Eduardo José Sanchez, RA, LEED AP Project Architect REPRESENTATIVE PROJECTS: The Wharf Parcel 4 (2014-2015) Multi-Family Residential Building Washington, DC 370,000 SF, 280 unit mixed-use / multi-family residential building. Responsible for coordinating column & beam locations with structural engineer, coordinating grading & entrances with civil engineer, generating plan & section details, compiling glazing schedule, analyzing code diagrams, and preparing slab edge drawings. Also reviewed submittals & answered RFI’s during CA phase.

WDG - Work Samples

Embed Size (px)

Citation preview

Page 1: WDG - Work Samples

Eduardo José Sanchez, RA, LEED AP Project Architect

REPRESENTATIVE PROJECTS:

The Wharf Parcel 4 (2014-2015) � Multi-Family Residential Building � Washington, DC

370,000 SF, 280 unit mixed-use / multi-family residential building. Responsible for coordinating column & beam

locations with structural engineer, coordinating grading & entrances with civil engineer, generating plan & section

details, compiling glazing schedule, analyzing code diagrams, and preparing slab edge drawings. Also reviewed

submittals & answered RFI’s during CA phase.

Page 2: WDG - Work Samples

Eduardo José Sanchez, RA, LEED AP Project Architect

REPRESENTATIVE PROJECT:

Camden NoMa (2014) � Multi-Family Residential Building � Washington, DC

375,000 SF, 405 unit apartment building with 3 levels of underground parking. Responsible for generating unit

layouts and coordinating with MEP Engineer for layouts of ducts & risers within the building. Prepared plan and

section details during design phase as well.

REPRESENTATIVE PROJECT:

Rosslyn Plaza North - Renovation (2012-2013) � Office Building � Arlington, VA

Interior renovation of a 15 story, 300,000-sf building (approx. 20,000-sf per floor). Building included upgrades

to all main common areas: stairwells, bathrooms, mechanical rooms and elevator lobbies. Duties involved

attending regular OAC meetings, review of shop drawings, submittals & product data, responding to RFI’s,

issuing sketches and reviewing punch-lists. Served as primary CA contact during construction.