Web Based Online Adequacy Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July 27~31, 2014 Gaylord National Resort & Convention Center National Harbor, MD, USA Dr. Jaeseok Choi, Dept. of Electrical Eng. Gyeongsang National University, Jinju, GN, Korea Adequacy of Power Systems with Renewable Energy Sources (panel session) Thursday, 31 July, 2014 8:00 AM-12:00 PM National Harbor 8

Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

Web Based Online Adequacy Reliability Information System for

Power Systems Including Intermittent Resource Generators

1

IEEE PES GM2014July 27~31, 2014

Gaylord National Resort & Convention CenterNational Harbor, MD, USA

Dr. Jaeseok Choi, Dept. of Electrical Eng.

Gyeongsang National University, Jinju, GN, Korea

Adequacy of Power Systems with Renewable Energy Sources (panel session) Thursday, 31 July, 2014 8:00 AM-12:00 PM National Harbor 8

Page 2: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

2

2

I. IntroductionØ Web Based Online Real-time Reliability Integrated Information System is asked

rapidly for more efficiency and demand response in recent.

Ø Specially, the utilization of renewable resources has been receiving considerableattention in recent years. Furthermore, this system is more important forimplementing the smart grid.

Ø This paper describes a Web Based Online Real-time Reliability IntegratedInformation System, which is called as WORRIS v7.0 developed in this study.

Ø Grid constrained reliability evaluation is very important for grid expansion planningand operation when WTGs are added in a power system.

Ø In this paper, a new methodology for grid constrained probabilistic reliabilityevaluation of power systems including WTG is proposed.

Page 3: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

3

3

1. Eventual purpose diagram of WORRIS of power system and demand response

Page 4: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

4

4

2. Kinds of Uncertainties in Power Systems

u Aleatory uncertainty: Outage of Unit (Ex, Outage of Generator,Lines..)

u Epistemic uncertainty: Uncertainty of Information(Ex, Forecast of Load, Supply of Resources) [11,12].

Page 5: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

5

3. What is the relationship between uncertainties and flexibility in the new future power system?

V2G+/-

Page 6: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

6

4. Probabilistic Reliability Indices

1. Loss of Load Expectation (LOLE)• DLOLE [days/yr] • HLOLE [hours/yr]2. Expected Unserved Energy (EUE) or Expected Energy Not

Supplied (EENS)• EUE or EENS [MWh/yr]3. Frequency and Duration of Capacity Shortage Events

(F&D).4. Energy Index of Reliability (EIR)• EIR = 1- EENS/Total Demand Energy

Page 7: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

7

5. Power System Reliability Concept In New Era

Supply

Demand

Uncertainties: - Unit Outage- Resources Supply of REG- Supply of HEN - Supply from V2G etc.

Uncertainties: - Load forecasting - Demand Response- Charging of V2G etc.

Page 8: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

8

8

II. The Multi-state Operation Model of WTG

*This picture is HWN-WF in Jeju

Page 9: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

9

9

Power output [MW]

RV coVciV Wind Velocity

RP

Where, Vin: the cut-in speed [m/sec].VR: the rated speed [m/sec].Vco: the cut-out speed [m/sec].PR: the rated power [MW].

Pi = 0 0≤SWbi<Vci

= PR (A+BxSWbi+CxSWbi2) Vci≤SWbi<VR

= PR VR≤SWbi≤Vco

= 0 SWbi>Vco

( )( ) ( )

3

2V + V1

A = V V + V - 4 V V 2VV - V

ci Rci ci ciR R

Rci R

é ùæ öê úç ÷

è øê úë û

( )( ) ( )

3

2V + V1

B = 4 V + V - 3V + V2VV - V

ci Rci ciR R

Rci R

é ùæ öê úç ÷

è øê úë û

( )

3

2V + V1

C = 2 - 4 2VV - V

ci R

Rci R

é ùæ öê úç ÷

è øê úë û

* A,B,C parameters

A typical power output model of WTG

Page 10: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

10

10

pdf

Windvelocity[m/sec]

Power output [MW]

RV coVciV

RP

Windvelocity[m/sec]

Power

Probability

pdf Table of WTG multi-state model

Power ProbabilityP1P2···

Pn

PB1PB2

···

PBn

The outage capacity pdf of WTG

Page 11: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

11

11*This picture is SSN-WF in Jeju

III. Reliability Evaluation of A Composite Power System including

Intermittent Generator, WTG

Page 12: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

12

12

Lx Lx

ojx

Effective Load- HLI

Page 13: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

13

13

IC : total installed generating capacity [MW] Lp : system peak load[MW]Ä: operator meaning convolution integralHLIΦ0(xe - xoi)= HLIΦ(xL )HLIfoi(xoi): the probability distribution function of outage capacity of generator #i

1

1

( ) ( ) ( )

( ) ( )

HLI i e HLI i e HLI oi oi

HLI i e oi HLI oi oi

x x f x

x x f x dx

-

-

F = F Ä

= F -ò

The effective load duration curve (ELDC), HLIΦ(x)

Page 14: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

14

14

Reliability indices of LOLEHLI(Loss of load expectation) and EENSHLI(Expected energy not served)

[hours/yr]

[MWh/yr]

IC : total installed generating capacity [MW]

Lp : system peak load [MW]

ICxHLIHLI )x(LOLE=

= F

ò+

=LpIC

IC HLIHLI dx)x(EENS F

Reliability Evaluation at HLI including WTG

Page 15: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

15

15

k Lx2 2, tCT q

, i tiCT q

, NT tNTCT q

1 1, tCT q

)( ojosik xf

Lk x Lk xLk xLk x

Lk x

å1

1

ik

ikqAP

2

2

ik

ikqAP

ijk

ijk

qAP

iNSk

iNSkqAP

sijk

sijk

qAP

k Lx

k oNGjx k NGj

k NGj

APq

ìïíïî

2 2, 0tCT q =

, 0i tiCT q =

, 0NT tNTCT q =

1 1, 0tCT q =

(a) Actual system

(b) Synthesized fictitious equivalent generator

(c) Equivalent system

Composite power system effective load model at HLII (CMELDC)

7) J. Choi, R. Billinton, M. Futuhi-Firuzabed,"Development of A Nodal Effective Load ModelConsidering Transmission System ElementUnavailabilities" IEE. G.T&D, pp.79-89, Vol.152, No.1,Jan. 2005.

Page 16: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

16

16

Ä : the operator representing the convolution integral

kF0 = original load duration curve at load point #k

Kfosi : outage capacity pdf of the synthesized fictitious generator created by generators 1 to i, at load point #k.

( ) ( ) ( )

( ) ( )

k i e k o e k osi oi

k o e oi k osi oi oi

x x f x

x x f x dx

F = F Ä

= F -ò

CMELDC at HLII including WTG

Page 17: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

17

17

[hours/yr]

[MWh/yr]

EIRk= 1-EENSk/DENGk [PU]

Lpk: peak load at load point k [MW]

APk: maximum arrival power at load point k [MW]DENGk : demand energy at bus #k

kAPxNGkk )x(LOLE=

= F

ò+

= kk

k

LpAP

AP NGkk dx)x(EENS F

Bus(Nodal) Reliability Evaluation at HLII including WTG

Page 18: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

18

18

[MWh/yr]

[MW/cur.yr]

[hours/yr]

EIRHLII= 1-EENSHLII/DENGHLII [PU]

NL : number of load pointsELCk= EENSk/LOLEkEIR : Energy Index of Reliability

/HLII HLII HLIILOLE EENS ELC=

1

NL

HLII kk

EENS EENS=

= å

1

NL

HLII kk

ELC ELC=

= å

Reliability indices of the bulk system

Page 19: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

19

19

Expected Deterministic Reliability Indices of Bulk System

[%] 100)(

[%] 100

[%] 100

´-

=

´-

=

´-

=

Pt

Pt

Pd

Pdd

Py

Pyy

LLtEOPEORR

LLSCESRR

LLTIC

EIRR

EIRR : Expected Installed Reserve RateESRR : Expected Supply Reserve RateEORR : Expected Operating Reserve RateLPy : Peak Load for a yearLPd : Peak Load for a dayLPt : Peak Load for ‘t’

Page 20: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

20

20

kk

kkdk

ii

MSkkdk

MSiid

kkyk

iiy

FORAVR

tAVRtWTGtCGtEOP

AVRWTGCGSC

AVRWTGCGTIC

-=

´+=

´+=

´+=

åå

åå

åå

ÎÎ

ÎÎ

ÎÎ

1

)()()()(21

21

21

xx

rr

rr

TICy : Total Install Capacity for a yearSCd : Supply Capacity for a dayEOP(t) : Expected Operating Power for ‘t’CGi : Capacity of i time Conventional Generator WTGk : Capacity of i time Wind Turbine Generator AVRk :

Page 21: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

21

21

The step-by-step process for evaluating the reliability of a power system involving WTGs

Page 22: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

22

22

IV. Case Studies

Page 23: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

23

23

A map of Jeju Island

Page 24: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

24

24

Wind Speed around KoreaWind speed at surrounding of Jeju island

* Total W/P 249.1MW construction is submitted by IPP at Jeju island until 2012.

Wind around South Korea and Jeju Island

Page 25: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

25

25

Power System of Jeju Island

Page 26: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

26

26

Load variation curve patterns for a normal day at the load buses

0

20

40

60

80

100

120

140

160

180

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Time[hour]

Loa

d[M

W]

Bus 2 Bus 3 Bus 7 Bus 8 Bus 9 Bus 4 Bus 11

Page 27: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

27

27

Bus number

Unit Name Type C[MW] No. FOR

10 HWN1 WTG 50 1 -

9 SSN2 WTG 30 1 -

4 HLM3 WTG 20 1 -

1 HVDC HVDC 150 2 0.0285 NMJ1 T/P 100 2 0.0121 JJU1 T/P 75 1 0.0151 JJU2 T/P 75 1 0.012

1 HNM1 C/C 105 1 0.013

1 JJU3 G/T 55 1 0.013

1 JJU4 D/P 10 4 0.0185 NMJ2 D/P 20 2 0.018

Total 990 17 -

Line # SB EB Capacity Type cct FOR

1 1 2 300 T/L 2 0.001713

2 1 2 200 C/L 2 0.001000

3 2 3 200 T/L 2 0.005710

4 3 4 200 T/L 1 0.001142

5 4 6 200 T/L 1 0.001142

6 3 6 200 T/L 1 0.001142

7 6 7 200 T/L 1 0.001142

8 5 6 226 C/L 2 0.001000

9 7 8 200 T/L 1 0.005710

10 6 8 200 T/L 1 0.001142

11 8 9 200 T/L 1 0.004568

12 8 1 200 T/L 1 0.001142

13 1 10 200 T/L 1 0.004568

14 10 9 200 T/L 1 0.001142

15 2 11 220 C/L 1 0.001000

The system’s generation capacity = 990MWLoad peak = 681MW

Generators and Transmission System Dataof Jeju Power System (2012 year)

Page 28: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

28

28

HWN-WF SSN-WF HLM-WF

A 0.1203 0.1111 0.0928

B -0.06 [m/sec]-1 -0.063[m/sec]-1 -0.0649[m/sec]-1

C 0.0072 [m/sec]-2 0.0081[m/sec]-2 0.0093[m/sec]-2

Wind DataWind farm HWN-WF SSN-WF HLM-WF

Peak speed 45 m/s 40 m/s 35 m/s

Mean wind speed 8.5 m/s 7.6 m/s 6.4 m/s

Standard deviation 7 m/s 6 m/s 5 m/s

WTG DataWTG capacity 50MW 30MW 20MW

Cut-in speed(Vci) 5 m/s 5 m/s 5 m/s

Rated speed(VR) 16 m/s 15 m/s 14 m/s

Cut-out speed(Vco) 25 m/s 25 m/s 25 m/s

Data of HWN, SSN and HLM wind farms

Page 29: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

29

29

OCPDF of HWN wind farm (11-state model)

OCPDF of SSN wind farm (7-state model) OCPDF of HLM wind farm (5-state model)

The outage capacity probability distribution function (OCPDF)

Page 30: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

30

30

Reliability Indices at Buses of Jeju System

Grid not constrained Case Grid constrained CaseLOLE [10-

3hours/day] 3.452 19.532

EENS [MWh/day] 0.121973 12.092548EIR [pu] 0.99999 0.999189

System Reliability Indices of Jeju System

Load Point # Load Name Lp

LOLEk[hours/day]

EENSk[MWh/day]

EIRk[pu]

1 JEJU 200 0.019294 3.282110 0.999196

2 SIJU 230 0.019624 3.823397 0.999186

3 SEGP 100 0.019623 1.662342 0.999186

4 HALA 50 0.019620 0.831175 0.999186

5 SUSN 30 0.019616 0.498704 0.999186

6 HALM 20 0.019607 0.332482 0.999186

7 SAJI 100 0.019623 1.662342 0.999186

Results

Page 31: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

31

31

V. A Web based Online Real-time Reliability Integrated Information

System(WORRIS)http://worris.gsnu.ac.kr

*This picture is HWN-WF in Jeju

Page 32: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

32

32

http://worris.gsnu.ac.kr

Page 33: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

33

33

1. Project pane : Control parameters

1. Execution pane : Three buttons

3. Generator data pane :The characteristic data of each

generator

4. Transmission line list pane :The transmission line data

5. Load Information pane : The load information

1. WORRIS CmRelWin Interface

Page 34: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

34

34

The WORRIS PRI results for the Jeju power system

Page 35: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

35

35

The WORRIS PRI results for the Jeju city

Page 36: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

36

36

The WORRIS PRI results for the Seguipo city

Page 37: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

37

37

2. WORRIS PraWin Interface

Page 38: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

38

38

The WORRIS PRI results from PraWin

Page 39: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

39

39

The WORRIS DRI results from PraWin

Page 40: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

40

• TOC on Smart Grid Test Bed Town in Jeju

Page 41: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

41

Page 42: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

42

42

ž This paper presents a new approach for grid constrained probabilistic reliabilityevaluation of power systems including wind turbine generators using thecomposite power system effective load model developed by the authors

ž It is expected that the proposed method can provide useful information indetermining the location of WTGs in view of composite power system reliability.

ž This paper also describes a Web Based Online Real-time Reliability IntegratedInformation System called WORRIS Version 7.0.

ž The results indicate how a web-based monitoring system could form the basisfor customers to observe power system reliability information including windturbine generators.

ž The present intent is not to create a real time reliability information system butto focus on developing a one day ahead system.

VI. Conclusions

Page 43: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

43

43

1) Nick Jenkins, Ron Allan, Peter Crossley, David Kirschen, Goran Strbac, “Embedded Generation”, pp. 31-38, 2000.

2) Rajesh Karki, Po Hu, Roy Billinton,“A Simplified Wind Power Generation Model for Reliability Evaluation”, IEEE Transactions on Energy Conversion, Vol.21, No.2, June 2006.

3) Singh, Lago-Gonzalez, “Reliability Modeling of Generation Systems Including Unconventional Energy Sources,” IEEE Transactions on Power Apparatus and Systems, Vol. PAS-104, No.5, May 1985.

4) Billinton, R., Gan, L, “Wind Power Modeling and Application in Generating Adequacy Assessment,” Proceedings, the 14th Power Systems Computation Conference, Sevilla, Spain, June24-28,2000.

5) Liang Wu, Jeongje Park, Jaeseok Choi, A. A. El-Keib, Mohammad Shahidehpour, and Roy Billinton, “Probabilistic Reliability Evaluation of Power Systems Including Wind Turbine Generators Using a Simplified Multi-State Model: A Case Study” IEEE, PES, GM2009, July 26-30, Calgary, 2009.

6) Jaeseok Choi, Hongsik Kim, Junmin Cha and Roy Billinton; "Nodal Probabilistic Congestion and Reliability Evaluation of a Transmission System under Deregulated Electricity Market", proc. of conference, Vancouver, Canada, IEEE, PES, SM2001, July 16-19, 2001.

7) J. Choi, R. Billinton and M. Futuhi-Firuzabed “Development of a New Nodal Effective Load Model Considering Transmission System Element Unavailabilities” to be published by IEE proceedings on GTD, 2005.

8) Roy Billinton, Wenyuan Li, “Reliability Assessment of Electric Power Systems Using Monte Carlo Methods", pp.24-30, 1994.

9) Roy Billinton and Wenyuan Li, Reliability Assessment of Electric Power Systems Using Monte Carlo Methods :Plenum Press,1994.

10) Roy Billinton and Ronald N. Allan, Reliability Evaluation of Power Systems: Second Edition, Plenum Press, 1996.

11) Jaeseok Choi, Timothy Mount, Robert Thomas and Roy Billinton, "Probabilistic Reliability Criterion for Planning Transmission System Expansions" IEEG,T&D, Vol.153, No.6, pp.719-727, November, 2006

References

Page 44: Web Based Online Adequacy Reliability Information System ... · Reliability Information System for Power Systems Including Intermittent Resource Generators 1 IEEE PES GM2014 July

44

44

Thank you for your Attention!

[email protected]://worris.gsnu.ac.kr