Upload
rosanna-simpson
View
212
Download
0
Embed Size (px)
Citation preview
WGISS-GEO Session (Cont’)
Pakorn ApaphantFebruary 27th, 2007
The 25th WGISS Plenary, Sanya, China
CEOS-GEO
Action Number
CEOS Action Category:(1 to 4)
Action DescriptionDue Date
POC
POC Organization
All Agency and Organization Participation
CEOS Working Group and Constellation Participation
CL-06-02_13
1
Conduct an ACC / Climate Workshop to develop requirements and long-term plans for supporting the measurement and long-term trending of atmospheric Essential Climate Variables (ECV).
9/30/2008
Hilsenrath
(Martha)
NASA
NASA, NOAA, ESA, CSA, GEO ADC
AC, WGCV, WGISS
CL-06-02_14
1
WGISS IDN TT iterate with Climate SBA (Lead, Mitch Goldberg) to demonstrate climate data records showing long-term trends and variability information for societal benefit on CEOS IDN Portal providing access to ECVs. Candidate drill-throughs include e.g PATMOSX.
9/15/2008
Ken McDonald
NOAA
NOAA, NASA
WGISS
HE-06-03_2
2
Demonstrate a global smoke plume and dust forecasting product (IDEA) using multiple satellites and trajectory models for air quality health hazards.
6/30/2009
Jack Fishman (Karen)
NASA
NASA, NOAA, ESA, EC
AC, WGISS, WGEdu
HE-07-01_1
2
Develop a long-term plan for efficient and economical access to critical space-based imagery to support modeling, forecasting and monitoring of health issues.
6/30/2009
Murielle Lafaye
(WGISS:__ ??)
(Pual’s Action)
CNES
GEO, CNES, UNOOSA, WHO, GMES
WGISS
HE-06-03_3
2
Develop a plan to integrate in-situ vegetation health data to improve global Vegetation Health Index (VHI) products in affected countries
12/30/2009
?????Felix Kogan
(Natalia’s action)
WHONOAA, NESDIS, STAR
NOAA, NESDIS, STAR, WMO, WHOWHO
WGISS
WGCV??
-Financial Support for economical studies-Need support from WG on free access to space imagery data for heath issues
-Although they likely exist, in situ data needed for “calibration” on the productsare not freely accessible from many endemic malaria areas
AR-07-02_1
1
WGISS Sensor Web TT Scenario contributes to Sensor Interoperability Session in the next iteration of the Architecture Implementation Pilot.
10/1/2008
Terence van Zyl
CSIR
CSIR, NASA, JAXA
WGISS
AR-07-02_2
1
Participate in AIP in 2008 with catalogs server, WMS server and client and support its pilot activities. Evaluation of interface protocol between JAXA server and GEOSS portal/clearinghouse (after GEOSS clearinghouse/portal are identified).
10/1/2008
Satoko Miura
JAXA
JAXA
WGISS
DA-06-01_1
CEOS SIT convene data experts to review implementation guidelines and provide feedback to task lead.
TBD TBD TBD TBDWGISS
DA-07-03_5
1
In support of the Land Surface Imaging (LSI) Constellation, provide a demonstration prototype of an LSI Constellation portal.
9/1/2008
Lyndon Oleson
USGS
USGS, GISTDA, CRESDA, ISRO, NASA, NOAA
WGISS, LSI
DA-07-04_1
3
WGISS Sensor Web TT works with Jack Fishman and Ernie Hilsenrath to agree on prototype which, when implemented, demonstrates EO-1 tasking in response to smoke forecast, adding to HE-06-03_3.
3/1/2008
Terence van Zyl
CSIR
CSIR, NASA
WGISS, ACC
DA-07-06_1
3
Establish a Data Integration and Analysis Task Team, which would assist the Task Leads of DA-07-06 in enlisting interested data providers, sharing data integration methods, and organizing and participating in planned workshops.
3/1/2008
Possibly Satoko
JAXA
JAXA, NOAA
WGISS
WGISS-GEO Participation
Id rank act WGISS POC Note
CL-06-02 Yes YesMartha Maiden
2 actions for Martha and Ken
CL-06-05Lola Olsen
-
WA-07-01 YesSatoko Miura
WA-08-P1Satoko Miura
WGISS-GEO Participation
Task Id rank act WGISS POC Note
WA-06-07 Liu Chuang-Liu needs to coordinate
with WGEdu-to update the questionnaire
DA-06-04 Yes ??
DA-06-09 Yes Paul Kopp-Data Interoperability
Handbook-To fill the questionnaire
EC-07-01 Lola Olsen
AR-07-01 YesTerence Van
Zyl
WGISS-GEO Participation
Task Id rank act WGISS POC Comments/Actions
AR-07-02 Yes YesTerence Van
Zyl2 CEOS-GEO Actions for
Terence and Satoko
DA-06-01 Yes D. ClarkWGISS doesn’t have any
related activities
DA-07-03 Yes Martha Median
-WGISS Will recommend as a priority
-1 CEOS-GEO action for Lyn-Need questionnaire
DA-07-04 YesTerence Van
Zyl-
DA-07-06 Yes Satoko
(New) WGISS-GEO Participation
HE-06-03 Yes Karen/Terence - To complete questionnaire
HE-07-01Yes
???WGISS doesn’t have any
related activity
AG-06-04 Yes Grid TT ?? Limited resource.
DA-07-01 Wyn Cudlip-WGCV <TMSG> Lead-To complete questionnaire
DI-06-09 YesPakorn Apaphant
-TBC after Disaster SBA meeting (April 25)
-To complete questionnaire
Request to PoCs
Short term– <New offers> to complete the questionnaire <Due Mar 6>
– Follow up “actionable actions”, If any– Respond emails
Medium and long term– Coordinate with CEOS-GEO task lead– Follow up “actionable actions”– Develop, Implement, and Update– Brief Progress report quarterly (3, 6, 9, 12)
– Respond emails