TITLE TYPE SOUTH CENTRAL LIGHT RAIL EXTENSION L I G H T R A I L E X T E N S I O N S O U T H C E N T R A L Voter approved AUGUST/SEPTEMBER 2018 WELCOME BIENVENIDOS

WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

WELCOMEBIENVENIDOS

Page 2: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

2-LANE VS 4-LANE COMPARISON

2-LANE 4-LANE

Landscape - Trees 4,400 linear feet of 4-foot wide tree areas, estimated 160 trees

2,000 linear feet of 4-foot wide tree areas, estimated 65 trees

Bicycles Dedicated buffered lanes Mixed with automobile traffic

Bus Pullouts 21 None

Automobile and Light Rail Speed Limits 35 MPH 30 MPH

Salt River Bridge and Roundabouts 2 travel lanes 2 travel lanes

Dedicated Left-Turn Lanes

All 17 signalized collector and neighborhood streets

At 4 of the 17 signalized collector and neighborhood streets

Travel Time (Baseline - Broadway) 4.5 Minutes 7.5 Minutes

Cost Difference No change Approximately $7 Million

MPH

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased.

Page 3: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

COMPARACIÓN DE 2 CARRILES VS 4 CARRILES

2 CARRILES 4 CARRILES

Árboles Ornamentales 4,400 pies lineales de áreas de 4 pies de ancho para árboles, se calculan 160 árboles

2,000 pies lineales de áreas de 4 pies de ancho para árboles, se calculan 65 árboles

Bicicletas Carriles dedicados amortiguados Mezcladas con el tráfico de automóviles

Bahías para Autobuses 21 Ninguna

Límites de Velocidad para Automóviles y el Tren Ligero

35 MPH 30 MPH

Puente de Salt River y Glorietas 2 carriles de viaje 2 carriles de viaje

Carriles Dedicados para Dar Vuelta a la Izquierda

Todas las 17 calles reguladoras y del vecindario con semáforos

En 4 de las 17 calles reguladoras y del vecindario con semáforos

Tiempos de Viaje (Baseline - Broadway) 4.5 Minutos 7.5 Minutos

Diferencia en el Costo No hay cambio Aproximadamente $7 millones de dólares

MPH

El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 4: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

PROJECT MILESTONESHITOS DEL PROYECTO

20192015 201820172011/2012 2013 20162000/

2004 2014

Phoenix City Council approves $50M for South Central Extension funding

El Concilio de la Ciudad de Phoenix aprueba $50M para la financiación de la Extensión Sur Central

South Central corridor study and community engagement begin

Comienza el estudio del corredor Sur Central y la participación comunitaria

Environmental Assessment begins with Public Scoping Meeting

Comienza la Evaluación Medioambiental con una Reunión Pública de Exploración

Project enters Federal Transit Administration (FTA) development phase

El proyecto entra en la fase de desarrollo de la Administración Federal de Transporte (FTA)

Federal environmental clearance received

Se recibe la autorización medioambiental federal

Phoenix City Council approves downtown configuration and transfer hub

El Concilio de la Ciudad de Phoenix aprueba la configuración del centro de la ciudad y del centro de trasbordos

Phoenix City Council approves light rail on Central Avenue

El Concilio de la Ciudad de Phoenix aprueba al tren ligero en Central Avenue

Voters pass local and regional initiatives supporting transit, including South Phoenix corridor

Los votantes aprueban iniciativas locales y regionales apoyando el transporte masivo, incluyendo al corredor del Sur de Phoenix

2000 & 2004

2011 & 2012

Voters approve Prop. 104; 75% approval rating along the South Central corridor

Los votantes aprueban la Proposición 104; índice de aprobación del 75% a lo largo del corredor Sur Central

AUG/AGO 2015

Phoenix City Council responds to petition requesting 4-lane redesign and suspension of project development

El Concilio de la Ciudad de Phoenix responde a la petición pidiendo el re-diseño de 4 carriles y la suspensión del desarrollo del proyecto

APR/ABR 2018

Phoenix City Council approves 2-lane configuration and station locations

El Concilio de la Ciudad de Phoenix aprueba la configuración de 2 carriles y la ubicación de las estaciones

NOV 2014 APR/ABR 2017

Phoenix City Council approves advancing completion date to 2023

El Concilio de la Ciudad de Phoenix aprueba avanzar la fecha de terminación a 2023

JAN/ENE 2016

Submit request for FTA Full Funding Grant Agreement

Se presenta la solicitud el Acuerdo del Otorgamiento para la Financiación Completa de la administración FTA

2019

DEC/DIC 2013 FEB 2015 NOV 2015

Project enters FTA engineering phase

El proyecto entra en la fase de ingeniería de la administración FTA

NOV 2018

Construction begins

Comienza la construcción

FALL/OTOÑO 2019JAN/ENE 2017 SEP 2017

Page 5: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

PROJECT FUNDING FINANCIAMIENTO DE PROYECTO

HOW IS SOUTH CENTRAL LIGHT RAIL FUNDED?¿CÓMO ES FINANCIADA LA EXTENSIÓN SUR CENTRAL DEL TREN LIGERO?

WHAT FUNDS COULD BE USED FOR OTHER PHOENIX PROJECTS?¿QUÉ FONDOS SE PODRÍAN USAR PARA OTROS PROYECTOS EN PHOENIX?

Phoenix City Council action needed to realocate funds

Accion necesaria de el Concilio de la Ciudad de Phoenix para reasignar fondos

Funds ONLY available for South Central Light RailFondos SÓLO disponibles para la Extensión Sur Central

del Tren Ligero

$Regional Proposition

400 Sales Tax

Proposición Regional400 de Impuestos Sobre

la Venta

City of Phoenix Transit 2050 Sales Tax

Transporte 2050 de Impuestos Sobre la Venta de la Ciudad de Phoenix

Federal Congestion Mitigation and Air Quality Grant

Subvención Federal de Mitigación de la Congestión y

Calidad del Aire

Federal New Starts Grant

Subvención Federal Nuevos Inicios

23%

23%

16%

0%

49%

0%

12%

0%

Page 6: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

LIGHT RAIL IN 2019 AND 2023TREN LIGERO EN 2019 Y 2023

44th S

t/W

ashingto

n St

19th

Ave

/Dunla

p Ave

Dorsey/

Apache B

lvd

Gilbert

Rd/Main S

t

Central StationDowntown

Phoenix

Central A

ve/C

amelb

ack R

d

Country C

lub Dr/M

ain St

19th

Ave

/Cam

elback

Rd

TempeStreetcar

DowntownPhoenix

19th

Ave

/Dunla

p Ave

Dorsey/

Apache B

lvd

Central A

ve/C

amelb

ack R

d

44th S

t/W

ashingto

n St

Country C

lub Dr/M

ain St

Baselin

e Rd/C

entral A

ve

19th

Ave

/Cam

elback

Rd

Gilbert

Rd/Main S

t

Central Station

Light Rail System 2019 / Sistema del Tren Ligero en 2019 Light Rail System 2023 / Sistema del Tren Ligero en 2023

Page 7: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

2-Lane at Mid-block / 2 Carriles a Media Cuadra

4-Lane at Mid-block / 4 Carriles a Media Cuadra

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

LANDSCAPEJARDINERÍA ORNAMENTAL

Page 8: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

2-Lane at Bus Pullout / 2 Carriles en la Bahía de Autobuses

4-Lane at Bus Stop / 4 Carriles en la Parada de Autobús

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

LANDSCAPEJARDINERÍA ORNAMENTAL

Page 9: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

TRAFFIC FLOWFLUJO DE TRÁFICO

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

2-Lane at Intersection / 2 Carriles en la Intersección

4-Lane at Intersection / 4 Carriles en la Intersección

Page 10: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

17

10

Nina Mason Pulliam Rio Salado Audubon Center

Four (4) lanes on the Salt River Bridge and roundabouts not possible within environmental limits of 2-lane design.

Cuatro (4) carriles en el puente Salt River y las glorietas no son posibles dentro de los límites ambientales del diseño de 2 carriles.

3rd Avenue Loop

5th Street Loop

St. Anthony’s Catholic Church

Ed Pastor Transit Center

Travis L. Williams Family Services Center

St. Vincent de Paul

St. Catherine of Sienna Catholic Church

McKinley Loop

Baseline Rd

South Mountain Ave

7th

Ave

Cent

ral A

ve

7th

St

Buckeye Rd

Broadway Rd

Southern Ave

Roeser Rd

Van Buren St

Roosevelt StMcKinley St

Lincoln St

UPRR

Mohave St

Watkins St

Salt River

Je�erson St

Valley Metro Rail / StationTren de Valley Metro / Estación

South Central Light Rail Extension / StationExtensión de Tren Ligero South Central / Estación

Capitol / I-10 West ExtensionExtensión Capitol / I-10 West

4-Lane4 Carriles

2-Lane2 Carriles

LEGEND / LEYENDA

4-LANE CONCEPT OVERVIEWPANORAMA GENERAL DEL CONCEPTO DE 4 CARRILES

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased.

El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 11: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

PHOTO SIMULATION - BUCKEYESIMULACIONES FOTOGRÁFICAS - BUCKEYE

EXISTING / EXISTENTE

2-LANES / 2 CARRILES

4-LANES / 4 CARRILES

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 12: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

PHOTO SIMULATION - ROESERSIMULACIONES FOTOGRÁFICAS - ROESER

EXISTING / EXISTENTE

2-LANES / 2 CARRILES

4-LANES / 4 CARRILES

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 13: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

PHOTO SIMULATION - SOUTHERNSIMULACIONES FOTOGRÁFICAS - SOUTHERN

EXISTING / EXISTENTE

2-LANES / 2 CARRILES

4-LANES / 4 CARRILES

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 14: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

PHOTO SIMULATION - AUDUBON ROUNDABOUTSIMULACIONES FOTOGRÁFICAS - GLORIETAS AUDUBON

EXISTING / EXISTENTE

PROPOSED / PROPUESTO

Landscape, street lights, and other design elements not final. / Jardinería ornamental, alumbrado público y otros elementos de diseño no definitivos

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 15: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

SOUTH CENTRAL ROUNDABOUTSGLORIETAS EN EL ÁREA SUR CENTRAL

Why Roundabouts?• Provides delivery and freight truck access

to industrial/commercial businesses on both sides of Central Avenue

• Allows cars to travel along Central Avenue without stopping for trains

¿Por Qué Glorietas?• Provee acceso para camiones de entregas y de

carga a los negocios industriales/comerciales en ambos lados de Central Avenue

• Permite a los autos transitar por Central Avenue sin detenerse por los trenes

Four (4) lanes on the Salt River Bridge and roundabouts not possible within environmental limits of 2-lane design. Cuatro (4) carriles en el puente Salt River y las glorietas no son posibles dentro de los límites ambientales del diseño de 2 carriles.

Page 16: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

TRAFFIC SIGNAL PHASES - NORTHBOUND & SOUTHBOUNDFASES DE LOS SEMÁFOROS DE TRÁFICO - DIRECCIÓN NORTE Y SUR

Northbound and southbound automobiles turn Vueltas de automóviles en dirección norte y sur

Southbound through and left turn automobiles De paso en dirección sur y vuelta a la izquierda para automóviles

Northbound through and left turn automobiles De paso en dirección norte y vuelta a la izquierda para automóviles

Northbound and southbound through automobiles De paso para automóviles en dirección norte y sur

2-LANE / 2 CARRILES 4-LANE / 4 CARRILES

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 17: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

TRAFFIC SIGNAL PHASES - LIGHT RAILFASES DE LOS SEMÁFOROS DE TRÁFICO - TREN LIGERO

Southbound light rail, northbound and southbound through automobiles Tren ligero en dirección sur, de paso para automóviles en dirección norte y sur

Southbound light rail Tren ligero en dirección sur

Northbound light rail Tren ligero en dirección norte

Northbound light rail, northbound and southbound through automobiles Tren ligero en dirección norte, de paso para automóviles en dirección norte y sur

2-LANE / 2 CARRILES 4-LANE / 4 CARRILES

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 18: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSIONLIG

HT RAIL EXTENSION

SO

UTH CENTRAL

Voter approved

AUGUST/SEPTEMBER 2018

Eastbound and westbound through automobiles and left turns De paso para automóviles en dirección este y oeste y vuelta a la izquierda

Eastbound and westbound through and left turn automobiles De paso en dirección este y oeste y vuelta a la izquierda para automóviles

2-LANE / 2 CARRILES 4-LANE / 4 CARRILES

TRAFFIC SIGNAL PHASES - EASTBOUND & WESTBOUNDFASES DE LOS SEMÁFOROS DE TRÁFICO - DIRECCIÓN ESTE Y OESTE

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 19: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSION

AUGUST/SEPTEMBER 2018

LIGHT RAIL EXTENSIO

N

SO

UTH CENTRAL

Voter approved

EMERGENCY VEHICLE OPERATIONOPERACIÓN DE VEHÍCULOS DE EMERGENCIA

2-LANE / 2 CARRILES 4-LANE / 4 CARRILES

Cars use bike lane during

emergencies

Los automóviles usan el carril

ciclista durante las emergencias

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.

Page 20: WELCOME BIENVENIDOS - Valley Metro · ˆ ˇ ˘ ˚˜ ˆ ˙ ˚ M P H ˝ ˙ ˆ ˇ ˘ ˝ ˆ AS/SEEBER 2018 2-LANE VS 4-LANE COMPARISON 2-LANE 4-LANE Landscape - Trees 4,400 linear feet

T I T L E

T Y P E

SOUTH CENTRAL

LIGHT RAIL EXTENSION

AUGUST/SEPTEMBER 2018

LIGHT RAIL EXTENSIO

N

SO

UTH CENTRAL

Voter approved

Cars don’t stop for buses

Los carros no se detienen para los

autobuses

BUS OPERATIONOPERACIÓN DE AUTOBUSES

2-LANE WITH BUS PULLOUT / 2 CARRILES CON BAHÍA PARA AUTOBUSES 4-LANE WITH NO BUS PULLOUT / 4 CARRILES SIN BAHÍA PARA AUTOBUSES

4-lane concept remains within environmental limits of 2-lane design; no additional properties or buildings would be purchased. El concepto de 4 carriles se mantiene dentro de los límites ambientales del diseño de 2 carriles; no se comprarían propiedades o edificios adicionales.