Welcome to Fisher Road Recycling. 1355 Fisher Road Cobble Hill, BC V0R 1L0 250-733-2108 250-883-0783. Fisher Road Recycling (FRR). Who we are: Recycling Centre in Cobble Hill What we do: Receive and compost material into Class A Compost Receive and recycle other products - PowerPoint PPT Presentation
Citation preview
Welcome toFisher Road Recycling
1355 Fisher Road Cobble Hill, BC V0R 1L0 250-733-2108 250-883-0783
Fisher Road Recycling (FRR)Who we are:• Recycling Centre in Cobble Hill
What we do:• Receive and compost material into Class A Compost• Receive and recycle other products
What we’ve done:• Invested over 1.7 million dollars into upgrades to create a state of
the art recycling facility
Products are received from:• Local area• Surrounding Districts within South Island
Aerial Comparison 2006 vs 2010
Construction of Air Floor # 1 for Inside Receiving Building
May 18, 2006
June 10, 2006
Construction of Receiving Building
Jan. 19, 2007 Jan. 19, 2007
Jan. 19 2007 June 9, 2011
Herhof Cells Covered by Receiving Bay
October 26, 2005 March 19, 2006
April 20, 2007 June 19, 2009
Herhof Cells Biofilter Upgrade
Feb. 25, 2006 March 11, 2006
March 17, 2006 April 16, 2010
Biofilters for Receiving Building
06/16/2009 06/16/2009
07/11/2009 05/19/2010
Fisher Road Recycling Composting Processes
Turning your waste into Grade A Compost
FRR Inside Composting – Receiving Building
• Material is received into large Receiving Building.
• The air in the building is controlled for odors by a large fan and two Biofilters.
• The food waste, yard and garden material are mixed and placed in one of three large Herhof cells for composting.
• After the material exit the Herhof Cells, the material is placed on controlled aerated floors inside the receiving building for a period of time.
Biofilters for Receiving Building
• The Receiving Building is a Negative pressure environment.
• The Biofilters System (picture bottom left) enables the air to be filtered decreasing the odors from the Receiving Building.
FRR Inside Composting to Outside Composting Process
• The inside composted material is moved from inside the receiving building to one of two large outdoor aerated concrete pads designed to control odors by positive aeration (forced air).
• The material continues to compost and age while on the concrete pads.
• Once the product is aged, it is screened to be sold to commercial businesses, landscapers, and homeowners as Class A Compost.
Development of Air floor # 2
Jan. 19, 2007 June 17, 2010
July 13, 2010 Aug. 17, 2010
Development of Air Floor # 3
02/08/2011 02/08/2011
02/08/2011 06/07/2011
Current Construction of Air Floor #4
June 7, 2011 June 7, 2011
June 7, 2011 June 7, 2011
Leachate Collection ponds
October 22, 2010 Jan. 4, 2011
April 20, 2011 June 7, 2011
Top Outside Concrete Pad
April 9, 2006 April 13, 2006
April 29, 2006 June 10, 2006
Fisher Road Recycling Centre
Recycling Centre
• Developed in 2010.• Provides residential and
commercial drop off location to dispose of municipal solid waste.
• Top picture reflects recycling centre June 2005.
• Bottom picture reflects upgrades completed in early 2010.
FRR Goals
• Committed to helping new regions in developing new recycling programs.
• Sharing our experiences and ideas.
• Working together with stakeholders to promote recycling of material in a collaborative process.
• Improving our operations and facility.