34
Rochdale Holdings Pty Ltd A.B.N. 85 009 049 067 trading as: HERRING STORER ACOUSTICS Suite 34, 11 Preston Street, Como, W.A. 6152 P.O. Box 219, Como, W.A. 6952 Telephone: (08) 9367 6200 Facsimile: (08) 9474 2579 Email: [email protected] WHITE GUM AIR PARK LOT 2308 CAMERON ROAD, MALEBELLING ACOUSTIC ASSESSMENT JULY 2017 OUR REFERENCE: 22023‐2‐17117

WHITE GUM AIR PARK - Shire of York

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WHITE GUM AIR PARK - Shire of York

Rochdale Holdings Pty Ltd A.B.N. 85 009 049 067 trading as:

HERRING STORER ACOUSTICS Suite 34, 11 Preston Street, Como, W.A. 6152 P.O. Box 219, Como, W.A. 6952 Telephone: (08) 9367 6200 Facsimile: (08) 9474 2579 Email: [email protected]

   

WHITE GUM AIR PARK     

LOT 2308 CAMERON ROAD, MALEBELLING     

ACOUSTIC ASSESSMENT     

     

JULY 2017            

OUR REFERENCE: 22023‐2‐17117  

Page 2: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics

 

DOCUMENT CONTROL PAGE    

ACOUSTIC ASSESSMENT  AIR PARK 

 

CAMERON ROAD, MALEBELLING    

Job No: 17117  

Document Reference: 22023‐2‐17117  

  

FOR  

WHITE GUM AIR PARK  

DOCUMENT INFORMATION 

Author:  Paul Daly  Checked By:  Tim Reynolds 

Date of Issue:  25 July 2017   

REVISION HISTORY 

Revision  Description  Date  Author  Checked 

1  Client Comments  24/08/2017  PLD   

         

         

         

         

DOCUMENT DISTRIBUTION 

Copy No.  Version No.  Destination  Hard Copy Electronic Copy 

1  1 

David Maiorana [email protected]  cc Andrew Cotterell Email: [email protected]   

1  2 

David Maiorana [email protected]  cc Andrew Cotterell Email: [email protected]   

         

         

         

Page 3: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics

    

EXECUTIVE SUMMARY  The purpose of this study was to assess noise emissions of aircraft using the White Gum Air Park facility.  The  assessment  has  been  requested  by  the  Shire  of  York  and  relates  to  an  application currently under assessment for the construction of additional aircraft hangers at the facility.  To determine noise  received at  the neighbouring  residence  from  the White Gum Air  Park,  noise emissions  from aircraft operating at  the park have been based on the results of noise modelling, which has been calibrated against hand held observed noise level measurements.  From  the  literature  examined,  there  is  no  criteria  that  specifically  applies  to  the  assessment  or management of aircraft noise from a facility such as the White Gum Air Park.   In  Western  Australia,  the  assessment  of  noise  is  undertaken  using  either  the  Environmental Protection (Noise) Regulations 1997 or State Planning Policy 5.4 Road and Rail Transport Noise and Freight Considerations  in  Land Use Planning. Both  the  regulations  and policy  specifically  exclude assessment of aircraft noise.  Assessment  of  aircraft  noise  for  airports  such  as  Perth  and  Jandakot  airport  are  assessed  and managed under State Planning Policy 5.1 Land use planning in the vicinity of Perth Airport and; State Planning Policy 5.3 Land Use Planning in the Vicinity of Jandakot Airport. Both these policies use the Commonwealth Airports Act 1996 as a basis due to the airports being situated on Commonwealth land. As the White Gum Air Park is located on private land, the act and policies do not apply.  Australian  Standard  (AS)  2021:2015  Acoustics  ‐  Aircraft  noise  intrusion  ‐  Building  siting  and construction provides criteria for suitability of building sites. The standard is concerned with land use planning and building treatments in the vicinity of an airport. The objective is to provide guidance to regional  and  local  authorities,  organisations,  communities  and  others  associated with  urban  and regional planning and building development on the siting and construction of new buildings against aircraft noise intrusion and on the acoustical adequacy of existing buildings near aerodromes. It is noted that the standard is not intended to be applied for the purpose of assessing the effects of noise from aircraft. AS2021:2015 generally uses the relevant Australian Noise Exposure Forecast (ANEF) for  consideration  of  building  sites  as  to  being  “acceptable”,  “unacceptable  “or  “conditionally acceptable”.   Where aerodrome usage (such as the White Gum Air Park) is confined to a small number of civil, non‐jet aircraft movements the production of an ANEF chart may not be justified and is unlikely to occur.  In  these  cases,  AS2021:2015  provides  alternative  noise  metrics,  which  are  contained  in Appendix E of the standard and are summarised below in Table E1. 

 TABLE E1 – BUILDING SITE ACCEPTABILITY BASED ON AIRCRAFT NOISE LEVELS* 

Number of Flights Per Day Aircraft Noise Level Expected at Building Site dB(A) 

Acceptable  Conditionally Acceptable  Unacceptable 

House, home unit, flat, caravan park, school, university, hospital, nursing home 

>30  <70  70‐75  >75 

15‐30  <80  80‐85  >85 

<15  <90  90‐95  >95 

*The values in Table 1 are based on a small aerodrome with a small number of civil, non‐jet aircraft movements. They should not be used in any other circumstance. 

    

Page 4: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics

Based on the above information, the appropriate criteria for this assessment has been based on the recommendations contained in AS2021:2015. As the White Gum Air Park, has around 15‐30 flights per day (on the busiest day), the acceptable noise level for surround buildings types (house) would be <80 dB(A) LAmax and conditionally acceptable 80‐85 dB(A) LAmax.  The nearest noise sensitive premises (highly noise sensitive) is located approximately 100m from the centre of runway 09 towards the north. At this location, the LAmax noise level of the worst case (take‐off) operation has been determined to be 71 dB(A)  for  the most common aircraft  type using  the runway. For ground activities, such as aircraft taxiing around site, the LAmax noise level is 47 at the same premise.  Even though noise emanating from aircraft using the air park complies with the stated applicable criteria,  to  formalise  the  operations  of  the  White  Gum  Air  Park,  it  is  recommended  that  a management plan (which includes noise) be developed. This management plan provides a level of security  to  the  facilities  operations  and  to  other  stakeholders  which  may  be  affected  by  the operations.  

    

Page 5: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics

    

   CONTENTS 

 

1.  INTRODUCTION  1 

2.  BACKGROUND  1 

3.  CRITERIA  1 

4.  MEASUREMENTS  2 

5.  MEASURED RESULTS  6 5.1  OBSERVED NOISE LEVEL MEASUREMENTS  6 5.2  CONTINUOUS NOISE MONITORING  7 

6.  MODELLING  8 

7.  DISCUSSION  9 

8.  CONCLUSION  10      

APPENDICIES   

    A    Locality Plan   

    B    Continuous Noise Monitoring Results          Observed Noise Measurement Results      B    Noise Contour Plots  

   

Page 6: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        1  

1. INTRODUCTION  

Herring Storer Acoustics was commissioned by The White Gum Air Park on behalf of the owners, Andrew and Mary Cotterell, to carry out a noise study for the operations located at Lot 2308 Cameron Road, Malebelling (See Figure A2 in Appendix A for Study Area), with regards to noise emissions from aircraft using the park.  This assessment is provided to support the regulatory approvals processes sought from the Shire of York for the construction of additional hangers at the facility.  As part of the study, the following was carried out:  

•  Identification of individual operations and the associated noise levels.  

•  Measurement of aircraft and continuous monitoring of existing operational noise levels.  •  Predictive noise modelling of the noise emissions associated with the air park operations.  •  Assess the noise levels at the nearest surrounding noise sensitive premises.  

For information, a locality plan is shown in Appendix A.   

2. BACKGROUND  Runway 09‐27 has been in active use for over 37 years. Whitegum Farm have used runway 09‐27 for 17  years  (with  permission  of  property  owners  during  the  entire  period).  There  has  not  been complaint  in  the  past  17  years  in  regards  to  the  operations,  including  the  later  10  years where SkySports Flying School have operated from both runways. Hours of possible operation are sunrise to sunset. The runways and facilities are used by various visiting aircraft including agricultural crop spraying aircraft when in season.  

3. CRITERIA  

From  the  literature  examined,  there  is  no  criteria  that  specifically  applies  to  the  assessment  or management of aircraft noise from a facility such as the White Gum Air Park.   In  Western  Australia,  the  assessment  of  noise  is  undertaken  using  either  the  Environmental Protection (Noise) Regulations 1997 or State Planning Policy 5.4 Road and Rail Transport Noise and Freight Considerations  in  Land Use Planning. Both  the  regulations  and policy  specifically  exclude assessment of aircraft noise.  Assessment  of  aircraft  noise  for  airports  such  as  Perth  and  Jandakot  airport  are  assessed  and managed under State Planning Policy 5.1 Land use planning in the vicinity of Perth Airport and; State Planning Policy 5.3 Land Use Planning in the Vicinity of Jandakot Airport. Both these policies use the Commonwealth Airports Act 1996 as a basis due to the airports being situated on Commonwealth land. As the White Gum Air Park is located on private land, the act and policies do not apply.  Australian  Standard  (AS)  2021:2015  Acoustics  ‐  Aircraft  noise  intrusion  ‐  Building  siting  and construction provides criteria for suitability of building sites. The standard is concerned with land use planning and building treatments in the vicinity of an airport. The objective is to provide guidance to regional  and  local  authorities,  organisations,  communities  and  others  associated with  urban  and regional planning and building development on the siting and construction of new buildings against aircraft noise intrusion and on the acoustical adequacy of existing buildings near aerodromes. It is noted that the standard is not intended to be applied for the purpose of assessing the effects of noise 

Page 7: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        2  

from aircraft. AS2021:2015 generally uses the relevant Australian Noise Exposure Forecast (ANEF) for  consideration  of  building  sites  as  to  being  “acceptable”,  “unacceptable  “or  “conditionally acceptable”.   Where aerodrome usage (such as the White Gum Air Park) is confined to a small number of civil, non‐jet aircraft movements the production of an ANEF chart may not be justified and is unlikely to occur.  In  these  cases,  AS2021:2015  provides  alternative  noise  metrics,  which  are  contained  in Appendix E of the standard and are summarised below in Table 1. 

 TABLE 1 – BUILDING SITE ACCEPTABILITY BASED ON AIRCRAFT NOISE LEVELS* 

Number of Flights Per Day Aircraft Noise Level Expected at Building Site dB(A) 

Acceptable  Conditionally Acceptable  Unacceptable 

House, home unit, flat, caravan park, school, university, hospital, nursing home 

>30  <70  70‐75  >75 

15‐30  <80  80‐85  >85 

<15  <90  90‐95  >95 

Hotel, motel, hostel, public building 

>30  <75  75‐80  >80 

15‐30  <85  85‐90  >90 

<15  <95  95‐100  >100 

Commercial Building 

>30  <80  80‐85  >85 

15‐30  <90  90‐95  >95 

<15  <100  100‐105  >105 

*The values in Table 1 are based on a small aerodrome with a small number of civil, non‐jet aircraft movements. They should not be used in any other circumstance. 

 Appropriate Criteria  Based on the above information, the appropriate criteria for this assessment has been based on the recommendations contained in AS2021:2015. As the White Gum Air Park, has around 15‐30 flights per day, the acceptable noise level for surround buildings types (house) would be <80 dB(A) LAmax and conditionally acceptable 80‐85 dB(A) LAmax.   

4. MEASUREMENTS  

To enable the assessment of noise emissions from the Whit Gum Air Park, noise level measurements were carried out on the 16th June 2017 and continuously from the 7th to the 11th July 2017.   Noise level measurements were conducted using two methods. The first method involved utilising two Ngara loggers recording continuous noise levels at two different locations. The noise monitors recorded continuous noise  levels  from the 7th  to 11th  July 2017. The first  logger was setup at  the northern boundary of Lot 2308, near to the closest neighbouring residential receiver. The second unit  was  positioned  on  the  southern  boundary  of  Lot  2308.  Both  loggers  were  set  to  record continuous noise  levels  for  the assessment period and were  time synchronised so  that  the noise levels at each location were comparable. Notations for aircraft movements and type over this period were made  by  the  operators  of  the  facility  and  have  been  provided  for  information  in  Table  2. Monitoring locations and pictures of the monitors are shown in Figure 1 and 2 below. 

Page 8: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        3  

TABLE 2 – AIRCRAFT MOVEMENT LOG SAT 8TH  TO MONDAY 10TH JULY 2017 

Date Time  Aircraft  Runway 

Saturday 8th July 2017 

12:30  Ultralight Zodiac  Arrival Runway 27 

13:00  Ultralight Zodiac  Departure Runway 27 

Sunday 9th July 2017 

08:00  Microlight  Departure Runway 09 

08:10  Microlight  Departure Runway 09 

08:45  Microlight  Arrival Runway 09 

09:15  Microlight  Arrival Runway 09 

09:25  Microlight  Arrival Runway 09 

15:15  Ultralight Foxbat  Departure Runway 27 

15:30  Microlight  Departure Runway 09 

16:15  Ultralight Foxbat  Arrival Runway 09 

16:45  Microlight  Arrival Runway 09 

Monday 10th July 2017 

11:00  Cessna  Touch And Go Runway 09 

                     

  

FIGURE 1 – CONTINUOUS MONITORING LOCATIONS    

Page 9: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        4  

 

              

      

                    

FIGURE 2 – MONITORING LOCATION PICTURES  

The second method of measurement was short term hand held noise level measurements using a Svan 948 integrated sound and vibration level meter. These measurements were carried out in the near field to an operating aircraft at various operating parameters.   The aircraft measured was an Aeroprakt A22 Foxbat with a Rotax 912, 100 Horsepower motor. Noise levels within 1 to 3 metres of the aircraft were measured to allow calculation of the sound power levels. During the measurements, the aircraft was run at maximum rpm to allow for the highest noise level. Additionally, noise level measurements were conducted when the aircraft was running through the prefight checks (higher than idle operations), taxiing in and around the runway, and take‐off and landing operations.  Pictures of the measurement position and aircraft are shown in Figure 3.  

Monitor A View At

Boundary

Monitor A View Towards

Res A

Monitor B View South

Monitor B View North

Page 10: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        5  

                                        

FIGURE 3 – FOXBAT AIRCRAFT NOISE MEASUREMENTS 

 Weather conditions during the course of the measurements were observed as calm (wind) and cool temperatures with some cloud cover. This was confirmed on the Bureau of Meteorology web site which recorded a daily observation of calm and cool conditions. 

    

Page 11: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        6  

5. MEASURED RESULTS  

Based on the analysis of the measured noise levels from the White Gum Air Park operations, noise levels at various locations have been determined. Detailed representation of results in the form of graphical plots are contained in Appendix B. 

 5.1 OBSERVED NOISE LEVEL MEASUREMENTS 

 The resultant noise levels from hand held, observed measurements of a Foxbat aircraft are contained in Table 3 below. 

 TABLE 3 MEASURED NOISE LEVELS AEROPRAKT FOXBAT AIRCRAFT dB(A) 

Operating Parameter  Distance   LAsmax  Comments 

Checking   2m  82.5  On Ground Right Side 

Full Revs 2m  2m  101.7  On Ground Right Side 

Full Revs Rear 1m  1m  93.8  On Ground Tail Side 

Take Off 6m Side  6m  97.3  To Side of Runway 

Touch and Go (pass at 20m high) 6m to side runway 

6m  73.3  To Side of Runway 

Landing 6m side  6m  73  To Side of Runway 

Ground moving past (Taxiing) 60m either side of measurement location 

6m  72.8  To Side of Runway 

 Additional  to  the  overall  noise  level  measured  (Table  3),  time  history  noise  levels  were recorded for each operating parameter. The time history allows for analysis of the duration of the activity. Figure 4 details a graphical plot of the time history for an aircraft to pass by while taxiing on the runway. The measurement location for this event remained stationary, with  the measurement  carried  out when  the  aircraft was  approximately  60m  away,  and continued until 60m past the measurement point. 

      

             

  

FIGURE 4 – FOXBAT AIRCRAFT NOISE MEASUREMENTS TIME HISTORY ‐ TAXIING   

Page 12: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        7  

5.2 CONTINUOUS NOISE MONITORING  

Results  of  the  continuous  noise monitoring  have  been  summarised  in  Table  4,  with  the graphical  example  contained  in  Figure  5  for  Sunday  9th  July  (highest  amount  of  aircraft movements). Noise level data was correlated against the known times for an aircraft event as per the log provided previously in Table 2. For the graphical plots the aircraft type and landing airstrip over the duration of the monitoring have been noted for comparison of the noise levels. 

 TABLE 3 MEASURED NOISE LEVELS dB(A) 

Date  Time / Aircraft Type and Runway 

Noise Level LAmax dB(A) 

Logger A (Northern Boundary) 

Logger B (Southern Boundary) 

Saturday 8th July 2017 12:30 ‐ Ultralight Zodiac Arrival Runway 27  47  51 

13:00 ‐ Ultralight Zodiac Departure Runway 27  52  55 

Sunday 9th July 2017 

08:00 ‐ Microlight Departure Runway 09  66  66 

08:10 ‐ Microlight Departure Runway 09  75  70 

08:45 ‐ Microlight Arrival Runway 09  64  72 

09:15 ‐ Microlight Arrival Runway 09  59  67 

09:25 ‐ Microlight Arrival Runway 09  75  68 

15:15 ‐ Ultralight Foxbat departure Runway 27  68  62 

15:30 ‐ Microlight Departure Runway 09  60  46 

16:15 ‐ Ultralight Foxbat arrival Runway 09  57  69 

16:45 ‐ Microlight Arrival Runway 09  53  70 

Monday 10th July 2017  11:00 ‐ Cessna touch and go Runway 09  66  58 

 Note:   To allow for any time disparity between the log and the monitored noise levels, the 

maximum noise level for five minutes either side of the noted time has been used.    

                  

 

FIGURE 5 – MONITORED NOISE LEVEL COMPARISON AGAINST KNOWN AIRCRAFT EVENT TIMES 

Page 13: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        8  

6. MODELLING  

Noise emissions from the operating White Gum Air Park was modelled with the computer programme SoundPlan.  Sound  power  levels  used  for  the  calculations  are  based  on  the measured  noise  levels conducted on site (Table 3).  Two modelling scenarios were developed for the White Gum Air Park operations being: 

 Scenario 1 – Foxbat Aircraft Take off, any runway;  Scenario 2 – Foxbat aircraft taxiing, any runway or hanger location (including future hangers). 

 The Aeropark Foxbat aircraft has been used as  the basis of  the noise modelling. From  information provided, this is understood to be a representation of the worst‐case noise levels for the facility. The modelled scenarios have been calibrated against the measured noise levels conducted on site.  It is noted that to allow for any noise associated with the additional hangers, aircraft noise sources have been located at all  the future hangers, not yet constructed. This allows for assessment of noise for current and future operations.  The source height for scenario 1 is 1m above ground and scenario 2 allows for the aircraft noise source to be 1m to 150m (500 feet) to represent a take‐off operation.   The receiver locations have been based on the aerial image (Figure 6) for the area surrounding the air park. 

                     

 FIGURE 6 – RECEIVER LOCATIONS 

 Weather conditions for modelling were as stipulated in the DER’s” Draft Guidelines on Environmental Noise for Prescribed Premises” and for the night period as listed in Table 4. 

   

Page 14: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        9  

TABLE 4 – WEATHER CONDITIONS 

Condition  Day 

Temperature  20°C 

Relative humidity  50% 

Pasquill Stability Class  E 

Wind speed  4 m/s* 

* From sources, towards receivers. Resultant noise levels for the for the above scenarios are summarised in Table 5 for known receiver locations. The graphical noise contour plots are contained in Appendix D. 

 TABLE 5 – MODELLED NOISE LEVELS DB(A) LAMAX 

Receiver Location Scenario 1 

Ground Operations Scenario 2  

Take‐off Operations 

Residence A  47  71 

Residence B  13  43 

Residence C  0  31 

Residence D  8  37 

Residence E  18  45 

  

7. DISCUSSION  

To determine noise  received at  the neighbouring  residence  from  the White Gum Air  Park,  noise emissions  from aircraft operating at  the park have been based on the results of noise modelling, which has been calibrated against hand held observed noise level measurements.   The nearest noise sensitive premises (highly noise sensitive) is located approximately 100m from the centre of runway 09 towards the north. At this location, the LAmax noise level of the worst case (take‐off) operation has been determined to be 71 dB(A)  for  the most common aircraft  type using  the runway. For ground activities, such as aircraft taxiing around site, the LAmax noise level is 47 at the same premise.  The usage of the White Gum Air Park by air craft is intermittent. Over the course of the study period, logging  of  aircraft  flights  resulted  in  aircraft  movements  of  generally  2  to  3 movements  during weekdays  and  6  to  9 movements  during  weekends.  Each  landing  or  take  off  was  counted  as  1 movement.  As previously explained, there is no criteria to relate the noise levels to, however, using AS2021:2015 as  a  guide  to  building  acceptability,  the  highest  assessable  noise  level  at  the  nearest  residential building for an airfield having 15‐30 aircraft movements per day is a noise level of <80 dB(A). This can be compared against the noise level at Residence A which has been assessed at 71 dB(A).   Whilst  the current aircraft movements are at around 9 on  the busiest day,  it  is unlikely  that  the additional  hangers  will  significantly  impact  on  the  quantity  of  movements.  To  future  proof  the assessment and allow for the noise  levels associated with an  increase  in traffic  for  the additional hangers, the use of the 15‐30 aircraft movements criteria would be considered appropriate.   

   

Page 15: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics Our Ref: 22023‐1‐17117        10  

 

8. CONCLUSION  

Even  though  noise  emanating  from  aircraft  complies  with  the  stated  criteria,  to  formalise  the operations of the White Gum Air Park, it is recommended that a management plan (which includes noise) is developed. This management plan provides a level of security to the facilities operations and to other stakeholders which may be affected by the operations.  Information which would be contained within the management plan would be generally as follows: 

 

Outline of operations, mission statement, background etc. 

Management of operational activities. 

Flight paths. 

Standard hours of operation. 

Fly Neighbourly Agreement. 

Flight training guidelines. 

Noise complaint process. 

Noise assessment and monitoring. 

Land use planning for future development. 

Communication and consultation. 

Page 16: WHITE GUM AIR PARK - Shire of York

                 

APPENDIX A  

LOCALITY PLAN – SITE LAYOUT  

 

Page 17: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics            Page 1 of 1 Our ref: 22023‐1‐17117            Appendix A 

FIGURE A1 – WHITE GUM AIR PARK LAYOUT PLAN 

                                   

Page 18: WHITE GUM AIR PARK - Shire of York

                 

APPENDIX B  

 CONTINOUS NOISE MONITORING RESULTS   

Page 19: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 1 of 2 Our Ref: 22023‐1‐17117          Appendix B 

 

   

Page 20: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 2 of 2 Our Ref: 22023‐1‐17117          Appendix B 

 

Page 21: WHITE GUM AIR PARK - Shire of York

                 

APPENDIX C  

 HAND HELD NOISE RESULTS  

Page 22: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 1 of 4 Our Ref: 22023‐1‐17117          Appendix C 

  

Page 23: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 2 of 4 Our Ref: 22023‐1‐17117          Appendix C 

   

Page 24: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 3 of 4 Our Ref: 22023‐1‐17117          Appendix C 

   

Page 25: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 4 of 4 Our Ref: 22023‐1‐17117          Appendix C 

 

Page 26: WHITE GUM AIR PARK - Shire of York

                 

APPENDIX D  

NOISE CONTOUR PLOTS  

Page 27: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 1 of 2 Our Ref: 22023‐1‐17117          Appendix D 

                          

Page 28: WHITE GUM AIR PARK - Shire of York

Herring Storer Acoustics          Page 2 of 2 Our Ref: 22023‐1‐17117          Appendix D 

 

Page 29: WHITE GUM AIR PARK - Shire of York

Bushfire Attack Level Assessment Report Prepared by a BPAD Accredited Practitioner

AS 3959 BAL Assessment Report This report has been prepared by an Accredited BPAD Practitioner using the Simplified Procedure (Method 1) as detailed in Section 2 of AS 3959 – 2009 (Incorporating Amendment Nos 1, 2 and 3). FPA Australia makes no warranties as to the accuracy of the information provided in the report. All enquiries related to the information and conclusions presented in this report must be made to the BPAD Accredited Practitioner. Property Details and Description of Works

Address Details Unit no

Street no

Lot no 2308

Street name / Plan Reference Cameron Road

Suburb Malebelling

State WA

Postcode 6302

Local government area

York

Main BCA class of the building Class 10a

Use(s) of the building

Aircraft Hangers

Description of the building or works

Proposed Aircraft Hangers

Report Details

Report / Job Number J004703

Report Version 1

Assessment Date 15 September 2016

Report Date 29 September 2016

BPAD Accredited Practitioner Details

Name John Greenwood

BPAD 336633

29 September 2016

Authorised Practitioner Stamp

Company Details

Reliance on the assessment and determination of the Bushfire Attack Level contained in this report should not extend beyond a period of 12 months from the date of issue of the report. If this report was issued more than 12 months ago, it is recommended that the validity of the determination be confirmed with the Accredited Practitioner and where required an updated report issued.

CERTIFIED

1/10/2016

Page 30: WHITE GUM AIR PARK - Shire of York

P a g e | 2

BAL Assessment Report

Site Assessment & Site Plans The assessment of this site / development was undertaken on 15 September 2016 by a BPAD Accredited Practitioner for the purpose of determining the Bushfire Attack Level in accordance with AS 3959 - 2009 Simplified Procedure (Method 1).

CERTIFIED

1/10/2016

Page 31: WHITE GUM AIR PARK - Shire of York

P a g e | 3

BAL Assessment Report

Vegetation Classification

All vegetation within 100m of the site / proposed development was classified in accordance with Clause 2.2.3 of AS 3959-2009. Each distinguishable vegetation plot with the potential to determine the Bushfire Attack Level is identified below.

Photo ID: 1 Plot: 1

Vegetation Classification or Exclusion Clause

Excludable - 2.2.3.2(f) Low Threat Vegetation

Description / Justification for Classification

Plot 1 refers to a orchard on the neighbouring property, which has been excluded as being managed and low threat.

Photo ID: 2 Plot: 1

Vegetation Classification or Exclusion Clause

Excludable - 2.2.3.2(f) Low Threat Vegetation

Description / Justification for Classification

An alternative view of Plot 1.

CERTIFIED

1/10/2016

Page 32: WHITE GUM AIR PARK - Shire of York

P a g e | 4

BAL Assessment Report

Photo ID: 3 Plot: 2

Vegetation Classification or Exclusion Clause

Excludable - 2.2.3.2(f) Low Threat Vegetation

Description / Justification for Classification

Plot 2 is an area of low threat managed grassland surrounding the proposed buildings.

Photo ID: 4 Plot: 2

Vegetation Classification or Exclusion Clause

Excludable - 2.2.3.2(f) Low Threat Vegetation

Description / Justification for Classification

An alternative view of Plot 2.

CERTIFIED

1/10/2016

Page 33: WHITE GUM AIR PARK - Shire of York

P a g e | 5

BAL Assessment Report

Relevant Fire Danger Index The fire danger index for this site has been determined in accordance with Table 2.1 or otherwise determined in accordance with a jurisdictional variation applicable to the site.

Fire Danger Index

FDI 40 Table 2.4.5

FDI 50 Table 2.4.4

FDI 80 Table 2.4.3

FDI 100 Table 2.4.2

Potential Bushfire Impacts The potential bushfire impact to the site / proposed development from each of the identified vegetation plots are identified below.

Plot Vegetation Classification Effective Slope Separation (m) BAL 1 Excludable – Clause 2.2.3.2(f) - - BAL – LOW 2 Excludable – Clause 2.2.3.2(f) - - BAL – LOW

Table 1: BAL Analysis Determined Bushfire Attack Level (BAL) The Determined Bushfire Attack Level (highest BAL) for the site / proposed development has been determined in accordance with clause 2.2.6 of AS 3959-2009 using the above analysis.

Determined Bushfire Attack Level BAL – LOW

CERTIFIED

1/10/2016

Page 34: WHITE GUM AIR PARK - Shire of York

P a g e | 6

BAL Assessment Report

Appendix 1: Plans and Drawings

Plans and drawings relied on to determine the bushfire attack level

Drawing / Plan Description Landscape Plan

Drawing Number D2015-0300

Revision 3 Date of Revision 30/11/2015

CERTIFIED

1/10/2016