Upload
alaura
View
22
Download
0
Embed Size (px)
DESCRIPTION
Workshop for Palestinian Tertiary Education Institutions. نقاط الضعف في المقترحات المقدمة لصندوق تطوير الجودة في الدورات السابقة Weakness Points of the proposals submitted to (QIF) in the previous cycles August 14 th 2008 Quality Improvement Fund. Outline. - PowerPoint PPT Presentation
Citation preview
WorkshopWorkshop for for
Palestinian Tertiary Education Palestinian Tertiary Education Institutions Institutions
الضعف نقاطالجودة تطوير لصندوق المقدمة المقترحات في
السابقة الدورات في
Weakness Points
of the proposals submitted to (QIF) in the previous cycles
August 14th2008
Quality Improvement Fund
الضعف نقاطالجودة تطوير لصندوق المقدمة المقترحات في
السابقة الدورات في
Weakness Points
of the proposals submitted to (QIF) in the previous cycles
August 14th 2008
Quality Improvement Fund
OutlineOutline
• Objectives, Content & Expected outputs of the workshop
• Summary about submitted proposals
• List of weakness points in QIF First, Second, IT and Third Cycle
• Internal Evaluation Checklist Form
• Statistics about TEIs Which did not Awarded
• Components of an ideal proposal
• Objectives, Content & Expected outputs of the workshop
• Summary about submitted proposals
• List of weakness points in QIF First, Second, IT and Third Cycle
• Internal Evaluation Checklist Form
• Statistics about TEIs Which did not Awarded
• Components of an ideal proposal
العمل ورشة من الهدف
المقدمة • المقترحات في الضعف نقاط توضيحالسابقة الدورات في الجودة تطوير لصندوق
مقترحات كتابة عند لتجنبها وذلك الصندوق لمنحالقادمة للدورات مشاريع
المشاريع • مقترحات لتقديم المؤسسات تشجيعالصندوق منح من لالستفادة
العمل ورشة من الهدف
المقدمة • المقترحات في الضعف نقاط توضيحالسابقة الدورات في الجودة تطوير لصندوق
مقترحات كتابة عند لتجنبها وذلك الصندوق لمنحالقادمة للدورات مشاريع
المشاريع • مقترحات لتقديم المؤسسات تشجيعالصندوق منح من لالستفادة
المحتوى
المقدمة • المقترحات في الضعف نقاط عرضفي السابقة للصندوق الدورات
الصندوق • وطاقم مجلس مع مفتوح ولقاء نقاش
المحتوى
المقدمة • المقترحات في الضعف نقاط عرضفي السابقة للصندوق الدورات
الصندوق • وطاقم مجلس مع مفتوح ولقاء نقاش
المتوقعة المخرجات
نقاط بأهم العالي التعليم مؤسسات توعيةفي للصندوق المقدمة المقترحات في الضعفالجودة تطوير صندوق لمنح السابقة الدورات . الصندوق ومعايير تتناسب مقترحات وتقديم
المتوقعة المخرجات
نقاط بأهم العالي التعليم مؤسسات توعيةفي للصندوق المقدمة المقترحات في الضعفالجودة تطوير صندوق لمنح السابقة الدورات . الصندوق ومعايير تتناسب مقترحات وتقديم
Summary about submitted proposals to QIFSummary about submitted proposals to QIF
1st Cycle 2nd Cycle IT Cycle3rd Cycle Total
Call Cycle Jul-0515-Mar-0610- Dec. 200610-Dec-06
Deadline for receiving the proposals
29 Sep. 2005 14-May-0621-Mar-072-May-07
TEIs submitted proposals
2529192194
proposals submitted by TEIs
41463033148
List of weakness points in QIF Cycles (C1, C2, IT and C3)List of weakness points in QIF Cycles (C1, C2, IT and C3)
Internal Evaluation
Checklist Form
Internal Evaluation
Checklist Form
Tertiary Education Project - Quality Improvement Fund - Internal Evaluation Sheet
Institute :
Proposal Title :Code
#ChecklistTick Notes
AAll elements of the application are provided fully institution should be provided by a form
A1Grant application form fits category
A2Accreditation of the Academic Programm from AQAC (if needed)
A3Presence of Quality Assurance Unit
A4The project has external benefits measured by partnerships & role of the partner (added Value)
A5Introduction and Summary
A6Project goals and developmental objectives measured by performance indicators
A7Expected results (outputs) measured by performance indicators
A8Project Risks and tools to overcome them
A9Workplan: tasks, sub activities, strategies, and implementation (should be consistent with the outcomes and results)
A10
Monitoring and evaluation plan
A11
Feasibility studies, survey, training, workshops
A12
Project financial sustainability (alternative sources of funding will be pursued)
Part APart A
B
Institute's Credibility & Management: Negative Scoring of TEIto be filled by QIF) TEI has credibility for implementing QIF projects based on its records at QIF and as evaluated by the board and technical teams, Project management (Team) (HR and physical resources
Max Score
QIF Staff Score
B0TEI never Funded by QIF0
B1Reliable Contact Person-) 1 or
0(
B2Abide to Deadlines -) 1 or
0(
B3Communication & Logistics -) 1 or
0(
B4Feedback & Reporting -) 1 or
0(
B5Positive cooperation -) 1 or
0(
CRequested Budget
C1Max equipments (40% of QIF)
C2Max international consultants (20% of QIF)
C3Min contribution of TEI (10% of the total budget)
C4Detailed & Summarized budget
C5Project Duration - consistent with QIF manual
*overall project value is high (Relationship of benefits to cost)
Continued... Part B & CContinued... Part B & C
DProject Concept: A score to be filled individually by each board member followed by
group discussion durning boar d meeting to finalize the score.Score
Aparagraph should be provided to be read by
board
D1Project is relevant to Quality Improvement of Tertiary Education (QIF objectives) 40
D2Problem statement/project justification /Target group/ are well defined 25
D3Project has influence and impact on labor market and/or institutional improvement 25
D4Project has an innovative idea or concept 10
QIF Board Decision: Project concept final score( (
Continued... Part DContinued... Part D
Statistics about TEIs not AwardedStatistics about TEIs not Awarded
Components of an Ideal Proposal Components of an Ideal Proposal
Merits of an Ideal Proposal Merits of an Ideal Proposal
Thank You for your AttendanceThank You for your Attendance