28
Workshop 3: Realizing nZEB Hospital Buildings together Date: 23 rd May 2016 Time: 10.30-12.00 Location: Columbinesalen

Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

Workshop 3:

Realizing nZEB Hospital Buildings

together

Date: 23rd May 2016Time: 10.30-12.00 Location: Columbinesalen

Page 2: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

1

Workshop 3 - Realizing nZEBHospital Buildings Together

Wim Maassen

Date: 23rd May 2016Time: 10.30-12.00 Location: Columbinesalen

Inspiration & Enthusiasm

Wubbo Ockels (1946‐2014)

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Expected Workshop Results

Advice to REHVA:

How can Hospital Buildings achieve nZEB?

What are the most promising technical solutions?

What is necessary to implement these solutions in practice?

How can REHVA stimulate the above?

2

Page 3: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

2

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Your Facilitators

3

Wim MaassenLeading Professional – Royal HaskoningDHVTU/e Fellow – Eindhoven University of Technology

Hans BesselinkSenior Consultant – Royal HaskoningDHVREHVA FellowTVVL Delegate

Dave BaasGraduate Student Building Services – Eindhoven University of Technology, Department Built Environment

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Royal HaskoningDHV

4

New University Hospital Aalborg Construction

Page 4: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

3

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Royal HaskoningDHV

5

Rotterdam Erasmus Medical CenterProject Management, Building Services

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Royal HaskoningDHV

6

Amsterdam VU Medical CenterMulti disciplines, Energy Master Planning, Imaging Center, Diagnostic Center, BREEAM

Page 5: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

4

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Project: nZEB Hospital Buildings

Royal HaskoningDHV executes project with Eindhoven University of Technology. Supported by TVVL and REHVA.

Goal: Give information and insight in nZEB developments Contribute to the road to nZEB

Focus: Existing Hospitals: energy saving potential and measures New Hospitals: optimized solutions and realistic nZEB

definitions

7

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 20168

Related research projects:

Reduced ventilation for isolation rooms (AMC Rotterdam)

Renovation existing Policlinic (AMC Amsterdam)

Feasibility NL nZEB Hospital definitions

Closing the Energy Performance Gap

Transformation of multi- to one-patient rooms (AMC Utrecht)

Project: nZEB Hospital Buildings

Page 6: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

5

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Program

Introduction - Explanation workshop 20 min

Workshop part I - Feedback part I 25 min

Break 5 min

Workshop part II - Feedback part II 25 min

Advice to REHVA - Roundup 15 min

9

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Roadmap to nearly Zero Energy Buildings

10

2014: The Netherlands compete in the REHVA Student Competition

Page 7: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

6

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Energy Performance CoefficientOffices

11

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Energy Performance CoefficientOffices

12

Page 8: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

7

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201613

nZEB is technically feasible!

2011 TNT Centre HoofddorpEPC= 0.67, including bio‐fuel CHP ‐1.6 LEED platinum

EPC= ‐0.298 &  BREEAM outstanding

2012 Venco Campus  Eersel

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

NL nZEB Definitions

14

Page 9: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

8

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

DRAFT - NL nZEB definitions(July 2015)

15

Building 

function

Energy 

demand

[kWh/m2.y]

Energy use

[kWh/m2.y]

Sustainable 

energy [%]

Dwellings 25 25 50

Offices 50 25 50

Schools 50 80 50

Health Care 

facilities

65 120 50

∆EPC(2015)

-/- 100%

> -/- 100%

-/- 50%

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

NL Fossil Energy Use

16

Schoenmakers I., 2014, A systematic approach to obtain energy reduction in the complex HVAC systems of UMCs, MSc thesis TU/e. Eindhoven, Netherlands

Page 10: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

9

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Energy use AMC

17

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Energy Use AMCventilation, heating & cooling

18

Schoenmakers I., 2014, A systematic approach to obtain energy reduction in the complex HVAC systems of UMCs, MSc thesis TU/e. Eindhoven, Netherlands

Page 11: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

10

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Energy Use AMCVentilation, heating & cooling

19

Schoenmakers I., 2014, A systematic approach to obtain energy reduction in the complex HVAC systems of UMCs, MSc thesis TU/e. Eindhoven, Netherlands

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

NL nZEB Hospital Buildings scores

20

Variants Energy demand

[kWh/m2.y]

Energy use

[kWh/m2.y]

Sustainable 

energy [%]

Draft NL nZEB

Definitions

65 120 50

Existing NL 

Hospitals

200 300 ?

Page 12: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

11

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

3Use fossilenergy 

efficiently

1Reduce energy demand

2Apply sustainable energy sources

Trias Energetica method

nZEB approach (Trias Energetica)

21

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

3Use fossilenergy 

efficiently

1Reduce energy demand

2Apply sustainable energy sources

5Use fossil energy 

efficiently 

1

User demand & behaviour

2Reduce energy demand

3Apply sustainable energy sources

4

Energy exchange and storage systems

Trias Energetica method

Five step method

nZEB approach (5-step)

22

Page 13: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

12

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

nZEB approach – User Central

23

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

nZEB approach – Healing Environment

24

[Picture: aarhus arkitekterne]

Page 14: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

13

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

nZEB approach – Energy Exchange & Storage

25

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201626

nZEB approach – Energy Exchange & Storage

Page 15: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

14

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201627

Step Measures

1. User demand &   Behaviour

Lower internal heat loads (more use of stand by mode), zoning, smart and individual control systems (human in the loop, SR ventilation), low flow fume hoods, low energy consuming MRI, Combiningprocesses/equipment/test set ups

2. Reduce Energy    Demand

Insulation,  envelope airtightness, heat recovery ventilation/hot tapwater, use daylight, thermal mass, demand control ventilation, LED lighting, Less heating and cooling (change standards), energy efficientappliances, less or no humidification

3. ApplySustainable & Energy Sources

Photovoltaic solar cells, biomass, wind energy, adiabatic cooling

4. Energy Exchange& Storage

Long term energy storage in the soil/acquifer (LTES), short term energy storage (buffers, Phase Change Materials), Concrete Core Activation(TABS), Exchange energy between internal/external functions

5. Efficient use offossil energy

High efficient boilers, chillers, heat pumps, cogeneration of heat andpower

nZEB approach (5-step) - Measures

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

SR ventilation

28

Page 16: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

15

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Workplace Air Conditioning HUMAN IN THE LOOP

Human in the loop

29

2012: The Netherlands wins Rehva Student Competition

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Connect

30

Page 17: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

16

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

20% about products

80% about processes/organisation

Circular economy

31

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Stakeholders for building developmentStakeholder Interests

• Municipality Perform policyAchieve certain facility in area

• Project developer Amount of m2€/m2 and €/mw.Performances

• Investor Contract periodsLow risks

• Contractor(s) Good deal: efficient work for good return

• End User High qualityPleasant building

32

Page 18: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

17

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Connections

Contract forms:

• Design (& Build) (DB) Product• Design, Build, Finance, Maintain (DBFM) Service

• ESCO: Energy Service Company

33

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Continuous improvements

34

Page 19: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

18

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

CASE

35

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Case VU-VUmc Hospital

36

Page 20: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

19

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Case VU-VUmc Hospital - Policlinic

Extended life time 10 to 30 years

No reliable design and monitoring data

No thorough recommissioning

Energy costs reduction of € 300,000.– per year realized by professional optimization.

37

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Case VU-VUmc Hospital - Policlinic

38

Page 21: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

20

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

VU-VUmc - District Development

39

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

VU-VUmc - District Development

40

• first in yellow, Cancer Center Amsterdam (CCA); 

• second in red, Policlinic; • third in brown,  Acta and O2 research 

buildings VU‐VUmc;• fourth in orange,  Westflank;• fifth in green, Hospital building and 

related structures; • sixth in blue, central energy plan 

andt;• seventh, Gebouw Zuid building for 

VUmc offices. 

Page 22: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

21

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Area and buildings

41

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201642

Page 23: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

22

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201643

Step Measures

1. User demand &   Behaviour

• Occupancy‐based smart controls ventilation, heating and cooling

• Occupancy‐based smart control lighting and equipment 

2. ReduceEnergy    Demand

• Upgrade HVAC system (CAV=>VAV)

• Upgrade building envelope

• Upgrade lighting systems

Case VU-VUmc Hospital - Policlinic

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Material – Workshop part I & II

44

Page 24: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

23

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Workshop Part I

• Split into teams of 5 persons

• Fill out matrix (part 1) and create an energy neutral building (15 min)

• One person gives a short feedback of the results (team process, design approach, top 5-10 solutions) to the other teams using matrix, etc. (1-2 min)

• Teams vote for best team results (=> Winner part 1)

45

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

5Use fossil energy 

efficiently 

1

User demand & behaviour

2Reduce energy demand

3Apply sustainable energy sources

4

Energy exchange and storage systems

Five step method

nZEB approach (5-step)

46

Page 25: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

24

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

nZEB approach – User Central

47

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201648

Step Measures

1. User demand &   Behaviour

2. Reduce Energy    Demand

3. ApplySustainable & Energy Sources

4. Energy Exchange& Storage

5. Efficient use offossil energy

Results REHVA Workshop

Page 26: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

25

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Workshop: Part 1

49

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Workshop Part II

• Split into teams of 5 persons

• Fill out matrix (part 2) and work on interests and connections of different stakeholders (15 min)

• One person gives a presentation of the results (team process, stakeholder management approach, top 5 solutions) to the other teams using matrices part 1 and 2, etc. (1-2 min)

• Teams vote for best team results (=> Winner part 2)

50

Page 27: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

26

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Workshop: Part 2

51

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 2016

Advice to REHVA

How can Hospital Buildings achieve nZEB?

What are the most promising technical solutions?

What is necessary to implement these solutions in practice?

How can REHVA stimulate the above?

52

Page 28: Workshop 3: RealizingnZEBHospitalBuildings · 19/05/2016 1 Workshop 3 - Realizing nZEB Hospital Buildings Together Wim Maassen ... University of Technology, Department Built ... 2012

19/05/2016

27

Workshop - Realizing nZEB Hospital Buildings together | 22nd-25th May 201653

Thank you for your contribution!

For more information contact:

Wim [email protected] +31 6 537 05 294 

Healthcare: www.royalhaskoningdhv.com/healthcarenZEB:  www.royalhaskoningdhv.com/nzeb