15
What obstacles exist to the siting of wind generation? Lisa Linowes, Industrial Wind Action Group NARUC Wind Siting Session November 14, 2007 Anaheim, California

What obstacles exist to the siting of wind generation? Lisa Linowes, Industrial Wind Action Group NARUC Wind Siting Session November 14, 2007 Anaheim,

Embed Size (px)

Citation preview

What obstacles exist to the siting of wind generation? Lisa Linowes, Industrial Wind Action Group

NARUC Wind Siting SessionNovember 14, 2007Anaheim, California

Benefit – Cost Trade-off

THE OBSTACLES

• Unreliable generation

• Noise and health effects

• Property value questions

• Wildlife and habitat impacts

• Aesthetics

November 14, 2007 www.windaction.org 2

November 14, 2007 www.windaction.org 3

Grid interconnection requests by region (as of 10/07):

New England (NE ISO): 2,100 MW New York (NY ISO): 6,800 MW Mid-Atlantic region (PJM): 24,500 MW (northern IN and IL)Mid-West region (MISO): 65,500 MWTexas (ERCOT): 35,500 MW (most of TX)South-central region (SPP): 19,300 MW (KS, OK, TX panhandle)Western region (WECC): 11,200 MW (entire western US)

TOTAL: 164,900 MW Notes: a) rounded to nearest 100 MW;b)some numbers may be inflated due to occasional multiple interconnection study applications;c)entry in the queue does not guarantee a project will be built; however, it is an indicator of activity.

FROM WEST COAST:

Intermittent resource.

Can’t be counted on to meet peak load.

Typically doesn’t blow on hottest days of the year.

Less than 10% of nameplate at summer peak.

November 14, 2007 www.windaction.org 4

Source: California ISO integration of renewable resources report (Draft) 9/07

TO EAST COAST:

Highly VariableWind speeds are highly variable hour to hour (see graph).

Pay real-time RatesDeviation from day-ahead schedule; pay real-time rate for energy imbalance.

Reserve ChargesAll energy produced above/ below day-ahead tolerance band assessed operating reserve charges.

November 14, 2007 www.windaction.org 5

Source: Independent Economic Assessment of the Proposed Bluewater Offshore Wind Farm 11/07

TO EUROPE:

Two major studies, identical conclusions:wind energy provides 8% effective capacity.

The relative contribution of wind power to Germany’s guaranteed capacity will fall continuously to 4% by 2020.

Given forecast wind capacity of over 48,000MW , only 2,000MW of traditional power production replaced by wind .

November 14, 2007 www.windaction.org 6

Source: E.ON Netz GmbH Wind Report 2005

November 14, 2007 www.windaction.org 7

Noise? – Yes, unbearable and

there’s no escape.

“The noise …is at times unbearable. At best we get a constant pulsating thump from the blades …During summer months it sometimes becomes impossible for us to sit out in our garden. When we go inside … the pulsating noise is so invasive.”

Letter in the Carmarthen Journal May 2005

“Noise and vibrations from the turbines penetrate our homes.

At times there is no escape from it. It doesn’t matter which room you go to, there is no escape.

[It] ranges from the sound of a high range jet to a fleet of planes …approaching but never arrive. When it’s really bad it takes on a repetitive, pulsating, thumping noise that can go on for hours or even days. “

W. Todd Testimony to ME Wind Power Task Force Sep 2007 Other issues: shadow strobe, flicker …

November 14, 2007 www.windaction.org 8

Noise: Lots of research; limited understanding

Property devaluation? Studies not conclusive;

methodologies questioned.

November 14, 2007 www.windaction.org 9

Somerset PA (above): “disturbed”

Lempster NH (left) : “pristine”

Annual kill of bats by wind turbines in only the Mid-Atlantic Highlands region is projected to be 111,000 by 2020. (Kunz et.al)

Thousands of birds/bats killed yearly at individual wind sites in WV, TN, PA, NY and Alberta. Altamont is not an anomaly! (post-construction surveys)

Only modest investments in monitoring and data collection. In some cases, researchers locked out (NAS report, 5/07)

Wildlife and habitat?

Precautionary principle should

prevail.

November 14, 2007 www.windaction.org 10

Economic opportunity?

Costs of industrializing rural America

Inflated economic gain, jobs

Costs for backup power and transmission

Active lobbying for reduced tax burden

November 14, 2007 www.windaction.org 11

myth

November 14, 2007 www.windaction.org 12

Canadian project (left)

Spearville KS (below)

reality

November 14, 2007 www.windaction.org 13

Elk River KS – the flint hills

100 – 1.5 MW turbines

Images courtesy Kevin Sink

What can you do? Recognize wind ‘farms’ and wind ‘parks’ for what they are – Electric generating facilities.

Look before you embrace – Contradicting research should raise a red flag.

Enable “public-friendly” proceedings – Participation should not be exempted – as recently happened in MD.

Instigate state and local guidelines –

Protect the public and the environment from negative impacts.

November 14, 2007 www.windaction.org 14

Thank You

Lisa Linowes

www.windaction.org603-838-6588