1
Legend/Notes Drawing Number Scale(s) Drawing Number Revision of Project Status Rev Date Description of Revisions Drawn Designed Drawing Title Contractor(s) Date Drawn Checked Approved Chkd Appr Date Date Date ELR & Mileage Alternative Reference Signed Signed Signed Signed Sheet Tel: Fax: +44 (0)121 483 5000 +44 (0)121 483 6333 The Axis 10 Holliday Street Birmingham West Midlands B1 1TF 124130-EMF-DRG-ATK-910003 A02 FOR APPROVAL THE NETWORK RAIL (NORTON BRIDGE AREA IMPROVEMENTS) ORDER J. MARSH 16/04/2012 P. DARBY 20/04/2012 J. HAYES 20/04/2012 N. HARDWICK 20/04/2012 1:2500 @ A1 2 4 124130-EMF-DRG-ATK-910003 A02 PLANNING ACT 2008 INFRASTRUCTURE PLANNING THE INFRASTRUCTURE PLANNING (APPLICATIONS: PRESCRIBED FORMS AND PROCEDURE) REGULATIONS 2009 THE NETWORK RAIL (NORTON BRIDGE AREA IMPROVEMENTS) ORDER PLANNING INSPECTORATE (NATIONAL PLANNING DIRECTORATE) REF NO. TR040004 REFERENCE DRAWINGS DRAWING TO BE READ IN CONJUNCTION WITH: 124130-EMF-DRG-ATK-910001 KEY PLAN FOR WORKS 124130-EMF-DRG-ATK-910116 EARTHWORKS CROSS SECTIONS 124130-EMF-DRG-ATK-910117 EARTHWORKS CROSS SECTIONS 124130-EMF-DRG-ATK-910118 EARTHWORKS CROSS SECTIONS NOTES: KEY: EXISTING DWELLING EXISTING RIVER PROPOSED RIVER DIVERSION PROPOSED TRACK PROPOSED DRAINAGE PERMANENT NETWORK RAIL LAND BOUNDARY PERMANENT HIGHWAY LAND BOUNDARY EXISTING HIGHWAY TO BE STOPPED UP NETWORK RAIL ACCESS RIGHTS PROPOSED FOOTPATH DIVERSION EXISTING FOOTPATH CROSS SECTION (REFER TO DRAWING 124130-EMF-DRG-ATK-910xxx) COUNTY OF STAFFORDSHIRE BOROUGH OF STAFFORD DO NOT SCALE NORTON BRIDGE SEARCHLIGHT LANE SCAMNELL LANE SHALLOWFORD B5026 STONE ROAD MEECE BROOK STATION ROAD WEST COAST MAINLINE 100 50 0 150 200 250m SCALE 1:2500 124130-EMF-DRG-ATK-910004 124130-EMF-DRG-ATK-910002 DOWN AND UP NORTON BRIDGE LINES EXISTING SLURRY PIT TO BE REMOVED AND BACKFILLED EARTHWORKS MITIGATION BUND EARTHWORKS MITIGATION BUND DOWN SLOW LINE SEARCHLIGHT LANE JUNCTION MAINTENANCE COMPOUND SEARCHLIGHT LANE JUNCTION OVERBRIDGE 3 EXISTING B5026 STONE ROAD TO BE STOPPED UP 3m WIDE CARRIAGEWAY (KERBED) WITH VERGE, 5m WIDE CARRIAGEWAY AT OVERBRIDGE 3 J 910116 J 910116 P03 25.05.12 CONSULTATION PD JH NH P04 01.06.12 CONSULTATION PD JH NH A01 23.11.12 FOR APPROVAL GP JH NH A02 16.09.13 FOR APPROVAL SJR SJR MD X 910xxx X 910xxx K 910117 K 910117 L 910117 L 910117 M 910117 M 910117 P 910117 P 910117 Q 910117 Q 910117 S 910118 S 910118 T 910118 T 910118

WEST COAST MAINLINE STATION ROAD · 2016-05-04 · procedure) regulations 2009 the network rail (norton bridge area improvements) order planning inspectorate (national planning directorate)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WEST COAST MAINLINE STATION ROAD · 2016-05-04 · procedure) regulations 2009 the network rail (norton bridge area improvements) order planning inspectorate (national planning directorate)

Legend/Notes

Dra

win

g N

um

be

r

Scale(s)

Drawing Number Revision

of

Project

Status

Rev Date Description of Revisions Drawn

Designed

Drawing Title

Contractor(s)

Date

Drawn

Checked

Approved

Chkd Appr

Date

Date

Date

ELR & Mileage

Alternative Reference

Signed

Signed

Signed

Signed

Sheet

Tel:

Fax:

+44 (0)121 483 5000

+44 (0)121 483 6333

The Axis

10 Holliday Street

Birmingham

West Midlands

B1 1TF

124130-EMF-DRG-ATK-910003A02

FOR APPROVAL

THE NETWORK RAIL

(NORTON BRIDGE

AREA IMPROVEMENTS)

ORDER

J. MARSH

16/04/2012

P. DARBY

20/04/2012

J. HAYES

20/04/2012

N. HARDWICK

20/04/2012

1:2500 @ A1

2 4

12

41

30

-E

MF

-D

RG

-A

TK

-9

10

00

3A

02

PLANNING ACT 2008

INFRASTRUCTURE PLANNING

THE INFRASTRUCTURE PLANNING

(APPLICATIONS: PRESCRIBED FORMS AND

PROCEDURE) REGULATIONS 2009

THE NETWORK RAIL (NORTON BRIDGE AREA

IMPROVEMENTS) ORDER

PLANNING INSPECTORATE (NATIONAL

PLANNING DIRECTORATE)

REF NO. TR040004

REFERENCE DRAWINGS

DRAWING TO BE READ IN CONJUNCTION WITH:

124130-EMF-DRG-ATK-910001 KEY PLAN FOR WORKS

124130-EMF-DRG-ATK-910116 EARTHWORKS CROSS SECTIONS

124130-EMF-DRG-ATK-910117 EARTHWORKS CROSS SECTIONS

124130-EMF-DRG-ATK-910118 EARTHWORKS CROSS SECTIONS

NOTES:

KEY:

EXISTING DWELLING

EXISTING RIVER

PROPOSED RIVER DIVERSION

PROPOSED TRACK

PROPOSED DRAINAGE

PERMANENT NETWORK RAIL LAND BOUNDARY

PERMANENT HIGHWAY LAND BOUNDARY

EXISTING HIGHWAY TO BE STOPPED UP

NETWORK RAIL ACCESS RIGHTS

PROPOSED FOOTPATH DIVERSION

EXISTING FOOTPATH

CROSS SECTION (REFER TO DRAWING

124130-EMF-DRG-ATK-910xxx)

COUNTY OF STAFFORDSHIRE

BOROUGH OF STAFFORD

DO NOT SCALE

NORTON BRIDGE

S

E

A

R

C

H

L

I

G

H

T

L

A

N

E

S

C

A

M

N

E

L

L

L

A

N

E

SHALLOWFORD

B

5

0

2

6

S

T

O

N

E

R

O

A

D

M

E

E

C

E

B

R

O

O

K

ST

AT

ION

RO

AD

W

E

S

T

C

O

A

S

T

M

A

IN

L

IN

E

100500 150 200 250m

SCALE 1:2500

124130-E

MF

-D

RG

-A

TK

-910004

124130-E

MF

-D

RG

-A

TK

-910002

DOWN AND UP

NORTON BRIDGE LINES

EXISTING SLURRY PIT TO BE

REMOVED AND BACKFILLED

EARTHWORKS

MITIGATION BUND

EARTHWORKS

MITIGATION BUND

DOWN

SLOW LINE

SEARCHLIGHT

LANE JUNCTION

MAINTENANCE

COMPOUND

SEARCHLIGHT

LANE JUNCTION

OVERBRIDGE 3EXISTING B5026 STONE

ROAD TO BE STOPPED UP

3m WIDE CARRIAGEWAY

(KERBED) WITH VERGE,

5m WIDE CARRIAGEWAY

AT OVERBRIDGE 3

J

910116

J

910116

P03 25.05.12 CONSULTATION PD JH NH

P04 01.06.12 CONSULTATION PD JH NH

A01 23.11.12 FOR APPROVAL GP JH NH

A02 16.09.13 FOR APPROVAL SJR SJR MD

X

910xxx

X

910xxx

K

910117

K

910117

L

910117

L

910117

M

910117

M

910117

P

910117

P

910117

Q

910117

Q

910117

S

910118

S

910118

T

910118

T

910118