April 2020 Transport for NSW Woolgoolga to Ballina Pacific Highway upgrade Dual carriageway at Pillar Valley looking north east Glenugie to Tyndale - Project update

Woolgoolga to Ballina - Pacific Highway upgrade – …...April 2020 Transport for NSW Woolgoolga to Ballina Pacific Highway upgrade Dual carriageway at Pillar Valley looking north

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Woolgoolga to Ballina - Pacific Highway upgrade – …...April 2020 Transport for NSW Woolgoolga to Ballina Pacific Highway upgrade Dual carriageway at Pillar Valley looking north

April 2020

Transport for NSW

Woolgoolga to Ballina Pacific Highway upgrade

Dual carriageway at Pillar Valley looking north east

Glenugie to Tyndale - Project update

Glenugie north interchange at Eight Mile Lane looking north east

Glenugie south interchange looking south

Opening the new motorway between Glenugie and Tyndale The 36 kilometre section of new motorway between Glenugie and Tyndale will shortly open to traffic weather permitting As part of these changes South Grafton and Ulmarra will be bypassed

This new section will feature the opening of two interchanges new north and southbound rest areas at Pine Brush and several overpass bridges connecting local communities

The bypassed section of highway between Glenugie and Maclean will be renamed Big River Way Big River Way will continue to connect communities across the region once this section of the Woolgoolga to Ballina upgrade opens to traffic

The Tyndale south interchange and the split interchange at Glenugie will open in their permanent arrangement as part of this traffic change

This will join the recently opened section between Tyndale and Maclean These two sections combined will provide 48 kilometres of dual carriageway

Accessing the new motorwayOnce the interchanges open to traffic motorists will access and exit the motorway at a number of new locations

Glenugie south interchange This interchange has a northbound off ramp and a southbound on ramp Access to Grafton for northbound motorists will be via the northbound off ramp at Glenugie Motorists will then continue on Big River Way to South Grafton Motorists travelling south from Grafton on Big River Way access the highway by using the southbound on ramp at Glenugie

Glenugie north interchange at Eight Mile LaneThis interchange has a northbound on ramp and a southbound off ramp from Eight Mile Lane To travel north to Tyndale from Glenugie Wooli and surrounding areas motorists will use the northbound on ramp Access to Glenugie Wooli and surrounding areas for southbound motorists will be via the southbound off ramp

Tyndale south interchange at Bensons Lane This interchange has a northbound off ramp and a southbound on ramp Access to Tyndale for northbound motorists will be via the northbound off ramp To travel south from Tyndale motorists will use the southbound on ramp

View the inset map to familiarise yourself with the new permanent access points

Southbound off ramp

Southbound on ramp

Northbound on ramp

Northbound off ramp

Upgraded motorway

Eight Mile Lane

TUCABIA

GLENUGIE

ULMARRA

TYNDALE

Coldstream R

iver

Clarence River

Reillys Lane

Ave

nue

Roa

d

Big River Way

Coldstream Road

Big R

iver Way

South Arm

Col

dstr

eam

Roa

d

Tuca

bia-

Tynd

ale

Road

Airport Road

Eight Mile Lane

Airport

Wooli Road

Firth Heinz Road

Wooli Road

Upgraded Pacific Motorway

Bostock Road

Six Mile Lane

Upgrad

ed P

acific Motorw

ay

Rest areas

Glenugie North interchange

Bensons Lane

To Ballina

To Grafton

To Maclean

To Co13s Harbour

Southboundon ramp

U Turn bay

Access to and fromBig River Way

Northboundo13 ramp

Big River Way

Sheehys Lane

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Southbound on ramp

Northboundo ramp

Bus stop andturnaround bay

Old Pacific Highway

To Ballina

To Grafton

To Cos Harbour

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Northboundon ramp

To Ballina

To Grafton

Southboundo ramp

To WooliEight Mile Lane

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Tyndale South interchange

Glenugie South interchange

Accessing the new motorway

Rest area factsbull 5 picnic shelters

bull 15 car parking bays

bull 3 car and trailer parking bays

bull 20 heavy vehicle parking bays

bull Unisex toilet block

bull Foot paths for all foot traffic areas

bull Accessible toilet and parking facilities

ACCESS POINTSTyndale South Southbound on ramp to Pacific Motorway

Northbound off ramp to Tyndale and surrounding areas

Glenugie South Southbound on ramp to Pacific Motorway

Northbound off ramp to Grafton Ulmarra Wooli and surrounding areas

Glenugie North Southbound off ramp for Grafton Ulmarra Wooli and surrounding areas

Northbound on ramp to Pacific Motorway

We have been working hard to complete the section between Glenugie to Tyndale Wersquore excited to be opening this 36 kilometre section and thank the community for its patience Take a look at some of the great images wersquove captured during construction

A

B

C

D

E

F

F

E

A

B

DC

Traffic will be moved on to the new section of road

This document contains important information about public transport projects in your area If you require the services of an interpreter please contact the Translating and Interpreting Service on 131 450 and ask them to call Transport Projects on 1800 778 900 The interpreter will then assist you with translation

Contact usContact us at any time

1800 778 900 (toll free)

W2B pacificcompletecomau

pacifichighwaynswgovau

PO Box 546 Grafton NSW 2460

Transport for NSW 76 Victoria Street Grafton NSW 2460

How will the work affect youWe will be moving traffic onto the new section of road Before opening the road traffic will be stopped for up to 10 minutes on the highway

Think PAC ndash Plan Awareness CautionThere will be delays and motorists should avoid travel or seek alternative routes on the day of the traffic change If you must travel before driving we ask motorists to remember PAC to help make your journey as safe and efficient as possible

PlanRegister for email and SMS alerts so we can let you know when road closures and stoppages are in place To register phone 1800 778 900 (dial 1) or email W2Bpacificcompletecomau Check for traffic updates visit livetrafficcom download Live Traffic NSW App or call 132 701

Awareness Look for electronic message boards located on the Pacific Highway and local roads alerting motorists about work dates and changed traffic conditions

Caution Traffic controllers will be onsite to direct motorists Please keep to speed limits ignore GPS follow signs and traffic controllersrsquo directions

Big River WayThe new local road name will be published in the NSW Government Gazette and local newspapers Property owners affected by the changes will receive a letter from Clarence Valley Council with formal notification of their new address Clarence Valley Council will provide new address information to Australia Post Australian Electoral Commission Australian Taxation Office and emergency services

Safer and more reliable journeys Faster travel times Improved

transport efficiency

pacifichighwaynswgovau

Pub No 20119

Page 2: Woolgoolga to Ballina - Pacific Highway upgrade – …...April 2020 Transport for NSW Woolgoolga to Ballina Pacific Highway upgrade Dual carriageway at Pillar Valley looking north

Glenugie north interchange at Eight Mile Lane looking north east

Glenugie south interchange looking south

Opening the new motorway between Glenugie and Tyndale The 36 kilometre section of new motorway between Glenugie and Tyndale will shortly open to traffic weather permitting As part of these changes South Grafton and Ulmarra will be bypassed

This new section will feature the opening of two interchanges new north and southbound rest areas at Pine Brush and several overpass bridges connecting local communities

The bypassed section of highway between Glenugie and Maclean will be renamed Big River Way Big River Way will continue to connect communities across the region once this section of the Woolgoolga to Ballina upgrade opens to traffic

The Tyndale south interchange and the split interchange at Glenugie will open in their permanent arrangement as part of this traffic change

This will join the recently opened section between Tyndale and Maclean These two sections combined will provide 48 kilometres of dual carriageway

Accessing the new motorwayOnce the interchanges open to traffic motorists will access and exit the motorway at a number of new locations

Glenugie south interchange This interchange has a northbound off ramp and a southbound on ramp Access to Grafton for northbound motorists will be via the northbound off ramp at Glenugie Motorists will then continue on Big River Way to South Grafton Motorists travelling south from Grafton on Big River Way access the highway by using the southbound on ramp at Glenugie

Glenugie north interchange at Eight Mile LaneThis interchange has a northbound on ramp and a southbound off ramp from Eight Mile Lane To travel north to Tyndale from Glenugie Wooli and surrounding areas motorists will use the northbound on ramp Access to Glenugie Wooli and surrounding areas for southbound motorists will be via the southbound off ramp

Tyndale south interchange at Bensons Lane This interchange has a northbound off ramp and a southbound on ramp Access to Tyndale for northbound motorists will be via the northbound off ramp To travel south from Tyndale motorists will use the southbound on ramp

View the inset map to familiarise yourself with the new permanent access points

Southbound off ramp

Southbound on ramp

Northbound on ramp

Northbound off ramp

Upgraded motorway

Eight Mile Lane

TUCABIA

GLENUGIE

ULMARRA

TYNDALE

Coldstream R

iver

Clarence River

Reillys Lane

Ave

nue

Roa

d

Big River Way

Coldstream Road

Big R

iver Way

South Arm

Col

dstr

eam

Roa

d

Tuca

bia-

Tynd

ale

Road

Airport Road

Eight Mile Lane

Airport

Wooli Road

Firth Heinz Road

Wooli Road

Upgraded Pacific Motorway

Bostock Road

Six Mile Lane

Upgrad

ed P

acific Motorw

ay

Rest areas

Glenugie North interchange

Bensons Lane

To Ballina

To Grafton

To Maclean

To Co13s Harbour

Southboundon ramp

U Turn bay

Access to and fromBig River Way

Northboundo13 ramp

Big River Way

Sheehys Lane

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Southbound on ramp

Northboundo ramp

Bus stop andturnaround bay

Old Pacific Highway

To Ballina

To Grafton

To Cos Harbour

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Northboundon ramp

To Ballina

To Grafton

Southboundo ramp

To WooliEight Mile Lane

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Tyndale South interchange

Glenugie South interchange

Accessing the new motorway

Rest area factsbull 5 picnic shelters

bull 15 car parking bays

bull 3 car and trailer parking bays

bull 20 heavy vehicle parking bays

bull Unisex toilet block

bull Foot paths for all foot traffic areas

bull Accessible toilet and parking facilities

ACCESS POINTSTyndale South Southbound on ramp to Pacific Motorway

Northbound off ramp to Tyndale and surrounding areas

Glenugie South Southbound on ramp to Pacific Motorway

Northbound off ramp to Grafton Ulmarra Wooli and surrounding areas

Glenugie North Southbound off ramp for Grafton Ulmarra Wooli and surrounding areas

Northbound on ramp to Pacific Motorway

We have been working hard to complete the section between Glenugie to Tyndale Wersquore excited to be opening this 36 kilometre section and thank the community for its patience Take a look at some of the great images wersquove captured during construction

A

B

C

D

E

F

F

E

A

B

DC

Traffic will be moved on to the new section of road

This document contains important information about public transport projects in your area If you require the services of an interpreter please contact the Translating and Interpreting Service on 131 450 and ask them to call Transport Projects on 1800 778 900 The interpreter will then assist you with translation

Contact usContact us at any time

1800 778 900 (toll free)

W2B pacificcompletecomau

pacifichighwaynswgovau

PO Box 546 Grafton NSW 2460

Transport for NSW 76 Victoria Street Grafton NSW 2460

How will the work affect youWe will be moving traffic onto the new section of road Before opening the road traffic will be stopped for up to 10 minutes on the highway

Think PAC ndash Plan Awareness CautionThere will be delays and motorists should avoid travel or seek alternative routes on the day of the traffic change If you must travel before driving we ask motorists to remember PAC to help make your journey as safe and efficient as possible

PlanRegister for email and SMS alerts so we can let you know when road closures and stoppages are in place To register phone 1800 778 900 (dial 1) or email W2Bpacificcompletecomau Check for traffic updates visit livetrafficcom download Live Traffic NSW App or call 132 701

Awareness Look for electronic message boards located on the Pacific Highway and local roads alerting motorists about work dates and changed traffic conditions

Caution Traffic controllers will be onsite to direct motorists Please keep to speed limits ignore GPS follow signs and traffic controllersrsquo directions

Big River WayThe new local road name will be published in the NSW Government Gazette and local newspapers Property owners affected by the changes will receive a letter from Clarence Valley Council with formal notification of their new address Clarence Valley Council will provide new address information to Australia Post Australian Electoral Commission Australian Taxation Office and emergency services

Safer and more reliable journeys Faster travel times Improved

transport efficiency

pacifichighwaynswgovau

Pub No 20119

Page 3: Woolgoolga to Ballina - Pacific Highway upgrade – …...April 2020 Transport for NSW Woolgoolga to Ballina Pacific Highway upgrade Dual carriageway at Pillar Valley looking north

TUCABIA

GLENUGIE

ULMARRA

TYNDALE

Coldstream R

iver

Clarence River

Reillys Lane

Ave

nue

Roa

d

Big River Way

Coldstream Road

Big R

iver Way

South Arm

Col

dstr

eam

Roa

d

Tuca

bia-

Tynd

ale

Road

Airport Road

Eight Mile Lane

Airport

Wooli Road

Firth Heinz Road

Wooli Road

Upgraded Pacific Motorway

Bostock Road

Six Mile Lane

Upgrad

ed P

acific Motorw

ay

Rest areas

Glenugie North interchange

Bensons Lane

To Ballina

To Grafton

To Maclean

To Co13s Harbour

Southboundon ramp

U Turn bay

Access to and fromBig River Way

Northboundo13 ramp

Big River Way

Sheehys Lane

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Southbound on ramp

Northboundo ramp

Bus stop andturnaround bay

Old Pacific Highway

To Ballina

To Grafton

To Cos Harbour

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Northboundon ramp

To Ballina

To Grafton

Southboundo ramp

To WooliEight Mile Lane

Upgraded Pacific Motorway Ramps and access roadsBridgeDirection of trac

LEGEND

Tyndale South interchange

Glenugie South interchange

Accessing the new motorway

Rest area factsbull 5 picnic shelters

bull 15 car parking bays

bull 3 car and trailer parking bays

bull 20 heavy vehicle parking bays

bull Unisex toilet block

bull Foot paths for all foot traffic areas

bull Accessible toilet and parking facilities

ACCESS POINTSTyndale South Southbound on ramp to Pacific Motorway

Northbound off ramp to Tyndale and surrounding areas

Glenugie South Southbound on ramp to Pacific Motorway

Northbound off ramp to Grafton Ulmarra Wooli and surrounding areas

Glenugie North Southbound off ramp for Grafton Ulmarra Wooli and surrounding areas

Northbound on ramp to Pacific Motorway

We have been working hard to complete the section between Glenugie to Tyndale Wersquore excited to be opening this 36 kilometre section and thank the community for its patience Take a look at some of the great images wersquove captured during construction

A

B

C

D

E

F

F

E

A

B

DC

Traffic will be moved on to the new section of road

This document contains important information about public transport projects in your area If you require the services of an interpreter please contact the Translating and Interpreting Service on 131 450 and ask them to call Transport Projects on 1800 778 900 The interpreter will then assist you with translation

Contact usContact us at any time

1800 778 900 (toll free)

W2B pacificcompletecomau

pacifichighwaynswgovau

PO Box 546 Grafton NSW 2460

Transport for NSW 76 Victoria Street Grafton NSW 2460

How will the work affect youWe will be moving traffic onto the new section of road Before opening the road traffic will be stopped for up to 10 minutes on the highway

Think PAC ndash Plan Awareness CautionThere will be delays and motorists should avoid travel or seek alternative routes on the day of the traffic change If you must travel before driving we ask motorists to remember PAC to help make your journey as safe and efficient as possible

PlanRegister for email and SMS alerts so we can let you know when road closures and stoppages are in place To register phone 1800 778 900 (dial 1) or email W2Bpacificcompletecomau Check for traffic updates visit livetrafficcom download Live Traffic NSW App or call 132 701

Awareness Look for electronic message boards located on the Pacific Highway and local roads alerting motorists about work dates and changed traffic conditions

Caution Traffic controllers will be onsite to direct motorists Please keep to speed limits ignore GPS follow signs and traffic controllersrsquo directions

Big River WayThe new local road name will be published in the NSW Government Gazette and local newspapers Property owners affected by the changes will receive a letter from Clarence Valley Council with formal notification of their new address Clarence Valley Council will provide new address information to Australia Post Australian Electoral Commission Australian Taxation Office and emergency services

Safer and more reliable journeys Faster travel times Improved

transport efficiency

pacifichighwaynswgovau

Pub No 20119

Page 4: Woolgoolga to Ballina - Pacific Highway upgrade – …...April 2020 Transport for NSW Woolgoolga to Ballina Pacific Highway upgrade Dual carriageway at Pillar Valley looking north

Traffic will be moved on to the new section of road

This document contains important information about public transport projects in your area If you require the services of an interpreter please contact the Translating and Interpreting Service on 131 450 and ask them to call Transport Projects on 1800 778 900 The interpreter will then assist you with translation

Contact usContact us at any time

1800 778 900 (toll free)

W2B pacificcompletecomau

pacifichighwaynswgovau

PO Box 546 Grafton NSW 2460

Transport for NSW 76 Victoria Street Grafton NSW 2460

How will the work affect youWe will be moving traffic onto the new section of road Before opening the road traffic will be stopped for up to 10 minutes on the highway

Think PAC ndash Plan Awareness CautionThere will be delays and motorists should avoid travel or seek alternative routes on the day of the traffic change If you must travel before driving we ask motorists to remember PAC to help make your journey as safe and efficient as possible

PlanRegister for email and SMS alerts so we can let you know when road closures and stoppages are in place To register phone 1800 778 900 (dial 1) or email W2Bpacificcompletecomau Check for traffic updates visit livetrafficcom download Live Traffic NSW App or call 132 701

Awareness Look for electronic message boards located on the Pacific Highway and local roads alerting motorists about work dates and changed traffic conditions

Caution Traffic controllers will be onsite to direct motorists Please keep to speed limits ignore GPS follow signs and traffic controllersrsquo directions

Big River WayThe new local road name will be published in the NSW Government Gazette and local newspapers Property owners affected by the changes will receive a letter from Clarence Valley Council with formal notification of their new address Clarence Valley Council will provide new address information to Australia Post Australian Electoral Commission Australian Taxation Office and emergency services

Safer and more reliable journeys Faster travel times Improved

transport efficiency

pacifichighwaynswgovau

Pub No 20119