Evian 2011. Technical Stops:. what were the issues in 2011, minimizing impact and improving recovery. Acknowledgments: S.Claudet , K.Dahlerup , F.Duval , K.Foraz , M.Nonis , M.Poyer , H.Thiesen , J.Uythoven , W.Venturini. M.Solfaroli. Outline. General view Methodology - PowerPoint PPT Presentation
Citation preview
what were the issues in 2011, minimizing impact and improving
recovery M.Solfa
roli
Technical
Stops:Acknowledgments: S.Claudet, K.Dahlerup, F.Duval, K.Foraz, M.Nonis, M.Poyer, H.Thiesen, J.Uythoven, W.Venturini
Evian 2011
M.Solfaroli - Technical Stops 2Evian - 12/12/11
Outline
General view
Methodology
The 5 TSs one by one
Pulling the numbers together
Conclusions
M.Solfaroli - Technical Stops 3Evian - 12/12/11
General OverviewStart
dateEnd date Length Time before
next TS (days)
TS#1 28/03 31/03 4 days 38 (5.4 wk)
TS#2 09/05 12/05 4 days 52 (7.4 wk)
TS#3 04/07 08/07 5 days 51 (7.3 wk)
TS#4 29/08 02/09 5 days 65 (9.3 wk)
TS#5 07/11 11/11 5 days 26 (3.7 wk)
Time allocated for recovery: 1 day
23 % of global time = TUNNEL
INTERVENTIONS(including Xmas break)
M.Solfaroli - Technical Stops 4Evian - 12/12/11
Methodology
HOW IT HAS BEEN DONE: All TS interventions screened and all recovery issues examined Some beam checks need to be done repetitively (i.e. loss
maps)...should they be considered as part of recovery time? YES! What does represent the limit between recovery and operation
(back in SB, back on program, first beam in,...)?
GOALS: Spot out possible correlations between
recovery time and TS interventions Identify major problems Investigate strategies for improvement
BEGINNING END
TS Mon @7am First HW re-commissioning test
MACHINE RECOVERY First HW re-commissioning test First beam commissioning test
BEAM COMMISSIONING First beam commissioning test GOAL of the week is accomplished
M.Solfaroli - Technical Stops 5Evian - 12/12/11
WHERE WERE WE?
Slot of 1.38 TeV operation Last 3.5 TeV physics fill (1645):• 200 b (24 bpinj) - (ready for 296 b)• ~1.22E11 p per bunch• Peak lumi: 2.5E32 cm-2 s-1
TS#128 – 31 March – 4 days + 1 recovery day
60%
30%10%
3243 keys given
GOAL of the weekRecovery from TS and start
preparation for high intensity
M.Solfaroli - Technical Stops 6
Sat 2nd ~2pm
Recovery
Evian - 12/12/11
TS#1 - Recovery
tThu 31st 6.25pm
CRYO
Fri 1st 10.29am
Fri 1st 9.59pm
Beam comm
Start of HWC
Global CRYO start First
pilot
Inj region aperture measurements for
higher intensity
Activity Duration [h]Tunnel activities (TS) 84
Recovery 31
Beam commissioning 12
TOT 127
MKB.B2
Sat 2nd 01.23am
Dump @450GeV
66%
10%24%
TOTAL NOT related HW SWTIME lost 14.5 h 48% 62% 38%
Mon 28th
7am
TS
M.Solfaroli - Technical Stops 7Evian - 12/12/11
TS#2
WHERE WERE WE?
Last 3.5 TeV physics fill (1755):• 768 b (72 bpinj)• ~1.25E11 p per bunch• Peak lumi: 9E32 cm-2 s-1
o Quench propagation test on RB.A56o FPA on RQD/F.A67
2831 keys given
60%
16% 24%
09 - 12 May – 4 days + 1 recovery day
GOAL of the weekTS, re-establish physics conditions,
alignment of RPs, VdMs
M.Solfaroli - Technical Stops 8
CRYOCRYO
Evian - 12/12/11
TS#2 - Recovery
tThu 12th 2.10pm
RecoverySat 14th 2.10pm
Beam commSun 14th
9am
Start of HWC
Global CRYO start First
pilotPreparation
for VdM scan
Activity Duration [h]Tunnel activities (TS) 79
Recovery 55(27h cryo stop not counted)
Beam commissioning 12
TOT 146
Thu 12th 6.31pm
Fri 13th 11am
Lost P8(communication)
Fri 13th 08.42am
Sat 14th 9pm
Pilots cycle
54%38%
8%
TOTAL NOT related HW SWTIME lost 15.5 h 94% 90% 10%
Mon 9th
7am
TS
~27 h
M.Solfaroli - Technical Stops 9
04 - 08 July – 5 days + 1 recovery day
Evian - 12/12/11
TS#3 - The longest one
WHERE WERE WE?
Last 3.5 TeV physics fill (1901):• 1380 b (144 bpinj)• ~1.16 E11 p per bunch• Peak lumi: 1.26E33 cm-2 s-1
o Quench propagation test on RB.A56o Test of DQQBS boards in S81
3062 keys given
65%
26%9%
GOAL of the weekContinue with the satellite
collision scheme(264b and higher)
M.Solfaroli - Technical Stops 10
CRYO
Evian - 12/12/11
TS#3 – Recovery
tFri 8th 7.19pm
RecoveryMon 11th 7.22pm
BeamThu 14th
7am
Start of HWC
Global CRYO start First
pilotEnd of loss
maps
Activity Duration [h]Tunnel activities (TS) 108
Recovery 22
Beam commissioning 22(18 + 4)
TOT 148
Sat 9th 8.05am
Sun 10th 11.11am
Sat 9th
5.27pmTue 12th 3.15pm
InjectionCRYOPower cut
When the power cut arrived, beam commissioning was almost completed
(a TCDQ-TCSG cross check was ongoing)
Recovery Beam comm
TOTAL NOT related HW SWTIME lost 19.5 h 46% 85% 15%
14.5%14.5%
71%
Mon 04th
7am
TS
M.Solfaroli - Technical Stops 11Evian - 12/12/11
TS#4
WHERE WERE WE?
Last 3.5 TeV physics fill (2040):• 1380 b (144 bpinj)• ~1.29E11 p per bunch• Peak lumi: 2.1E33 cm-2 s-1
3645 keys given
69%
24%7%
o Quench propagation test on RQD/F.A56
29 August - 02 September – 5 days + 1 recovery day
GOAL of the weekTS, recovery from TS, 1 m
beta*, Alice polarity change
M.Solfaroli - Technical Stops 12
CRYO
Evian - 12/12/11
TS#4 - Recovery
tMon 29th
7amFri 2nd
2.10pm
Beam commSat 3rd
10.59am
Start of HWC
Global CRYO start First
pilot
Start of fill that reached
beta* 1m
Activity Duration [h]Tunnel activities (TS) 106
Recovery 9
Beam commissioning 9
TOT 124
Fri 2nd
5.14pmFri 2nd
10.33pm
RecoverySat 3rd
1.41am
First pilots ramp
86%
7% 7%
~3 h without beam from injectors
TOTAL NOT related HW SWTIME lost 6.5 h 15% 8% 92%
TS
M.Solfaroli - Technical Stops 13Evian - 12/12/11
TS#5
WHERE WERE WE?
Last 3.5 TeV physics fill (2267):• 1380 b (144 bpinj)• ~1.5E11 p per bunch• Peak lumi: 3.5E33 cm-2 s-1
o Quench propagation test on RQD/F.A56
3404 keys given
70%
24%6%
07 - 11 November – 5 days + 1 recovery day
GOAL of the weekTS, recovery, ions (stable
beams) over the weekend
M.Solfaroli - Technical Stops 14
CRYO
Evian - 12/12/11
TS#5 - Recovery
tFri 11th
4.58pm
Beam commSat 12th
06.40am
Start of HWC
Global CRYO start First
pilotPhysics
conditions
Activity Duration [h]Tunnel activities (TS) 107
Recovery 7
Beam commissioning 6
TOT 120
Fri 11th 5.48pm
Sat 12th
00.13am
RecoverySat 12th
00.32am
Asynch BD @ 450 GeV
Pb commissioning included
Sat 12th
02.31am
SB
89%
6% 5%
TOTAL NOT related HW SWTIME lost 4 h 50% 62% 38%
Mon 7th
7am
TS
M.Solfaroli - Technical Stops 15Evian - 12/12/11
Keys Maintenance Improving Problem fixing
TS#1 3243 60% 30% 10%
TS#2 2831 60% 24% 16%
TS#3 3062 65% 26% 9%
TS#4 3645 69% 24% 7%
TS#5 3404 70% 24% 6%
Tunnel activities vs TSs
Some numbers…
M.Solfaroli - Technical Stops 16Evian - 12/12/11
Time lost [h] NOT related HW SW
TS#1 14.5 48% 62% 38%
TS#2 15.5 94% 90% 10%
TS#3 19.5 46% 85% 15%
TS#4 6.5 15% 8% 92%
TS#5 4 50% 62% 38%
Pretty low statistics to have meaningful conclusions......in general HW issues require more time to be fixed
…more…
M.Solfaroli - Technical Stops 17Evian - 12/12/11
…and more!Recovery + Beam
commissioningTOT TS time
(x-1)*24 + 12 + 24Recovery coefficient
(theoretical)Recovery
coefficient (real)
TS#1 43 h 108 h 0.22 0.4
TS#2 40 h(67 h including cryo stop) 108 h 0.22 0.37
TS#3 44 h(130 h considering the power cut) 132 h 0.18 0.33
TS#4 18 h 132 h 0.18 0.13
TS#5 13 h 132 h 0.18 0.09
X = number of days allocated Allocated time for recovery = 24 h
Recovery time vs TSs Recovery coefficient
M.Solfaroli - Technical Stops 18Evian - 12/12/11
• Cryo: no systematic maintenance anymore, it would be OK with 4 (or even 3) TSs provided a minimum of 5 days each (this year was good!)
• QPS: minimum of 3 stops (ideally in May, August and October). Minimum duration 4 ½ days as in 2011.
• EPC: not particular systematic intervention needed, but at least 1-2 days every 9 – 10 weeks
• EL: TSs needed to repair/reset/maintain some systems that are not in good shape. Nevertheless, till the machines work…
• CV: global time already at the limit. It would be difficult to keep for more than 8-9 weeks
• Experiments? (CMS: “we would be ready to go to 4/5d every 10 weeks if needed”)
• Injectors?
Client requests
M.Solfaroli - Technical Stops 19Evian - 12/12/11
Conclusions Need to improve fault details recording
Most of activities is maintenance, can it be reduced?
No systematic source of trouble over the 5 TSs !!
It seems clear that we are improving in recovery… (“After TS, an increment in faults was observed. Effect
is decreasing along the run” Walter @Chamonix 2011) Need to apply a control for SW changes (through a
meeting to coordinate and create a list?) which could: Improve changes, by coordinating them Increase operational efficiency, by making easier
the identification of the source of problems Reduce impact of changes on other systems
4 TSs foreseen for 2012...can we push forward some maintenance and have 3 TSs of 5 days?
2012
M.Solfaroli - Technical Stops 20Evian - 12/12/11
Back-up slides
M.Solfaroli - Technical Stops 21Evian - 12/12/11
TS#1 – Issues 1/2
Issue Duration Reason Connected?
BLM sanity check failure ~12 h but temporary solution adopted Update of configuration DB Y
RB.A12 multiple trip 3 h Card to be changed Likely (active filter manipulation)
Vacuum valve control 4 h not continuously RBAC issue Likely (RBAC modification?)
RCS.A78B2 trip 2 h Power module to be changed N
QPS (B16.R1 opening quench loop) 1.5 h Noise coming from SPS quad N
Beam process regeneration failure 0.5 h Timeout in DB connection to
be increased N
Loading setting on PCs
0.5 h
Ref mismatch Likely (connected to DB
configuration update?)
...on COLL Position error
...on PCs Java exception
RCBXH3.L1 trip 1 h Manipulation on PC N
M.Solfaroli - Technical Stops 22Evian - 12/12/11
TS#1 – Issues 2/2
Issue Duration Reason Connected?
Dump kicker fault 1 h Local intervention Likely
QPS on RQD/F.A81 0.5 h Expert reset N
RQTD.A45B1 trip 1.5 h Short circuit on the current lead Y
ROD./F.A34B1 trip 0.5 h Fault reset by EPC N
XPOC 1 h Expert check N
Orbit instability (not blocking) ~2 h Not fully understood but solved by
taking out RPLA.30L4.RCBV30.L4B1 N
RF cavity 6B2 trip 0.5 h Spurious interlock N
XPOC/IPOC failure on dump 0.5 h Expert check N
COLL dump 0.5 h TCDQ position interlock enabled during TS Y
M.Solfaroli - Technical Stops 23Evian - 12/12/11
TS#2 – Issues 1/2
Issue Duration Reason Connected?
RB.A23 quench loop cannot be closed 3 h Broken relay to be changed N
RD3.R4 quench3.5 h was OK, but
further investigation done the day after
Reset solved the problem N
RD34 Few min Acc value was incorrect Possibly
DIP communication glitch Few min unknown N
HS failure Masked in SIS, but solution the day after Parameter manipulation on SIS Y
RF desynchronized 0.5 h “We do not know why (aging, temp, humidity...?)” N
CRYO loss 26.5 h Communication N
VAC valves cannot be opened 0.5 h Unknown N
M.Solfaroli - Technical Stops 24Evian - 12/12/11
TS#2 – Issues 2/2
Issue Duration Reason Connected?
XPOC latch and IQC failure 0.5 h DB manipulation done during TS Y
Interlock on TCLIB.6R2B1 2 h Broken sensor N
S12 & S23 trip 4 h AUG TI2 N
DFB level manipulation in S78 1.5 h Level instable N
LBDS self-triggering 3.5 h Power supply of MKD generator M broke N
XPOC analysis repetitive faults n.a. Missing VAC data and wrong
dump patter Y
M.Solfaroli - Technical Stops 25Evian - 12/12/11
TS#3 – Issues 1/2
Issue Duration Reason Connected?
Cannot drive settings on TDI in P8 1.5 h Left in expert mode Y
RQD/F.A78 switches cannot be closed 5h Fuse to be changed N
Beam dump faulty for both beams 0.5 h Not clear N
MCS checks on MKD2 and SMP E limit failure 2.5 h HW and DB inconsistent Y
RCO.A56B2 QPS not OK 0.5 h + 0.5 h Expert reset needed N
MKI1 fails during softstart 2 h Possibly
LBDS cannot be armed 0.5 h Possibly
XPOC expert signature needed 0.5 h Server to be reboot Probably
RQ10.L1B2 trip 3 h Water fault Y
M.Solfaroli - Technical Stops 26Evian - 12/12/11
TS#3 – Issues 2/2
Issue Duration Reason Connected?RQ6.L8B1/B2 trip 0 h Water fault Y
Patrol lost 2 h PAD problem N
Problem with actual trim
0.5 h Re-deployment needed LikelyADT setting cannot be charged
Actual trim not working for lumi-knob
XPOC manual reset needed during test
Test was not needed for safe beam...initially delayed, then postponed to next TS
Trying to solve a bad timing problem in inject&dump.Not solved, rolled-back!
Y, but problem was already
present
RQ4.R6B2 trip 0.5 h FGC fault N
M.Solfaroli - Technical Stops 27Evian - 12/12/11
TS#4 - Issues
Issue Duration Reason Connected?
COLL error 2 h CO modification to be rolled-back Y
DC BCT calibration failure Can live with Likely
BPM calibration failure 2 h Crate to be re-started Likely
HS not working properly Still working Not clear Possibly
XPOC EIC reset does not work 1 h Had to be rolled-back Y
Problem with FIDEL corrections
QFB switching OFF + chroma measurement problem
0.5 h Tune fitter settings re-deployed Likely
4 RQDFs trip 0.5 h QFB correction too high N
XPOC reset failure 0.5 h Not clear N
OP vistar not working Not blocking Not clear possibly
M.Solfaroli - Technical Stops 28Evian - 12/12/11
TS#5 - Issues
Issue Duration Reason Connected?
Some settings don’t match DB Y
Some VAC valves don’t open 0.5 h VAC still not good Y
DIP and vistar problem 0 h
RF interlock cannot be reset 2 h
ITL1 wire position not OK Not blocking SIS masked Y
XPOC latched 1 h TSU failure Y
BSRA publishing not valid results 0 h “check mode” left (masked in
the XPOC Y
XPOC failure BLM values out of threshold
M.Solfaroli - Technical Stops 29
CRYO
Evian - 12/12/11
TS#3 - Recovery
tMon 04th Fri 8th 7.19pm
TS RecoveryMon 11th 7.22pm
BeamThu 14th
7am
Start of HWC
Global CRYO start First
pilotEnd of loss
maps
Activity Duration [h]Tunnel activities (TS) 108
Recovery 92 (32h cryo stop)
Beam commissioning 38 (2 h SB not considered)
TOT 238
Sat 9th 8.05am
Sun 10th 11.11am
Sat 9th
5.27pmTue 12th 3.15pm
Injection
2 h SB with 2 bunches done meanwhile
CRYOPower cut
When the power cut arrived, beam commissioning was almost completed
(a TCDQ-TCSG cross check was ongoing)
Recovery Beam comm
16%45%
39%
M.Solfaroli - Technical Stops 30Evian - 12/12/11
General Overview
MD,
tech
nica
l sto
p
MD,
tech
nica
l sto
p
MD,
tech
nica
l sto
p, S
QU
EEZE
MD,
tech
nica
l sto
p, s
crub
bing
75 ns50 ns
Smaller emittance
Increased n. bunches Increased bunch
intensityBeta* = 1m
28 % of global time = TUNNEL INTERVENTIONS