1
NAVAL SEA SYSTEMS COMMAND
What’s New in Nonskid?
NSRP SPC Panel Meeting
Portland, OR
September 2016
Mr. Mark Ingle, P.E.
SEA 05P2
(202) 781-3665
Distribution A: Approved for Public Release
2
OBJECTIVES
• Summarize evolving Naval Sea Systems Command (NAVSEA) organization and coating requirements:
•• Headquarters NAVSEA organization & objectives.
• Summarize what’s new in NAVSEA nonskid and maintenance coating costreduction strategies:
•• FY-18 Standard Item 009-32 updates discussed at Aug 2016SSRAC.
•• Presented status of new, thermal spray nonskid (TSN) documentation at SSRAC.
•• Analyzing life-cycle performance of (TSN) materials to reduce total life cycle costs.
• Discuss opportunities for new ideas and NSRP SPC input into NAVSEA efforts to develop new requirements and streamline coating installation
practices.
Naval Systems Engineering Directorate (SEA 05)
Technical Domain Manager (TDM)Chief Systems Engineer (CSE)
Office of the CHENG
SEA 05B Deputy / COS
(SEA 05B1)
Aircraft Carrier Design &
Systems Engineering
(SEA 05V)
Chief Finance Office
(SEA 05B3)
Surface Ship Design &
Systems Engineering
(SEA 05D)
Integrated Warfare Systems
Engineering (SEA 05H)
Cost Engineering &
Industrial Analysis
(SEA 05C)
Ship Integrity &
Performance Engineering
(SEA 05P)
Chief Workforce Office
(SEA 05B2)
Special Projects
(SEA 00U/05X)
Executive Director / CHENG
Deputy / Chief Technology Officer
(SEA 05B)
Littoral and Mine Warfare
Design & Systems Engineering
(SEA 05L)
Technology Office
(SEA 05T)
Submarine/Submersible
Design & Systems
Engineering
(SEA 05U)
Technical Policy &
Standards (SEA 05S)
Undersea Warfare Systems
Engineering
(SEA 05N) (NUWCNPT TD)
Surface Warfare Systems
Engineering
(SEA 05W) (NSWCDD TD)
Marine Engineering
(SEA 05Z)
L&MW Warfare Systems
Engineering
(SEA 05M) (NSWCPC TD)
Explosive Ordnance
Engineering
(SEA 05E) (NSWC IH TD)
T&E Technical
Advisor
Deputy Commander /
CHENG(SEA 05)
Chief HR & Admin
Office
(SEA 05B6)
Draft: As of 8/22/16
3
Code Product Related SpecsAll All Technical Products, Managerial All
AF Antifouling Coating Systems MIL-PRF-24647
TNK Tank Coatings, Epoxy Primers MIL-PRF-23236
MIL-DTL-24441
PRM Primers, Single Component TT-P-645
TOP Topside, Alkyds & Polysiloxanes MIL-PRF-24635
INT Interior Coatings (SEA 08) MIL-DTL-24607
MIL-PRF-24596
MIL-DTL-15090
MIL-DTL-1115
HT High Temp Coatings, Metallic TT-P-28
PWD Powder, Interior, Cosmetic MIL-PRF-24712
NSK Nonskid MIL-PRF-24667
DCK Deck Coverings MIL-D-3134
MIL-PRF-3135
MIL-PRF-24613
MIL-PRF-32171
SUR Abrasive blasting, surface prep MIL-A-22262
SEL Sealants & Preservatives MIL-PRF-16173
NAVSEAINST 9630.1
DOC Policy Documents NSTM 631, NSTM 634
S636-MAN, CCAMM
Standard Item 009-32
Standard Item 009-26
COR Corrosion/PCOE Policy/Design DODI 5000.67
RSH Research & Development To be determined
UNDS Regulations, Underwater hull TBD
NAVAIR
Aircraft Engines
TWH:
Habitability
SEA 08R
TWH: Underwater
Hull Husbandry
SDMs: Surface,
Submarine,
Carrier
Technical Authority Pyramid - Coatings & Corrosion ControlDraft: Sept. 2016
Navy Employee Navy Developmental Employee Contractor
Ingleall
Castle(EM)
All, COR
Lemieux(EA)
All, RSH
Vacant(EM)
NSK, All
Wegand(EM)
RSH, NSK
Lattner(EM)COR
Haslbeck(EM)
All, AF
J. Martin(EM)
TOP, TNK
Melhuish(EM)
All, NSK
Brinckerhoff(EM)All
Tagert(EM)
TNK, NSK
Kenney(EM)
VA-Class
Jones(EM)
NSK, DCK
Iezzi(EM)
RSH TOP
Smith(EM)
UNDS
Wigle(EM)CCAT
Slebodnick(EM)
RSH, TNK, NSK
Merlino(LE)
DOCs
Carroll(LE)NSK
ThomasCOR
Clayton(LE)
DOCs
Lawrence(LE)AF
StankeTNK, All
HolmAF
Adams(LE)
NSK, RSH
MillerTNK, NSK
ZuwialaCOR
CisconAll
ParkDOCs
FosterAll
SheridanRSH, All
F. MartinHT, COR
SpicerTNK, NSK
Needham(LE)
COR, All
WebbRSH
InternAll
EllorCOR
Ault(LE)
TNK, RSH
Langaster(LE)TNK
Ranero(EM)
All, NSK
EAs
EMs
LEs
KoglerSUR
TWH
4
Delegated signature authority
Ong(EA)All
Eppard(EM)
NSK, TNK
Duckworth(EA)All
Distribution A: Approved for Public Release
HQ
5
FY-18, Standard Item 009-32
Updates Discussed at August 2016 SSRAC
• Standard Specifications for Ship Repair and Alteration Committee (SSRAC) met in Newport News, VA in August 2016 to address:
- 98 proposals addressed by Preservation Subcommittee:
“Top Ten” Action Items will create new requirements or help clarify existing requirements:
1. ESTABLISH working group to refine and develop new Standard Item on Thermal Spray Nonskid
(TSN). Working group to include:
- NAVSEA - Technical Warrants for coatings and materials, SEA 05D field representative.
- NRL - Engineers that developed and applied TSN to LHA/LHD.
- NSWC-PD - Nonskid ISEA.
- NSWC-CD - Thermal spray engineers.
- MARMC - Deck-plate nonskid QA.
- PSNS & IMF - Deck-plate nonskid QA.
Distribution A: Approved for Public Release
Adopted = 14
Adopt as modified = 35
Not adopted = 36
Action Items = 13
6
FY-18, Standard Item 009-32
Updates Discussed at August 2016 SSRAC
2. CONTINUE process of publishing TSN technical documentation to support TSN application
Standard Item to include:
MIL-PRF-XX704 TSN material specification MIL-PRF-24647 nonskid specification
Standard Item 009-XX on TSN installation Standard Item 009-32
Technical Publication (e.g., MIL-STD-1687) SSPC-QP 1, NACE/SSPC credentials
3. DEVELOP supporting documentation to clarify deck-plate assessment of surface profiles.
Supporting documentation to be in the form of slides or images to articulate concepts.
4. DEVELOP supporting documentation to clarify requirements for re-using nonskid
mixing blades and defining blade cleanliness.
5. DEVELOP supporting documentation to clarify requirements for preparing tie-downs, inspecting
tie-downs, and implementing the FY-18, Standard Item 009-32 update items on:
- Removing the term “bars” to allow coating of aircraft and vehicle tie-down types.
- Address reported tie-down inspection practices.
- Address dust tape call-out.
Distribution A: Approved for Public Release
≈≈
≈
7
FY-18, Standard Item 009-32
Updates Discussed at August 2016 SSRAC
6. COMPLETE PDS to reactivate TT-C-492 “Coating Compound, Paint Antisweat” or draft new specification for
anticondensation and/or insulation coatings.
● 19 Aug 2016 - SEA 05S concurs with transfer of “ownership” of TT-C-492 to SEA 05P2.
● 22 Aug 2016 - SEA 05P2 proposes NRL/NSWC team to update requirements with:
- Type/Class for products that absorb
moisture.
- Type/Class for single-pack products
that insulate with microspheres.
- Type/Class for two-pack products
that create high R-value coating.
7. REVIEW Army specification MIL-PRF-14105, “Paint, Heat-Resisting (for Steel Surfaces)” for possible
replacement of FY-17, Change 1, Standard Item 009-32, Note (39) and Table 5, Line 7.
8. DEVELOP MRC for Fleet to clean flight deck using “Green Clean” technology in FY-17, Change 1,
Standard Item 009-32, Table 2, Line 26.
9. UPDATE ASTM F718 to include additional information or “rules of thumb” from paint manufacturers about
ventilation issues.
10. ASSESS new anticondensation coatings based on Action Item 6 schedule.
Distribution A: Approved for Public Release
SSRAC meeting group accepted or will accept 63% of proposed changes.
Why Use TSN To Improve Flight Deck Performance?
8
TSN is only material
that can withstand
direct F-35 exhaust
gas impingement.
TSN has low macro-
profile and smaller
“chips” that can
break off lowering
risk of aircraft engine
FOD.
TSN is aluminum and
small (e.g., 400 grit or
smaller) Al2O3 aggregate
as compared with 24-30
grit Al2O3 in conventional
epoxy nonskid. Conventional Nonskid Chips TSN, wear particles , 400 grit aggregate
TSN can resist V-22
exhaust gas heat.
NRL validating that
V-22 exhaust gas
impingement can
crack conventional
nonskid.
Distribution A: Approved for Public Release
Action Item - New TSN Standard Item
Re-establish Profile Using Aluminum-oxide Abrasive Blasting
Steel deck after UHPWJ cleaning,
extensive corrosion staining. SSPC-SP5 white metal level of cleanliness
with surface profile of 4.5- to 5.0-mils.
Background: Epoxy nonskid installed over steel shot SSPC-SP 10 with OQE indicating profile satisfied requirements.
NOT ADEQUATE for TSN installation.
Plan: Develop new Standard Item 009-XX to define the twin-wire arc spray process & equipment demonstrated
on LHA/LHD.
TSN applications on LHA/ LHD have shown SSPC-SP 5 cleanliness obtained on old decks using Al2O3 media.9
Distribution A: Approved for Public Release
Critical New
Requirement
Action Item - New TSN Standard Item
Process Summary
10Distribution A: Approved for Public Release
Plan: Standard Item 009-XX to define the twin-wire arc spray process & equipment as
demonstrated on LHA/LHD.
TSN Standard Item 009-XX will define detailed process and G-points to ensure successful coating application.
Plan: New Standard Item 009-XX will include similar approach with columns to Standard Item 009-32 to show how layers
of thermal spray are to be applied to create corrosion-resistant, rough, nonskid system.
Standard Item 009-XX will define detailed process, with G-points, to ensure successful application of TSN nonskid coatings.
11Distribution A: Approved for Public Release
Action Item - New TSN Standard Item
Process Summary to Define Coats
TSN COATING FORMED IN LAYERS
TSN COATING FORMED IN
TWO, UNIQUE LAYERS
6”
ASSESSMENT: Location forward and in tram-line deck marking.
- Blister area: 0.03 ft2
- Hammer and chisel needed break blister and pry up the
delaminated layer.
- No evidence of “red rust,” or inter-coat delamination between
aluminum layers.
- No evidence of cracking or spreading of blister.
ROOT CAUSE: TSN applied in this area to correct thin initial coating using small,
hand-controlled robotic spray unit.
Likely lack of cleanliness in overcoated area.
Why Must Standard Item Define Cleanliness Between Coats?
Delamination Risk
ISSUE: Ship’s force detects “blister” in TSN nonskid after 23 months of service.
Key Point: Blister was apparent and ship’s force could repair area before FOD created.12
Plan: Standard Item 009-01 may need updates to address provisions for HEPA filters and air
emission controls to satisfy San Diego, CA Air Quality Management District requirements.
Status: Presented slides at SSRAC in Aug. 2016.
Key question is whether Standard Item 009-01 will ensure environmentally compliant application of TSN nonskid coatings.
13Distribution A: Approved for Public Release
Action Item - New TSN Standard Item
New Process Creates New Environmental Challenges
14
TSN Technical Requirements Being Developed
High priority specification creation work of interest to SEA 00, SEA 05, & multiple Flags.
TSN Fielding
Vital to Amphibious Ships
& Fleet Operations
FY-18 New
NAVSEA
Standard Item
New military
specification
MIL-PRF-XX704
for TSN wire
material.
Update Naval Ships
Technical Manual
Chapter 634
Material Installation Process / Qualifications In-service
Update current
MIL-STS-1687A
to Technical
Publication
Distribution A: Approved for Public Release
Update MRC
for TSN Inspection
and Repair
by Ship’s Force
Under review by
SEA 05P
Process: SEA 05S SSRAC SEA 05S SEA 05S NSWC-PD
Status: SEA 05P2 review SEA 05P2 SEA 05P2 review NSWC-PD 1st Draft of Maintenance
complete to comments complete to Action Card for TSN Inspection
SEA 05S on 1st Draft, SEA 05S to CNSP on 17 May 2016
19 May 2016 complete 19 May 2016
19 Aug 2016 1-5 Aug 2016 12 Aug 2016 29 Jul 2016 SEA 05P2
SEA 05S concurs Presented to SEA 05S suggests Delivers FINAL draft cards
with need for QPL SSRAC. Revision as Technical to USFF N43 Flight Deck
Publication. Readiness Working Group
30 Aug 2016 29 Aug 2016
SEA 05S edits SSRAC edits done NSWC-PD to include in new
complete NRL to set up MRC deck.
Reading Session
Background:
Develop MIL-PRF-XX704 to define the wire material used with
twin-wire arc spray process & equipment as demonstrated on LHA/LHD.
Key Material Specification Provisions:
Coating to be formed over SSPC-SP 5 white metal level of cleanliness
by automated twin-wire arc system.
Multiple coats of TSN acceptable to build final coating system.
Wire material Type/Class to specify allowable hazardous heavy metals.
Wire material Type/Class to define whether wire is solid or cored.
Qualification Tests:
Conformance tests (e.g., metals levels, lubricants, packaging) to be
conducted on wire feed stock.
Coating conformance tests to exclude silicate color topping (another specification).
Qualification testing on coating with application parameters demonstrated on LHD
and LHA.
Status:
12 Aug 2016 - SEA 05S approved document as requiring a QPL.
30 Aug 2016 - SEA 05S completes draft document with revisions based on QPL listing, including updated references,
current “phraseology,” deleting data reports that cannot be required.
New military specification is to have qualified products list for wire feed materials that can form TSN coatings.
Action Item - NEW TSN Material Specification
MIL-PRF-XX704
15Distribution A: Approved for Public Release
● LHA 6 TSN installed using solid wire that is 97% Al / 3% Ti.
● LHD 1 and LHD 5 TSN installed using cored wire that is 5054 Al jacket / aluminum oxide (400 grit) core.
Cross Section: solid core aluminum wire
with elemental Ti.
Cross Section: hollow core aluminum alloy wire
with discrete aluminum oxide particles.
Transfer Efficiency: 68% Transfer Efficiency: 57%
Application Rate: 84 - 112 ft2/hour Application Rate: 84 - 112 ft2/hour
No reportable chromium on MSDS. Chromium reported as 0.15 – 0.35%
New MIL-PRF-XX704 to address Types or Class for both solid and cored TSN wire.
16Distribution A: Approved for Public Release
Action Item - NEW TSN Material Specification
MIL-PRF-XX704 Wire Type
Plan: Update MIL-STD-1687A to include requirements for personnel training and qualification to apply
wire material with the twin-wire arc spray process & equipment demonstrated LHA/LHD.
Key Update Provisions:
Defines required applicator training.
Outlines safety requirements.
Defines applicator qualification process and audit
For Quality Assurance/
Guides the applicator through the entire process
Including containment, legacy nonskid removal,
surface preparation, TSN application, color topping,
legacy nonskid tie-in and repair/
maintenance procedures.
May reference a CID to define the kind of robots used in the process.
Status:
12 Aug 2016 - SEA 05S completed Project Initiation Review (PIR) and determined document
must be modified to a Technical Publication.
Update to Technical Publication will leverage existing thermal spray training and certification requirements for TSN.
Action Item - Update to MIL-STD 1687A
Qualifications
17Distribution A: Approved for Public Release
NAVSEA Guidance
Surface Profile Measurement Validation – As-found Condition
ISSUE: As-found decks include multiple surface conditions that will influence ability to collect
representative surface profile data.
GUIDANCE:
1. Before nonskid removal, define scope of areas requiring abrasive blasting based on observed
SSPC-VIS 1, Rust Grade C or D (as shown in red).
2. After nonskid removal, collect representative, as-found surface profile data from areas with intact,
adherent nonskid (as shown in green). Data may be collected from exposed “black staining.”
3. Report required data on Standard Item 009-32 Appendices.
18
Action Item – Develop Supporting Documentation
Standard Item 009-32 - Nonskid Profile Assessment
Distribution A: Approved for Public Release
NAVSEA guidance slide for NST Center website to clarify data collection intent. NSRP input needed on clarity and content.
NAVSEA Guidance
Surface Profile Measurement Validation – Abrasive Blasted Condition
ISSUE: Abrasive blasted decks have multiple surface conditions that will influence ability to collect
representative surface profile data.
GUIDANCE:
1. After abrasive blast cleaning, validate SSPC-SP 10 near white metal cleanliness and required surface
profile using ASTM D4417, Method B or Method C from areas without visible pitting or corrosion metal
loss (as shown in green).
2. After abrasive blast cleaning, validate SSPC-SP 10 near white metal cleanliness using SSPC-VIS 1 for
Rust Grade C or D in areas with visible pitting or corrosion metal loss (as shown in red).
3. Report required data on Standard Item 009-32 Appendices.
19
Action Item – Develop Supporting Documentation
Standard Item 009-32 – Abrasive Blasted Profile Assessment
Distribution A: Approved for Public Release
NAVSEA guidance slide for NST Center website to clarify data collection intent. NSRP input needed on clarity and content.
20
Action Item – Develop Supporting Documentation
Standard Item 009-32 – Reuse of Nonskid Mixing Blades
Distribution A: Approved for Public Release
NAVSEA guidance slide for NST Center website to clarify data collection intent. NSRP input needed on clarity and content.
NAVSEA Guidance
Nonskid Mixing Blade Cleanliness
ISSUE: Nonskid mixing blades that are free of previously applied paint/nonskid may be reused to
mix nonskid.
Reused blade that Blade contaminated with
is free of nonskid - with nonskid –
ACCEPTABLE for use NOT ACCEPTABLE for use
New blade that is
free of nonskid -
ACCEPTABLE for use
GUIDANCE:
1. Blades shall be 99% free of residual coating or corrosion staining when viewed without magnification.
2. Up to 1% cured coating or corrosion staining may be retained in corners, welds, corrosion pits,
and other irregular surface areas.
3. All retained coating and corrosion staining, when wiped with nonskid solvent applied to clean,
light-colored shall not leave any colored residue on the rag.
21
Action Item – Develop Supporting Documentation
Standard Item 009-32 – Tie Down Inspection
Distribution A: Approved for Public Release
NAVSEA guidance slide for NST Center website to clarify data collection intent. NSRP input needed on clarity and content.
SSPC-SP 2 or SP 3
in these areas
NAVSEA Guidance
Surface Cleanliness & Coating Integrity Validation on Tie Downs
ISSUE: Interpretation of surface cleanliness and coating integrity validation requirements on
aircraft and vehicle tie-downs highly variable across RMCs & shipbuilders.
GUIDANCE:
1. Surface preparation to SSPC-SP 2 or SP 3 is authorized in
areas that are shielded or shadowed from abrasive blast or waterjet cleaning or power tool cleaning.
2. Required surface profile measurements to be taken in areas that can be abrasive blasted to SSPC-SP 10 or
waterjet cleaned to NACE/SSPC- WJ-2/L or power tool cleaned to SSPC-SP 15.
3. Tie-down coating coverage shall be validated without use of a mirror or flashlight on all fittings.
10% of all tie-downs in each work zone shall be inspected using a mirror and flashlight.
4. For tie-down installation, NAVSEA Drawing 803-1916300, Note T-1D requires that 100% of crossbars to be tested
to ensure proper fit of the TD-1 hook. Excessive coating runs, drips, sags, puddles, or inadequate removal
of old coating during surface preparation can interfere with fit of the TD-1 hook.
22Distribution A: Approved for Public Release
Action Item – Develop Supporting Documentation
Standard Item 009-32 – Reuse of Nonskid Mixing BladesISSUE: Standard Item 009-32 update “lessons learned” that nonskid mixing is a manual process and that
inadequately mixed nonskid exhibits irregular cure.
SOLUTION: NRL completed project to develop effective, automated nonskid mixing equipment.
Inadequate nonskid mixing adversely affected nonskid deck installation.
Effective performance demonstrated on nonskid deck at Puget Sound Naval Shipyard.
Draft Commercial Item Description (CID) A-A-XX695 for nonskid mixing equipment
to SEA 05S on 17 Jun 2016 with authorization to proceed to Government & Industry review.
25 Jul 2016 - Project Initiation Review (PIR) initiated.
5 Aug 2016 - PIR complete and NAVSEA is adjudicating comments.
Mix all qualified nonskid Double vortex mixing blades
6,000 gal. mixed without repair Three blades per unit
One blade being used
1.7 hp pneumatic motor One blade free of nonskid
ready to be installed
1 to 175 rpm speed control
One blade being cleaned
with solvent, rags,
and wire brush
Blades for 5 & 6 gallon cans
NSRP SPC comments on CID A-A-XX695 needed . New equipment will speed production & reduce risk.
23
Summary
• NAVSEA goal is to ensure all coating and nonskid applications satisfy performance requirements.
• NAVSEA transitioning new thermal spray nonskid to fleet service to support V-22 and F-35 operations and to reduce the risk of aircraft engine FOD.
• NAVSEA will publish FY-18, Standard Item 009-32 in Jan 2017.
• NAVSEA will publish DRAFT Standard Item 009-XX on TSN for industrycomment in Jan 2017.
• NAVSEA goal to work with NSRP SPC to streamline coating productionprocesses while ensuring coating durability and attain anticipated service life.
Distribution A: Approved for Public Release
24
Backup slides