Well development techniquesWell development techniques
Purposes of studying on discipline: Studying the well development
techniques.
Purposes of studying on discipline: Studying the well development
techniques.
Tasks of studying on discipline:Students knowledge acquisition on
destination and operation principles of equipment for well development.
Tasks of studying on discipline:Students knowledge acquisition on
destination and operation principles of equipment for well development.
Well flowing is possible when reservoir energy is large enough to meet the followng condition:
General indispensable
condition for well flowing утргсз pppp
зпл pp
Bottom-hole pressure magnitude must be high enough to overcome:
Hydrostatic pressure of fluid in a flow column; Friction pressure drops in a tube equipment; Wellhead pressure.
Flowing well developmentFlowing well development
Reservoir pressure must be larger than the bottom-hole pressure to produce the well stream
Oil-well artesian flowing (Well flowing, without gas bubble)
It is possible when:• Well-fluid does not contain the solute gas and the bottom-
hole pressure exceeds hydrostatic pressure of fluid in a flow column;
• Well-fluid contains the solute gas and the well-head pressure exceeds the saturation pressure.
Oil-well flowing at the expense of gas energy(Well flowing, with gas bubble)
Well flowing may occur when: Bottom-hole pressure exceeds the saturation pressure (gas
is separated in a flow column); Bottom-hole pressure is lower than saturation pressure (gas
is separated in a well bottom zone).
Clipping of a flow column;
Flow control;
Pressure measuring in a flow line and in an annular space of a well;
Transporting various measuring devices to a bottom hole
is one where the flowing occurs at the expense of reservoir energy.
Cas
ing
head
Chr
istm
as t
ree
Flow head includes: Casing head, Christmas tree
Flowing wellFlowing well
Flow head provides the following: Flow head provides the following:
Three-way flow head schemeThree-way flow head scheme
1. Christmas tree
2. Casing head;
3. Valve gates;
4. Three-way tee;
5. Bean;
6. Buffer valve gate with a cross-over valve and manometer.
The application advisability of the cross-way flow head scheme is caused by necessity to replace the bean
without well shutdown.
Cross-way flow head schemeCross-way flow head scheme
1. Christmas tree
2. Casing head;
3. Valve gates;
4. Cross tee;
5. Bean;
6. Buffer valve gate with a cross-over valve and manometer.
1
23
45
6
5
WellWell flowing control devicedevices s (beans)
Operating conditions of flowing wells may vary by:
Creation of opposite pressure in a flow line with the help of a well-head
bean
Creation of local flow resistance in the bottom section of flow column with the help of bottom-hole bean
Selection of a diameter and length of a flow column
Operating conditions of a flowing well depends on the fluid consumption, which is regulated by the
modification of a bean throat
Well-head bean with a demountable bush
1. Flange;
2. Metal gasket;
3. Metal case;
4. Demountable bush;
5. Socket.
Such bean is applied in oil wells with large content of mechanical impurities
Regulation of the fluid consumption is realized by the modification of a demountable bush throat.
Regulation of the fluid consumption is realized by the modification of a demountable bush throat.
Adjustable well-head bean
1. Demountable nozzle;2. Needle tip;3. Metal case;4. Rod;5. Post;6. Handwheel.
Such bean is applied in oil wells with low content of mechanical
impurities
Stepped regulation of the fluid consumption is realized by the modification of a demountable
nozzle throat.Stepless regulation of the fluid consumption is realized by the modification of the throat area
between a needle tip and nozzle (by rotation of a handwheel )
Mechanical well development techniques are based on the utilization of additional energy:
Pump mechanical energy Compressed gas energy
Pumping well development Gas-lift well development
Mechanical well development techniques are used when the reservoir energy exhausts.
Mechanical well development techniques are used when the reservoir energy exhausts.
Mechanical well development technique application