11

web.cimne.upc.edu P2/Travel/V-15136 C.Agelet/V...Partners involved: ARC, Proservice, Innospexion, Put, Ascamm 12:15 Technical Status: Executive summary. Nº 3 Automated cast iron processes

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Definitive-Agenda FLEXICAST Project Project number: 314540 General Assembly (30 m) Date: Thursday 26th March 2015 Place: CNR facilities "Area della Ricerca" Via Pietro Gobetti, 101, 40129 Bologna Italy Participants: All consortium partners, Mr. Arnaud Petein (EC Project Officer) & Mr. Vincenzo Nicoló (Project Technical Adviser) 11:00 Welcome 11:15 Technical Status: Executive summary. Nº 1 Cast iron manufacturing cell (WP2/6) T2.1- Induction and plasma fusion and heating T2.2- New pouring system (high performance and low resources consuming) T2.3- New and low cost nodularisation treatment (magnesium vapour,...) T2.4- Inoculants and inoculation systems. Deliverables for the next period (36 m) Partners involved: Ondarlan, Tecnalia, F de Roda, Foseco, and LABSON-UPC 11.45 Technical Status: Executive summary. Nº 2 Data gathering, AI and cast iron quality (WP3/6) T3.1 Real-Time Data Gathering (RTDG). T3.2 Statistical process Control System (SPC). T3.3 Case-based and Fuzzy Inductive Reasoning. T3.4 Holistic enabling technologies for cast iron quality validation a) Differential thermal analysis, b) Internal sanity inspection (X-ray approach). Deliverables for the next period (36 m) Partners involved: ARC, Proservice, Innospexion, Put, Ascamm 12:15 Technical Status: Executive summary. Nº 3 Automated cast iron processes (WP4/6) T4.1.1 -Automation test samples cell T4.1.2 -Design of a robotic cell for the automatic configuration of the multi-part molding box T4.2 - Robot cell for deburring and grinding Deliverables for the next period (36 m) Partners involved: F de Roda, CNR-Itia, Comau

12:45 Technical Status: Executive summary. Nº 4 Simulation and optimization techniques (WP5/6) T5.1 Thermo-fluid dynamic modelization a) Melted metal flows simulation in cast iron processes and b) Casting process simulation. T5.2 Experimental validation and procedures Deliverables for the next period (36 m) Partners involved: F de Roda, PUT, Cimne, Labson-UPC, CNR-Imamoter, TSS 13:30 Lunch break 14:30 Technical Status: Executive summary. Nº 5 Life cycle assessment of specific cast iron parts (WP7) a) Permanent communication, b) Capitalise knowledge generated by design activity and the experience returns from using pilot applications. c) Formalising results of the project in guidelines and possible standards, contributing to building European standardisation in this field. Leading partner: CNR-Imamoter Partners involved: all 15:00 WORKING SESSION (Partners round table) Subject: Exploitation Plan (WP8) Participants: all partners Leading partner: ASCAMM Partners involved: all 16:30 Flexicast progress. a) Progress review and dissemination b) Documents approval (deliverables 30 m, etc) c) Deliverables next 36 m period Reported by Labson-UPC (Coordinator) 16:45 Administrative and Financial issues. a) 2nd payment b) Summary: Planning. Reported by UPC. Partners involved: all 17:00 Closure of the Meeting. Notes: 26 th March 2015 From 17:30 to 19:30 PSC and PEC Project Committees meetings PSC (UPC, F de Roda, ASCAMM, CNR, INNOSPEXION, ONDARLAN and CIMNE) PEC (UPC, F de Roda, ASCAMM, CNR)