Upload
clement-barton
View
218
Download
1
Tags:
Embed Size (px)
Citation preview
Primary Responsibilities• Road Safety• Road Maintenance• Storm Water Maintenance and Repair• Infrastructure Improvement (Capital Projects)• Infrastructure Inspection• Lending a Helping Hand
Road Safety• Snow Removal
• Brickman• Practical Property Group
• Pothole Repair• FE Harding• 108 tons of Asphalt placed (88 hot/20 cold)
• Federal HSIP Grant• Highway Safety Improvement Program• $1.5 Million awarded for ADA and intersection safety
improvements
Road Maintenance• Pothole repair• Crack sealing
• Spring and Fall Seasons• Night work
• Shoulder repair• Infrared patching• Resurfacing
• Highway Safety Improvement Program• $1.5 Million awarded for intersection safety improvements
Storm Water Maintenance and Repair• Erosion and encroachment inspection• Culvert replacement and repair• Sink hole repair• Ditching and swale repair
Infrastructure Improvement• 2015 Spring Resurfacing• 156th and Springmill Round-a-bout• 191st and Tomlinson Round-a-bout• Grand Park Blvd. Extension• 161st and Oakridge Round-a-bout• Mill Street Extension