STAR ACADEMIES Star Academies runs a growing network of primary and secondary schools, with clusters in Lancashire, West Yorkshire, Greater Manchester, the West Midlands and London. It is our mission to deliver the very best education to young people in our schools across the UK. As well as achieving excellent academic results, Star schools are deeply committed to the personal development of our young people. We are proud to contribute to the communities we work in and students have the opportunity to support local projects. THE TEAM Wates have brought together a team of designers, engineers and specialists to develop proposals and prepare the documentation to support the Planning Application. The team comprises: Contractor Wates Construction Architect Sheppard Robson Landscape Ares Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden Boys’ Leadership Academy (EBLA), Birmingham East is a newly founded 800 place boys’ school run by Star Academies. It is proposed that a new school will be constructed on a site on Alum Rock Road, which is due to open in early 2021.

WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

STAR ACADEMIES

Star Academies runs a growing network of primary and secondary schools, with clusters in Lancashire, West Yorkshire, Greater Manchester, the West Midlands and London. It is our mission to deliver the very best education to young people in our schools across the UK. As well as achieving excellent academic results, Star schools are deeply committed to the personal development of our young people. We are proud to contribute to the communities we work in and students have the opportunity to support local projects.

THE TEAM

Wates have brought together a team of designers, engineers and specialists to develop proposals and prepare the documentation to support the Planning Application. The team comprises:

Contractor Wates ConstructionArchitect Sheppard RobsonLandscape AresPlanning ELG PlanningTransport TPSFlood Risk/Drainage CurtinsNoise Stroma

WELCOMETo the Alum Rock Road proposals

Proposed Site

Eden Boys’ Leadership Academy (EBLA), Birmingham East is a newly founded 800 place boys’ school run by Star Academies. It is proposed that a new school will be constructed on a site on Alum Rock Road, which is due to open in early 2021.

Page 2: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

CONSTRAINTS

The scheme has been prepared having taken account of a number of key constraints relating to topography, past uses, flood risk/drainage and current uses surrounding the site. The constraints plan identifies the key issues that have influenced the location of the proposed school.

The diagrams show the main constraints that have influenced the location of the proposed school.

Page 3: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

THE PROPOSED DEVELOPMENTAlum Rock Road

Alum Rock Road

Alum Rock Road 12

34

23 24 25 26 27 28 29 30 31 32 33 34 35

59 60 61 62 63 64 65 66 67 68 69 70

41 42 43 44 45 46 47 48 49 50 51 52 53

12

77 78 79 80 81 82 83 84 85 86

12

34

23 24 25 26 27 28 29 30 31 32 33 34 35

59 60 61 62 63 64 65 66 67 68 69 70

41 42 43 44 45 46 47 48 49 50 51 52 53

12

77 78 79 80 81 82 83 84 85 86

EV

EV

COACH DROP OFFCOACH DROP OFF

MOTORCYCLES

6.1

m

3m

Multipurpose Hall

AblutionsAcc WC

Chair Store SEN SGR

Ante-space

Ablutions

Dining Area

Staff Changing

SEN Therapy/ MI room

SEN Co

SEN ResourceSEN LGR

Multi-materials store/prep room

Lift

Acc WC

SEN SGRSEN Store

Stair 2

Ante-space

Stair 3

Trust Office / HotDesking

Head's Office

General Office /Reception

Data Office

Exam Store

Sick Room

PA Office

Finance Office Heads of Year

Conference / MeetingRoom

Acc WC

Pupil Entrance

Visitor Entrance

Interview Room

Reprographics

Hygiene Room

Elec Room

Tank Room

Tea Point

Waiting

Cl

ICT / Graphic Art ICT / Graphic Art

Staff Toilet

General store (centralstock)

Pupil Toilet Suite

Reception

Food Tech

SLTStair 1

General Art

Specialist Store

Cl

Library ResourceCentre

Library Store

PE store (Sports Hall)Plant

School Sports Hall

PE Store (ActivityStudio)

External PE Store

Personal Storage(Community Lockers)

Pupil Changing andShowers

PE Store (Community)

Site Super Office

Staff Work

Activity Studio

Accessible / StaffChanging

Maintenance Store

Cl

Pupil Changing andShowers

Office

Dry Store

Store GT

Pupil Toilet Suite

Pupil Toilet Suite

Pupil Toilet Suite

Kitchen

Water Fountain

Water Fountain

Tea Point

Q

N

77 Parkway Camden Town London NW1 7PU

T: +44 (0)20 7504 1700 E: [email protected]

CLIENT

PROJECT

SCALE@A1 ORIGINATOR CHECKED

A1

The copyright in this drawing is vested in Sheppard Robson and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing.

The areas are approximate and can only be verified by a detailed dimensional survey of the completed building. Any decisions to be made on the basis of these predictions, whether as to project viability, pre-letting, lease agreements or otherwise, should include due allowance for the increases and decreases inherent in the design development and building processes. Existing buildings may present anomalies in relation to surveyed/drawn plans that may also effect the stated areas. All areas are subject to Town Planning and Conservation Area Consent and detailed Rights to Light analysis.Figures relate to the likely areas of the building at the current stage of the design and are calculated using one of the following (as stated in the accompanying areas schedule) IPMS1, IPMS2, IPMS 3, Gross External Area (GEA), Gross Internal Area (GIA) or Nett Internal Area (NIA) methods of measurement from the RICS Property Measurement 1st edition.

AREA MEASUREMENT

FOR ELECTRONIC DATA ISSUE

The contractor shall check and verify all dimensions on site and report any discrepancies in writing to Sheppard Robson before proceeding work

Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in test, on the drawing.

DO NOT SCALE FROM THIS DRAWING

© COPYRIGHT

DATE AUTHORISED

KEYPLAN

DRAWING NO. REV.

SR NO.STATUS PURPOSE FOR ISSUE

- - - - - -

1 : 200

05/0

4/2

019 1

2:5

1:3

5

Eden Boys School Leadership Academy

02/21/19 MC HI JJ

6285

Stage 0

S2 Sketch

General ArrangementGround Floor Plan

FS0759 SRA XX 00 DR A SK-000

REV. DATE AMENDMENT

General ScienceLaboratory

General ScienceLaboratory

Seminar Room

Seminar RoomSeminar RoomSeminar Room

General ScienceLaboratory - Sixth

Form

General ScienceLaboratory - Sixth

Form

Additional Classroom -Sixth Form

Additional Classroom -Sixth FormAdditional Classroom

ICT Rich Classroom

Specialist ScienceLaboratory

Specialist ScienceLaboratory

Sixth Form Social

Sixth Form Study

Stair 2

Stair 3

Riser

Riser

Pupil Toilet Suite

Pupil Toilet Suite

SLT

Lift

Staff Work

Riser

SLT

Chemical Store

Science Prep Room

Riser

Staff Work

Dining Below

Department Legend

Circulation

Non Net Areas

Office

Store

Teaching

27 m²

Stair 1

55 m²

Additional Classroom

Store GT

Cl

Acc WCStaff Toilet

Water Fountain

Seminar Room

Q

N

77 Parkway Camden Town London NW1 7PU

T: +44 (0)20 7504 1700 E: [email protected]

CLIENT

PROJECT

SCALE@A1 ORIGINATOR CHECKED

A1

The copyright in this drawing is vested in Sheppard Robson and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing.

The areas are approximate and can only be verified by a detailed dimensional survey of the completed building. Any decisions to be made on the basis of these predictions, whether as to project viability, pre-letting, lease agreements or otherwise, should include due allowance for the increases and decreases inherent in the design development and building processes. Existing buildings may present anomalies in relation to surveyed/drawn plans that may also effect the stated areas. All areas are subject to Town Planning and Conservation Area Consent and detailed Rights to Light analysis.Figures relate to the likely areas of the building at the current stage of the design and are calculated using one of the following (as stated in the accompanying areas schedule) IPMS1, IPMS2, IPMS 3, Gross External Area (GEA), Gross Internal Area (GIA) or Nett Internal Area (NIA) methods of measurement from the RICS Property Measurement 1st edition.

AREA MEASUREMENT

FOR ELECTRONIC DATA ISSUE

The contractor shall check and verify all dimensions on site and report any discrepancies in writing to Sheppard Robson before proceeding work

Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in test, on the drawing.

DO NOT SCALE FROM THIS DRAWING

© COPYRIGHT

DATE AUTHORISED

KEYPLAN

DRAWING NO. REV.

SR NO.STATUS PURPOSE FOR ISSUE

- - - - - -

1 : 200

05/0

4/2

019 1

2:5

1:4

0

P06

Eden Boys School Leadership Academy

06/29/16 MC HI JJ

6285

Stage 0

S2 Sketch

General ArrangementSecond Floor Plan

FS0759 SRA XX 02 DR A SK-002

REV. DATE AMENDMENT

P01 24/01/19 First Issue

P02 25/01/19 GA Plan layouts updated

P03 31/01/19 GA Plan layouts updated

P04 01/02/19 GA Plan layouts updated

P05 07/02/19 GA Plans / Elevations updated

P06 15/02/19 GA Plan layouts updated

General Classroom -Maths

General Classroom -Maths

General Classroom -Maths

General Classroom -Multi Purpose

General Classroom -Languages

General Classroom -Languages

General Classroom -Languages

General Classroom -Maths

General Classroom-English

General Classroom-English

General Classroom-English

General Classroom -Multi Purpose

General Classroom-Humanities

General Classroom-Humanities

General Classroom-Humanities

ICT / Business Studies

ICT / Business Studies- Sixth Form

Stair 2

Stair 3

SLT

ECM Office

Staff Toilet

Cl Store GT

Staff WorkStore GT

SLTICT OfficeStaff Work

Riser

RiserRiser

Riser

Dining Below

Pupil Toilet Suite

Pupil Toilet Suite

Acc WC

Director of Learning27 m²

Stair 1

Server Room

Store GT

Acc WC

Plant

Below

Roof Access

Water Fountain

Ladder

General Classroom-English

Q

N

77 Parkway Camden Town London NW1 7PU

T: +44 (0)20 7504 1700 E: [email protected]

CLIENT

PROJECT

SCALE@A1 ORIGINATOR CHECKED

A1

The copyright in this drawing is vested in Sheppard Robson and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing.

The areas are approximate and can only be verified by a detailed dimensional survey of the completed building. Any decisions to be made on the basis of these predictions, whether as to project viability, pre-letting, lease agreements or otherwise, should include due allowance for the increases and decreases inherent in the design development and building processes. Existing buildings may present anomalies in relation to surveyed/drawn plans that may also effect the stated areas. All areas are subject to Town Planning and Conservation Area Consent and detailed Rights to Light analysis.Figures relate to the likely areas of the building at the current stage of the design and are calculated using one of the following (as stated in the accompanying areas schedule) IPMS1, IPMS2, IPMS 3, Gross External Area (GEA), Gross Internal Area (GIA) or Nett Internal Area (NIA) methods of measurement from the RICS Property Measurement 1st edition.

AREA MEASUREMENT

FOR ELECTRONIC DATA ISSUE

The contractor shall check and verify all dimensions on site and report any discrepancies in writing to Sheppard Robson before proceeding work

Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in test, on the drawing.

DO NOT SCALE FROM THIS DRAWING

© COPYRIGHT

DATE AUTHORISED

KEYPLAN

DRAWING NO. REV.

SR NO.STATUS PURPOSE FOR ISSUE

- - - - - -

1 : 200

05/0

4/2

019 1

2:5

1:3

7

P05

Eden Boys School Leadership Academy

06/29/16 MC HI JJ

6285

Stage 0

S2 Sketch

General ArrangementFirst Floor Plan

FS0759 SRA XX 01 DR A SK-001

REV. DATE AMENDMENT

P01 24/01/19 First Issue

P02 25/01/19 GA Plan layouts updated

P03 31/01/19 GA Plan layouts updated

P04 01/02/19 GA Plan layouts updated

P05 07/02/19 GA Plans / Elevations updated

Ground Floor Plan

Visual of Dining Room

Visual of a Typical Classroom

First Floor Plan Second Floor Plan Aerial view from Alum Rock Road

Page 4: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

EXTERNAL ELEVATIONS

North Elevation

East Elevation

South Elevation

West Elevation

Main entrance view from Alum Rock Road

Aerial view of Hard Play Area

Aerial view of Reflection Garden

Page 5: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

LANDSCAPING AND PLAYING FIELDS

Car Park

94 Spaces inc. 4 disabled bays

Sports Pitches2 X Multi-Use Games Area

(MUGAs)

Service

Main Pedestrian Entrance

Hard Play

Reflection Garden

Landscape Strategy

The proposed site layout has been developed in response to a number of constraints and opportunities that have informed the building position, access arrangements and views.

The proposed orientation of the building has been carefully considered to minimise neighbouring residential properties on Alum Rock Road and Ludlow Road being overlooked.

The orientation and location of the building on the site also create the opportunity to consolidate the hard play, hard games courts, service yards and parking in a way that maximises the ability of the rest of the site to be used for external sport. Maximising the area of usable playing field is a key benefit of the site layout and is consistent with Birmingham promoting opportunities for sport in the run up to the 2022 Commonwealth Games.

All site access is via Alum Rock Road, which includes separate pedestrian access to prevent pedestrians and vehicles from coming into conflict.

The planting treatment of the site boundary is very important for setting the character of the school and integrating it successfully into its surroundings. Larger tree species are proposed for Alum Rock Road in order to reinforce and reinstate the tree lined character of Alum Rock Road. Formal lines of trees are also proposed along the residential streets of Rockville Road and Alderson Road in order to help create the feel of a residential avenue.

On the boundary with Ludlow Road, a more irregularly spaced band of trees, set 3 to 4 metres in from the boundary, help reduce inter-visibility between the site and the rear of the residential properties.

Page 6: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

ACCESS TRAFFIC AND PARKING

Accessibility

Owing to its location, in Alum Rock, the proposed school is well placed to take advantage of a wide range of existing sustainable travel infrastructure:

• There is a wide network of cycle routes in the vicinity of the site. An advisory on-road cycle route is present along Brook Hill Road, Alum Rock Road (between Brook Hill Road and Foxton Road) and Foxton Road. The cycle route on Alum Rock Road passes along the site frontage;• There is a controlled pedestrian crossing on Alum Rock Road, to the west of the junction with Foxton Road and there are additional pedestrian crossing facilities in close proximity to the site. These would facilitate pupils walking to and from the proposed school; • There are bus stops located on both sides of Alum Rock Road, in the immediate vicinity of the site and further bus stops on Belchers Lane to the east of the site, and Bridge Road to the south west of the site; and• A Travel Plan is being prepared, which will seek to encourage and facilitate sustainable travel by both pupils and staff.

Access and Parking

A new vehicle access is proposed from Alum Rock Road, located between Foxton Road and Brook Hill Road. This will facilitate access to a 94 space car park and drop-off area within the site boundary. Through the provision of a drop-off area within the site, it is intended that all pupil drop off and pick up will occur within the site and not along Alum Rock Road. Consideration is being given, through discussion with Birmingham City Council Highways Officers, to amending parking restrictions on Alum Rock Road on the site frontage to further enforce this.

A second vehicular access is proposed for the service yard to the north west of the site. This would keep the main access where pupils congregate separate from service vehicle movements.

Methodology

A Transport Assessment is being prepared to accompany the planning application. There is an ongoing dialogue with Birmingham City Council Highways Officers to ensure that the methodology is agreed and appropriate. This takes into account work undertaken to date on the site with regards to previous planning applications, as well as reflecting the observed operation of the existing Eden Boys’ School in Perry Bolt. The Transport Assessment considers, amoung other things:

• The anticipated level of trips generated as a consequence of the development proposals;• Likely catchment and routing of trips associated with pupils travelling to and from the school;• The impact of school trips upon the operation of junctions along Alum Rock Road through modelling of junctions; • Road safety along Alum Rock Road; and• Servicing and pupil drop off / pick up arrangements, to ensure that these occur within the site.

Page 7: WELCOME [] · 2019-04-10 · Planning ELG Planning Transport TPS Flood Risk/Drainage Curtins Noise Stroma WELCOME To the Alum Rock Road proposals Proposed Site Eden ... assignment

TIMELINE & FEEDBACK

Ways to get in touch……

We would welcome your comments on the development proposals. There are four ways you can provide feedback:

1. Complete a feedback form at the consultation event.

2. Submit comments in writing to:

EBLA Birmingham East, c/o ELG Planning, 55 Coniscliffe Road, Darlington, DL3 7EH.

3. Send an email to: [email protected] with your name, address and comments.

4. Visit the website and leave comments on the feedback form.

We would welcome your comments on the development proposals by 26th April 2019.

PLANNING

APPLICATION

CONSULTATION

You are invited to attend a drop-in consultation event regarding the redevelopment of a site on

Alum Rock Road to construct a new school. Exhibition boards will display the emerging plans for

the proposed development and members of Wates Construction (the contractor) and the

professional design team will be on hand to answer any questions.

Further details and ways to submit comments can be found at:

www.elgplanning.co.uk/consultation/ebla-birmingham-east

Naseby Youth & Community Centre,

Naseby Road, B8 3HG

4pm until 7pm

Thursday 11th April 2019

Eden Boys’ Leadership Academy,

Birmingham East

Eden Boys’ Leadership Academy (EBLA), Birmingham East is a newly founded 800 place boys’

school run by Star Academies. It is proposed that a new school will be constructed on a site on Alum

Rock Road, which is due to open in early 2021.

The development proposals have been developed by Sheppard Robson Architects on behalf of Star

Academies and Wates Construction.

For those who are unable to attend the consultation event, the information displayed will be made

available at: www.elgplanning.co.uk/consultation/ebla-birmingham-east

Drop in session The exhibition boards will also be displayed at Naseby Youth & Community Centre on Thursday 11th

April between 4pm and 7pm.

DEVELOPMENT PROPOSALS

Ways to get in touch……We would welcome your comments on the development proposals. There are four ways you can

provide feedback:

1. Complete a feedback form at the consultation event.

2. Submit comments in writing to: EBLA Birmingham East, c/o ELG Planning,

55 Coniscliffe Road, Darlington, DL3 7EH.

3. Send an email to: [email protected] with your name, address and

comments.

4. Visit our website (see above) and leave comments on the feedback form.

We would welcome your comments on the development proposals by 26th April 2019.

Please Note All responses will be held by ELG Planning in accordance with GDPR 2018. Your contact details will not be made public

or be retained on any database.

This community consultation exercise has been commissioned by Wates prior to any planning application being

submitted. It will not replace the standard public consultation exercise undertaken by Birmingham City Council when

dealing with any formal planning application.