Stores and Operations Summary Standard Plots. Week in Review: 06/02/03 –06/09/03. Keith Gollwitzer – FNAL. Stores Summary. Integrated Luminosity for the Week. B4 Fridge stability - Abort. E4 wet engine replaced. Ice balls Lead failure Leads too cold. Recovery from shutdown. - PowerPoint PPT Presentation

Citation preview

Page 1: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

f Week in Review: 06/02/03 –06/09/03

Keith Gollwitzer – FNAL

• Stores and Operations Summary• Standard Plots

Page 2: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 2

f Stores Summary

StoreInitialLum.(E30)

Deliv’dLum. (nb-1)

TerminationDuration

(hr) Comments

2636 20.8 621 Intentional 15.3 Stack of 112mA; Not full 53MHz for 1 transfer

2642 31.2 976 Intentional 17.6 Stack of 174mA (shot 123mA)

2644 28.7 171 Abort 2.0Stack of 169mA; ARF1 trip for 2 transfersB4 Fridge excursion led to unstable fridge

2646 26.5 923 Intentional 22.6 Stack of 111mA

2658 28.2 378 Abort 5.2Stack of 121mA

QBS Controller failure

2662 24.2 725 Intentional 16.2 Stack of 101mA

2665 29.9 838 Intentional 14.6 Stack of 157mA

2667 27.4 - On Going - Stack of 127mA

Page 3: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 3

f Integrated Luminosity for the Week

Rec

over

y fr

om s

hutd

own

Ice

ball

s

Lea

d fa

ilur

e

Lea

ds to

o co

ld

B4

Fri

dge

stab

ilit

y -

Abo

rt

Mai

nten

ance

(aw

ait s

tack

)

QB

S c

ontr

olle

r F

ailu

re -

Abo

rt

E4

wet

eng

ine

repl

aced

Page 4: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 4

f Summary (1)

• Lost Stores – B4 Fridge excursion of cooldown valve led to an

unstable fridge condition which led to abort. May been seeing this problem and have been investigating (1st store lost to these excursions).

– QBS Controller failed on NO A/C bit; aborted store

• Cool to too Cold– 3 ice balls found after power outages and recovery

• Water is used to regulate temperature (problems last weekend)

• 1 ice ball due to nitrogen leak; able to reseal

– Leads to cold• Fafa

Page 5: Week in Review: 06/02/03 –06/09/03
Page 6: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 6

f Summary (2)

• TeV operation not quite recovered– Losses:

• 150GeV when opening the helix

• Start of ramp (more than usual)

• Pbars at flattop; tune adjustments fix

– Lifetime is quite a bit smaller than early May

• TeV maintenance– ~12 hours of 3-bumps to locate apertures

• Have done quick check of ½ of TeV ring

• C46 bump causes changes in tunes; strong sextupoles

– Tunes up the ramp

Page 7: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 7

f Tevatron Losses

Total ProtonsTotal CurrentTotal Pbars2nd set of Pbars

Store 2642

Store 2662

Prot

on L

oad

Prot

on L

oad

Pbar

Loa

d

Pbar

Loa

d

Open Helix

Ramp

Ramp

1st Cogging

Page 8: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 8

f Summary 3• Lost Stack of 60mA

– Debuncher vacuum leak closed vacuum valves

• Other Pbar Problems– Lithium Lens LCW valve problem– Breaker at AP0 trip affecting AP2 and AP3 supplies– 95 degree LCW pump tripped– Water leak on A:A1S12 fixed during vacuum repair

• Busy Proton Source with– Change outs of LRF5 and LRF1– MH2 regulation– MKS04 Kicker; cable termination– ORBMP water flow valve– Pulse shifter– Continuous tuning of LINAC and Booster

• SY120: 1 short and 1 longer beam period

Page 9: Week in Review: 06/02/03 –06/09/03
Page 10: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 10

f SY120: Last week “spraying into P3”

P1 and P2 wires

P3 wires

Page 11: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 11

f SY120 Progress: P1+P2+P3 into transfer hall

Made use of E4 fridge replacement to have ~6hrs of beam

P3 wires

Page 12: Week in Review: 06/02/03 –06/09/03
Page 13: Week in Review: 06/02/03 –06/09/03
Page 14: Week in Review: 06/02/03 –06/09/03

All Experimenters' Mtg - 9 Jun 03

K. Gollwitzer - FNAL 14

f Brief Summary

• The week– Many problems (some recovery related?)

– 86hrs of stores

– TeV maintenance when• 2 stores aborted early

• 1 lost stack

– SY120 beam progress

• FY03 total is 156pb-1; 11 weeks to shutdown

• Goal for this week– Stack and Store

• Will do at least one between stores TeV maintenance period(s)– Reduction of strong sextupole at C46

– Continue 3-bump aperture scan of TeV