WE EXIST TO BUILD GREAT THING S DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission Bay

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

Embed Size (px)

Citation preview

Page 1: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Presentation for

Panelized SystemsUCSF Medical Center at Mission Bay

Page 2: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Presenters

Steve Spence: DPR General Superintendent

Dan Casale: DPR BIM Engineer– Project Team:– University of California San Francisco– DPR Construction– Anshen & Allen Architects– Cambridge Group

Page 3: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Project Background

UCSF Mission Bay Campus– Hospital – 650,000 SF – OSHPD 1– Outpatient Building – 250,000 SF – OSHPD

1/3– Energy Center – 20,000 SF

Total Value = $1.68 Billion Target Budget = $1.58 Billion <$100M> UCSF Medical Center at Mission Bay

Page 4: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Scope of Work

Produce fully coordinated models that can be used to create OSHPD submittals for the Hospital / OPB and EC

Preconstruction Services Only Currently over by $100M and team

needs to address this Use BIM / VDC and Lean Principles

Page 5: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Pre-Fabrication

Ideas:– Brain-storming

session.• Every idea was

analyzed– Identified

Constraints

Page 6: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Pre-Fabrication

Ideas That Work– Industry

Standard:• Pre-cut Conduit & MC• Pre-Punch Panels• Pre-fab J-Boxes• Trim for Fixtures• Bathroom Carriers• Pre-Spooled & Jointed

Pipe• Pre-Section Duct• VAV & Attenuator

Sections• Soffit Drops• Box Headers• Headwall Units

Ideas that Don’t Work– Pre-Fab Bathrooms

• Structure Won’t Allow It

– Joint Racking• OSHPD Won’t Allow

It– Pre-Fabbed Electrical

Rooms– Med-Gas Rack

• OSHPD Won’t Allow It

Page 7: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Pre-Fabrication

Potential Ideas:– Joint Racking for Plumbing & HVAC– Fire-stopping Systems– RE-Bar Cages– Pre-Fabricate Wall Panels

Page 8: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Drywall/Stud Modeling

Page 9: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Software

Challenges:– Software Under-

Developed• Automated Openings• Automate Backing• Further Develop

Shop-Drawings• Pre-Fabrication

Benefits:– Much more efficient

than traditional placement.

– Identify King & Corner Stud Clashes

– Identify Constructability Constraints

– Facilitate Pre-fabrication Effort

Page 10: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Page 11: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems

Prefabrication– Currently performing

feasibility analysis.• What’s the engineering say?• Can it be coordinated?• How many panels must be

pre-fabbed to break even?• How big can they be?• Optimal height?• Schedule Impact?• Where should we target?• Etc…?

Page 12: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems

Preliminary Research:– Labor Unions– Pre-Fabrication Site– Engineering

Requirements– OSHPD Approval– Machine Proposal

Preliminary Answers:– Labor Unions must work

locally– Pre-fab site subject to

location constraints– Panels can span 8’ and

are stronger than traditional walls

– OSHPD is OK– Custom Machine can be

built

Page 13: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems

Hybrid system– Individual Panels– Up to 8’ in length– Target 6” above

ceiling– Designed lengths for

“layout framing”– Complete with

• Backing• In-wall MEP• Top & bottom track

Page 14: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems

In-fill– Traditional “stick

framing”– King studs, infill

above 9’6”

Page 15: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Installation Process

Process:1. Corner, Kong, &

Top Track Placed2. Panels laid in3. In-fill framing

comes behind.4. Walls inspected

and closed.

Page 16: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Alternate Installation Process

Process:1. Corner, Kong, &

Top Track Placed2. In-fill framing.3. Panels laid in4. Walls inspected

and closed.

Page 17: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Target Areas

Identify Repetitive Areas of the Floor Plan

Same Rooms= Repeating Panels

10 Different Panels Used 100x’s

Vs. 100 Panels Used

10x’s

Page 18: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Page 19: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Floor Plan

Page 20: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Assembly Drawing

Assembly Drawings Contain:– Individual

Panels– Matched up– Total Wall

Assembly with Infill Framing

Page 21: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems Combine panels

& infill– Total wall

system– Higher Quality– Shorter

installation schedule

Page 22: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems

Page 23: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Panelized Systems

Page 24: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Challenges Models for 3-6 have already been created and coordinated.

– 30,000SF every 20 days. Pre-fabrication was not addressed during these phases

– Critical studs occur every 4’ in most patient rooms Schedule Impact

– What is the schedule impact? Are we more efficient? What are the productivity rates?

Engineering– Do panels have to match infill above?– How far can we span?

Page 25: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

Advantages

Quality Control Productivity Rate Productivity Tracking Waste Reduction Schedule Benefits = Cost Benefits

Page 26: WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission

WE EXISTTO BUILDGREATTHING

S

DPR ConstructionUCSF Mission BayPre-fabrication Effort

What’s Next

Currently Modeling Critical Studs Prior to Coordination

Subs should be able to coordinate around studs supporting panels.