WELCOME
The purpose of this meeting is to provide a final update on Roosevelt Station design and gather public comment.
6 p.m. – Meeting opens
6:30 p.m. – Presentation begins
How to comment:
• Fill out a comment card provided at the comment table
• Speak with our staff at this meeting
• Send an email to [email protected]
• Call 206-398-5300 to speak to the outreach team
NE 75th St
N 85th St
Lake
City
Way N
E
Roos
evel
t Way
NE
25th
Ave
NE
NE 45th St
NE 50th St
Eastl
ake
Ave
NE
NE 73rd St
N Pacific St
NE 100th St
NE 103rd St
NE 95th St
NE 92nd St
NE 91st St
NE 90th St
NE 85th St
NE 82nd St
NE 80th St
NE 78th StNE 77th StLatona Ave NE
NE 68th StNE 67th StNE 66th St
NE 65th St
NE 64th St
NE 62nd St
NE 59th St
NE 53rd St
NE 47th St
NE 43rd St
NE 41st St
NE 42nd St
NE 40th St
NE Boat St
NE 88th St
NE 55th St
Banner Way NE
NE Ravenna Blvd
Roos
evel
t Way
NE
11th
Ave
NE
Mon
tlake
Blv
d NE
15th
Ave
NE
NE 70th St
5th
Ave
NE
8th
Ave
NE
4th
Ave
NE
3rd
Ave
NE
Mer
idia
n Av
e N
Bagl
ey A
ve N
7th
Ave
NE
8th
Ave
NE
12th
Ave
NE
Univ
ersit
y W
ay N
E 16th
Ave
NE
17th
Ave
NE
18th
Ave
NE
20th
Ave
NE
21st
Ave
Ne
Rave
nna
Ave
NE
Corli
ss A
ve N
Broo
klyn
Ave
NE
E Stevens Way
NE Northgate Way
U District Station
University ofWashington Station
Roosevelt Station
Northgate Station
5
5
GREEN LAKE PARK
RAVENNA PARK
HUSKYSTADIUM
UNIVERSITY OFWASHINGTON
NORTH SEATTLECOMMUNITY
COLLEGE
ROOSEVELTHIGH SCHOOL
NORTHGATEMALL
NORTHGATETRANSIT CENTER
MAPLE LEAFTUNNEL PORTAL
Tunnel Route
Retained Cut-fill Route
Park-and-Ride Lot
Elevated Route
Station
P
Transit CenterTC
Sample Travel Times
Northgate to Husky Stadium
7 minutes
U District to Downtown
Bellevue
32 minutes
Roosevelt to Sea-Tac Airport
44 minutes
Downtown Seattle to Northgate
14 minutes
Safeco &CenturyLink fields
to Northgate
20 minutes
MAP KEY
2/15
NORTHGATE LINK EXTENSIONROUTE AND STATIONS
Station final design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30% design open house . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
60% design open house . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
90% design open house . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Demolition & environmental clean-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Early utility relocation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Station excavation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tunneling (Maple Leaf tunnel portal to University of Washington Station) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Station construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Systems installation / testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Link light rail service begins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Duration of noise variance and nighttime work
ROOSEVELT STATION SCHEDULE
2 /15
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Excavation pit – Excavation crews used a conveyor belt to lift dirt out of the site and onto trucks waiting next to 12th Avenue NE.
Ring stockpile – The first of two tunnel boring machines is expected to reach the Roosevelt Station excavation site in early March. Crews are stockpiling the concrete segments that will form the walls of the tunnels.
65th restoration – Crews are restoring the pavement at the intersection of NE 65th Street and 12th Avenue NE. This work is expected to be complete in late spring/early summer.
CONSTRUCTION PHOTOSROOSEVELT STATION
SOUTH ENTRANCE
NORTH ENTRANCE
STATION ENTRANCESROOSEVELT STATION 90% DESIGN
2/15
LOOKING NORTH
LOOKING SOUTH
VIEW FROM NE 66TH STREET & 12TH AVENUE NEROOSEVELT STATION 90% DESIGN
2/15
NORTH LOBBY
PLATFORM
STATION INTERIORROOSEVELT STATION 90% DESIGN
2/15
SOUTH LOBBY
SOUTH LOBBY ESCALATORS/STAIRS
STATION INTERIORROOSEVELT STATION 90% DESIGN
2/15
SITE PLAN
SITE PLAN AND BIRDSEYE VIEWROOSEVELT STATION 90% DESIGN
2/15
BIRDSEYE VIEW