Upload
ranapsinha
View
223
Download
0
Embed Size (px)
DESCRIPTION
mvbm
Citation preview
CONTENTS
Foreword (vii)
APPLICATION 1. Some of the Issues Pertaining to Power Transformers in Indian Power Sector
- SK. Ray Mohapatra 3
2. Dynamic Loading of Power Transformers Based on Real-Time Monitoring - Brian D. Sparling 14
3. Standardization of Large Power Transformers - Dinkar Devate, Amit Mittal and MinaI Kataria 25
4. Selection Criteria for Generator Transformer in Sub & Super Critical Power Stations - Raryan Bandyopadhyay, Mitesh V. Shah and Dominic S Fernandes 35
5. Nitrogen based Transformer Explosion and Fire Prevention System - A Comprehensive Asset Management Solution - VK. Wakchaure and TP Govindan 51
6. Specification Options, Online Measurement & QAP for Enhancement of Transformer Operational Life - L. Subramanyam. A. Jyothish Kumar and Y C. Maryunatha 57
DESIGN & FACTORY TESTING 7.
8.
9.
10.
11.
12.
An Approach to Reliable Design ofUHV Transformer for POWERGRID's 1200 kV Testing Station at Bina - VK. Lakhiani, G Sreelatha and MM Goswami
Development of Ultra - High Voltage (UHV) 1000 kV AC Transformer - Zhong Juntao
Development of New Specification for Transformer Oil used during Processing & Testing of Power Transformers at Works - R. K. Tiwari, S K. Mahajan and D. Varyani Development of Phase Shifting Transformers - R.K. Tiwari, JS Kuntia and S Sachdeva
Standardized Specification for Flux-density and CRGO for Optimizing the use of High-permeability CRGO & Conventional eRGO - Deepak Srivastava and D. Krishna lyer
Dissolved Gas Analysis - Diagnostic Tool dunng Transfonner Factory Tests - A bhay Agrawal
(ix)
77
88
111
116
125
137
13. Testing ofTransfonners for Transferred Surge - A Key Tool for Verifying Design and Manufacturing - Y. V. Joshi
INSTALLATION, OPERATION AND MAINTENANCE
14.
15.
16.
17.
18.
19
Operational Problems of Power Transfonners in Northern Grid - K.K. Arya and Vikram Singh
765/400 kV Power Transfonners - Operational Experiences - s.K. Mishra, P C.Sastry and S. Suresh
Operational Experience of 400 kV Class Auto-Transfonners in POWERGRID System - R.C Yadav, CS.Sarkar, VK. Bhaskar and Gunjan Agrawal
Installation Do's and Don'ts, Procedures and Site Drying - Ranjan Joseph
Modern Trends in Application, Installation, Operation & Maintenance - Bhaskar Sharma, A. K. Arora and Pradeep Kumar
Maintenance ofInsulation System in Transfonners - Paper and Oil - u.c. Patel and Alka Shah
DIAGNOSTIC & FIELD TESTING
20.
21.
22.
23.
24.
Sweep Frequency Response Analysis (SFRA) - Recent International Field Experiences - Simon Ryder
Eliminating Interference during Field Testing of Power Transfonner Insulation - Oleh W Iwanusiw
Technical Aspects Related to Testing ofSF6 to Oil Bushing & EHV Cable Tennination for Large Power Transfonners - D. Maheswaran, Geetha Hariharan and S. Arthanari
Partial Discharge Detection in Power Transfonner by Acoustic Emission Technique - Case Study - Shailesh Patel, Dipak Zala and R.B. Desai
Online Assessment of Transfonner Bushing Insulation - Robert C. Brusetti and Mohan Watwe
25. Advanced DSP Methods Applied for Pattern Recognition of PD in Transfonner - Imteyaz Siddiqui, A. Kraetge, Kay Rethmeier and Manish Gupta
(x)
143
151
158
168
In
188
204
215
225
232
244
251
26.
27.
Worldwide Standardization Process of SFRA and Case studies - Aradhana Ray. Sridhar Shenoy and Charles Sweetser
Partial Discharge Detection and Location in Power Transformers using the UHF Technique - D. Templeton, Robert Brinzer, Sudhanshu Gupta and MD. Judd
CONDITION MONITORING
28. Application of Dissolved Gas Analysis for Monitoring Oil Filled Bushing Condition
29.
30.
- B. Pahlavanpour
On-line Partial Discharge Diagnosis at Power Transformers - S. Markalous. M Boltze and A. Bolliger
Dielectric Frequency Response Measurements for Condition Assessment of Power Transformers - Peter Werelius and Matz Ohlen
31. Moisture and Dielectric Properties Analysis of Power Transformer by DIRANA Measurement
32.
33.
34.
- Aradhana Ray. Sridhar Shenoy. as. Papneja and Maik Koch
Transformer Condition Assessment is becoming a Strategic Tool for Utilities - Lars Pettersson. Lena Melzer and Kjell Carrander
Bushing Diagnostics by PPD+FDS Method - Sridhar Shenoy. Aradhana Ray and Charles Sweetser
Enhancing Reliability and Life Span of Transformer through Innovative Condition Monitoring Techniques - Jyoti Shrivastava and CM Shrivastava
FAILURE ANALYSIS
35.
36.
Towards Reliable Power Transformers Learning from Experience - Mohan Watwe
Functional Reliability of on Load Tap Changers - Anand Khanna and D. Krishna Iyer
37. A Case Study of Repeated Failure of Generator Transformer of URI Power Station in the Year 2004 - Nain Singh. Ratish Kumar and 1. Chaudhary
(xi)
276
284
299
307
320
333
345
360
368
383
392
401
38.
39.
Phenomena ofHtgh Circulating Current in Delta Winding in a Bank of Three I-Phase Auto Transformers: Case Study - K. G Krishnan, D. Varyani, S. K. Mahajan, J S. Kuntia, G Chakladher
and R. K. Tiwari
Case Studies on Failure Analysis of Distribution Transformers at Indira Gandhi Centre for Atomic Research, DAE, Kalpakkam - L. Subrarnanyarn, N. Djearadjane, T. V Shanrnugasundararn,
A. Jyothish kurnar and YC Manjunatha.
Sponsors' ProfLIe
(xii)
404
411
417
00000011000000120000001300000014