6
Valley South Subtransmission Project Final EIR Cover Title Page Execuve Summary ES.1 Introducon and Background ES.2 Environmental Analysis ES.3 Alternaves ES.4 Summary of Environmental Impacts and Migaon Measures A. Introducon A.1 Overview of the Proposed Project A.2 Project Objecves, Purpose, and Need A.3 Agency Use of this Document A.4 Overview of the Environmental Review Process A.5 Reader’s Guide to this EIR B. Project Descripon B.1 Project Overview B.2 Project Locaon B.3 Project Components B.4 Project Construcon B.5 Operaon and Maintenance B.6 Electric and Magnec Fields Management B.7 Applicant Proposed Measures C. Environmental Analysis C.1 Introducon to Environmental Analysis C.1.1 Organizaon of Secon C C.1.2 Analycal Assumpons C.1.3 Environmental Assessment Methodology C.1.4 Cumulave Scenario and Methodology C.1.5 Applicant-Proposed Measures C.1.6 Migaon Monitoring C.2 Aesthecs Introducon Scoping Issues Addressed C.2.1 Environmental Seng C.2.2 Regulatory Framework C.2.3 Applicant-Proposed Measures C.2.4 Environmental Impacts and Migaon Measures

 · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

Valley South Subtransmission ProjectFinal EIRCover

Title Page

Executive SummaryES.1 Introduction and BackgroundES.2 Environmental AnalysisES.3 AlternativesES.4 Summary of Environmental Impacts and Mitigation Measures

A. Introduction A.1 Overview of the Proposed ProjectA.2 Project Objectives, Purpose, and NeedA.3 Agency Use of this DocumentA.4 Overview of the Environmental Review ProcessA.5 Reader’s Guide to this EIR

B. Project Description B.1 Project OverviewB.2 Project LocationB.3 Project ComponentsB.4 Project ConstructionB.5 Operation and MaintenanceB.6 Electric and Magnetic Fields ManagementB.7 Applicant Proposed Measures

C. Environmental AnalysisC.1 Introduction to Environmental Analysis

C.1.1 Organization of Section CC.1.2 Analytical AssumptionsC.1.3 Environmental Assessment MethodologyC.1.4 Cumulative Scenario and MethodologyC.1.5 Applicant-Proposed MeasuresC.1.6 Mitigation Monitoring

C.2 Aesthetics IntroductionScoping Issues AddressedC.2.1 Environmental SettingC.2.2 Regulatory FrameworkC.2.3 Applicant-Proposed MeasuresC.2.4 Environmental Impacts and Mitigation Measures

Page 2:  · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

C.3 Agricultural Resources IntroductionScoping Issues AddressedC.3.1 Environmental SettingC.3.2 Regulatory FrameworkC.3.3 Applicant-Proposed MeasuresC.3.4 Environmental Impacts and Mitigation Measures

C.4 Air Quality IntroductionScoping Issues AddressedC.4.1 Environmental SettingC.4.2 Regulatory FrameworkC.4.3 Applicant-Proposed MeasuresC.4.4 Environmental Impacts and Mitigation Measures

C.5 Biological Resources IntroductionScoping Issues AddressedC.5.1 Environmental SettingC.5.2 Regulatory FrameworkC.5.3 Applicant-Proposed MeasuresC.5.4 Environmental Impacts and Mitigation Measures

C.6 Cultural and Paleontological Resources IntroductionScoping Issues AddressedC.6.1 Environmental SettingC.6.2 Regulatory FrameworkC.6.3 Applicant-Proposed MeasuresC.6.4 Environmental Impacts and Mitigation Measures

C.7 Geology and Soils IntroductionScoping Issues AddressedC.7.1 Environmental SettingC.7.2 Regulatory FrameworkC.7.3 Applicant-Proposed MeasuresC.7.4 Environmental Impacts and Mitigation Measures

C.8 Greenhouse Gas Emissions IntroductionScoping Issues AddressedC.8.1 Environmental SettingC.8.2 Regulatory FrameworkC.8.3 Applicant-Proposed MeasuresC.8.4 Environmental Impacts and Mitigation Measures

C.9 Hazards and Hazardous Materials Introduction

Page 3:  · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

Scoping Issues AddressedC.9.1 Environmental SettingC.9.2 Regulatory FrameworkC.9.3 Applicant-Proposed MeasuresC.9.4 Environmental Impacts and Mitigation Measures

C.10 Hydrology and Water Quality IntroductionScoping Issues AddressedC.10.1 Environmental SettingC.10.2 Regulatory FrameworkC.10.3 Applicant-Proposed MeasuresC.10.4 Environmental Impacts and Mitigation Measures

C.11 Land Use and Planning IntroductionScoping Issues AddressedC.11.1 Environmental SettingC.11.2 Regulatory FrameworkC.11.3 Applicant-Proposed MeasuresC.11.4 Environmental Impacts and Mitigation Measures

C.12 Noise IntroductionScoping Issues AddressedGeneral Information on NoiseGeneral Information on VibrationC.12.1 Environmental SettingC.12.2 Regulatory FrameworkC.12.3 Applicant-Proposed MeasuresC.12.4 Environmental Impacts and Mitigation Measures

C.13 Recreation IntroductionScoping Issues AddressedC.13.1 Environmental SettingC.13.2 Regulatory FrameworkC.13.3 Applicant-Proposed MeasuresC.13.4 Environmental Impacts and Mitigation Measures

C.14 Transportation and Traffic IntroductionScoping Issues AddressedC.14.1 Environmental SettingC.14.2 Regulatory FrameworkC.14.3 Applicant-Proposed MeasuresC.14.4 Environmental Impacts and Mitigation Measures

D. Alternatives D.1 CEQA Requirements

Page 4:  · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

D.2 Alternatives Screening MethodologyD.3 Alternatives Retained for AnalysisD.4 Alternatives Eliminated from Full EIR EvaluationD.5 Comparison of Alternatives

E. Other CEQA Considerations E.1 Environmental Effects Found not to be SignificantE.2 Significant Effects that Can Not be AvoidedE.3 Irreversible and Irretrievable Commitments of ResourcesE.4 Growth-Inducing ImpactsE.5 Energy ConservationE.6 Intentional Destructive Acts

F. Public Participation and Consultation F.1 Public Participation and NotificationF.2 Organization and Tribal ConsultationF.3 EIR Preparers

G. References

H. Glossary and Acronyms

AppendicesAppendix 1 Scoping Summary Appendix 2 Air Quality Appendix 3 Biological Resources

3-1. Observed Wildlife List3-2. Plants Observed

Appendix 4 Alternatives Screening Report Appendix 5 Comments and Responses Appendix 6 Mitigation Monitoring Plan

Figures Figure ES-1 Project Location and Vicinity Figure ES-2 Subtransmission Line Route Figure A-1 Project Location and Vicinity Figure A-2 The EIR Process Figure B-1 Subtransmission Line Route Figure B-2a Typical Subtransmission Structures Figure B-2b Typical Subtransmission Structures Figure B-2c Typical Subtransmission Structures Figure B-2d Typical Subtransmission Structures Figure B-3 Example of Existing Marker Ball (Prior to Installation) Figure B-4 Typical Subtransmission Vault Figure B-5 Typical Subtransmission Duct Bank Figure B-6a ROW Ownership Figure B-6b ROW Ownership

Page 5:  · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

Figure B-6c ROW Ownership Figure B-7 Proposed Staging Yards Figure B-8 Proposed Pull and Tension Sites, Splicing Sites, and Guard Structures Figure B-9 Proposed Subtransmission Line Route EMF Evaluation Sections Figure C.1-1 Cumulative Projects Figure C.2-1 KOP Locations Figure C.2-2a KOP 1 Leon Rd. at Simpson Rd. – Existing View Figure C.2-2b KOP 1 Leon Rd. at Simpson Rd. – Visual Simulation Figure C.2-3a KOP 2 Domenigoni Parkway – Existing View Figure C.2-3b KOP 2 Domenigoni Parkway – Visual Simulation Figure C.2-3c Linear Viewpoint Map – Domenigoni Parkway Figure C.2-4a KOP 3 Northbound Leon Road – Existing View Figure C.2-4b KOP 3 Northbound Leon Road – Visual Simulation Figure C.2-5a KOP 4 Leon Road at Fowler Drive – Existing View Figure C.2-5b KOP 4 Leon Road at Fowler Drive – Visual Simulation Figure C.2-6a KOP 5 Lantana Way at Leon Road – Existing View Figure C.2-6b KOP 5 Lantana Way at Leon Road – Visual Simulation Figure C.2-7a KOP 6 Westbound SR 79 – Existing View Figure C.2-7b KOP 6 Westbound SR 79 – Visual Simulation Figure C.2-8a KOP 7 Benton Road – Existing View Figure C.2-8b KOP 7 Benton Road – Visual Simulation Figure C.2-9a KOP 8 Murrieta Hot Springs Road – Existing View Figure C.2-9b KOP 8 Murrieta Hot Springs Road – Visual Simulation Figure C.2-10a KOP 9 Suzi Lane – Existing View Figure C.2-10b KOP 9 Suzi Lane – Visual Simulation Figure C.3-1a Farmland Designations Figure C.3-1b Farmland Designations Figure C.3-1c Farmland Designations Figure C.4-1 Wind Rose from Perris Valley Monitoring Station (2007-2011) Figure C.5-1a Map A Vegetation and Cover Types Figure C.5-1b Map B Vegetation and Cover Types Figure C.5-1c Map C Vegetation and Cover Types Figure C.5-1d Map D Vegetation and Cover Types

Map A Jurisdictional Features Figure C.5-2b Map B Jurisdictional Features Figure C.5-2c Map C Jurisdictional Features Figure C.5-2d Map D Jurisdictional Features Figure C.5-2e Map E Jurisdictional Features Figure C.5-2f Map F Jurisdictional Features Figure C.5-2g Map G Jurisdictional Features Figure C.5-3a Map A CNDDB Figure C.5-3b Map B CNDDB Figure C.5-4a Map A Special Status Plant Species Occurrences Figure C.5-4b Map B Special Status Plant Species Occurrences Figure C.5-4c Map C Special Status Plant Species Occurrences Figure C.5-4d Map D Special Status Plant Species Occurrences

Page 6:  · Web viewExecutive Summary ES.1Introduction and Background ES.2Environmental Analysis ES.3Alternatives ES.4Summary of Environmental Impacts and Mitigation Measures A.Introduction

Figure C.5-5a Map A Special Status Wildlife Species Occurrences Figure C.5-5b Map B Special Status Wildlife Species Occurrences Figure C.5-5c Map C Special Status Wildlife Species Occurrences Figure C.5-5d Map D Special Status Wildlife Species Occurrences Figure C.7-1 Regional Geologic Map Figure C.7-2 Active Regional Faults and Historic Earthquakes Figure C.12-1 Ambient Noise Monitoring Locations Figure C.13-1 Parks and Recreational Areas Figure C.13-2 Trail Locations Figure D-1 SCE Subtransmission Line Route Alternatives Figure D-2a KOP 10 Scott Road- Alternative 1 Existing View Figure D-2b KOP 10 Scott Road- Alternative 1 Visual Simulation Figure D-3 Additional Viewpoint A, Scott Road at Menifee Road, Existing View Figure D-4 Additional Viewpoint B, Mussa Lane, Existing View Figure D-5 Partial Underground Alternative Figure D-6 Typical Subtransmission Duct Bank Figure D-7 Typical Subtransmission Vault Figure D-8a KOP 11 Leon Road- Alternative 2, Existing View Figure D-8b KOP 11 Leon Road- Alternative 2, Visual Simulation