Gehrlicher Solar America Corp.21 FADEM ROADSPRINGFIELD, NJ 07801Phone Main: +1 908 219 4379Toll Free: +1 877 844 9174Fax: +1 908 219 4375Homepage: www.gehrlicher.us
Sheet No:
Sheet Name:
Scale:
Professional Engineer:
PE Seal:
PreliminaryCustomer ApprovalPermitting
ConstructionAs-built
DRAWING ISSUE
Proj
ect
Nam
e:
Site
Add
ress
:
Project ID:
Other____________REVISIONS
DateRev By DescriptionApp07/25/20110 LG Presale drawingLG
09/22/20111 LG Issued for Weston ApprovalLG
09/26/20112 LG Issued for Permit SubmittalLG
10/14/20113 LG Revised per Weston commentsLG
11/01/20114 LG Revised per Weston comments10/27/2011,Racking information added
LG
11/04/20115 LG Revised per Weston comments11/01/2011LG
11/04/20116 LG Issued for ConstructionLG
WESTON - DARTMOUTH
1275 NORTH HIXVILLE ROAD
DARTMOUTH, MA 02727
151.34kWp PHOTOVOLTAIC SYSTEM
PROJECT LOCATION GENERAL NOTES DRAWING INDEX
1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON THE DRAWINGS, INCLUDING EXISTING STRUCTURES, AND
NOTIFY THE DESIGNER OF ANY DISCREPANCY IN THE DRAWINGS AND/OR EXISTING CONDITIONS BEFORE STARTING THE WORK.
2. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK AS INDICATED ON THE DRAWINGS AND SPECIFICATIONS.
3. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER.
4. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH ANY EQUIPMENT AND ITS INSTALLER.
5. ALL ELECTRICAL WORK TO BE INSTALLED BY A CERTIFIED ELECTRICIAN AND APPRENTICES WORKING UNDER THE DIRECT
SUPERVISION OF THE LICENSED ELECTRICAL CONTRACTOR.
6. SYSTEM INSTALLATION SHALL BE IN ACCORDANCE WITH NEC 2008 AND LOCAL CODES AND STANDARDS.
7. PROVIDE ALL WORKING CLEARANCES AT NEW AND EXISTING EQUIPMENT PER NEC 110.26.
8. FOLLOW INVERTER MANUFACTURES INSTALLATION INSTRUCTIONS.
9. DC GROUNDED CONDUCTORS SHALL BE MARKED WHITE AT ALL TERMINATIONS. EQUIPMENT GROUNDING CONDUCTORS (EGC)
SMALLER THAN #4 AWG SHALL BE BARE OR HAVE CONTINUOUS GREEN INSULATION. EQUIPMENT GROUNDING CONDUCTORS
(EGC) LARGER THAN OR EQUAL TO #4 AWG SHALL BE MARKED AS EGC (GREEN) WHEREVER ACCESSIBLE. DC UNGROUNDED
CONDUCTORS SHALL BE MARKED RED.
10. SYSTEM TO BE BONDED AND GROUNDED IN ACCORDANCE WITH ARTICLE 690 OF NEC.
11. ALL CONDUCTORS SHALL BE COPPER UNLESS OTHERWISE NOTED.
12. WIRE STRAPS TO BE STAINLESS STEEL.
13. ALL METALLIC CONDUIT TO BE GROUNDED BY A GROUND BUSHING AT ALL ENCLOSURES.
14. ALL FASTENERS SHALL BE CONSTRUCTED OF CORROSION RESISTANT MATERIALS APPROPRIATE FOR SITE CONDITIONS.
CONNECTORS SHALL BE TORQUED PER DEVICE LISTI NG OR INSTALLATION DOCUMENTATION REQUIREMENTS.
15. ALL EXISTING OVERHEAD AND UNDERGROUND FACILITIES SHOWN ON THE LAYOUT PLANS ARE DIAGRAMMATIC IN NATURE AND
FOR INFORMATIONAL PURPOSES ONLY. ACTUAL LOCATIONS SHALL BE FIELD VERIFIED AND DOCUMENTED PRIOR TO
EXCAVATION OR EXECUTION OF THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIELD
VERIFICATION OF THE ACCURACY OF ALL AS-BUILT DOCUMENTS USED IN THE PROCESS OF THE WORK.
16. CONTRACTOR SHALL LOCATE AND MARK ALL ELECTRICAL CIRCUITS AND UNDERGROUND UTILITIES IN THE AREA OF
CONSTRUCTION PRIOR TO ANY EXCAVATION REQUIRED FOR INSTALLATION OF DUCTS, DIRECT BURIED CONDUIT, OR EQUIPMENT
PADS. THE CONTRACTOR SHALL PHYSICALLY VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES INDICATED PRIOR TO
THE START OF CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, PROTECTING AND/OR RELOCATING
ANY EXISTING UTILITIES ENCOUNTERED IN THE WORK AREAS.
17.
18. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO CAUSE AS LITLE DISTURBANCE AS POSSIBLE AND PROTECT THE NATURAL
ENVIRONMENT AND RESOURCES OF THE FACILITY DURING THE COURSE OF THE WORK. ALL DISTURBED AREAS SHALL BE
RETURNED TO THEIR PRE-CONSTRUCTION STATE OR BETTER. AREAS WHICH ARE SEEDED OR SODDED WITH ESTABLISHED
GRASS SHALL BE SEEDED AS SOON AS PRACTICABLE AFTER COMPLETION OF THE WORK IN THAT AREA.
19. ALL EXCESS SOIL, EXCAVATION, WASTE AND DEBRIS SHALL BE REMOVED FROM THE SITE AS SOON AS PRACTICAL DURING THE
COURSE OF THE WORK. SOIL AND EXCAVATION MATERIALS SHOULD BE REMOVED FROM THE FACILITY AND NOT STOCK PILED
UNLESS THEY ARE TO BE REUSED.
20. ALL CONTRACTORS MUST COMPLY WITH FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO THE ENVIRONMENT.
ADDITIONALLY ALL WORK MUST CDMPLY WITH THEIR SAFETY MANUALS, AS WELL AS OSHA REQUIREMENTS AND STANDARDS.
21. THE CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF ON-SITE PERSONNEL. IF ENGINEERING STAFF OR OTHER SAPETY
PERSONNEL OBSERVE AN UNSAFE CONDITION, WORK WILL BE STOPPED WITHOUT CONTRACT EXTENSION UNTIL THE UNSAFE
CONDITION(S) IS/ARE REMEDIED. ACCIDENT REPORT FORMS (OSHA FORM 301 OR 300) WILL BE SUBMITTED FOR EACH
REPORTABLE OCCUPATIONAL INJURY, ILLNESS, OR LOST TIME ACCIDENT. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING
OSHA IN THE EVENT OF A SERIOUS EMPLOYEE ILLNESS OR INJURY.
22. ALL CONDUCTORS AND EQUIPMENT SHALL BE CONSIDERED ENERGIZED UNLESS CHECKED, TAGGED, GROUNDED, AND CHECKED
AGAIN.
23. THE CONTRACTOR SHALL CONDUCT DAILY SAFETY MEETINGS COVERING THE FOLLOWING ITEMS:
23.1. PROPER WEARING/USE OF PERSONAL PROTECTIVE EQUIPMENT (PPE) AND TRAINING TO PROPERLY DON/DOFF ALL PPE.
23.2. CONTROL OF ACCESS TO THE JOB SITE AND CLEANLINESS OF THE JOB SITE.
23.3. ELECTRICAL SAFETY ON THE JOB SITE.
23.4. RECOGNITION OF POTENTIAL HAZARDS AT THE JOB SITE AND ESTABLISHING ABATEMENT PROCEDURES TO MINIMIZE THEM.
23.5. AS REQUIRED DURING WORK PERFORMANCE, ABIDE BY ALL EXCAVATION AND TRENCHING REGULATIONS.
24. THE CONTRACTOR SHALL CONDUCT THE FUELING AND LUBRICATING OF EQUIPMENT AND MOTOR VEHICLES IN A MANNER THAT
PROTECTS AGAINST SPILLS AND EVAPORATION. ALL USED OIL GENERATED ON SITE WILL BE MANAGED IN ACCORDANCE WITH
40CFR 279. THE CONTRACTOR WILL DETERMINE IF ANY USED OIL GENERATED WHILE ON-SITE EXHIBITS A CHARACTERISTIC OF
HAZARDOUS WASTE. IN ADDITION, USED OIL CONTAINING 1000 PARTS PER MILLION OF SOLVENTS WILL BE CONSIDERED A
HAZARDOUS WASTE AND DISPOSED OF AT THE CONTRACTORS EXPENSE. USED OIL MIXED WITH A HAZARDOUS WASTE WILL ALSO
BE CONSIDERED A HAZARDOUS WASTE.
25. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PREVENT RELEASES/SPILLS OF OIL AND HAZARDOUS MATERIALS. IN THE
EVENT OF ANY RELEASES OF OIL AND HAZARDOUS MATERIALS, CHEMICALS, OR GASES; IMMEDIATELY (WITHIN 15 MINUTES)
NOTIFY THE LOCAL FIRE DEPARTMENT. THE CONTRACTOR SHALL MAKE VERBAL AND WRITTEN NOTIFICATIONS AS REQUIRED BY
THE FEDERAL 40CFR 355, STATE, AND LOCAL REGULATIONS. THE CONTRACTOR SHALL COLLECT AND PROVIDE INFORMATION AS
NEEDED BY THE INVESTIGATING AUTHORITY. SPILL RESPONSE SHALL BE IN ACCORDANCE WITH 40CFR 300 AND APPLICABLE
STATE AND LOCAL REGULATIONS. CONTAIN AND CLEAN UP THESE SPILLS WITHOUT COST TO THE OWNER. IF OWNER ASSISTANCE
IS REQUESTED OR REQUIRED, THE CONTRACTOR SHALL REIMBURSE THE OWNER FOR SUCH ASSISTANCE.
ROOF MOUNTED SYSTEM (IF APPLICABLE) :
25. ALL ROOFING REPAIRS MUST MAINTAIN EXISTING CLASS AND TYPE OF ROOF AND ALL WORK SHALL BE IN ACCORDANCE WITH THE
ROOFING MANUFACTURER'S INSTALLATION REQUIREMENTS.
26. ALL CONDUIT TO BE INSTALLED NO LESS THAN 3-1/2" FROM THE ROOF SURFACE IN ACCORDANCE WITH THE ADJUSTMENT
FACTORS OF NEC TABLE 310.15(B)(2)(C)
C1.1 COVER SHEET
L1.1 PV ARRAY LAYOUT (OVER SURVEY)
L1.2 PV ARRAY LAYOUT
E1.1 SINGLE LINE DIAGRAM
E2.1 CONDUCTOR AND CONDUIT SCHEDULE
E4.1 INVERTER PAD DETAILS
ABBREVIATIONS
AL ALUMINUM
AR ARRAY
CONST CONSTRUCTION
D DEPTH
DEG DEGREE
DIA DIAMETER
DSN DESIGN
E EXISTING
EMT ELECTRICAL METALLIC TUBING
EQUIV EQUIVALENT
F/A FAST ACTING
FT FOOT
GRC GALVANIZED RIGID CONDUIT
GRD GROUND
H HEIGHT
HVAC HEATING VENTILATION AIR CONDITIONING
IN INCH
LB CONDULET BODY
MAX MAXIMUM
MIN MINIMUM
MSB MAIN SWITCHBOARD
MDP MAIN DISTRIBUTION PANEL
NTS NOT TO SCALE
OEM ORIGINAL EQUIPMENT MANUFACTURER
PV PHOTOVOLTAIC
PVI PHOTOVOLTAIC INVERTER
RT RAINTIGHT
SCH SCHEDULE
SLD SINGLE LINE DIAGRAM
SS STAINLESS STEEL
TYP TYPICAL
UL UNDERWRITERS LABORATORY
U.N.O. UNLESS NOTED OTHERWISE
WD WIDTH
E5.1 DATA SHEETS
E6.1 STRINGING DIAGRAM
E7.1 DETAILS - SHEET 1
DAS1.1 DAS DRAWINGS (FROM DRAKER)
P1.1 PILE LAYOUT, INVERTER 1
P1.2 PILE LAYOUT, INVERTER 2
A B c
1
2
N 2514DO
3
4
5
I
SET C.B.
6 I ' I " -
zw
7
8 N 251000
9
10
1 1
A B c
D
-, 0 ------
\
D
E
+ !I'
"' I co Ol ~ '!\ I ~ ~LA PATHFINDERII q.ocATI ~~Js (TYP.>
"' I
E
F
0
F
G H
W-7S _{ ' .._ __ - - , 0 "'-
1"'-- lllb:. I ' '
-- ./ " '
r'r' Olr-. "-N Dr-.
G
I I
/
/ /
/
I I I I
I I I \
" I /
NN (
H
J
/ ./
/ --/
/'
---------,,...~=- - --/ - -=-'------/
( l .lll!._
---
J
-
K
~'!(-
"
K
' '\ I ' \ \ \ \ \ \ \ \ \ \ \
L
W-6S 0
W-6D •
C>
L
0 -
DRAKER DAS
PV COMBINING PANELBOARD
INSTALL HOUSE METER
ENCLOSURE IN ELECTRICAL ROOM
ADJACENT TO LINE SIDE TAP
(CTs TO BE INSTALLED IN SWITCHGEAR
ON SERVICE FEEDERS DOWNSTREAM
OF PV INTERCONNECTION)
UTILITY AC DISCONNECT
LOCATED ON OUTSIDE WALL
ADJACENT TO ELECTRICAL
ROOM
Gehrlicher Solar America Corp.
21 FADEM ROAD SPRINGFIELD, NJ 07801 Phone Main: +1 908 219 4379 Toll Free: +1 877 844 9174 Fax: +1 908 219 4375 Homepage: www.gehrlicher.us
Professional Engineer:
PE Seal:
DRAWING ISSUE Preliminary Construction Customer Approval As-built Permitting Other____________
REVISIONS Rev By App Description Date
Presale drawing0 LG LG 07/25/2011
1 LG LG 09/22/2011
2
Issued for Weston Approval
LG LG Issued for Permit Submittal 09/26/2011
3 Revised per Weston commentsLG LG 10/14/2011
4 LG LG Revised per Weston comments10/27/2011, 11/01/2011 Racking information added
5 LG LG Revised per Weston comments11/01/2011 11/04/2011
6 11/04/2011LG LG Issued for Construction
Proj
ect
Nam
e:
Site
Add
ress
:
Sheet Name:
Project ID:Scale: Sheet No:
http:www.gehrlicher.us
Gehrlicher Solar America Corp.
21 FADEM ROAD SPRINGFIELD, NJ 07801 Phone Main: +1 908 219 4379 Toll Free: +1 877 844 9174 Fax: +1 908 219 4375 Homepage: www.gehrlicher.us
Professional Engineer:
PE Seal:
DRAWING ISSUE Preliminary Construction Customer Approval As-built Permitting Other____________
REVISIONS Rev By App Description Date
Presale drawing0 LG LG 07/25/2011
1 LG LG 09/22/2011
2
Issued for Weston Approval
LG LG Issued for Permit Submittal 09/26/2011
3 Revised per Weston commentsLG LG 10/14/2011
4 LG LG Revised per Weston comments10/27/2011, 11/01/2011 Racking information added
5 LG LG Revised per Weston comments11/01/2011 11/04/2011
6 11/04/2011LG LG Issued for Construction
INVERTER 1 (50kW) PAD PLAN VIEW INVERTER 2 (75kW) PAD PLAN VIEW
1 2SCALE: 1" = 1' SCALE: 1" = 1'
Proj
ect
Nam
e:
Site
Add
ress
:
Sheet Name:
Project ID:Scale:INVERTER PAD DETAIL INVERTER PAD GROUNDING DETAIL
3 4SCALE: 1/2" = 1' SCALE: 1" = 1' Sheet No:
http:www.gehrlicher.us
INVERTER 1 STRINGING DIAGRAM
1SCALE: 3/32" = 1'
INVERTER 2 STRINGING DIAGRAM
2SCALE: 3/32" = 1'
Gehrlicher Solar America Corp.21 FADEM ROAD SPRINGFIELD, NJ 07801 Phone Main: +1 908 219 4379 Toll Free: +1 877 844 9174 Fax: +1 908 219 4375 Homepage: www.gehrlicher.us
Sheet No:
Sheet Name:
Scale:
Professional Engineer:
PE Seal:
Preliminary Customer Approval Permitting
Construction As-built
DRAWING ISSUE
Proj
ect
Nam
e:
Site
Add
ress
:
Project ID:
Other____________ REVISIONS
DateRev By DescriptionApp 07/25/20110 LG Presale drawingLG
09/22/20111 LG Issued for Weston ApprovalLG
09/26/20112 LG Issued for Permit SubmittalLG
10/14/20113 LG Revised per Weston commentsLG
11/01/20114 LG Revised per Weston comments10/27/2011, Racking information added
LG
11/04/20115 LG Revised per Weston comments11/01/2011LG
11/04/20116 LG Issued for ConstructionLG
A I B I c I D I E I F I G I H I I I J I K I L I M I N I 0 p
1 1
- 29'-1l6" -
231 '-515" 16
2 "'
2 u
- 3'-6" 39'-01~"
{row 1 I 32 Piles~~ - 5'-~ " 5'-6~" r--- 7'-4~" 7'-4~ ' -16 16 dAYOUTADDil IONAL PILES AT 270DEG AZIMUTH (TYP) .. ' 1'\ • ' • • • • • • • • • • • • • • • • • • • ~ '-v
7'-41~"1 .. 1 1 7'-41~" l' l ~._,~:- '-./ 3 U01 U01 ~RW-1 3 25'-1~ ~" 25'-1~ ~" 25'-1~~" 25'-1 ~ ~"
5'-~" 5'-6~" J. J. 7' 4~" 7' " - - 16 16 -
' 1'\ • • • • • • • • • • • • • • • • • • • • • • • / r ' '-v 7'-41~"1 1 j 7'-41~"
'-./
4 U01 {row 2 I 32 Piles} U01 4 .. - D D -
D D 181 D
29'-1l6" 116'-0~ ~"
5 5 RW-2 ~
-
6 6
- -'
< 7 > 7
1'----o.q-
- <
A
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8 -2
-
9
-
10
-
1 1
A
I B I c I D I E I F I G I H I I J I <
K I
: I I I
L I M
C=~~----~--------------rn====r=========J----------------~
<
<
------------- ·-<
.---------------------------~154'-315"'------------------------------------. 16
r--------------+---77'-1 01~"·---------------J < 6'-8"'--------.------l
r-3'-6"
7'-4~" 7' 4~" - 16 {row 3 I 22 Piles} P.' -4::.;'7
---
990
990
990
22
22
25°
C
1.3
3
First- and middle-table / Anfang- und Mitteltisch
2 3040223 Assembly-F3x4_A_3_3_V3 0050-00-0075 1
1 304xxxx Assembly - post and Adaptor (80x55x5 [mm]) 0050-00-xxxx 3
Pos.-Nr. Artikelnummer Benennung (engl.) Dateiname Menge
2.7
2.5 2.18
2.1
End-table / Endtisch
3 3040302 Assembly cable routing 1576, post covering 0050-00-0055 1
2 3040223 Assembly-F3x4_A_3_3_V3 0050-00-0075 1
1 304xxxx Assembly - post and Adaptor (80x55x5 [mm]) 0050-00-xxxx 4
Pos.-Nr. Artikelnummer Benennung (engl.) Dateiname Menge
6690
1650 30 1650 30 1650 30 1650
B E
1875
1.2 D1.4 1.5
3072
668
8015
7680
668
708
1656
708
50
A 1000
1.1
577
2240 2240 2240
Standard length of post 2400mm and 2900mm 3.3
1307 125 1352
Z
Y
X
3.5 3800056 Hexagonal Nut_DIN 934_M16_8_P3E 2
3.4 3800094 Hexagonal Bolt_DIN 933_M16x25_8.8_P3E 2
3.3 3800218 coverage for post C125 0100-01-0005 1
3.2 3800239 Cable routing covering 1.576mm 0050-01-0076 1
3.1 3800236 Cable routing 1.576mm 0050-01-0074 1
3 3040302 Assembly cable routing 1576, post covering 0050-00-0055 1
2.18 3800018 Connector 150x30 [mm] 0050-01-0114 2
2.17 3800170 Socket head cap screw_DIN7984_M8x60_8.8_Geomet 321. B 48
2.16 3800125 Hexagonal Nut with Flange_DIN 6923_M12_10_Geomet 321.B 36
2.15 3800056 Hexagonal Nut_DIN 934_M16_8_P3E 24
2.14 3800094 Hexagonal Bolt_DIN 933_M16x25_8.8_P3E 24
2.13 3800195 crossbeam with hole d=18mm, 1576mm long, t=2mm 0050-01-0059 6
2.12 3800163 Force distributor plate 4mm, L=80mm 0100-01-0026 24
2.11 3800100 Hexagonal Bolt with Flange_DIN 6921_M12x30_12.9_Geomet 321.B 24330 495 495 690 495 495 690 495 495 690 495 495 330 2.10 3800121 Hexagonal Bolt with Flange_DIN 6921_M12x20_12.9_Geomet 321.B 12
2.9 3800026 Socket head cap screw_DIN7984_M8x12_8.8_P3E 24
2.8 3120030 Gehrtec middle clamp top 0050-01-0113 24
2.7 3120032 Gehrtec end clamp top 0050-01-0111 24 3.5 3.4
2.6 3120031 Gehrtec middle clamp bottom 0050-01-0112 24
2.5 3120034 Gehrtec end clamp bottom right 0050-01-0110 122.17 3.2
Zeich
nung
urhe
berre
chtlic
h ges
chütz
t. Dies
e Unte
rlage
ist E
igentu
m de
r Dr
awing
subje
ct to
copy
right.
This
docu
ment
is the
prop
erty
ofGe
hrlic
her S
olar A
G. Je
de V
erwe
rtung
, Ver
vielfä
ltigun
g, Ve
rbre
itung
, Ver
öffen
tlichu
ngGe
hrlic
her S
olar A
G. It
may n
ot be
used
, rep
rodu
ced,
distrib
uted,
und V
orfüh
rung
darf
nur m
it aus
drüc
klich
er Z
ustim
mung
der E
igentü
merin
erfol
gen.
publi
shed
and e
xhibi
ted w
ithou
t the e
xpre
ss co
nsen
t of th
e own
er
2.152.4 3120033 Gehrtec end clamp bottom left 0050-01-0109 12
2.8 2.3 3800230 Module girder F-992. t=2.5mm 0050-01-0054 12
2.2 xxx 1650x990x50 -- 12
2.14 2.10 2.1 3800242 Longitudinal beam F-1650, t=1.75mm 0050-01-0087 2
2.2 2 3040223 Assembly-F3x4_A_3_3_V3 0050-00-0075 1 1.5 3800100 Hexagonal Bolt with Flange_DIN 6921_M12x30_12.9_Geomet 321.B 4
2.91.4 3800125 Hexagonal Nut with Flange_DIN 6923_M12_10_Geomet 321.B 4
1.3 3800169 Adaptor 345mm short (80x55x5 [mm]) 0050-01-0003 12.13 1.2 3800168 Adaptor 425mm long (80x55x5 [mm]) 0050-01-0002 1
2.3 1.1 380xxxx post C125 0050-01-0000 1 1 304xxxx Assembly - post and Adaptor (80x55x5 [mm]) 0050-00-xxxx 1
2.16
2.1 2.16 Pos.-Nr. Artikelnummer Benennung (engl.) Dateiname Menge Maßstab 1:10 Projektion: ISO E Gewicht 322.61 kgB (1 : 2) CONFIDENTIAL Freimaße Material Material 2.6 2.11 ISO 2768 m-H Oberfläche 3.1 Datum Name F3x4_A_3_3_V3; 1650x990-Erstellt 22.02.2011 HME2.12 GesamtaufbauC (1 : 1) Geprüft 23.02.2011 AFR F3x4_A_3_3_V3; 1650x990- Overall design
Freigabe --- ---Projekt: 0050 - gehrtec BASE v2.0 Art.Nr. Zeichnungs-Nummer
E (1 : 2) A0D (1 : 1)A (1 : 2) 0050-00-0076-A Blatt 1 1 /Alle Rechte nach DIN 34 vorbehalten
Zust. Revision Datum Name Ersatz für --- Ersetzt durch --- 23.02.2011
2.4
Additional Information Concerning Key Benefits of Sustainability Enhancements ReSolve, Inc. Superfund Site
16 November 2011
1. Reduction in Chemical Use: The actual chemical use before implementation of the ABR system, and the expected use after transition to the ABR system are detailed in the table below:
Chemical
Prior to Sustainability Enhancements
After Sustainability Enhancements Comments
(lbs/year) (lbs/year) Sodium Hydroxide (25%)
34,144 4,600 The use after transition to the sustainability enhancements is estimated based on the need to raise the pH of the ABR effluent from 6.0 to 6.5 and the buffering capacity of the ABR effluent observed during the ABR pilot test.
Sulfuric Acid (93%) 2,675 0 Not needed for ABR operations Polymer (Neat) 283 50 Estimated amount of polymer needed for
conditioning sludge collected during pipeline cleaning and from phase separator.
Potassium Permanganate
1,635 0 Not needed for ABR operations
Sodium Hypochlorite
961 0 Not needed for ABR operations
Aluminum Chlorhydrate
6,605 0 Not needed for ABR operations
Total 46,302 4,650 Percent Reduction in Chemical Use 90% Note: The chemical use prior to the sustainability enhancements is annualized based on the 35-gpm treatment plant flow rate since 1 December 2010.
2. Reduction in Sludge Production/Disposal: The only sludge that will be generated during the ABR operations will be from cleaning of pipelines (primarily the extraction well pipelines) and from settling of suspended solids in the phase separator and influent tank. Based on a total suspended solids in the influent of less than 5 mg/L and a conservative estimate that 5% of the iron in the influent will precipitate on the pipelines,
Additional Information Concerning Key 16 November 2011 Benefits of Sustainability Enhancements Page 2 of 2 ReSolve, Inc. Superfund Site
the sludge production will decrease from the 54,800 pounds generated during Year 13 of operations to less than 2500 pounds annually after transition to the ABR system. This represents a reduction of approximately 95%
3. Solar Electricity Generation: Electricity use at the site has averaged approximately 240,000 kilowatt-hours (KWH) per year during operation of the existing treatment system. Based on changes to pump sizes and reductions in blower and compressor operations, the treatment system is expected to use approximately 206,000 KWH annually after transition to the sustainability enhancements. The solar photovoltaic system will generate a maximum of 151 kilowatts (KW) and, on average (depending on weather), should generate 186,000 KWH per year, which is 90% of the expected annual future electricity use at the site. The solar photovoltaic system can be expanded by 10 to 12 KW if future electricity use at the site is greater than expected, thereby maintaining on-site electricity generation at approximately 90% of on-site electricity use.
Weston-ReSolve Solar Design 11-21-11Gehrtec Solar Base 11-28-11F3x4_A_3_3_V3Zeichenansicht43Zeichenansicht44Zeichenansicht47Zeichenansicht48Zeichenansicht49Detailansicht A (1 : 2)Detailansicht B (1 : 2)Detailansicht C (1 : 1)Detailansicht D (1 : 1)Detailansicht E (1 : 2)
Additional Information Concerning Key Benefits of Sustainability Enhancements 11-21-11
barcode: *577284*barcodetext: SDMS Doc ID 577284