Welcome The executive business briefing focused on travel options in Tysons Corner

Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

WelcomeThe executive business

briefing focused on travel

options in Tysons Corner

Page 2: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Monika SamtaniMorning News

Reporter/Anchor, WUSA 9

Page 3: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

John LynchRegional Transportation

Program Director, VDOT

Page 4: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Keep Tysons Moving

Employer Briefing

JUNE 27, 2013

Page 5: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Major Improvements Underway• More than $1.5 billion worth of

transportation improvement projects on I-95 in Northern Virginia this summer

• 29-mile construction zone spans from south of D.C. line to Stafford County, VA

• Active Projects: I-95 Express Lanes

I-95 Shoulder Improvements

Defense Access Ramp

BRAC Improvements at Mark Center

Completion of Dulles Corridor Metrorail (Phase I)

Page 6: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

95 Express Lanes

Page 7: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

95 Express Lanes: Scope of Improvements• Expand existing reversible HOV lanes

from two to three lanes for 14 miles from just north of Edsall Road on I-395 to the Prince William Parkway

• Improve the existing two HOV lanes for six miles from Prince William Parkway to Route 234/Dumfries

• Build new nine mile reversible extension of existing HOV lanes from Dumfries to Garrisonville Rd in Stafford County

• Add new or improved access to and from HOV/HOT network at key interchanges

Page 8: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

• Preliminary Design: 100% complete

• Design + Construction: 35% complete

Dayshift & Nightshift Work

• 8:00 a.m. to 3:30 p.m.

• 8:00 p.m. to 5:00 a.m.

• Extended Weekend hours 11 p.m. to 9 a.m.

• Nightly and extended weekend closures of HOV Lanes

95 Express Lanes Work Activities

Page 9: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Major Upcoming Construction

Upcoming steel beam operations requiring lane closures, detours and stoppages on I-95 include:

• I-95 SB at Dumfries/Joplin Flyover Ramp scheduled for weekend of July 12-14

• Fairfax County Parkway Flyover Ramp scheduled for August/September 2013

• North of Edsall Road, Turkeycock Flyover Ramp scheduled for September 2013

• Telegraph Road Overpass near Quantico schedule for late summer/fall 2013

• Garrisonville Road Flyover Ramp scheduled for late fall 2013

Page 10: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Congestion Relief Strategies for I-95/I-395On the Road

• Increased Virginia State Police presence and Safety Service Patrols – including coverage on Route 1 (major detour route)

• Increased dynamic message signs alerting travelers to construction and of construction trucks entering the work zone “Queue signs” to warn drivers of trucks entering the highway

• Speed radar trailers to slow traffic in the work zone• More PCMS & CCTV units to monitor the work zone and post safety messages

Coordination with Other I-95 Improvement Projects• Coordination between multiple entities to ensure smooth implementation of

multiple construction operations and traffic impacts: VDOT Megaprojects VDOT NOVA and Fredericksburg Districts Contractors Public outreach teams

Page 11: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Tips for Commuters

• Allow extra time or adjust your schedule: Leave earlier or stay later

• Avoid overnight travel on I-95

• Plan an alternate route

• Carpool or Vanpool

• Try transit

“Know before you go!”

• Sign-up for alerts at VAmegaprojects.com

• Call Virginia Megaprojects’ HOT Line

number: 1-877-9595-222 (yes, 9595…a

play on I-95)

• Go to 511virginia.org or call 511 for real-

time traffic information

Page 12: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

495 Northbound Shoulder-Use Lane Project• Approximately 1.5 mile congestion

relief project from the end of the 495 Express Lanes (Old Dominion Drive) to just past the George Washington Parkway Interchange: Shoulder-use lane will provide five

travel lanes during peak p.m. travel times

Will reduce delays and backups for drivers headed to the American Legion Bridge and into Maryland

• Construction scheduled to start mid-2014

• The new lane will be open to traffic by late 2014

Page 13: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Stay Informed

• VAmegaprojects.com for the latest construction activities and traffic impacts

• Virginia Megaprojects’ HOT Line number: 1-877-9595-222 (yes, 9595…a play on I-95)

• 511virginia.org or call 511 for real-time traffic information

• GetAroundVA.com for information and links to commuting alternatives

Page 14: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Kevin GinnertyDirector – Project Delivery,

Transurban

Page 15: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

KEVIN GINNERTY

JUNE 27, 2013

EXPRESS LANES

Page 16: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

95 Express Lanes

» Create a regional

HOV/transit network with

seamless connections to

the 495 Express Lanes

» Helps solve congestion

issues to help Virginia

remain an attractive place

to do business – critical to

Tysons Corner

redevelopment

» Fluor-Lane 95 has an

excellent safety record Express Lanes allow

you to take control of

your valuable time.

Page 17: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Orange Cones. No Phones.

» Distracted driving awareness

campaign

» Distracted Driving report from

AAA Mid-Atlantic and

Transurban-Fluor:

– 56 percent of I-95 drivers

are distracted by cell phone

use

» New on-road Orange Cones. No

Phones. signs remind drivers to

put down phones, focus on road

Page 18: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Using the 95 Express Lanes

Page 19: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Using the 95 Express Lanes

Page 20: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

495 EXPRESS LANES

Page 21: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

495 Express Lanes

» Opened in November 2012, in

operation for seven months

» Your answer to Beltway traffic

congestion

» New exits including two in

Tysons Corner

– Westpark Drive

– Jones Branch Drive

Page 22: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Customer Feedback

Page 23: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Ongoing Improvements

» Working to enhance

the Express Lanes for

customers:

– Speed limit increase

from 55 mph to 65 mph

– Pavement marking

enhancements

– Additional signage

– Traffic signal

improvements

Page 24: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Relief for Tysons Travelers

Trip Recorded Trip Time*

Braddock Road to Tysons Corner (via Westpark Drive)

7 minutes

I-66 to Tysons Corner (via Westpark Drive)

1 minute, 50 seconds

Dulles Toll Road to Springfield 9 minutes, 45 seconds

Braddock Road to Lee Highway 4 minutes

Gallows Road to Jones Branch Drive

5 minutes

*Actual recorded trip times

Page 25: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Spotlight on Tysons

Page 26: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Using the Lanes

» Using the lanes is easy

» All drivers must have an E-

ZPass or E-ZPass Flex

» Check out

495ExpressLanes.com for:

– Videos that show how to get on

and off the lanes

– Information on current traffic

levels and toll prices

– Answers to your questions on

how to use the lanes

Page 27: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Key Takeaways

» Express Lanes are providing a faster, more predictable trip

» You need an E-ZPass

» Let us help you communicate about how the Express Lanes work and the benefits of taking the lanes for your employees

» Safety is our top priority so fasten your seatbelts and stay focused on the road

Page 28: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Click to edit Master title style

» Click to edit Master text styles

– Second level

• Third level

– Fourth level

• Fifth level

Page 29: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Marcia McAllisterCommunications Manager,

Dulles Corridor Metrorail

Project

Page 30: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Keep Tysons Moving

Marcia McAllister

Communications Manager

June 27, 2013

Page 31: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary
Page 32: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

2009 • First Keep Tysons Moving Rally

• $900 Million Full Funding Agreement

• Warnings of disruptions

Page 33: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Connecting Tysons Corner; East Reston to downtown DC to Largo

Substantial Completion : September 2013

Metro will set the opening date; anticipated now after Christmas

Almost Done

Page 34: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Now four years later...

• 124, 350 feet of linear track

• 6 miles of aerial guideway

• 2,769 concrete segments

• 39 miles of post-tensioned cables

• 21 utility relocations

• Route 7 shifted more than 60 feet

• Multiple lane closings

Page 35: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Construction Now 94% Complete

• All station structures in place

• Pedestrian bridges and entrance pavilions

are in place

• Utility Work is done

Page 36: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

… to turn vision …into reality

Page 37: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary
Page 38: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary
Page 39: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

39

Page 40: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

40

Future is Now…

“The Silver Line makes Fairfax County’s largest

submarkets – Tysons and the Dulles Corridor –

major-league business and residential centers.”

Gerald L. Gordon, Ph.D., president and CEO, Fairfax

County Economic Development Authority

Page 41: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Phase 2

• Capital Rail Constructors

• Notice to Proceed Expected July 2013

• Prior To Groundbreaking: Summer 2013

• Design

• Surveying

• Soil Testing

• Anticipated Completion Late 2018

41

Page 42: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

42

THANK YOU

TYSONS

Page 43: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Christy WegenerManager of Fairfax

Connector Operations and

Planning, FCDOT

Page 44: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia

Tysons Projects Update

Fairfax County

Department of Transportation

Keep Tysons Moving

June 27, 2013

Page 45: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia

Tysons Bus Service Highlights

• Three-route circulator network in Tysonso Tysons Corner, Greensboro and Spring Hill Stations

o Every 10-minutes during rush hour on Weekdays; 15-20

minutes at all other times

• New and Enhanced Feeder Bus Network to Tysonso Vienna/Merrifield

o McLean

• Overall10% increase in Fairfax Connector bus serviceo 40-50% of existing routes are changing

o New bus service in the Dulles Corridor to the Wiehle Station

Fairfax Connector

Silver Line Bus Service Plan

Page 46: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia

Fairfax Connector Route 422

Serving Greensboro Station

Page 47: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia

Fairfax Connector Route 423Serving Tysons Corner and Spring Hill Stations

Page 48: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia

Fairfax Connector Route 424

Serving Spring Hill Station

Page 49: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia Tysons System Map

Page 50: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, VirginiaExpress Connector

• Express Connector bus service to

Tysons launched in 2013

o Lorton to Tysons – Route 493

o Springfield to Tysons – Route

494

o Burke Centre to Tysons Service

– Route 495

• Four unique circulation patterns in

Tysons

• Service every 20-30 minutes during

rush hour

• Upcoming Changes

o Reduction in Fare – July 1, 2013

o Modification of routing/schedule

– December 2013

Page 51: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, VirginiaPedestrian Program Updates

• In November 2011 Fairfax County completed the

Tysons Metrorail Station Access Management Study

(TMSAMS)

• TMSAMS provided recommendations on improved

transit, pedestrian and bicycle accommodations

• TMSAMS recommended 85 pedestrian improvement

projects

• In December 2009 the Board allocated federal CMAQ

funding of $4.375 million for 8 priority TMSAMS

pedestrian improvement projects

Page 52: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, VirginiaPedestrian Program Updates

• In July 2012 the Board allocated federal Regional Surface

Transportation Program (RSTP) funding of $12.8 million for

28 TMSAMS pedestrian improvement projects

• Developers and the Silver Line Project are building eight

TMSAMS pedestrian improvement projects

• As of June 2013 nine TMSAMS pedestrian improvement

projects are complete

• Current project locations and status can be found at

http://www.fairfaxcounty.gov/fcdot/dullesmetro/tysonsimp.htm

Page 53: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, VirginiaJones Branch Connector Update

Project Goals: • Develop preliminary design for the Jones Branch Connector which

will provide a connection between Dolley Madison Blvd (Route

123) and Jones Branch Drive.

• Develop a cross section in accordance with urban design elements

for Tysons which will support multi-modal forms of transportation

including transit, bicycles, pedestrians, and auto vehicles.

Project Status and Schedule:• Preliminary design (30% level) plans developed.

• Construction estimated to initiate in Summer 2016 and be

completed by Spring 2018.

Page 54: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

County of Fairfax, Virginia

For more information on

Fairfax Connector Bus Service

and

Bicycle and Pedestrian Projects

Visit our table!

www.fairfaxconnector.com

www.fairfaxcounty.gov/fcdot

Page 55: Welcome [] · for Tysons which will support multi-modal forms of transportation including transit, bicycles, pedestrians, and auto vehicles. Project Status and Schedule: • Preliminary

Thank you.