains• Percolation as an outfall for storage areas • QA/QC, Public review and comment • Maintenance and FIRMs effective flood hazard zones • Event Based rainfall. Spatial and temporal
distribution of the design event
• Overland Weirs in 1-D unsteady state models – Connected reservoirs or channel to a
reserviors
• Storage threshold for Initial abstraction in the hydrology and storage threshold for dynamic storage (explicit in the model)
• The G&S is not an excuse, not to think.