Commander 1240 E. 9th St. Ninth Coast Guard District Cleveland, OH 44199 Staff Symbol: (dpb) Phone: (216) 902-6086 FAX: (216) 902-6088 E-mail:[email protected] December 13, 2016 PUBLIC NOTICE 09-04-16 All interested parties are notified that an application has been received by Commander, Ninth Coast Guard District, from the Wisconsin Department of Transportation (WisDOT) for approval of location and plans for the replacement of a moveable bridge over a navigable waterway of the United States. WATERWAY AND LOCATION: Wisconsin State Route 116, Mile 2.43, Wolf River, Village of Winneconne, Winnebago County, Wisconsin. CHARACTER OF WORK: Replacement of a double-bascule highway bridge with a fixed highway bridge. The proposed replacement bridge would be constrncted on the same alignment but would be located approximately 65-feet s9uth of the existing bridge. The existing bridge would be replaced in its entirety. The fishing piers shown on the attached plans are not paii of the Coast Guard's pe1mitting decision and would fall under the permitting jurisdiction of the U.S. Army Corps of Engineers. PROPOSED MINIMUM NAVIGATIONAL CLEARANCES: EXISTING PROPOSED Horizontal: 85.5-ft between bridge piers, Horizontal: 115-ft between bridge piers, normal to the axis of the navigation channel. normal to the axis of the channel. Vertical (closed position): 9-feet at center Vertical: 23.5-ft at center with 23.25-ft at the (RefelTed to Mean Sea Level at New York, limits of the navigation channel (RefelTed to NY) Standard Low Water, Elevation 745.64, IGLD85) Vertical (open position): Unlimited ENVIRONMENTAL CONSIDERATIONS: Federal Highway Administration (FHWA), the lead federal agency for the proposed project, issued a Finding of No Significant Impact (FONSI) for the project as proposed on August 5, 2014 for purposes of the National Environmental Policy Act (NEPA). A protective fendering system will not be utilized. This notice solicits the need for a bridge . protective fendering system.

Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

Embed Size (px)

Citation preview

Page 1: Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

Commander 1240 E. 9th St. Ninth Coast Guard District Cleveland, OH 44199

Staff Symbol: (dpb) Phone: (216) 902-6086 FAX: (216) 902-6088 E-mail:[email protected]

December 13, 2016

PUBLIC NOTICE 09-04-16

All interested parties are notified that an application has been received by Commander, Ninth Coast Guard District, from the Wisconsin Department of Transportation (WisDOT) for approval of location and plans for the replacement of a moveable bridge over a navigable waterway of the United States.

WATERWAY AND LOCATION: Wisconsin State Route 116, Mile 2.43, Wolf River, Village of Winneconne, Winnebago County, Wisconsin.

CHARACTER OF WORK: Replacement of a double-bascule highway bridge with a fixed highway bridge. The proposed replacement bridge would be constrncted on the same alignment but would be located approximately 65-feet s9uth of the existing bridge. The existing bridge would be replaced in its entirety. The fishing piers shown on the attached plans are not paii of the Coast Guard's pe1mitting decision and would fall under the permitting jurisdiction of the U.S. Army Corps of Engineers.

PROPOSED MINIMUM NAVIGATIONAL CLEARANCES:

EXISTING PROPOSED

Horizontal: 85.5-ft between bridge piers, Horizontal: 115-ft between bridge piers, normal to the axis of the navigation channel. normal to the axis of the channel.

Vertical (closed position): 9-feet at center Vertical: 23.5-ft at center with 23.25-ft at the (RefelTed to Mean Sea Level at New York, limits of the navigation channel (RefelTed to NY) Standard Low Water, Elevation 745.64,

IGLD85)

Vertical (open position): Unlimited

ENVIRONMENTAL CONSIDERATIONS:

Federal Highway Administration (FHWA), the lead federal agency for the proposed project, issued a Finding of No Significant Impact (FONSI) for the project as proposed on August 5, 2014 for purposes of the National Environmental Policy Act (NEPA).

A protective fendering system will not be utilized. This notice solicits the need for a bridge . protective fendering system.

Page 2: Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

This notice solicits the need for navigation lighting for the proposed project.

The proposed replacement bridge is located within a mapped 100-year Federal Emergency Management Agency (FEMA) floodplain. As proposed, the project requires six bridge piers to be constructed within the Wolf River. Approximately 2,570-feet of the Wolf River riverbed will be impacted as a result of installing cofferdams around the proposed pier footings, excavating river sediments from within the cofferdams, and constructing the pier footings. The applicant applied to the U.S. Aimy Corps of Engineers (USACE) for a Section 404 permit on July 14, 2016.

On November 8, 2016, the Wisconsin Department of Natural Resources (WisDNR) granted a Water Quality Ce1tification (WQC) for the proposed project pursuant to Section 401 of the Federal Clean Water Act.

The proposed project is not located within the State of Wisconsin's Coastal Zone Management (CZM) Plan.

No Federal or State-designated freshwater wetlands exist within the project's Area of Potential Effect (APE).

The Wisconsin State Historic Preservation Office (SHPO) made the dete1mination on June 9, 2011, that the project as proposed would constitute No Adverse Affect to resources listed or eligible for listing on the National Register of Historic Places (NRHP).

- -

No parklands are expected to be adversely affected by the proposed project.

The project as proposed will not result in any direct or indirect effects on any known Federally­listed threatened or endangered species or habitat per U.S. Fish and Wildlife Service (USFWS) survey conducted on June 28, 2016. On November 8, 2016, WisDNR determined that no State­listed threatened, endangered, or special concern natural resources are likely to be impacted as a result of the proposed project.

The project is not expected to affect any known Essential Fish Habitats (EFH), as designated by National Marine Fisheries Service (NMFS). A Coast Guard review ofNMFS' EFH Mapper revealed no habitat areas of paiiicular concern or areas protected from fishing located in the proposed project's APE.

Winnebago County, WI, is designated as an attainment area by the Environmental Protection Agency (EPA) for the six criteria air pollutants listed in the National Ambient Air Quality Standards (NAAQS). As the proposed project is not increasing roadway capacity or traffic volume it will not contribute to any violation of the NAAQS. The East Central Wisconsin Regional Planning Commission (ECWRPC), the Metropolitan Planning Organization for the area, has incorporated the proposed project in the area's 2016-17 Transp01iation Improvement Plan (TIP). ECWRPC's TIP has been incorporated into WisDOT's Statewide Transp01iation Improvement Program (STIP).

2

Page 3: Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

As proposed, the replacement bridge will not be adding roadway capacity or increasing traffic volume. Present and future noise levels are not expected to approach the noise abatement criteria at any noise monitoring receptor within the APE. Per 23 CFR 722, a Noise Impact Analysis predicting future noise levels and abatement was not required.

Relocation of residences and businesses will not be required.

In reference to the provisions of Executive Order 12898, Environmental Justice, we are soliciting information concerning possible impacts of the proposed project on minority and low-income populations.

SOLICITATION OF COMMENTS:

This Public Notice requests comments from Federal, State and Local agencies to identify potential permit requirements or environmental impacts. This Public Notice also requests comments from waterway users and marine facilities regarding the proposed navigation clearances. Interested parties are requested to express their views, in writing, on the proposed bridge project giving sufficient detail to establish a clear understanding of their reasons for supp011 of or opposition to the proposed work.

Comments will be received for the record at the Office of Commander ( dpb ), Ninth Coast Guard District, 1240 East Ninth Street, Cleveland, Ohio 44199, through January 12, 2017. These comments will be made pat1 of the case record.

Map of location and plans attached.

/Isl/

SCOT M. STRIFFLER Bridge Program Manager By direction of Commander, Ninth Coast Guard District

NOTICE TO POSTMASTER: It is requested the above notice be conspicuously and continuously posted until January 12, 2016.

3

Page 4: Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

~~:-... ~ ... ··-··-·· ·".":': .. ·. :·:---=--:":"."".'~~~-·.,.,,--~·-'-"'"""-""' ·-·"'--""·-·---"'.:;_"''-"""·'""""''""-'""-"~--..,.,.._.,,......,_~ ... ~..,,.-,,_ ........ ,..~,~-~-~""""""""-""''-""",..,...... ....... ;c._~~1

. -'d[J 0 ::, - ~ '.: · ~ •m . IAke =· -~~ ___ __;L_ __ ~-----l-'nn_mJf ~:-~r'-1 n . ~ 3 ~ 3 . . . Winnecoo.ne / 3\ . ..,no • .., L l

1 0\

·fi!

§ 5-

JAQUES RD

I I I

~ I I

QUICllY RD I

~ I

Ii I ;;, I

0 I

D fi! I

fi!

~1 ~

\ ' z I

" I I

' ' ' -- -- --~ I - -- ---

31 I : BAUER ill: I -az I\. (!) I 36 I RD

Rf,

PROJECT LOCATION

1'/ · 1 on~~ I I \: \ \ I fG.-r--_ _.__ __ ~-1-....-'

I --.., ?;; tffi §~~tfi! 8 a::

Lake Butte jJ ..

des p Mons

#''~''ttci9,'~llttr~,,, 'I. § •• ~ ' ~ * . .....~

14 ICHAEL A ~ ~

1

'ti ~ MALCOLM . \,~ -o ~ E-30025 · .w: ·:; ~-... 11:pr1eton - i!:!!~ ~ ,;{\.. "·'I ' • .... ~

'-' -..·_-,,. · ,. 'fv .~~,.;J. ~ \J'.f\ •• ··"' ..!Y.'"" ;s ,,,,. 'I> 1.0·· ....... ~' ~

IQ 4 ~,~NA\.. .,,,,,~

vivrt:-0'it'''"'

DR

I I '@ I

~I , :1 ::l I 1

J: I

1' ~

z ~ . ..-1

,/1,

/

.. g . -·, ~~ Vl CZ,',/ t\'!O \

I ._- .-"' '<i:)C:pYJ I

STRUCTURE B-70-316 UNITED ST ATES COAST GU,\f1:'l

BRIDGE PERMIT DRAWINGS

APPLICANT: WISCONSIN DEPARTMENT OF TRANSPORTATION

CONSUL TANT: OMNNI ASSOCIATES, INC

NAME OF BRIDGE: B-70-316

ROADWAY: STH 116

WATERWAY: WOLF RIVER

RIVER MILE: 2.4

LOCATION: V. OF WINNECONNE WINNEBAGO COUNTY, WI

PLAN DATE: 10/14/2016

LOCATION MAP SHEET 1 OF 3

Page 5: Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

•. " • .,..,.-.,,...... 00-.-.., ..:..1 - · .... . . ....... -.r,; ; .~ .v- ·._._, . ...... ..._.._. ., ~: .,:_, • ,-_·_,...1:_., . .- .·r>•V.•I-'•,-· :~ ..... ,,._,~ _,..,;: .. •· ~~-- - • .- • •- . ... · .,,. . . . ... , .._ ,_,.,;. rr : ;,,_ .. ...._,_,,~_ ,,.,,. • .,,; . ...-c ... ,:.._• · •- • .--"'" ... ·..- ,'o · • .;. i

. ·- - ----~.::.~-~-,~----~-------~~-.. F.-·-~~.1-...-~~ .. _..:.:,__,_._..___:._..._. .... ~~--...-"-..--~~--------:..:,~------~·'"--~·----~~--.,--:~-~7~~~~-.:«<-·< :.,,, ~;, 'J

(ITT-- · 1 co~t~~ ~ --~ -. - " ., -- lr2rr \ .. l! - 1

\ ~ 0 100 200 1 0-,,-""*-=. ~1 \~ I J IJ d 1ef [' ' , NAVD88 !__) ==1

1 ~ I 1· \] 1: = : 1..~ !l_n ~ ,

' ... J.t:.i.CJi. ·-- ! 5 : DOCK t , ~--

-- -'1 f_:;,_l.L.--1_1'•1 -~---' 1 <

r·-J ,

PROPERTIESl\ LLC

1- --

0::: w > 0:::

) ~l.

'" J "'""" i\' :

1-----_jl_ TO BE REMOVED 1 ;;;

EXISTING STRUCTURE 8-70-913~ :

;:

B-70-322 I I - l(ii~~1~t~LATFORM) I .f _y-'-'-·~~-'-'J (FISHING PLATFORM) ' ' f----- ---- , l_*'-_ __c._·~- __ j_ __ ---~--, - _ _ --- -=------- INLINL . I --~-------;;;:::::--=--;;;:::--:=t:::.:::;;;:===::;===:;~t:i;;::~ 22 ;JI[ __ ~- ~ -- ~ ~ r--:~~i=,===-:__ -=- _D . -------: =~---*-~-=-=t~\:.:~_::c_:_" ," · ;-· j

---ll'-----r-- ------,:l=t--·u--*::::;-;::, 1J ~i- ~PROPOSED STH H6 & I _, - · · ·

"I--- ~ I 11 _,_, r 111---

- 1 · PIER , , 1ER 4 f 3RIDGE CONSTRUCTION fl.

PIER 2 >­:::i 0 LOOKOU TS

PIER 5 PIER 6 1 • ·-.. L...-'

-- = - i-- ./ I I 11 DOCT<' PIER

" -- , J \ J J~~ ______ ..;.:-_·:.:_-:_~l'.Y s HOLTz-r1 ,r-~ w DOCK

,--' _ _J - ---

PIER, TYP.

"'I~ ' .... <r ::i U>O

I I • so.a·

NA VI GA Tl ON AL CHANNEL

I

(TYP. AT N. SIDE PIER 3 & S. SIDE OF ?IER , )

I . l .. .-.EXECUTIVE-- -­

_ _ _ .. /INVESTMENTS, LLC---•

- 1 i I L__ ___ _ -2!; ---·

DOC\<' (J- -l-JI

-;, J•- ·

!. ,.[·''-': rocrc-' ' ., K

I _;,

I , /'·~LJ i I I)' ' : 1., _o1,_·....A-': L______ _J ''-...;._) , . ·- .1 / I

I I

SIGN

II :_Li 'l n n * I Ii 1

h 6:1G1,J, 1~ ~~ j \;..l I I 'I Ii u

: I l u

O* J! r I -, i . I

'"-' g]S zO:: <: 1~ :i::,z

'"'1tl

>,, r~

STRUCTURE 8- 70-316 UNITED STATES COAST GUARD

BRIDGE_E_ERMIT DRAWINGS

APPLICANT:

CONSULT ANT:

NAME OF BRIDGE:

ROADWAY:

WATERWAY:

RIVEP MILE: LOCATION:

PLAN DATE:

PLAN VIEW

WISCONSIN DEPARTMENT OF TRANSPORTATION

OMNNI ASSOCIATES, INC

B-70-316

STH 116

WOLF RIVER

2.'-o/. m- WINNEt;ONNE WINNEBAGO COUNTY, WI

10/19/2016

SHEET 2 OF 3

Page 6: Wisconsin State Route 116, Mile 2.43, Wolf River, Village protective fendering system will not be ... Regional Planning Commission ... bridge project giving sufficient detail to establish

-. ;, ,... .., - .

r-- -. ______ .._.....__ ... , _ _.. _ ___ , .... ,_- .... ,-:--o-· ~--.. - ·- :-___ .. _._._ ..... .-.,......_.. .. ·~·-.- , . ~.-......-----. -. -~~--:=-~:r:-·'.~':"-:-:---~-... .. .......-........ ~_..,...-:-:--·---.,- . .-._. ......,,,.,,,..,...~.__......--=-:-:_--~-~- ,,.,..~--·.-r-·---- - -------~~ -----J~-~':""''''''4

PROF"ILE GRADE

780 LINE

747'-6" BACK TO BACK OF ABUTMENTS

115'-0"

r SP~N 4 ,;:i 1 ffi ffiZ I

d~ d~~ I ~~g l

~ci~a 1 7ti~~ , ~~::5

HO . , )<·:----_:>()"' : . ..(>~>~)~> . "' WOLF RIVER 100-YEAR 7GO c- OELROl~!~jllGHWATER ~-t;,.._~'/..~..:_.,.-<)~><~)\._:".;·. SELTD 7~o5w6 ,.WATER1 ~FLOOD EL- 149.S6 750 ' • • ~. • , __

- - -- -- !U'-0" CLEAR I ~~~ - -- ---- - ------ --·-; ---- - - -~--- : ------- -

) 90'·0" ~

710 NA ~GlNT~g~AL 700 EXISTING GROUNDLINE RIVERBED EL. 746.10

AT UPSTREAM FACE CCENTER-SPANl

ELEVATION NORMAL TO WOLF RIVER

NOTES: 200' 1. ELEVATIONS SHOWN ON THIS SHEET ARE BASED ON INTERNATIONAL GREAT LAKES

DATUM 191"5 (IGLD':5).

100'

o· 100'

SCALE FEET

200'

2. DESIGN SPECIFICATIONS PER AASHTO LRFD.

PROFILE

STRUCTURE B-70-316 UNITED STATES COAST GUARD

BRIDGE PERMIT DRAWINGS

APPLICANT: 'MSCONSIN DEPARTMENT OF TRANSPORTATION

CONSULTANT: OMNNI ASSOCIATES, INC

NAME OF BRIDGE: 8-70-316

ROADWAY: STH 116

WATERWAY: WOLF RIVER

RIVER MILE: 2.4 LOCATION: V. OF WINNECONNE

'MNNEBAGO COUNTY, 'M

PLAN DATE: 10/ 19/2016

SHEET 3 OF 3