BIM – MEP AUS Innovation Form 2014
Building Information Modelling What’s in it for the Client?
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
Why Draw in 3D ? (Thanks to John McCarthy AO)
Reduce Clashes
Reduce Cannibalisation
Reduce Materials
Reduce Labour
Improve Productivity
Reduce Construction Cost
Reduce Time
Reduce Interest
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
Architecture
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
1 Bligh was
Designed and Documented
Entirely in BIM!
Design Development
Sustainability Analysis
BIM in Construction
Facilities Management With BIM
BIM Throughout!
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
1 Bligh was
Designed and Documented
Entirely in BIM!
Strong commitment by DEXUS to BIM
Entire consultant team used BIM
All subcontractors in BIM
Head Contractor in BIM
32 parties in combined model
BIM by Everyone!
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
Construction Stage
Appoint BIM Manager
Head Contractor implements BIM
All subcontractors expected to use BIM
BIM Execution Plan developed
Training and secondment programs
to BIM thus enabling project team
Information requirements, standards,
protocols and publication cycle defined
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
A Strategic Approach to
Implementation and
Management
Not a project team of geniuses
No specialist software or hardware: Revit and Navisworks as the main platforms
Standard PC workstations
Single BIM Manager
Identify the desired outcomes
Identify required tasks and information
Find ways to deal with the issues
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
Elevation/Section
3D study
Plan
Detail
Central Building Information Model
Schedule
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
Image by Arup
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
The BIM Process
“On-site clashes have been
dramatically reduced, leading to higher quality work, improved coordination
between tradesmen and time savings.”
“Over 10,000 clashes have been detected prior to site works through the delivery of the project.
The Bligh Street BIM model now accommodates
over 30 individual discipline models” Bruce Jones, Grocon
“We reduced waste, we saved time,
we increased quality” Tony Gulliver, Development Manager, Dexus Property Group
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
The BIM Process
“sections of this complex geometry have been set out by surveyors in 3D
with information generated directly from the BIM model – in doing so,
the correctness and precision of
construction has been improved.”
“We saw accelerated coordination
of disciplines and trades.”
“Many of the most complex areas of
Bligh Street such as basements, plant rooms and the
roof structure, simply could not have been
designed or constructed without
the use of BIM.” Bruce Jones, Grocon
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
So what did DEXUS get?
Reduced clashes
Reduced cannibalisation
Reduced materials
Reduced labour
Improved productivity
Reduced tolerances
Higher quality finishes
1st CBD High rise 6 Star Green Star
Integrated building and tenant model
Integrated building management system
Lower ongoing operating costs
1 BLIGH
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
40% recycled concrete 90% steel with 50% recycled content FSC certified timber Recycled timber Solar cooling
Tri-generation
Black water treatment
Rainwater harvesting
Sewer mining
Naturally ventilated atrium
Double skin facade
1 BLIGH ESD
BIM – MEP AUS Innovation Form 2014
So what of the future?
Build on past achievements
Embrace Technological Change
Benchmark and specify BIM-MEPAUS
Integrate BIM Systems for Portfolios
Educate Owners and Facility Managers
Construction Innovation 2014 Forum
BIM – MEP AUS Innovation Form 2014
Victor P. Hoog Antink
with thanks to
Construction Innovation 2014 Forum