West Phoenix / Central Glendale Transit Corridor Study. Public Meetings May 2013. 20-Mile Light Rail Line. Ridership. Opened in December 2008 Success is in the ridership 50% above projections 13.5 million riders in FY 2012 5.9% more than in FY 2011 42,000 average weekday riders - PowerPoint PPT Presentation

Citation preview

Page 1: West Phoenix / Central Glendale Transit Corridor Study

West Phoenix / Central GlendaleTransit Corridor Study

Public Meetings

May 2013

Page 2: West Phoenix / Central Glendale Transit Corridor Study

20-Mile Light Rail Line

2

Page 3: West Phoenix / Central Glendale Transit Corridor Study

Ridership

3

Opened in December 2008 Success is in the ridership

• 50% above projections• 13.5 million riders in FY 2012• 5.9% more than in FY 2011• 42,000 average weekday riders• Over one million riders per month• 60,000+ riders three times

Page 4: West Phoenix / Central Glendale Transit Corridor Study

$6.9 billion total investment along alignment (planned, under construction or completed) • $5.4 billion private investment• $1.5 billion public investment

16,500+ residential units

129 million square ft. commercial

3,400+ hotel rooms

Defining Success: Economic Development

Page 5: West Phoenix / Central Glendale Transit Corridor Study

Future High Capacity Transit Corridors

5

Page 6: West Phoenix / Central Glendale Transit Corridor Study

Overall Project Schedule

6

Page 7: West Phoenix / Central Glendale Transit Corridor Study

West Phoenix/Glendale Corridor- Background

Phoenix Transit Tax passed (2000) and GO Glendale Transportation Tax passed (2001)

Glendale corridor in Regional Transportation Plan(Proposition 400 passed 2004)

Expanded study area to include emerging activity centers along the Loop 101 corridor such as Westgate City Center (2013)

7

Page 8: West Phoenix / Central Glendale Transit Corridor Study

8

Study Area

Page 9: West Phoenix / Central Glendale Transit Corridor Study

Study Purpose

9

Develop a recommendation for high capacity transit improvements in the study area including:

What type of transit (light rail, bus, streetcar)

Where to locate the alignment or route

Page 10: West Phoenix / Central Glendale Transit Corridor Study

Purpose of the Transit Project

10

Connect downtown Glendale and West Phoenix to existing light rail system

Connect major activity centers Improve mobility through and within the study area Support local planning priorities for transportation, land

use, and economic development

Page 11: West Phoenix / Central Glendale Transit Corridor Study

Opportunities and Constraints

11

Page 12: West Phoenix / Central Glendale Transit Corridor Study

1212

12

Population Density (2010)

Population per Square Mile

Page 13: West Phoenix / Central Glendale Transit Corridor Study

1313

Activity Centers/Destinations

Page 14: West Phoenix / Central Glendale Transit Corridor Study

Important Considerations for Transit

14

Provide cost-effective project Serve major employment and activity centers Provide mobility options Improve travel reliability Minimize community impacts Support community and regional plans and economic

development objectives Provide an improvement that is adaptable for future

extension to points father west including Westgate City Center

Page 15: West Phoenix / Central Glendale Transit Corridor Study

Types of Transit

15

Page 16: West Phoenix / Central Glendale Transit Corridor Study

Alternatives Evaluation Process

16

Page 17: West Phoenix / Central Glendale Transit Corridor Study

Study Schedule

17

Page 18: West Phoenix / Central Glendale Transit Corridor Study

Public Outreach Activities

Glendale Family Bike Ride – April 14, 2013 GO Glendale Open House – April 24, 2013 Public Meetings

Glendale – May 6, 2013 Phoenix - May 16, 2013

Updates available via email and social media www.valleymetro.org/glendale

18

Page 19: West Phoenix / Central Glendale Transit Corridor Study

19