35
Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director of Water Studies

Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Workshop on Information Systems for Performance Indicators

October 4, 9:00 a.m.

Sanford Berg

Director of Water Studies

Page 2: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Some Thoughts

Spare us from cowardice that shrinks from new truths;

Spare us from laziness that is content with half-truths; and

Spare us from arrogance in thinking that we know all truth.

Page 3: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Public Utility Research Center

Research Expanding the body of knowledge in public utility regulation, market reform, and infrastructure operations (e.g. benchmarking studies of Peru, Uganda, Brazil, Japan, and Central America)

Education Teaching the principles and practices that support effective utility policy and regulation (e.g. PURC/World Bank International Training Program on Utility Regulation and Strategy, January 2011)

Service Engaging in outreach activities that provide ongoing professional development and promote improved regulatory policy and infrastructure management (e.g. in-country training and university collaborations)

www.purc.ufl.edu

Page 4: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Information Systems for Performance Indicators

Thank UNHabitat, CWWA, and CBWMP

Establish baseline information for EU Proposal

Data Coordinators from Sixteen Utilities

Preliminary Results (29 items)

Primarily Water, future: Wastewater

Workshop for Prioritizing and Refining Data Collection

Workshop for Sharing information system expertise

Eight Illustrative Charts—Very Preliminary

Page 5: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

1. Total number of customers

Page 6: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

2. Workers per 1000 connections

Page 7: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Antigua

Bahamas

Barbados

Belize

BVI

Cayman

Curacao

Jamaica

Nevis

0

2

4

6

8

10

12

0 5,000,000,000 10,000,000,000 15,000,000,000 20,000,000,000 25,000,000,000

3. Workers per 1000 connections per total water delivered

Page 8: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

0.00%

50.00%

100.00%

150.00%

200.00%

250.00%

300.00%

350.00%

400.00%

4. Ratio total cost / total revenues

Page 9: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Bahamas

BelizeBVI

Cayman

Jamaica

Nevis0

20,000,000

40,000,000

60,000,000

80,000,000

100,000,000

120,000,000

140,000,000

160,000,000

0 5,000,000,000 10,000,000,000 15,000,000,000 20,000,000,000 25,000,000,000

5. Total operating costs / total water delivered

Page 10: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Bahamas

Barbados

BVI

Cayman

Curacao

Jamaica

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

0 5,000,000,000 10,000,000,00015,000,000,00020,000,000,00025,000,000,00030,000,000,000

6. Coverage / Total Water delivered

Page 11: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

AntiguaBahamas

Barbados

BVI

Cayman Curacao

Dominica

Jamaica

MartiniqueNevis

St Lucia

St Marteen

Trinidad & Tobago

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000

7. Percentage residential customers per total / total customers

Page 12: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Antigua

Bahamas

Barbados

BVI

Cayman

Curacao

Jamaica

Nevis0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

0 5,000,000,000 10,000,000,000 15,000,000,000 20,000,000,000 25,000,000,000

8. Percentage desalinated water / total water delivered

Page 13: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Future Data Collection

Expand the number of Utilities

Prioritize Data Collection

Unaccounted for Water

Rate Structures– Cross Subsidization?

– Financial Sustainability?

– Encourage Conservation?

Service Quality

Wastewater

Internal Governance

Page 14: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

GovernanceInstitutional Arrangements: Water and Sanitation Sector

(World Bank Working Paper 58, 2005)

Private Independent Policy that tariffs Participation Regulation should cover costs

Antigua &Barbuda N N NDominica N N YGrenada N N NSt. Kitts N N NSt. Lucia N Y YSt. Vincent N N NBarbados N Y YDominican Republic Y N NGuyana Y Y NJamaica N Y YTrinidad &Tobago N Y N

(The reader is referred to the original report for footnotes regarding the categories)

Page 15: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Lessons from Coordinators

1. Data Manager Commitment (strategic value, tool for company & regulator)

2. Data Manager Continuity (formalize role, support IBNET, capacity building--CariWOPs)

3. Centralized vs. Decentralized Systems (avoid Information Empires)

4. Benefits of Detailed Data (trends, incentives)

5. Data Definitions and Benchmarking Objectives

Page 16: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Lessons Continued

6. Operational Data (manage what you measure)

7. Other Data Sources (water resources, social statistics, local conditions: density, topology)

8. Information Technology and Management (IT necessary but not sufficient; supply chain)

9. Transparency and Public Policy (comparisons create pressures, promote reform)

10. Methodologies and Capacity-Building: beyond Key Performance Indicators (KPIs)

Page 17: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Consumers of Information

Regulatory Commissions (responsible for policy implementation in the sector: internal consensus?)

Government Sector Ministries (charged with policy development)

Government Treasuries (addressing fiscal issues)

International Investors (bond, equity, and strategic management teams)

Service Providers (state-owned enterprise or privately owned)

Un-served Citizens (rural and urban poor)

Current and Future Customers (trade-offs)

Multilaterals, donors, and NGOs (as a potential infrastructure project donors/funding agencies)

Page 18: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Observations It is better to have an approximation of the “right” performance

indicator than a precise calculation of an irrelevant number: benchmarking is an art and a science.

The CariWOPs Platform represents an valuable resource for the Caribbean.

The EU Proposal is an important catalyst for change.

“Believing is seeing.” Data collection, analysis, interpretation, and dissemination are key activities within utilities, so continued capacity-building is essential.

“If we are not changing the way we work, we could end up just where we are going.” (Chinese Proverb)

Page 19: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Extensions: Information, Conflict, and Sector Performance

1.Authority Conflicts: lack of clarity of roles

2.Cognitive (Factual) Conflicts: disagreements regarding current or historical facts and causal linkages

3.Value Conflicts: conflicting priorities and different weights on outcomes

4.Interest Conflicts: stakeholders benefit differentially from decisions

(from Shabman, 2005)

Page 20: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Context for Sector Leadership: Resolving Conflict and Making Choices

Utility will spend $700,000 in OPEX.

With $300,000 in CAPEX,

the utility claims it can provide

3000 new connections OR

Produce an increase of “six points”

in the water quality index, OR

Be at another point on the Frontier

(A, B, or C).

Change in Index of Water Quality

Number

Of New

Connections

5000

4000

3000

2000

1000

1 2 3 4 5 6 7 8 9

A

B

CX

Page 21: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

1 Authority Conflict

“Authority” conflicts” reflect different views regarding where

decisions will or ought to be made.

Who decides?

Jurisdiction may not yet be assigned or the issue might be addressed by multiple agencies.

Stakeholders will go jurisdiction-shopping—selecting the agency or the level of government most likely to support its interests in policy design and implementation.

Appeals procedures within the judicial system can delay implementation. In such situations, benefits delayed are (effectively) benefits denied.

Issues include: Finance Ministry vs. Water Ministry, Environmental Regulator vs. Sector Regulator

Page 22: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Authority Issues Facing Managers and Policy-makers

Who decides where to expand networks?

Who funds network expansion?

Who determines when prices are financially

sustainable?

Who monitors water quality?

Who sets water quality standards?

Who decides environmental requirements?

Who makes water resource allocation

decisions?

Change in Index of Water Quality

Number

Of New

Connections

5000

4000

3000

2000

1000

1 2 3 4 5 6 7 8 9

Page 23: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Conflict Resolution:Authority and Governance

Clarify Governance: Seek Changes in the Law—legal clarity

Promote Cooperation among Sister Agencies: avoid turf wars and limit political interference (short term versus long term perspectives)

Establish Task Forces to Address Issues

Educate the Courts and Promote Transparency

Improve Appeals Procedures

Encourage Citizen Awareness

Page 24: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

2. Cognitive Conflicts

“Cognitive” conflicts are disputes over facts: “What is?”

For example, How many new connections can be made with $300,000?

Technical disagreements reflect cognitive conflicts. Such conflicts can be reduced through comprehensive data collection and analysis.

Information Systems for Performance Improvement Plans

Page 25: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Factual Issues

With $300,000 in CAPEX,

NGO claims the utility can provide

5000 new connections

OR

Produce an increase of “10 points”

in the water quality index,

OR

Be at another point on the Frontier

(D, E or F).

Change in Index of Water Quality

Number

Of New

Connections

5000

4000

3000

2000

1000

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Page 26: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Conflict Resolution--Facts

Benchmarking Studies:

– Input Data (physical and monetary)

– Output Data (connections, water delivered, continuity, quality)

– Performance Indicators (trends, comparisons, targets)

Financial Sustainability Studies

– Income Statements

– Balance Sheets

– Cash Flow Statements

Examine Incentives and Estimate time to reach “the” frontier

Page 27: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

3. Values Conflicts

“Values” conflicts are more ideological in nature, reflecting the different preferences or values of groups.

What should be?

Is there a political consensus over the weight assigned to particular outcomes, especially outcomes involving non-monetary impacts?

Targets: Preferred outcomes depend on citizen attitudes.

Page 28: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Values Issues

Once the utility is on the Frontier . . .

Should more than $300,000 be invested?

Which Target: D? E? F?

Does meeting the target promote

social justice?

How should we prioritize

environmental objectives?

Change in Index of Water Quality

Number

Of New

Connections

5000

4000

3000

2000

1000

1 2 3 4 5 6 7 8 9

D

E

F

Page 29: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Conflict Resolution--Values

Public Education

– Publish Performance Comparisons

– Identify Trade-offs

– Reports to the Legislature

Promote Citizen Participation

– Regular Updates

– Citizen Advisory Boards

Limit the Rhetoric: Articulate a Vision

Facts Provide the Context

Page 30: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

4. Interest Conflicts

“Interest” conflicts reflect the differential impacts of policies on various stakeholder groups: “Who benefits from the policy?”

If the situation is actually a zero-sum game, one group benefits at another’s expense (unless there is compensation).

Special Interests: when the beneficiaries of a particular policy are concentrated (and per capita benefits are high) the beneficiaries will lobby.

If losers are diffuse (and the per capita damages are low), the result is a policy that benefits well-organized stakeholders—even when the costs to the losers outweigh the benefits to the winners.

Page 31: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Special Interest Issues

Pipe suppliers want to sell pipe.

IT providers want to sell systems.

Unions seek particular work rules.

Should more than $300,000 be invested?

What should prices be to different groups?

Un-served citizens want “D”

Current Customers want “F”

Which Group has Political Power?

Would some recommendations lead

to being inside the “frontier”?

Change in Index of Water Quality

Number

Of New

Connections

5000

4000

3000

2000

1000

1 2 3 4 5 6 7 8 9

D

E

F

Page 32: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Conflict Resolution--Interests

Do not pretend there are no conflicts

– View from the Balcony—step back from stakeholders

Take a Leadership Role in Identifying Benefits and Costs

Eg. OFWAT and EU Environmental Standards

– Collected compliance cost information from utilities

– Presented costs of meeting targets: current deadline vs. delay

Politicians make Final Decision (Accountability)

Companies and Other Groups can provide Leadership in Conflict Resolution

Page 33: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Conflict Resolution Matrix

Conflict Over

Facts

Conflict Over

Distribution of

Gains & Costs

Conflict Over

What is important

Conflict Over

Jurisdiction or

Authority

Addressed

By Research

And Negotiation

Addressed

By Research

Addressed by

Engaging

People with

Adaptive

Challenges

in Research

And Dialogue

Technical

Work

Adaptive

Work

From Mark Jamison

Page 34: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Additional Observations

Water problems are managed . . . Not solved.

“Everyone is entitled to their own opinions, but not to their own facts.” (Alan Greenspan)

Evidence-based decision-making is grounded in reality rather than fantasy or rhetoric.

A danger of quantitative studies: “If you torture the data enough, it will confess.”

Therefore: “Experts should be on tap, not on top.” (Winston Churchill)

Page 35: Workshop on Information Systems for Performance Indicators · 2010-10-12 · Workshop on Information Systems for Performance Indicators October 4, 9:00 a.m. Sanford Berg Director

Point your browser to http://www.regulationbodyofknowledge.org.