World map of power stations that I have worked in

Embed Size (px)

Citation preview

  • 1 inch

    755 mi / 1220 km

    1 cm

    297 mi / 480 km

    Operations ManagerLuthardt Group

    AlbaniaAugust 2011 to October 2011(1 x Ansaldo V64.3A CCGT)

    18

    Area Operations ManagerTihama Power

    KSAApril 2010 to April 2011

    (4 x GE-7FA Cogen cycle)

    17

    Production Manager (South)PowerWater Corporation

    AustraliaNovember 2011 to February 2012

    (various GT's, Dual fuel recip's, solar)

    19

    Production Manager (South)PowerWater Corporation

    AustraliaMay 2012 to present

    (various GT's, Dual fuel recip's, solar)

    21

    Simulator Training InstructorYokogawa Australia

    Bukkit Panggal Power StationBrunei

    March 2012 to April 2012

    20

    Shift Charge Engineer Alstom Power Ltd Hefei No.2 PRC

    March 2001 to June 2001(2 x 350MW Alstom ST)

    10

    Mechanical FitterComalco

    Yennora AustraliaMarch 1989 to February 1989

    3

    Operations Shift ManagerAlstom Power Ltd Manjung Malaysia

    January 2003 to January 2004(3 x Alstom 765MW ST)

    12

    Shift Operational Controller Powergen International

    Paiton II IndonesiaJuly 2001 to December 2002

    (2 x 612MW Siemens ST)

    11

    Shift Charge EngineerSiemens KWU

    Paiton II IndonesiaDecember 1999 to December 2000

    (2 x 612MW Siemens ST)

    9

    Operations MentorPower Generation Services MapTaPhut

    ThailandSeptember 2007 to February 2009(2 x 673 MW MHI Steam turbines)

    15

    Plant Performance ManagerPower Generation Services MapTaPhut

    ThailandMarch 2009 to March 2010

    (2 x 673 MW MHI Steam turbines)

    16

    Mechanical Fitter ApprenticeElectricity Corporation of NZ

    Huntly New ZealandFebruary 1984 to March 1988

    1

    Mechanical FitterElectricity Corporation of NZ

    Huntly New ZealandFebruary 1989 to June 1991

    2

    Boiler OperatorElectricity Corporation of NZ

    Huntly New ZealandJune 1991 to August 1997

    6

    Mechanical Fitter Electricity Corporation of NZ Te Awamutu New Zealand

    March 1996 to August 1997(1 x P&W FT-4C twinpac cogen plant)

    5

    Shift Charge Engineer Transalta NZ Ltd

    Taranaki CCP New ZealandAugust 1997 to June 1998(1 x Alstom GT-26 CCGT)

    7

    Shift Charge EngineerSiemens KWU

    Otahuhu New ZealandJune 1998 to December 1999(1 x Siemens V94.3 CCGT)

    8

    OperatorGenesis Energy Limited

    Huntly New ZealandJune 2005 to August 2006

    (4 x 250MW Parsons ST; 1 x MHI M701 400MW CCGT; 1 x LM6000)

    13

    Training InstructorGenesis Energy Limited

    Huntly New ZealandSeptember 2006 to August 2007

    (4 x 250MW Parsons ST; 1 x MHI M701 400MW CCGT; 1 x LM6000)

    14

    New Caledonia Koniambo NickelCommissioning Senior Operator/

    Shift Manager2 x BHEL CFB boilers and 135MW Siemens steam turbines, 2 x RR Trent gas turbines

    22

    Paiton II

    Huntly

    Boiler Operator

    Malaysia

    Area Operations Manager

    New Zealand

    Training Instructor

    New Zealand

    Shift Charge Engineer

    4 x 250MW Parsons ST with CE Canada p.f. boilers

    Huntly

    Australia

    Australia

    20

    Paiton II

    11

    New Zealand

    4 x 250MW Parsons ST with CE Canada p.f. boilers; 1 x MHI M701 400MW CCGT; 1 x LM6000

    Shedgum and Uthmaniyah

    Various GTs, Dual fuel recips, solar

    Operations Shift Manager

    Thailand

    Brunei

    Huntly

    New Zealand

    1 x Alstom GT-26 CCGT

    1 x P&W FT-4C twinpac cogen plant

    1 x Siemens V94.3 CCGT

    1 x Ansaldo V64.3A CCGTOperations Manager

    New Zealand

    2 x 612MW Siemens ST with CE Canada boilers

    Mechanical Fitter

    Otahuhu

    2 x 612MW Siemens ST with CE Canada boilers

    Vlore CCGT

    Mechanical Fitter

    19

    2 x 673 MW MHI Steam turbines and p.f. fired boilers

    6

    12

    21

    Bukit Panggal

    Huntly

    Huntly

    4 x 250MW Parsons ST with CE Canada p.f. boilers

    MapTaPhut

    17

    Taranaki CCP

    4 x 250MW Parsons ST with CE Canada p.f. boilers

    2 x 350MW Alstom ST

    2

    Operations Mentor

    Saudi Arabia

    New Zealand

    People Republic of China

    18

    3 x Alstom 765MW ST with p.f. fired boilers

    Shift Charge Engineer

    4 x GE-7FA Cogen cycle

    Mechanical Fitter Apprentice

    Alice Springs, Yulara and Tennant Creek

    7

    10

    MapTaPhut

    Mechanical Fitter

    Production Manager Southern Generation (Acting)

    Training Instructor (Simulator)

    Plant Performance Manager

    Operator

    New Zealand

    Production Manager Southern Generation

    16

    Shift Operational Controller

    4 x 250MW Parsons ST with CE Canada p.f. boilers

    1

    Thailand

    New Zealand

    Shift Charge Engineer / Commissioning Engineer

    8

    4

    14

    15

    Indonesia

    13

    3

    4 x 250MW Parsons ST with CE Canada p.f. boilers; 1 x MHI M701 400MW CCGT; 1 x LM6000

    Yennora, Sydney

    Albania

    Aluminium rolling mills, extrusion presses and remelt furnaces

    Hefei No.2

    Indonesia

    Various GTs, Dual fuel recips, solar

    9

    Australia

    New Zealand

    5

    Manjung

    Huntly

    2 x 673 MW MHI Steam turbines and p.f. fired boilers

    Mechanical Fitter

    Alice Springs, Yulara and Tennant Creek

    Te Awamutu

    Shift Charge Engineer / Commissioning Engineer

    Plant detailsJob descriptionSiteCountry

    Richard John Smith - Career highlights

    Commissioning Senior Operator/Shift Manager

    Silcar KoniamboNew Caledonia

    April 2014 to May 2015

    22