Oil & Gas Well Plug and Abandonment
XIV Lillehammer Energy Claims Conference
24-26 February 2010
John Reid
Plug & Abandonment
All wells at the end of their life cycle willundergo permanent plug & abandonment
Entails setting cement and / or mechanicalplugs to seal of pay zones, potential leakpoints, fresh water zones, and at surface
Well P & A Statistics
Up to 6,500 offshore platforms worldwide with totaldecommissioning costs estimated to be in excess ofUS$50,000,000,000
Between 2000 and 2010 an estimated 25,000 offshorewells have / will undergo permanent P & A
The majority are planned as part of an Asset or Fielddecommissioning programme
Many however are necessitated prematurely as a resultof facilities and / or wells being damaged.
P & A Requirement Hierarchy
Regulatory Authority
Industry Standards / RP
Operator Best Practices
World Wide Oil & Gas Real Estate
MMS
UKOOA
APPEA
NEBC / CNOBP / CNSOBP / ERCB NPD
DPR
PNGRB
ANP
MMS
Permanent P & A Tasks
Plugging Cement and / or Mechanical Cement retainers Cement plug - displacement Cement squeeze Profiled / Bridge Plug
Tubing / casing cement displacement Perforation / punch / milling / cutting
Tubing / casing site clearance Cutting, removal and recovery Wellhead removal and recovery
Surface Wells Solutions
Platform with surface wells.Topsides rig via riser.Cost Circa USD$1-2mm Tender jack up rig via riser.
Cost Circa US$1.5-5mm
Sub-Surface Wells - Rig Solution
Sub-surface wells. Mobile rig via subseariser. Cost Circa USD$6-10+mm
Sub-surface Wells Rigless Solution
Sub-surface wells. Rigless, from a DPSVvia subsea intervention lubricator.
Cost Circa US$2-5mm
M.S.L
Typical 5 Stage P & A
Seabed
Well Head Retrieval
Permanent P & A Challenges
Inability to re-enter well wellhead damage No vertical access Well condition - corrosion and integrity issues Inability to establish effective flow path for cementing Temporarily abandoned well problems Reservoir / formation problems Lack of accurate historical information
Formation Issues