WEST SEATTLE TRANSPORTATION COALITION
September 22, 2016
5
WATERFRONT SEATTLE PROGRAM
PROJECT SCHEDULE
PROMENADE
PROTECTED BIKE LANE
INTERSECTIONS
OVERLOOK WALKVIEW LOOKING SOUTHOVERLOOK WALKVIEW LOOKING SOUTH
OVERLOOK WALKPIKE PLACE MARKET WATERFRONT ENTRANCE
PIER 62/63
13
PIER 62/63REBUILT PIER AND FLOATING DOCK
14
PIER 62/63CONCERTS AND EVENTS
ENVIRONMENTAL REVIEW
• June 2015: AWPOW Draft Environmental Impact Statement (EIS) released for public comment
• April 2016: In response to comments and in alignment with the Master Plan for the Seattle Aquarium expansion, released a Supplemental Draft EIS for public comment
• Early November 2016: City plans to release AWPOW Final EIS, evaluating the AWPOW Preferred Alternative and responding to public comments
15
SUPPLEMENTAL DRAFT EIS
Evaluated two new alternatives:
• Overlook Walk Alternative 2: A revised Overlook Walk to accommodate a potential Aquarium expansion
• Main Corridor Alternative 2: Narrower Alaskan Way that does not include dedicated bus lanes between Yesler and King streets
SOUTHWEST TRANSIT PATHWAY
TRANSIT: SW TRANSIT PATHWAY
VEHICLES, PARKING AND LOADING
NORTH/SOUTH BICYCLE AND PEDESTRIAN MOVEMENT
FERRIES: LOADING AND UNLOADING
STREET DESIGN
MAIN CORRIDOR ALTERNATIVE 1
20
MAIN CORRIDOR ALTERNATIVE 2
21
ALASKAN WAY NORTH OF S WASHINGTON ST
SOUTH END CONNECTION
24
QUESTIONS?