53
BE Computer 2015 Pattern Software Testing Quality Assurance Mock END Paper Solution 2019-20 SEM-1 Q-1 a) What is bug, defect, error & failure give an example of each? Ans- DEFECT: It can be simply defined as a variance between expected and actual. Defect is an error found AFTER the application goes into production. It commonly refers to several troubles with the software products, with its external behavior or with its internal features. In other words Defect is the difference between expected and actual result in the context of testing. It is the deviation of the customer requirement. Defect can be categorized into the following: Wrong: When requirements are implemented not in the right way. This defect is a variance from the given specification. It is Wrong! Missing: A requirement of the customer that was not fulfilled. This is a variance from the specifications, an indication that a specification was not implemented, or a requirement of the customer was not noted correctly. Extra: A requirement incorporated into the product that was not given by the end customer. This is always a variance from the specification, but may be an attribute desired by the user of the product. However, it is considered a defect because it’s a variance from the existing requirements. ERROR: An error is a mistake, misconception, or misunderstanding on the part of a software developer. In the category of developer we include software engineers, programmers, analysts, and testers. For example, a developer may misunderstand a de-sign notation, or a programmer might type a variable name incorrectly – leads to an Error. It is the one which is generated because of wrong login, loop or due to syntax. Error normally arises in software; it leads to change the functionality of the program. BUG: A bug is the result of a coding error. An Error found in the development environment before the product is shipped to the customer. A programming error that causes a program to work poorly, produce incorrect results or crash. An error in software or hardware that causes a program to malfunction. Bug is terminology of Tester.

dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

BE Computer 2015 Pattern

Software Testing Quality Assurance

Mock END Paper Solution 2019-20 SEM-1

Q-1 a) What is bug, defect, error & failure give an example of each?

Ans- DEFECT:  It can be simply defined as a variance between expected and actual. Defect is an error found AFTER   the   application   goes   into   production.   It   commonly   refers   to   several   troubles  with   the   software products,  with  its external behavior or with  its  internal  features.   In other words Defect  is  the difference between expected and actual result in the context of testing.  It is the deviation of the customer requirement.

Defect can be categorized into the following:

Wrong: When requirements are implemented not in the right way. This defect is a variance from the given specification. It is Wrong!

Missing:  A requirement of the customer that was not fulfilled. This is a variance from the specifications, an indication   that  a   specification  was  not   implemented,  or  a   requirement  of   the   customer  was  not  noted correctly.

Extra: A requirement incorporated into the product that was not given by the end customer. This is always a variance from the specification, but may be an attribute desired by the user of the product. However, it is considered a defect because it’s a variance from the existing requirements.

ERROR: An error is a mistake, misconception, or misunderstanding on the part of a software developer. In the category of developer we include software engineers, programmers, analysts, and testers. For example, a developer may misunderstand a de-sign notation, or a programmer might type a variable name incorrectly – leads to an Error.   It   is  the one which  is generated because of wrong  login,   loop or due to syntax.  Error normally arises in software; it leads to change the functionality of the program.

BUG: A bug  is   the result  of  a  coding error.  An Error  found  in  the development  environment  before the product is shipped to the customer. A programming error that causes a program to work poorly, produce incorrect results or crash. An error in software or hardware that causes a program to malfunction. Bug is terminology of Tester.

FAILURE: A failure is the inability of a software system or component to perform its required functions within specified performance requirements. When a defect reaches the end customer it is called a Failure. During development Failures are usually observed by testers.

FAULT: An incorrect step, process or data definition in a computer program which causes the program to perform in an unintended or unanticipated manner. A fault is introduced into the software as the result of an error.   It   is  an anomaly in the software that may cause  it  to behave incorrectly,  and not according to  its specification. It is the result of the error.

Q-1 b) Differentiate between software Testing tool and Technique.

Page 2: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Ans- Technique is the actual method/manner/way to perform a particular task.

Tools are the objects or means which help in performing the tasks.

For example, Painting is a task and there are different techniques like oil painting, etc. Then there are some paintin gtools - like crayons, brushes, poster colors etc. Hope this makes sense...

When we talk in terms of software testing,

Testing techniques are the types of testing . Various testing techniques are functional testing, performance testing etc. They can be furthwer classified into many techniques.

Testing tools are software programs clubbed together to per testing activities. These tools generally provide record   and   playback   features   along  with   common   scripting   platform   to   customize   the   tests.   Common functional testing tools are - Quick Test Professional, Selenium etc. Common performance testing tools are Load Runner, Rational Performance Tester etc.

Imagine traveling from point A to B is the test that you need to perform. And the above image suggests that there are 2 ways to do it

Test technique 1 - By Running

Test technique 2 - By walking

But   in  both   these  2   techniques,  one   thing   is   common.  The   tool/   component  used   to   implement   these techniques. In both these techniques, the person uses his/ her legs to either run on walk.

So, Testing tools are the components or software packages you you to test an application, while the testing techniques dictates how you use these tools to test your application.

Practical example would be

Testing tool - Selenium WebDriver

Testing technique 1 - Sanity test script

Testing technique 2 - Regression test script

Q-2 a) what is impact of defect in different phases of Software development.

Ans- The cost of defects      can be measured by the impact of the defects and when we find them. Earlier the defect is found lesser is the cost of defect. For example if error is found in the requirement specifications during   requirements   gathering  and  analysis,   then   it   is   somewhat   cheap   to  fix   it.   The   correction   to   the requirement specification can be done and then it can be re-issued.

In the same way when defect or error is found in the design during design review then the design can be corrected and it can be re-issued. But if the error  is not caught in the specifications and is not found till the user acceptance then the cost to fix those errors or defects will be way too expensive.

Page 3: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

If the error is made and the consequent defect is detected in the requirements phase then it is relatively cheap to fix it.

Similarly   if   a   requirement   specification   error   is  made   and   the   consequent defect is   found   in   thedesign phase then the design can be corrected and reissued with relatively little expense.

The same applies for construction phase. If however, a defect is introduced in the requirement specification and it is not detected until acceptance testing or even once the system has been implemented then it will be much more expensive to fix. This is because rework will be needed in the specification and design before changes can be made in construction; because one defect in the requirements may well propagate into several places in the design and code; and because all the testing work done-to that point will need to be repeated in order to reach the confidence level in the software that we require.

It is quite often the case that defects detected at a very late stage, depending on how serious they are, are not corrected because the cost of doing so is too expensive.

b) What is bug tracking, bug fixing & bug verification?

Ans- Bug tracking means tracking the status of any bug until it get closed. At any point of time a bug must be in any of the states given below in the diagram-

Page 4: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

There are several stages in a bug life cycle

Open – bug that is raised and yet to be validated.

In Progress – bug is validated and under fixing.

Not a Bug – Sometimes developer or team lead can mark the bug as “Not a Bug” if the system is working according to specifications and bug is just due to some misinterpretation.

Deferred – When a bug cannot be addressed in that particular cycle it is deferred to future release.

Duplicate – Same bug is already logged by QA team.

Fixed – Bug has been fixed by developer and QA has to verify it in next build.

Reopened – When the bug is NOT fixed, QA reopens/reactivates the bug.

Closed – If bug is verified by the QA team and it is fixed then QA can mark bug as ‘Closed’ or a bug can be closed if the defect is duplicate or considered as NOT as bug.

Bug fix: A bug is a a mistake in the code A fix is a correction of that mistake

A bug is a flaw in a piece of software that causes it to not to do what was intended. A bug could be in the specification of the software (we should have made it do this instead of that), in the design and coding of the software   (we   said   it   should  do   this  but   it  does   that   instead),  or   sometimes   in   the  documentation   (the software   does   exactly   what   we   want   it   to   do,   but   the   user   manual   says   something   different). A coding (programming) bug can manifest as incorrect results or crashes in the software system.

A bug fix is, simply the fix to a bug, that is, the set of modifications to the software system that would correct the flaw. For example:

Bug: The “cancel” button runs off the right edge of the screen on smaller phones.

Bug fix: Change the code to position the “cancel” button farther to the left.

Bug Fix Verification  is   a  process  of   verifying   if   the  bug  was  fixed  or  not.  SO  At  first  a   tester   re-tests 

application and then checks whether new bugs appeared after the previous bug was fixed.

Q. 3 A) Write test cases for simple calculator application.

Ans-

No. Test Case -ID

Test case Objec tive

Prereq uisite

Steps Inp ut data

Expect ed Result Act ual Resu lt

Re ma rks/ Sta tus

1 TC1 To add two  Calculato  1.Key in a valid integer  135  235(addition,  235 Pass

Page 5: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

No. Test Case -ID

Test case Objec tive

Prereq uisite

Steps Inp ut data

Expect ed Result Act ual Resu lt

Re ma rks/ Sta tus

integer and display the result on ten digit calculato

r is switched on

from - 9999999999 to +9999999999 2.Key in operator + 3.Key in second operand,a valid integer from - 9999999999 To +999999999

+ 100

above ten digits will be expressed in exponential form)

2 TC-2 To subtract two integer and display the result on ten digit calculator

Calculato r is switched on

1.Key in a valid integer from - 9999999999 to +9999999999 2.Key in operator - 3.Key in second operand,a valid integer from - 9999999999 To +999999999

135- 100

35(subtractio n,above ten digits will be expressed in exponential form)

35 Pass

3. TC-3 To multiply two integer and display the result on ten digit calculator

Calculato r is switched on

1.Key in a valid integer from - 9999999999 to +9999999999 2.Key in operator x 3.Key in second operand,a valid integer from - 9999999999 To +999999999

100 x 400

40000(multi plication,abo ve ten digits will be expressed in exponential form)

40000 Pass

4. TC4 To divide two integer and display the result on ten digit calculator

Calculato r is switched on

1.Key in a valid integer from - 9999999999 to +9999999999 2.Key in operator / 3.Key in second operand,a valid integer from - 9999999999 To +999999999

100/ 25

40(division,a bove ten digits will be expressed in exponential form)

40 Pass

5 TC5 To clear the screen

Calculato r is switched on

Press C Symbol ‗0‘ should appear on screen

Symbo l ‗0‘ appear s on screen

Pass

6 TC6 To delete digits one by one

Calculato r is switched on

Press <- (backspace) One Digit should be deleted from right hand side

One Digit is deleted from right handsi de

PASS

Q.3 b) Write test cases for Forms available on web page

Page 6: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Ans- • Test cases/scenarios for Forms– There are various types of form one can find on webpages, but fields are relatively same, according to which following are the scenarios to test the form

a. Test the form position on the web pageb. Check whether all controls are available on the form as per requirementc. Check the alignment of web controls in the formd. Test all labels of the formse. An asterisk is displayed near required fieldsf. Check the behavior of form by not filling up any data into the form.g. Check heading of the formh. Check phone number field with alphabetic data and with invalid formatsi. Check email field with invalid email formatj. Check Captcha field with reset buttonk. Save and cancel buttons in the forml. Check the behavior of form by adding random data in the text field.m. Validation message on required field or incorrect valuesn. Check whether the navigation between the fields is successful using tabo. Multiple clicks on the submit should not be allowed while the registration is in progress.p. Submit button can be disabled before entering the mandatory fields in the form.

Q- 4 A) Write eight test cases for ATM Machine.

Ans- Test Cases for ATM:

1. Verify the ‘ATM Card Insertion Slot’ is as per the specification2. Verify the ATM machine accepts card and PIN details3. Verify the error message by inserting a card incorrectly4. Verify the error message by inserting an invalid card (Expired Card)5. Verify the error message by entering an incorrect PIN6. Verify that the user is asked to enter the PIN after inserting a valid ATM Card7. Verify that PIN is encrypted8. Verify that there is an action like blocking of card occurs when the total no. of incorrect PIN attempts get surpassed9. Verify the user is allowed to do only one cash withdrawal transaction per PIN request10. Verify the machine logs out of the user session immediately after successful withdrawal11. Verify the message when there is no money in the ATM12. Verify the language selection functionality13. Verify the cash withdrawal functionality by entering some valid amount14. Verify the cash withdrawal functionality by entering an amount less than 10015. Verify the cash withdrawal functionality by entering an amount greater than the total available balance in the account.16. Verify the cash withdrawal functionality by entering an amount greater than per day limit17. Verify the user is allowed to enter the amount again in case the amount entered is not valid. A proper message should be displayed.

Page 7: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

18. Verify the ATM machine successfully takes out the money.19. Verify the ATM machine takes out the balance printout after the withdrawal20. Verify the font of the text displayed in ATM screen21. Verify the text on the screen buttons visible clearly.22. Verify the functionality of all the buttons on the keypad23. Verify the text on the buttons visible clearly.24. Verify that touch of the ATM screen is smooth and operational25. Verify the user is allowed to choose different account types like Savings, Current etc.,26. Verify the different combinations of operation and check if there will be an electricity loss in the middle of the operation. If there is an electricity loss in the middle of the transaction then the transaction should be marked as null and the amount shouldn’t be disclosed to others.27. Verify the functionality of the cash dispenser28. Verify the functionality of the receipt printer29. Verify whether the printed data is correct or not in the receipt30. Verify how much time the system takes to log out.

Q- 4 B) Write eight test cases for ATM Machine.

Ans- Test cases/scenarios for Links – There are two types of link can be available on web page that is internal and external links here are some test scenarios to test link on web page

a. Tool tips text should be available and meaningful.b. Check whether all external links are opening in new window with proper URLc. Test all internal links are navigating within application as per requirementd. Test links jumping on the same pagese. Check whether email address link opening the mail instance like outlookf. Test to check if there are any blank page to linkg. Test Links opening in other tab /window as per requirementh. Compatibility Testing for all links on other browsersi. Ensure that color of links change after the page is visited once. (This can vary as per the design).j. Ensure that the link color is as per the specification.k. Ensure that a hand icon is displayed when mouse pointer is hovered over the link.l. Check loading time for internal links as per requirementm. Check whether shared link is getting shared properly with correct addressn. Check whether shared link is getting opened properly

Q.5 A) Create Requirement Traceability Matrix Document for Online Flight Booking Application also explain advantage of Requirement Traceability Matrix

Ans- Advantages of Requirement Traceability Matrix (RTM):

1. Gives Overview of ALL the requirements

2. Shows how requirements are linked to Test Cases

3. Makes sure 100% coverage of requirements

Page 8: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

4. Easy to prepare

5. No special tool is required

Business Requirement Document (BRD) :

This document is provided by Client with high level business Requirements. Suppose for Flight Booking 

Application it shows below 2 requirements

BR_1 Reservation Module :

It should allow user to book one or more tickets, one way or round way for future dates

BR_2 Payment Module:

User should able to make payment for booked tickets via Credit / Debit Card or through Reward Points

Functional Specification Document (FSD) :

This document is prepared by Technical team which further elaborate business requirements into functional 

requirements that can be implemented in a software.

Suppose above 2 business requirements in BRD have more detailed functional requirements:

BR_1 Reservation Module :

FR_1 : One Way Ticket booking

It should allow user to book one way ticket

FR_2 Round Way Ticket

It should allows user to book round way ticket

FR_3 Multicity Ticket booking

It should allows user to book one way or round way ticket for multiple cities

BR_2 Payment Module:

FR_4: By Credit Card

It should allows user to make payment by Credit Cards

FR_5 By Debit Card

It should allows user to make payment by Debit Cards

FR_6 By Reward Points

It should allows user to make payment by Reward Points

And you have written some test cases or test scenarios for each functional requirement.

Page 9: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

So if we prepare simple Requirements Treaceability Matrix (RTM) for above example it would like as below:

Q-5. B) What are the skillset required by software tester? [7=3+4]

Ans-

Page 10: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Non-Technical Skills

Following skills are essential to becoming a good software tester. Compare your skill set against the following checklist to determine whether Software Testing is a reality for you-

Analytical skills: A good software tester should have sharp analytical skills. Analytical skills will help break up a complex software system into smaller units to gain a better understanding and create test cases. Not sure that you have good analytical skills - Refer this link      - if, if you can solve at least ONE problem you have excellent analytical skills.

Communication skill: A good software tester must have good verbal and written communication skill. Testing artifacts   (like  test  cases/plans,  test  strategies,  bug reports,  etc.)  created by the software tester should be easy to read and comprehend. Dealing with developers (in the event of bugs or any other issue) will require a shade of discreetness and diplomacy.

Time Management & Organization Skills: Testing at times could be a demanding job especially during the release of code. A software tester must efficiently manage workload, have high productivity, exhibit optimal time management, and organization skills

GREAT Attitude: To be a good software tester you must have a GREAT attitude. An attitude to 'test to break', detail orientation, willingness to learn and suggest process improvements. In the software industry,   technologies   evolve  with   an   overwhelming   speed,   and   a   good   software   tester   should upgrade his/her technical skills with the changing technologies. Your attitude must reflect a certain degree of independence where you take ownership of the task allocated and complete it without much direct supervision.

Passion: To   Excel      in any profession or job, one must have a significant degree of the passion for it. A software tester must have a passion for his / her field. BUT how do you determine whether you have a passion for software testing if you have never tested before? Simple TRY it out and if software testing does not excite you switch to something else that holds your interest.

Technical Skills

This list is long, so please bear with us

o Basic knowledge of Database/ SQL: Software Systems have a large amount of data in the background. This data is stored in different types of databases like Oracle, MySQL, etc. in the backend. So, there will be situations when this data needs to be validated. In that case, simple/complex SQL queries can be used to check whether proper data is stored in the backend databases.

Page 11: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

o Basic   knowledge   of   Linux   commands: Most   of   the   software   applications   like   Web-Services, Databases, Application Servers are deployed on Linux machines.So it is crucial for testers to have knowledge about Linux commands.

o Knowledge and hands-on experience of a Test Management Tool:Test Management is an important aspect of Software testing. Without proper test management techniques, software testing process will fail. Test management is nothing but managing your testing related artifacts.

For example - A tool like Testlink can be used for tracking all the test cases written by your team.

There   are  other   tools   available   that   can  be  utilized   for   Test  Management.   So,   it   is   important   to  have knowledge and working experience of such tools because they are used in most of the companies.

Knowledge and hands-on experience of  any Defect  Tracking tool- Defect  Tracking and Defect   life cycle are key aspects of software testing. It is extremely critical to managing defects properly and track them in a systematic manner.  Defect  tracking becomes necessary because the entire team should know about the defect including managers, developers, and testers. Several tools are used to lock defects including QC, Bugzilla, Jira, etc.

o Knowledge and hands-on experience of Automation tool: If if you see yourself as an "Automation tester" after a couple of years working on manual testing, then you must master a tool and get in-depth, hands-on knowledge of automation tools.

Q-6 A) Create Requirement Traceability Matrix Document for login into college portal which accept three inputs. They are USERID, PASSWORD and USER ROLE.

Ans- we are going to use two base line documents i.e. BRD (Business Requirement Document) and Functional Requirement Document (FRD) to write Test Cases and later map all of these documents into  Requirement  Traceability  Matrix   (RTM).  We are  going   to   consider   the   requirement   to   login into college portal  which accept three  inputs.  They are USERID,  PASSWORD and USER ROLE.  The following are the steps.

STEP 1: Our BRD (Business Requirement Document) will look as shown below.

Business Requirement (BSR)

Module Name

User Role Business Requirement Description

BSR1 Application Login and Logout

Student, Professor, Dean, Staff

A student can login with correct username and password (i.e. credentials) only if user role is selected as ‘Student’. Similarly it applies to user role as Professor, Dean, and Staff.

BSR2 Profile Page Student, Professor, 

Student, Professor, Dean, and Staff post successful login could see their profile details not the other 

Page 12: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Dean, Staff profiles.

BSR3 Task Assignment

Student, Professor, Dean, Staff

Student can accept or decline assignments assigned by Professor. Dean can approve and disapprove the assignment assigned by professor. Professor can approve and disapprove assignment submitted by Student. Staff is to capture the grade and marks submitted by professor towards student assignment.

STEP 2: Our corresponding (Functional requirement Document) FRD will look as shown below.

Functional Requirement (FTR)

Description

FTR1 User ID is a required field and cannot be empty.

FTR2 Password is a required field and cannot be empty.

FTR3 User role is a required field and should be chosen among Student, Professor, Dean, Staff.

FTR4 User ID, Password, and User Role are valid. Login Successful.

FTR5 If User ID or Password is wrong but User Role is valid. Login Unsuccessful.

FTR6 If User ID and Password are correct but User Role is invalid. Login Unsuccessful.

FTR7 Student, Professor, Dean, Staff can see their receptive profile page.

FTR8 Assignment Task can only be assigned by Professor.

FTR9 Student can accept or decline the assignment Task.

FTR10 Dean can approve or disapprove the assignment accepted by Student.

FTR11 Professor can approve or disapprove the assignment submitted by 

Page 13: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Student.

FTR12 Staff can capture the grade or marks provided by Professor towards Student’s assignment.

STEP 3: Testing team can use these two documents (i.e. BRD and FRD) and start preparing test cases (say the Test case covers successful login).

Test Case ID

Test Case Name Test Steps Test Data Expected Result

TC1 Successful Login 1) Browse the Login page URL.2) Enter correct user ID3) Enter Correct password4) Enter correct user role

Userid=abc123Password=123456

User Role= STUDENT

Successful Login and profile page is visible.

TC2 Unsuccessful Login due to invalid username and password

1) Browse the Login page URL.2) Enter correct user ID

3) Enter wrong password

4) Enter correct user role

Userid=abc123Password=wrong

User Role= STUDENT

Unsuccessful Login and Login page will show error.

TC3 Unsuccessful Login due to invalid user role

1) Browse the Login page URL.2) Enter correct user ID3) Enter Correct password

Userid=abc123Password=123456

User Role= DEAN

Unsuccessful Login and Login page will show error.

Page 14: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

4) Enter wrong user role

STEP 4: Let’s map the Business Requirement ID (BSR), and Functional Requirement ID (FTR) to the above Test Case. Above table will look as shown below.

Test Case ID

BSR FTR Test Case Name Test Steps Test Data Expected Result

TC1 BSR1 FTR4 Successful Login 1) Browse the Login page URL.2) Enter correct user ID3) Enter Correct password4) Enter correct user role

Userid=abc123Password=123456

User Role= STUDENT

Successful Login and profile page is visible.

TC2 BSR1 FTR5 Unsuccessful Login due to invalid username and password

1) Browse the Login page URL.2) Enter correct user ID3) Enter wrong password4) Enter correct user role

Userid=abc123Password=wrong

User Role= STUDENT

Unsuccessful Login and Login page will show error.

TC3 BSR1 FTR6 Unsuccessful Login due to invalid user role

1) Browse the Login page URL.2) Enter correct user 

Userid=abc123Password=123456

User Role= DEAN

Unsuccessful Login and Login page will show error.

Page 15: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

ID3) Enter Correct password4) Enter wrong user role

STEP 5: Likewise, complete above relationship table for all test cases and in the next step but extract the first three columns of the table i.e. Test Case ID (TC), Business Requirement ID (BSR), and Functional Requirement ID (FTR). It is nothing but you’re Requirement Traceability Matrix (RTM).

Test Case ID Business Requirement ID (BSR) Functional Requirement ID (FTR)

TC1 BSR1 FTR4

TC2 BSR1 FTR5

TC3 BSR1 FTR6

Requirement Traceability matrix (RTM)

Q-6 B) What is mutation testing? give an example

Ans- Mutation Testing is a type of software testing where we mutate (change) certain statements in the source code and check if the test cases are able to find the errors. It is a type of White Box Testing which is mainly used for Unit Testing. The changes in mutant program are kept extremely small, so it does not affect the overall objective of the program.

The goal of Mutation Testing is to assess the quality of the test cases which should be robust enough to fail  mutant code. This method is also called as Fault based testing strategy as it involves creating fault in the program

Mutation was originally proposed in 1971 but lost fervor due to high costs involved. Now, again it has picked steam and is widely used for languages such as   Java      and XML.

Page 16: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Following are the steps to execute mutation testing:

Step 1: Faults are introduced into the source code of the program by creating many versions called mutants. Each  mutant   should   contain   a   single   fault,   and   the   goal   is   to   cause   the  mutant   version   to   fail  which demonstrates the effectiveness of the test cases.

Step 2: Test cases are applied to the original program and also to the mutant program. A   Test Case      should be adequate, and it is tweaked to detect faults in a program.

Step 3: Compare the results of original and mutant program.

Step 4: If the original program and mutant programs generate the different output, then that the mutant is killed by the test case. Hence the test case is good enough to detect the change between the original and the mutant program.

Step 5:  If  the original program and mutant program generate same output, Mutant is kept alive. In such cases, more effective test cases need to be created that kill all mutants.

Original Program Mutant program

If (x>y) If(x<y)Print "Hello" Print "Hello"Else ElsePrint "Hi" Print "Hi"

Q-3 b) why independent testing team is required in organization?

Ans- Independent testing is a collection of tests performed by one or more professional software testers, who are not related to the product development team. They are called “independent” because they are 

Page 17: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

neither associated with the producer nor the consumer. Independent software testing can be conducted for web applications as well as applications on iOS and Android platforms. 

Key Advantages of Independent Testing

Independent testing has an upper hand over traditional testing in many ways. Let’s take a look at some of the key advantages that it offers:

1.   Improved  Software  Quality   –  One  of   the   top  benefits  of   outsourcing   testing   to   independent   testing organizations is improved software quality. Independent testing teams engage in a bias-free procedure and make   sure   that   the   product   is   developed   according   to   customer   requirements   and  meets   the   desired objectives while maintaining high quality.

2.  Experienced  and Skilled  Manpower  –   Independent   testing  organizations  have experienced and skilled manpower to carry out testing activities in the best possible manner. They hire the best of talent across various testing domains like automation testing, manual testing, load testing, security testing, etc.

3. Lower Life Cycle Costs – Organizations that employ independent testers can focus exclusively on quality and adherence to requirements and maintainability and scalability to address future needs. This ensures low failure rates and reduced maintenance costs. Rigorous testing cycles for both functional and non-functional aspects like performance and stress handling is covered.

4. Reduced Time to Market – There is a reduced and improved time to market for organizations having an independent   testing  practice.  Access   to  expertise   in   test  automation skills   ensures   faster   testing  cycles. Predictability to testing efforts ensures adherence to timelines. Optimized staffing ensures effective handling of dynamic requirements.

5. Flexibility – We are living in a fast-paced world and we need to be flexible in order to keep up with the pace. You can opt for automation testing or manual testing based on organizational needs. You can easily switch between manual and automation testing as independent testing organizations have the best of talent and expertise to do so.

Q-7 a) what is Selenium? What are the different Selenium components? [16=6+5+5]

Ans- Selenium is a free (open source) automated testing suite for web applications across different browsers and platforms. It is quite similar to HP Quick Test Pro (QTP now UFT) only that Selenium focuses on automating web-based applications. Testing done using Selenium tool is usually referred as Selenium Testing.

Selenium is not just a single tool but a suite of software's, each catering to different testing needs of an organization. It has four components.

Selenium Integrated Development Environment (IDE)

Selenium Remote Control (RC)

WebDriver

Selenium Grid

Page 18: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

1. Selenium-IDE:Selenium-IDE is the Integrated Development Environment for building Selenium test cases. It operates as a Firefox add-on.It is very easy to use. It has record and play feature and we can also write our own extensions and implement loops, if statements, use arrays, parameterize test cases. Selenium-IDE is very user friendly.Limitation of Selenium-IDE:It gets installed as an add-on on Mozilla and works only on Mozilla. IDE cannot work on browsers other than Mozilla. That’s why RC or webdriver is used.

2. Selenium-RC (Remote Control):Selenium Remote Control (RC) is a test tool that allows you to write automated web application UI tests in any programming language.Selenium Remote Control is great for testing complex AJAX-based web applications. Selenium Remote Control can be used for any java script enabled browser.Limitation of Selenium-RC:In RC we have to start the server again and again i.e. RC completely depends upon server. Switching between the multiple instances of the same browser is not possible. Switching between the multiple instances of the different browsers is not possible.

3. Selenium-Grid:Selenium Grid is a server that allows tests to use web browser instances running on remote machines. With Selenium Grid, one server acts as the hub.

4. Selenium WebDriverWebDriver is designed to provide a simpler, more concise programming interface in addition to addressing some limitations in the Selenium-RC API. WebDriver’s goal is to supply a well-designed object-oriented API that provides improved support for modern advanced web-app testing problems.

Q-7 b) What are the limitation of selenium?

Ans- It does not support and non web-based applications, it only supports web based applications.

Its an open source tool so in case of any technical  issues you need to rely on the selenium community forums to get your issue resolved.

You need to know at least one of the supported language very well in order to automate your application successfully.

No inbuilt reporting capability so you need plugins like JUnit and TestNG for test reports.

Lot of challenges with IE browser.

Selenium   supports   testing  of   only  web  based  applications  Mobile   applications   cannot  be   tested   using Selenium Captcha and Bar code readers cannot be tested using Selenium Reports can only be generated using third party tools like TestNG or Junit. As Selenium is a free tool, thus there is no ready vendor support 

Page 19: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

though the user can find numerous helping communities. User is expected to possess prior programming language knowledge.

We can use Selenium only to test web applications. We cannot test desktop applications or any other software

There is no guaranteed support available for Selenium. We need to leverage on the available customer communities

It is not possible to perform testing on images. We need to integrate Selenium with Sikuli for image based testing

There is no native reporting facility. But we can overcome that issue by integrating it with frameworks like TestNG or JUnit

Q-7 c) Why one should select selenium as test tool?

Ans- It’s very easy to setup and use

Selenium is an open source tool

Test scripts in Selenium can be written in any of these programming languages: Java,Python, C#, PHP, Ruby, Perl & .Net

Tests can be carried out in any of these OS: Windows, Mac or Linux

Tests can be carried out using any browser: Mozilla Firefox, Internet Explorer, Google Chrome, Safari or Opera

It can be integrated with tools such as TestNG & JUnit for managing test cases and generating reports

It can be integrated with Maven, Jenkins & Docker to achieve Continuous Testing

It is developed by Jason Huggins and his team. This is release under the Apache 2.0 license and can 

be downloaded and used without any charge.

Selenium is easy to get started with for simple functional testing of web application. It supports 

record and playback for testing web based application. Selenium supports multithreading feature i.e. 

multiple instance of script can be run on different browsers.

Q-8 a) Describe the selenium Web driver architecture with the help of diagram. [16=6+5+5]

Ans-

Page 20: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Selenium Webdriver  is  also a well-designed object oriented API  which helps  in communication between languages and browsers.

We have many programming languages like JAVA, C#, Python etc. and a programmer can write code using any language. To automate browser, a programmer needs to understand the logic of browsers.

Every browser has different logic of performing actions like loading a page, closing the browser etc. Some browsers are open source or some are not. Open source means we can see the code and can edit as well. But all browsers are not open source.  So, programmer can’t see code of all browsers and it is not possible to automate as well.

Here is the place, where selenium webdriver makes an entry. Selenium makes it possible for programmer to communicate  with   browsers   through  Webdriver.   Every   browser   has   provided   a   driver   through  which communication to browser is possible.

1. Language binding: To support multiple languages, selenium people has developed language bindings. If you want to use the browser driver in Java, use the Java bindings for Selenium Webdriver. If you want to use the browser driver in C#, Ruby or Python, use the binding for that language. All language binding can be downloaded from selenium official website.

2. Selenium Webdriver: It   is   an   API   which  makes   possible   to   communication   between   programming languages and browsers. It follows object oriented concepts. It has multiple classes and interfaces.

3. Browser drivers: A browser driver can be considered as a personal secretary of a boss. A browser drivers helps in communication with browser without revealing the internal logic of browser’s functionality. The browser driver is the same regardless of the language used for automation.

When the automation script is executed, the following steps are done internally:

1. A HTTP request is created and sent to browser driver for each selenium instruction or commands.

2. A browser driver receives the HTTP request through HTTP server.

3. HTTP server decides all steps to perform instructions which are executed on browser.

4. Execution status is sent back to HTTP server which is sent back to automation script.

Page 21: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Q-8 b) What is selenium? What is the different feature of it?

Ans- Selenium is a free (open source) automated testing suite for web applications across different browsers and platforms. It is quite similar to HP Quick Test Pro (QTP now UFT) only that Selenium focuses on automating web-based applications. Testing done using Selenium tool is usually referred as Selenium Testing.

Selenium is not just a single tool but a suite of software's, each catering to different testing needs of an organization. It has four components.

Selenium Integrated Development Environment (IDE)

Selenium Remote Control (RC)

WebDriver

Selenium Grid

Selenium is an open source tool

Test scripts in Selenium can be written in any of these programming languages: Java,Python, C#, PHP, Ruby, Perl & .Net

Tests can be carried out in any of these OS: Windows, Mac or Linux

Tests can be carried out using any browser: Mozilla Firefox, Internet Explorer, Google Chrome, Safari or Opera

It can be integrated with tools such as TestNG & JUnit for managing test cases and generating reports

It can be integrated with Maven, Jenkins & Docker to achieve Continuous Testing

It is developed by Jason Huggins and his team. This is release under the Apache 2.0 license and can 

be downloaded and used without any charge.

Selenium is easy to get started with for simple functional testing of web application. It supports 

record and playback for testing web based application. Selenium supports multithreading feature i.e. 

multiple instance of script can be run on different browsers.

Q-8 c) Enlist and explain the component of selenium tool?

Ans- Selenium is not just a single tool but a suite of software's, each catering to different testing needs of an organization. It has four components.

Selenium Integrated Development Environment (IDE)

Selenium Remote Control (RC)

WebDriver

Page 22: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Selenium Grid

1. Selenium-IDE:Selenium-IDE is the Integrated Development Environment for building Selenium test cases. It operates as a Firefox add-on.It is very easy to use. It has record and play feature and we can also write our own extensions and implement loops, if statements, use arrays, parameterize test cases. Selenium-IDE is very user friendly.Limitation of Selenium-IDE:It gets installed as an add-on on Mozilla and works only on Mozilla. IDE cannot work on browsers other than Mozilla. That’s why RC or webdriver is used.

2. Selenium-RC (Remote Control):Selenium Remote Control (RC) is a test tool that allows you to write automated web application UI tests in any programming language.Selenium Remote Control is great for testing complex AJAX-based web applications. Selenium Remote Control can be used for any java script enabled browser.Limitation of Selenium-RC:In RC we have to start the server again and again i.e. RC completely depends upon server. Switching between the multiple instances of the same browser is not possible. Switching between the multiple instances of the different browsers is not possible.

3. Selenium-Grid:Selenium Grid is a server that allows tests to use web browser instances running on remote machines. With Selenium Grid, one server acts as the hub.

4. Selenium WebDriverWebDriver is designed to provide a simpler, more concise programming interface in addition to addressing some limitations in the Selenium-RC API. WebDriver’s goal is to supply a well-designed object-oriented API that provides improved support for modern advanced web-app testing problems.

Q-9 a) What does SQA ensure? what are the goals of SQA? [17=6+6+5]

Ans-

Page 23: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Management Review: Management Review is also known as Software   Quality Assurance      or (SQA). It focuses more on the software process rather than the software work products. Quality Assurance is a set of activities designed to ensure that the project manager follows the standard process which is already pre-defined. In other words, Quality Assurance makes sure the Test Manager is doing the right things in the right way.

Audit: An audit is the examination of the work products and related information to assesses whether the standard process was followed or not.

As a Test Manager, you are the person who takes in charge these activities. However,you are at the highest

position in the project team. Who will review your tasks and check the project management activities are

executed to the highest standard?

Well, SQA auditor is the person who reviews and checks the project management activities are executed to 

the highest possible standard. Only through the result of this review, the Management Board can evaluate 

the quality of your project handling.

This is the reason why we do need Management Review or SQA in Test Management process.

The SQA interviews you, the Test Manager, to benchmark the project against set standards.

Benefits of SQA are -

1. Monitoring and improving the process.

2. Make sure that standers and procedures are followed

3.  Prepare the quality problem from occurring. 

Q-9 b) State and explain Principles of Quality management.

Ans- The eight principles are:

1 Customer focus

Organizations can establish this focus by trying to understand and meet their customers’ current and future requirements and expectations.

2 Leadership

Organizations succeed when leaders establish and maintain the internal environment in which employees can become fully involved in achieving the organization’s unified objectives.

3 Involvement of people

Page 24: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Organizations succeed by retaining competent employees, encouraging continuous enhancement of their knowledge and skills, and empowering them, encouraging engagement and recognizing achievements.

4 Process approach

Organizations enhance their performance when leaders manage and control their processes, as well as the inputs and outputs that tie these processes together.

5 System approach to management

Organizations sustain success when processes are managed as one coherent quality management system.

6 Continuous improvement

Organizations will  maintain current  levels of performance,  respond to changing conditions,  and identify, create and exploit new opportunities when they establish and sustain an ongoing focus on improvement.

7 Factual approach to decision making

Organizations succeed when they have established an evidence-based decision making process that entails gathering input from multiple sources, identifying facts, objectively analyzing data, examining cause/effect, and considering potential consequences.

8 Mutually beneficial supplier relationships

Organizations that carefully manage their relationships with suppliers and partners can nurture positive and productive involvement, support and feedback from those entities.

These principles form the conceptual foundation for the ISO portfolio of quality management standards and serve as the basis for the Good Manufacturing Practices (GMP), Good Clinical Practices (GCP), and Good Laboratory Practices (GLP) required by most government regulatory bodies. 

Q-9 c) What is ISO standard? What are advantages?

Ans- The International  Organization   for   Standardization (ISO /  ˈa   ɪ  so   ʊ   /  )   is   aninternational   standard-setting body composed of representatives from various national standards organizations.

Founded   on   23   February   1947,   the   organization   promotes   worldwide   proprietary,   industrial   and commercial standards.

The International Organization for Standardization is an independent, non-governmental organization, the members of which are the standards organizations of the 168[1] member countries.

Regulators and governments count on ISO standards to help develop better regulation, knowing they have a sound basis thanks to the involvement of globally-established experts.

To find out more about how ISO's  22459 standards touch almost all  aspects  of  daily   life,  and work  for businesses large and small, 

Elements of ISO Slandered

Page 25: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Management Responsibility

Quality System

Order Entry

Design Control

Document and Data Control

Purchasing

Control of Customer Supplied Products

Product Identification and Tractability

Process Control

Inspection and Testing Control of Inspection, Measuring, and Test Equipment

Inspection and Test Status

Control of Nonconforming Products

Corrective and Preventive Action

Handling, Storage, Packaging, and Delivery

Control of Quality Records

Internal Quality Audits

Training

Servicing

Statistical Techniques

Benefits of ISO-

Increased marketability

Reduced operational expenses

Better management control

Increased customer satisfaction

Improved internal communication

Improved customer service

Reduction of product-liability risks

Page 26: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Q-10 a) What is six sigma? Explain the term DMAIC & DMADV? [17=6+6+5]

Ans- Six Sigma can also be thought of as a measure of process performance, with Six Sigma being the goal, based on the defects per million. Once the current performance of the process is measured, the goal is to continually   improve the sigma level striving towards 6 sigma. Even if  the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will  still  reduce costs and increase customer satisfaction.

The Six Sigma DMAIC methodology is used when an organization is improving its existing processes during a process   improvement   project.   The   acronym   DMAIC   represents   five   project   phases:   Define,  Measure, Analyze, Improve, and Control.

The Six  Sigma DMADV methodology  is  used when an organization  is  creating new processes in order to achieve   their   customers’  needs.  The acronym DMADV represents  five  project  phases:  Define,  Measure, Analyze, Design, and Verify.

DMAIC focuses on:

defining business processes

measuring the current performance of a business process

finding the root cause of a problem

making improvements to the business process to reduce defects

implementing controls to alert leadership when the process is no longer in control.

DMADV focuses on:

defining the customer’s needs

measuring the customer’s needs

finding process options that will meet the customer’s needs

designing a business model that helps meet the customer’s needs

verifying that the new model meets the customer’s needs

Page 27: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

For more information on the fundamentals of these processes, please visit our detailed informational pages on DMAIC and DMADV.

Q-10 b) Define Software Quality & Software Quality Assurance. List the various objectives of SQA.

Ans- SOFTWARE QUALITY is the degree of conformance to explicit or implicit requirements and expectations.

Explanation

Explicit: clearly defined and documented

Implicit: not clearly defined and documented but indirectly suggested

Requirements: business/product/software requirements

Expectations: mainly end-user expectations

SOFTWARE QUALITY ASSURANCE (SQA) is  a set of activities for ensuring quality  in software engineering processes (that ultimately result in the quality of software products).

SQA Activities

It includes the following activities:

Process definition and implementation

Auditing

Training

SQA Processes

Processes include:

Software Development Methodology

Project Management

Configuration Management

Requirements Development/Management

Estimation

Software Design

Testing

etc

Once   the   processes   have   been   defined   and   implemented,   Quality   Assurance   has   the   following responsibilities:

Page 28: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

identifying weaknesses in the processes

correcting those weaknesses to continually improve the processes

The quality management system under which the software system is created is normally based on one or more of the following models/standards:

CMMI

Six Sigma

ISO 9000

Software  Quality  Assurance  encompasses   the  entire   software  development   lifecycle  and   the   goal   is   to ensure   that   the   development   and/or   maintenance   processes   are   continuously   improved   to   produce products that meet specifications/requirements.

Q-10 c) How cost and risk factors are affecting software quality.

Ans- Cost is the main driving factor for all  projects. When it  is done correctly,  it helps in the successful completion of  the project.   In this research we have discussed various factors that affect  the estimation procedure. These include team structure, team culture, managerial style, project type (Core application or integrated application), client’s working environment. 

Accurate estimation is   far  difficult   in  developing countries  where most of the organizations follow local standards. These inaccurate estimations lead to late delivery, less profit or in worst case complete failure. Software requirement gathering, development, maintenance, quality assurance and cost of poor quality are major groups responsible for overall cost in software production process.

 The exact proportion among them varies significantly in consecutive software releases, which is caused by many factors. The ever increasing need for the reliability of the software systems, especially mission critical applications   in   the  public   safety  domain,   raises   the  bar   for   the  accuracy  of   prediction  and  estimation techniques. 

The accuracy of estimations in many areas brings about more concerns regarding techniques already used in the   software   industry.   Widely   deployed   techniques,   such   as   Wideband   Delphi   method,   stress   the engineering and technical aspects of the process of how estimates are prepared

“Risk is future uncertain events with a probability of occurrence and a potential for loss”

Risk identification and management are the main concerns in every software project. Effective analysis of software risks will help to effective planning and assignments of work.

Categories of Risks

Schedule Risk:Project schedule get slip when project tasks and schedule release risks are not addressed properly.Schedule risks mainly affect a project and finally on company economy and may lead to project failure.

Page 29: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Wrong time estimation

 Resources are not tracked properly. All resources like staff, systems, skills of individuals etc.

 Failure to identify complex functionalities and time required to develop those functionalities.

 Unexpected project scope expansions.

Budget Risk:

 Wrong budget estimation.

 Cost overruns

 Project scope expansion

Operational Risks:Risks of loss due to improper process implementation failed system or some external events risks.Causes of Operational risks:

 Failure to address priority conflicts

 Failure to resolve the responsibilities

 Insufficient resources

 No proper subject training

 No resource planning

 No communication in the team.

Technical risks:Technical risks generally lead to failure of functionality and performance.Causes of technical risks are:

 Continuous changing requirements

 No advanced technology available or the existing technology is in initial stages.

 The product is complex to implement.

 Difficult project modules integration.

Programmatic Risks:These are the external risks beyond the operational limits. These are all uncertain risks are outside the control of the program.These external events can be:

  Running out of the fund.

Page 30: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

  Market development

  Changing customer product strategy and priority

  Government rule changes.

Q-11 a) Enumerate Ishikawa seven basic quality tools. Explain any Two in Details. [17=6+6+5]

Ans-

1. Cause-and-effect diagram:    (also called Ishikawa or fishbone chart): Identifies many possible causes for an effect or problem and sorts ideas into useful categories.

2. Check sheet:    A structured, prepared form for collecting and analyzing data; a generic tool that can be adapted for a wide variety of purposes.

3. Control   charts:    Graphs  used  to  study  how a  process  changes  over  time.  Comparing  current  data   to historical control limits leads to conclusions about whether the process variation is consistent (in control) or is unpredictable (out of control, affected by special causes of variation).

4. Histogram:    The most  commonly  used graph  for  showing   frequency distributions,  or  how often each different value in a set of data occurs.

5. Pareto chart:    Shows on a bar graph which factors are more significant.

6. Scatter diagram:    Graphs pairs of numerical data, one variable on each axis, to look for a relationship.

7. Stratification:    A technique that separates data gathered from a variety of sources so that patterns can be seen (some lists replace “stratification” with “flowchart” or “run chart”).

1. Histogram

Histogram introduced by Karl Pearson is a bar graph representing the frequency distribution on each bars.

The very purpose of Histogram is to study the density of data in any given distribution and understand the factors or data that repeat more often.

Histogram   helps   in   prioritizing   factors   and   identify  which   are   the   areas   that   needs   utmost   attention immediately.

Page 31: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Check sheet (Tally Sheet)

A check sheet can be metrics, structured table or form for collecting data and analysing them. When the information collected is quantitative in nature, the check sheet can also be called astally sheet.

The very purpose of checklist is to list down the important checkpoints or events in a tabular/metrics format and keep on updating or marking the status on their occurrence which helps in understanding the progress, defect patterns and even causes for defects.

Q-11 b) Describe Key element Total Quality Management?

Ans- Total Quality Management (TQM) is a management approach that originated in the 1950s and has steadily become more popular since the early 1980s. Total quality is a description of the culture, attitude and organization of a company that strives to provide customers with products and services that satisfy their needs. The culture requires quality in all aspects of the company’s operations, with processes being done right the first time and defects and waste eradicated from operations.

Page 32: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

TQM requires the help of those eight key elements. These elements can be divided into four groups according to their function. 

The groups are:I. Foundation – It includes: Ethics, Integrity and Trust.II. Building Bricks – It includes: Training, Teamwork and Leadership.III. Binding Mortar – It includes: Communication.IV. Roof – It includes: Recognition.

To be successful implementing TQM, an organization must concentrate on the eight key elements:

1. Ethics

2. Integrity

3. Trust

4. Training

5. Teamwork

6. Leadership

7. Recognition

8. Communication

Foundation

Foundation further includes Ethics, Integrity and Trust

The entire process of Total Quality Management is built on a strong foundation of Ethics, Integrity and Trust. Total Quality Management involves every single employee irrespective of his designation and level in the hierarchy.

Ethics: Ethics   is  an  individual’s  understanding of what   is  good and bad at   the workplace.  A thin  line of difference does exist between good and bad, which is for you to decide. Ethics teach an individual to follow code of conduct of organization and adhere to rules and regulations.

Integrity: Integrity refers to honesty, values and an individual’s sincerity at workplace. You need to respect your organization’s policies. Avoid spreading unnecessary rumours about your fellow workers. Total Quality Management does not work in an environment where employees criticize and backstab each other.

Trust: Trust is one of the most important factors necessary for implementation of total quality management. Employees need to trust each other to ensure participation of each and every individual. Trust improves relationship   among   employees   and   eventually   helps   in   better   decision  making  which   further   helps   in implementing total quality management successfully.

Bricks

Page 33: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Bricks are placed on a strong foundation to reach the roof of recognition. The foundation needs to be strong enough to hold the bricks and support the roof.

Training: Employees need to be trained on Total Quality Management. Managers need to make their fellow workers aware of the benefits of total quality management and how would it make a difference in their product   quality   and   eventually   yield   profits   for   their   organization.   Employees   need   to   be   trained   on interpersonal  skills,   the  ability   to  work  as a   team member,   technical  know-how,  decision making skills, problem solving skills  and so on. Training enables employees to implement TQM effectively within their departments and also make them indispensable resources.

Teamwork: Team work is a crucial element of total quality management. Rather than working individually, employees need to work in teams. When individuals work in unison, they are in a position to brainstorm ideas  and come up with  various   solutions  which  would   improve  existing  processes  and systems.  Team members ought to help each other to find a solution and put into place.

Leadership: Leadership   provides   a   direction   to   the   entire   process   of   Total  Quality  Management.   Total Quality  Management  needs   to  have  a   supervisor  who  acts  as  a   strong  source  of   inspiration   for  other members and can assist them in decision making. A leader himself needs to believe in the entire process of TQM for others to believe in the same. Proper downloads, briefs about TQM must be given from to time to employees to help them in its successful implementation.

Binding Mortar

Binding Mortar binds all the elements together.

Communication - Communication binds employees and extracts the best out of them. Information needs to be passed on from the sender to the recipient in its desired form. Small misunderstandings in the beginning lead to major problems later on. Employees need to interact with each other to come up with problems existing in the system and find their solutions as well.

Three types of Communication takes place between employees:

Downward Communication: Flow of information takes place from the management to the employees

Upward Communication: Flow of information takes place from the employees to the top level management

Sideways Communication: Communication also takes place between various departments.

Roof

Recognition: Recognition   is   the   final   element   of   Total   Quality  Management.   Recognition   is   the  most important factor which acts as a catalyst and drives employees to work hard as a team and deliver their lever best.   Every   individual   is   hungry   for   appreciation   and   recognition.   Employees   who   come   up   with improvement  ideas and perform exceptionally  well  must be appreciated  in  front  of  all.  They should be suitably rewarded to expect a brilliant performance from them even the next time.

Q-11 c) Explain with the example Product Quality Metric?

Ans- Software metrics can be classified into three categories −

Page 34: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

Product metrics −  Describes   the   characteristics  of   the  product   such   as   size,   complexity,   design features, performance, and quality level.

Process metrics − These characteristics can be used to improve the development and maintenance activities of the software.

Project metrics − This metrics describe the project characteristics and execution. Examples include the number of software developers, the staffing pattern over the life cycle of the software, cost, schedule, and productivity.

Some metrics belong to multiple categories. For example, the in-process quality metrics of a project are both process metrics and project metrics.

Software quality metrics are a subset of software metrics that focus on the quality aspects of the product, process, and project. These are more closely associated with process and product metrics than with project metrics.

Software quality metrics can be further divided into three categories −

Product quality metrics

In-process quality metrics

Maintenance quality metrics

Product Quality Metrics

This metrics include the following −

Mean Time to Failure

Defect Density

Customer Problems

Customer Satisfaction

Mean Time to Failure

It  is the time between failures. This metric is mostly used with safety critical systems such as the airline traffic control systems, avionics, and weapons.

Defect Density

It measures the defects relative to the software size expressed as lines of code or function point, etc. i.e., it measures code quality per unit. This metric is used in many commercial software systems.

Customer Problems

Page 35: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

It measures the problems that customers encounter when using the product.  It  contains the customer’s perspective towards the problem space of the software, which includes the non-defect oriented problems together with the defect problems.

The problems metric is usually expressed in terms of Problems per User-Month (PUM).

PUM = Total Problems that customers reported (true defect and non-defect oriented

problems) for a time period + Total number of license months of the software during

the period

Where,

Number of license-month of the software = Number of install license of the software ×

Number of months in the calculation period

PUM is usually calculated for each month after the software is released to the market, and also for monthly averages by year.

Customer Satisfaction

Customer satisfaction is often measured by customer survey data through the five-point scale −

Very satisfied

Satisfied

Neutral

Dissatisfied

Very dissatisfied

Satisfaction with the overall quality of the product and its specific dimensions is usually obtained through various  methods   of   customer   surveys.   Based   on   the   five-point-scale   data,   several  metrics  with   slight variations can be constructed and used, depending on the purpose of analysis. For example −

Percent of completely satisfied customers

Percent of satisfied customers

Percent of dis-satisfied customers

Percent of non-satisfied customers   Usually, this percent satisfaction is used.

Q-12 a) Write a short note on Total Quality Management (TQM)

Ans- The origin of the TQM goes back to the time of the First World War.

Basic Principles of TQM

Page 36: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

In TQM, the processes and initiatives that produce products or services are thoroughly managed. By this way of managing, process variations are minimized, so the end product or the service will have a predictable quality level.

Following are the key principles used in TQM:

Top management - The upper management is the driving force behind TQM. The upper management bears the responsibility of creating an environment to rollout TQM concepts and practices.

Training needs - When a TQM rollout is due, all the employees of the company need to go through a proper cycle of training. Once the TQM implementation starts, the employees should go through regular trainings and certification process.

Customer orientation - The quality improvements should ultimately target improving the customer satisfaction. For this, the company can conduct surveys and feedback forums for gathering customer satisfaction and feedback information.

Involvement of employees - Pro-activeness of employees is the main contribution from the staff. The TQM   environment   should   make   sure   that   the   employees   who   are   proactive   are   rewarded appropriately.

Techniques and tools - Use of techniques and tools suitable for the company is one of the main factors of TQM.

Corporate culture - The corporate culture should be such that it facilitates the employees with the tools and techniques where the employees can work towards achieving higher quality.

Continues improvements - TQM implementation is not a one time exercise. As long as the company practices TQM, the TQM process should be improved continuously.

The Cost

Some companies are under the impression that the cost of TQM is higher than the benefits it offers. This 

might be true for the companies in small scale, trying to do everything that comes under TQM.

According to a number of industrial researches, the total cost of poor quality for a company always exceeds 

the cost of implementing TQM.

In addition, there is a hidden cost for the companies with poor quality products such as handling customer 

complaints, re-shipping, and the overall brand name damage.

Q-12 b) Explain the following (any two)

Pareto Chart Scatter Diagram Cause and Effect Diagram

Ans-

Page 37: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

i) Pareto Chart

Also called: Pareto diagram, Pareto analysis

Variations: weighted Pareto chart, comparative Pareto charts

A Pareto chart is a bar graph. The lengths of the bars represent frequency or cost (time or money), 

and are arranged with longest bars on the left and the shortest to the right. In this way the chart 

visually depicts which situations are more significant. 

When analyzing data about the frequency of problems or causes in a process.

When there are many problems or causes and you want to focus on the most significant.

When analyzing broad causes by looking at their specific components.

When communicating with others about your data.

Analyze the occurrences of up to 10 defects. Start by entering the defects on the check sheet. This 

tool creates a Pareto chart using the data you enter.

i) Scatter Diagram

Also called: scatter plot, X–Y graph

The scatter diagram graphs pairs of numerical data, with one variable on each axis, to look for a 

relationship between them. If the variables are correlated, the points will fall along a line or curve. 

The better the correlation, the tighter the points will hug the line. 

Page 38: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

When you have paired numerical data.

When   your   dependent   variable  may   have  multiple   values   for   each   value   of   your   independent 

variable.

When trying to determine whether the two variables are related, such as:

i) When trying to identify potential root causes of problems.

ii) After brainstorming causes and effects using a fishbone diagram, to determine objectively 

whether a particular cause and effect are related.

iii) When determining whether two effects that appear to be related both occur with the 

same cause.

iv) When testing for autocorrelation before constructing a control chart.

The ZZ-400 manufacturing team suspects a relationship between product purity (percent purity) and 

the amount of iron (measured in parts per million or ppm). Purity and iron are plotted against each 

other as a scatter diagram, as shown in the figure below.

There are 24 data points. Median lines are drawn so that 12 points fall on each side for both percent 

purity and ppm iron.

To test for a relationship, they calculate:

A = points in upper left + points in lower right = 9 + 9 = 18

B = points in upper right + points in lower left = 3 + 3 = 6

Q = the smaller of A and B = the smaller of 18 and 6 = 6

N = A + B = 18 + 6 = 24

Then they look up the limit for N on the trend test table. For N = 24, the limit is 6.

Q is equal to the limit. Therefore, the pattern could have occurred from random chance, and no 

relationship is demonstrated.

Page 39: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

iii) Cause and Effect Diagram

Also Called: Cause-and-Effect Diagram, Ishikawa Diagram Variations: cause enumeration diagram, process fishbone, time-delay fishbone, CEDAC (cause–and–effect diagram with the addition of cards), desired–result fishbone, reverse fishbone diagram. 

The fishbone diagram identifies many possible causes for an effect or problem. It can be used to structure a brainstorming session. It immediately sorts ideas into useful categories. This Diagram is used

When identifying possible causes for a problem.

When a team’s thinking tends to fall into ruts.

Materials needed: flipchart or whiteboard, marking pens.

1. Agree on a problem statement (effect). Write it at the center right of the flipchart or whiteboard. Draw a box around it and draw a horizontal arrow running to it.

2. Brainstorm the major categories of causes of the problem. If this is difficult use generic headings:

o Methods

o Machines (equipment)

o People (manpower)

o Materials

o Measurement

Page 40: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

o Environment

3. Write the categories of causes as branches from the main arrow.

4. Brainstorm all the possible causes of the problem. Ask “Why does this happen?” As each idea is given, the facilitator writes it as a branch from the appropriate category. Causes can be written in several places if they relate to several categories.

5. Again ask “Why does this happen?” about each cause. Write sub-causes branching off the causes. Continue to ask “Why?” and generate deeper levels of causes. Layers of branches indicate causal relationships.

6. When the group runs out of ideas, focus attention to places on the chart where ideas are few.

This fishbone diagram was drawn by a manufacturing team to try to understand the source of periodic iron contamination. The team used the six generic headings to prompt ideas. Layers of branches show thorough thinking about the causes of the problem.

Q-12 c) Describe in details Defect Removal Effectiveness.

Ans- Defect Removal EfficiencyDefinition : The defect removal efficiency (DRE) gives a measure of the development team ability to remove defects prior to release. It is calculated as a ratio of defects resolved to total number of defects found. It is typically measured prior and at the moment of release.

CalculationTo be able to calculate that metric, it is important that in your defect tracking system you track:affected version, version of software in which this defect was found.release date, date when version was released

Page 41: dhomaseghanshyam.files.wordpress.com · Web viewEven if the improvements do not reach 6 sigma, the improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and

DRE = Number of defects resolved by the development team / total number of defects at the moment of measurement.

DRE is typically measured at the moment of version release, the best visualization is just to show current value of DRE as a number.

ExampleFor example, suppose that 100 defects were found during QA/testing stage and 84 defects were resolved by the development team at the moment of measurement. The DRE would be calculated as 84 divided by 100 = 84%

*****************************************THE END*********************************